HomeMy WebLinkAbout3624 CALIFORNIA AVENUE (3)F2411 qLv, 1'o
SWRCB, January 2002 Page —L oft`
Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performingperiodic testing of USTsecondary containment systems. Use the
appropriate pages ofthis form to report results for all components tested The completedform, written test procedures, and
printouts from tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name, DEL TACO MOBIL I Date ofTesting: 12/19/11
Facility Address: 3624 CALIFORNIA AVENUE, BAKERSFIELD
Facility Contact: I Phone:
Date Local Agency Was Notified of Testing: 10/31/11
Name of Local Agency Inspector (ifpresent during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Rich Environmental
Pass
Technician Conducting Test: RICH PHILLIPS
Not
Tested
Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: C6I /D40 A HAZ License Number: 809850
Manufacturer
Manufacturer Trainine
Component(s) Date Training Expires
INCON TS -STS 6/11/2012
UDC #5/6 x
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not
Tested
Repairs
Made Component Pass Fail Not
Tested
Repairs
Made
91PREM/DSL ANNULAR X UDC #5/6 x
87REG ANNULAR X UDC #7/8 X
87REG (DISP 41/2) SEC PIPE I X I UDC #9/10 X 1 1
87REG (DISP #7/8) SEC PIPE X 87REG FILL SUMP X
91PREM (DISP #1/2) SEC PIPE X 91PREM FILL SUMP X
91 PREM (DISP #7/8) SEC PIPE X DIESEL FILL SUMP X
DIESEL SEC PIPE X p 87 VAPOR BUCKET X
87REG STP X 91 VAPOR BUCKET X
91 PREM STP X
DIESEL STP X
UDC #1/2 X
UDC #3/4 X 1
Ifhydrostatic testing was performed, describe what was done with the water after completion oftests:
CERTIFICATION OF TECHNI AN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, thefacts state this document are accurate and infull compliance with legal requirements
Technician's Signature: Date: 12/19/11
SWRCB, January 2002
4. TANK ANNULAR TESTING
Page Z of
Test Method Developed By: 0 Tank Manufacturer X Industry Standard Professional Engineer
Other (Spec)
Test Method Used: Pressure X Vacuum 0 Hydrostatic
0 Other (Spec)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution:
Tank # 91/DSL Tank # 87 Tank # Tank #
Is Tank Exempt From Testing ?' Yes X No 0 Yes X No Yes C No 0 Yes No
Tank Capacity: 12K 12K
Tank Material: STEEL STEEL
Tank Manufacturer: UNKNOWN UNKNOWN
Product Stored: 911DIESEL 87
Wait time between applying
pressure/vacuum/water and
test:
30MIN 30MIN
starting
Test Start Time: 9:30 9:45
Initial Reading (RO: 11.0 10.5
Test End Time: 10:30 10:45
Final Reading (RF): 11.0 10.5
Test Duration: 60 MIN 60 MM
Change in Reading (RF -R,): 0 0
Pass/Fail Threshold or Criteria: 0 0
Test Result: X Pass C Fail X Pass 0 Fail Pass Fail 0 Pass 0 Fail
Was sensor removed for testing? X Yes 0 No NA X Yes No NA 0 Yes 0 No 0 NA 0 Yes 0No 0 NA
Was sensor properly replaced and
verified functional after testing? X Yes No 0 NA X Yes No 0 NA 0 Yes 0No 0 NA 0 Yes No [I NA
Comments — (include information on repairs made prior to testing and recommendedfollow -upforfailed tests)
Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code of Regulations, Title 23, Section 2637(a)(6))
SWRCB, January 2002
5. SECONDARY PIPE TESTING
qt-616
Page —L of
Test Method Developed By: Piping Manufacturer X Industry Standard Professional Engineer
Other (Spec)
Test Method Used: X Pressure Vacuum Hydrostatic
Other (Spec)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5%
Piping Run # 87 1/2 Piping Run # 87 7/8 Piping Run # 91 1/2 Piping Run # 917/8
Piping Material: PLASTIC PLASTIC PLASTIC PLASTIC
Piping Manufacturer: TCI TCI TCI TCI
Piping Diameter: 2" 2" 2" 2"
Length of Piping Run: 75' 75' 75' 75'
Product Stored: 87 87 91 91
Method and location of
piping-run isolation: BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP
Wait time between applying
pressure /vacuum /water and
starting test:
30 MIN 30 MIN 30 MIN 30 MIN
Test Start Time: VISUAL VISUAL 11:15 11:15
Initial Reading (Rj): LEAK LEAK 5.0 6.0
Test End Time: 12:15 12:15
Final Reading (RF): 3.0 6.0
Test Duration: 60 MIN 60 MIN
Change in Reading (RF -Rj): 2.0 0
Pass/Fail Threshold or
Criteria: 0 PSI 0 PSI
Test Result: Pass X Fail Pass X Fail Pass X Fail X Pass Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
87 1/2 (DISP) LEADING FROM A PEN HOLE IN TCI SINGLE WALL
PRODUCT LINE / LEAKING
911/2 (DISP) LEAKING FROM BLUE LINE PENETRATION
SECONDARY FROM SIP TO DISP 7/8. 91 PASSED
SECONDARY FROM STP TO DISP 7/8, 87 FAILED
L- 00
SWRCB, January 2002 Page L of
S. SECONDARY PIPE TESTING
Test Method Developed By: Piping Manufacturer X Industry Standard Professional Engineer
Other (Spec)
Test Method Used: X Pressure Vacuum Hydrostatic
Other (Spec)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5%
Piping Run #DSL
Piping Material: PLASTIC
Piping Run # Piping Run # Piping Run #
Piping Manufacturer. APT
Piping Diameter. 2"
Length ofPiping Run: 50'
Product Stored: DIESEL
Method and location of
piping-run isolation:
Wait time between applying
pressure /vacuum/water and
starting test:
30 MIN
Test Start Time: 10:00
Initial Reading (R,): 5.5
Test End Time: 11:00
Final Reading (RF): 5.5
Test Duration: 60 MIN
Change in Reading (RF-RO: 0
Pass/Fail Threshold or
Criteria: 0
Test Result: X Pass Fail Pass Fail Pass Fail Pass Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
SWRCB, January 2002
6. PIPING SUMP TESTING
fit-.)/
Page , _of
Test Method Developed By: Sump Manufacturer X Industry Standard 0 Professional Engineer
0 Other (Spec)
Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used INCON TS -STS Equipment Resolution:
Sump Diameter:
Sump # 87 Sump # 91 Sump # DIESEL Sump #
39" 39" 39"
Sump Depth: 57" 57" 57"
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS
Height from Tank Top to Top of
Highest Piping Penetration: 21" 21" 21"
Height from Tank Top to Lowest
Electrical Penetration: 12" 12" 12"
Condition ofsump prior to testing: GOOD GOOD GOOD
Portion ofSump Tested' 23" 23" 23"
Does turbine shut down when
sump sensor detects liquid (both
roduct and water)?*
0 Yes 0 No X NA Yes 0 No XNA Yes No X NA 0 Yes 0 No NA
Turbine shutdown response time
Is system programmed for fail -safe
shutdown ?*
0 Yes 0 No X NA Yes No XNA 0 Yes No X NA Yes No NA
Was fail -safe verified to be
o erational ?*
0 Yes 0 No X NA 0 Yes No X NA 0 Yes No X NA Yes No 0 NA
Wait time between applying
pressure /vacuum/water and starting
test:
30 MIN 30 MIN 30 MIN
Test Start Time: 10:45 11 :06 12:24 12:42 10:45 11:06
Initial Reading (Ri): 4.447 4.449 3.180 3.180 4.165 4.165
Test End Time: 11:01 11:21 12:40 12:37 11:01 11:21
Final Reading (RF): 4.449 4.449 3.180 3.180 4.165 4.165
Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF -&): 002 000 000 000 000 000
Pass/Fail Threshold or Criteria 002 002 002 002 002 002
Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail 0 Pass 0 Fail
Was sensor removed for testing? X Yes 0 No DNA X Yes No DNA X Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? X Yes No DNA X Yes 0 No NA X Yes 0No DNA Yes No NA
Comments — (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests)
Ifthe entire depth ofthe sump is not tested, specify how much was tested. Ifthe answer to any ofthe questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160)
e ofSWRCB, January 2002 Pag
7. UNDER- DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: UDC Manufacturer X Industry Standard Professional Engineer
Other (Spec)
Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic
Other (Specify)
Test Equipment Used: INCON TS -STS Equipment Resolution:
UDC #1/2
TCI
UTDC #3/4
TCI
UDC #5/6 UDC #7/8
UDC Manufacturer: TCI TCI
UDC Material: PLASTIC PLASTIC PLASTIC PLASTIC
UDC Depth: 19" 19" 19" 19"
Height from UDC Bottom to Top
ofHighest Piping Penetration:
9" 9" 9" 9"
Height from UDC Bottom to
Lowest Electrical Penetration:
9" 9" 9" 9"
Condition of UDC prior to
testin :
GOOD GOOD GOOD GOOD
Portion of UDC Tested i l" 11" 11" 11"
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?'
Yes D No X NA D Yes No X NA 0 Yes 0No X NA Yes 0 No XNA
Turbine shutdown response time
Is system programmed for fail-
safe shutdown ?' Oyes D No X NA Yes No X NA 0 Yes No X NA Yes 0 No X NA
Was fail -safe verified to be
operational?*
Dyes D No X NA D Yes D No X NA D Yes No X NA Yes 0 No X NA
Wait time between applying
pressure /vacuum /water and
starting test
30MIN 30MIN 30MIN 30MIN
Test Start Time: 12:24 12:42 12:24 12:42 1:48 2:16 12:08 12:24
Initial Reading (R,): 2.577 5.576 4.362 4.362 717 735 930 930
Test End Time: 12:40 12:57 12:40 12:57 2:03 2:31 12:23 12:40
Final Reading (RF): 2.578 2.578 4.362 4.361 717 735 930 930
Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF-Rj): 001 002 000 001 000 000 000 000
Pass/Fail Threshold or Criteria: 002 002 002 002 002 1 -.002 002 002
Test Resnilt: X Pass 0 Fail X Pass Fail X Pass 0 Fail X Pass 0 Fail
Was sensor removed for testing? X Yes 0 No DNA X Yes DNo DNA X Yes DNo NA X Yes No 0NA
Was sensor properly replaced and
verified functional after testing? X Yes 0 No NA X Yes DNo NA X Yes 0No NA X Yes 0No DNA
Comments - (include information on repairs made prior to testing andrecommendedfollow -upforfailed tests)
Ifthe entire depth ofthe UDC is not tested, specify how much was tested. if the answer to M ofthe questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002
7- UNDER- DISPENSER CONTAINMENT ffMCI TESTING
Ngb`t n
Page _1_ of
Test Method Developed By: UDC Manufacturer X Industry Standard Professional Engineer
0 Other (Specify)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
UDC Manufacturer.
UDC # 920 UDC # UDC # UDC #
TCI
UDC Material: PLASTIC
UDC D the 19"
Height from UDC Bottom to Top
ofHighest Piping Penetration:
9"
Height from UDC Bottom to
Lowest Electrical Penetration:
9"
Condition of UDC prior to
testing:
GOOD
Portion of UDC Tested 11"
Does turbine shut down when
UDC sensor detects liquid (both
induct and water)?*
Yes D No X NA 0 Yes No DNA 0 Yes No DNA D Yes No DNA
Turbine shutdown response time
Is system programmed for fail-
safe shutdown? yes No X NA Yes No DNA Yes No 0NA 0 Yes No NA
Was fail -safe verified to be
operational?' yes D No X NA 0 Yes C No NA D Yes No DNA Yes No NA
Wait time between applying
pressure/vacuum /water and
starting test
30MIN
Test Start Time: 1:21 1 :48
Initial Reading ): 4.013 4.012
Test End Time: 1:36 2:03
Final Reading F : 4.012 4.011
Test Duration: 15MIN 15MIN
Change in Reading (Rp -Ro: 001 001
Pass/Fail Threshold or Criteria: 002 002
Test Result: X Pass 0 Fail Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail
Was sensor removed for testing? X Yes No NA Yes No DNA Yes No 0NA 0 Yes No 0 NA
Was sensor properly replaced and
verified functional after testin ? X Yes No NA Yes No DNA 0 Yes :1 No 0 NA 0 Yes No 0N
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
Ifthe entire depth ofthe UDC is not tested, specify how much was tested. Ifthe answer to any ofthe questions indicated with an
asterisk (*) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002
S. FILL RISER CONTAINMENT SUMP TESTING
qq/0 I
Page I_ of Y
Facility is Not Equipped With Fill Riser Containment Sums
Fill Riser Containment Sumps are Present, but were Not Tested 0
Test Method Developed By: Sump Manufacturer X Industry Standard Professional Engineer
0 Other (Spec)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Specify)
Test Equipment Used: INCON TS-STS
If Sump # Fill Sump #
Sump Diameter:
Equipment Resolution:
Fill Sump # Fill Sump #
Sump Depth:
Height from Tank Top to Top of
Highest Piping Penetration:
Height from Tank Top to Lowest
Electrical Penetration:
Condition of sump prior to
testing:
Portion of Sump Tested
Sump Material:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading j):
Test End Time:
Final Reading RF):
Test Duration:
Change in Reading RF -R,):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail 0 Pass 0 Fail 0 Pass 0 Fail Pass 0 Fail
Is there a sensor in the sump? 0 Yes O No 0 Yes No Yes O No Yes 0 No
Does the sensor alarm when
either product or water is
detected?
Yes 0 No NA 0 Yes No 0 NA Yes 0 No NA 0 Yes No 0 NA
Was sensor removed for testing? Yes 0 No 0 NA Yes 0 No NA Yes No 0 NA Yes 0 No NA
Was sensor properly replaced and
verified functional after testing? Yes 0 No 0 NA Yes ONo DNA 0 Yes No DNA Yes No DNA
Comments — (include information on repairs made prior to testing, andrecommendedfollow -upforjailed tests)
NO FILL SUMPS
Page ofSWRCB, January 2002 Pag
9. SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes
Spill/Overfill Containment Boxes are Present, but were Not Tested 0
Test Method Developed By: Spill Bucket Manufacturer X Industry Standard Professional Engineer
0 Other (Spec)
Test Method Used: Pressure Vacuum X Hydrostatic
0 Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Spill Box #87 VPR Spill Box #91 VPR Spill Box # Spill Box #
Bucket Diameter. 12" 12"
Bucket Depth: 14" 14"
Wait time between applying
pressure/vacuum/water and
starting test:
30MIN 30MIN
Test Start Time: 10:45 11:06 10:45 11:06
Initial Reading (R,): 4.805 4.805 4.934 4.934
Test End Time: 11:01 11:21 11:01 11:21
Final Reading (RF): 4.865 1 4.865 4.934 4.934
Test Duration: l5MIN 15MIN 15MIN 15MIN
Change in Reading (RF -R,): 000 000 000 000
Pass/FaiI Threshold or
Criteria: 002 002 002 002
Test Result: X Pass Fail X Pass 0 Fail 0 Pass 0 Fail Pass Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
r_L-irn.0 PIUMIL
362,4 CALIFORNIA AUE
BAKERSFIELD CA
12/19/201i i1:01 AM
SUMP LEAK TEST REPORT
87VPR
TFST STARTED 10:45 AM
TEST STARTED 12/19/201i
BEGIN LEVEL 4.8658 IN
END TIME 11:01 AM
END DATE 12/19/2011
END LEVEL 8657 IN
LEAK THRESHOLD 0.802 IN
TEST RESULT PASSED
87STP
TEST STARTED 10:45 AM
TEST STARTED 12/19/2011
BEGIN LEVEL 4.4474 IN
END TIME 11:01 AM
END DATE 12/19/201!
END i-EUEL 4.4492 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
91UPR
TEST STARTED 10:45 AM
TEST STARTED 12/19/2611
BEGIN LEVEL 4.9343 IN
END TIME 11:01 AM
END DATE 12/19/2011
END LEVEL 4.9342 IN
LEAK THRESHOLD 8.002 IN
TEST RESULT PASSED
DSLSTP
TEST STARTED 10:45 AM
TEST STARTED 12/19/2011
BEGIN LEVEL 4.1658 IN
END TIME 11:01 AM
END DATE 12/19/2011
END LEVEL 4.1655 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
ELTACO MOBIL
362BAKERSFIIEDNCA
sE
12/19/2011 ii-.21 Am
SUMP LEAK TEST REPORT
87UPR
iLST STARTED
TEST STARTED
11:06 AM
12119/2011
BEGIN LEQ& 4.8657 IN
11:21 AMENDTIME
END DATE 12/19/2011
END LEVEL 4.8656 IN
xAK THRESHOLD 0.002 IN
TEST RESULT PASSED
87STP
TEST STARTED
TEST STARTED
11;06 At
12/19/2911
BEGIN LEVEL 4.4499 1
11:21 AENDTIME
END DATE 12/19/201
e.ND LEVEL 4.4516 ,
LEAK. THRESHOLD 0.002
TEST RESULT PA55
91VPR
TEST STARTED
TEST STARTED
i1:06 AM
la,c13420IN8EG11iLEVEL11:21 AMENDTIME
END DATE 12/19/2011
END LEVEL 4.9341 IH
LEAK THRE54{OLD 0.002 EDTESTRESULT
TEST RESULT
DSLSTP
I MW MOBIL33624CALIFORNIAAUtaAKERSFIELDCA
12/19/2011 !2:23 PM
SUMP LEAK TEST REPORT
UDC! -2
TEST STARTED 12;08 PMTESTSTARTED12/19/201! BEGIN LEVEL 2.5741 INENDTIME12:23 PMENDDATE, 12/19/2011ENDLEVEL2.5763 INLEAKTHRESHOLD0.002 INTESTRESULTINCREASED
UDC3 -4
TEST STARTEDTESTSTARTED 12:08 Pm
BEGIN LEVEL 12/19/2011
4.3626 INENDTIME
END DATE 12:23 PM
12/19/2011ENDLEVELLEAKTHRESHOLD4.3625 INTESTRESULT6.002 IN
PASSED
TEST STARTED 11:96 Am
12/19/2011ESTSTARTED
BEGIN LEVEL 4.1654 IN
END TIME 11:21 AM
12/19/2011ENDDATE
END LEVEL 4.1652 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
UDC7 -8
TEST STARTED 12:08 PM
TEST STARTED 12/19/2011
BEGIN LEVEL 0.9307 IN
END TIME 12:23 PM
END DATE 12 /19/2011
END LEVEL 0.9306 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
DELTACO MOBIL
3624 CALIFORNIA AUE
BAKERSFIELD CA
12/19/2011 12:40 PIS
SUMP LEAK TEST REPORT
UDCi -2
TEST STARTED 12:24 PM
TEST STARTED 12/19/2011
BEGIN LEVEL 2.5776 IN
END TIME 12:40 PM
END DATE 12/19/2011
END LEVEL 2.5780 IN
LEAK THRESHOLD 6.602 IN
TEST RESULT PASSED
UDC3 -4 DELTACO MOBIL
1:48 PM
UDC7-8
3624 CALIFORNIA HUETESTSTARTED12:42 PM r AKERSFIEL 7 uyTESTSTARTED12/19/2011
TEST STARTED 12:42 PM
BEGIN LEVEL 4.3624 IN 12/19/2011 2:03 PM
END TIME 12:57 PM
BEGIN LEVEL 0.9303 IN
END DATE 12/19/2011 SUMP LEAK TEST REPORTENDLEVEL4.3616 IN
LEAK THRESHOLD 0.002 IN UDC9 -10TESTRESULTPASSED
TEST RESULT FAILED
TEST STARTED 1:48 PM
TEST STARTED 12/19/201191STP
TEST STARTED
BEGIN LEVEL 4.0123 IN
TEST STARTED 12:42 PM END TIME 2 :03 PM
END DATE 0111.
011TESTSTARTED12/19/2011 4ENDLEVEL4. INBEGINLEVEL3.1804 IN LEAK THRESHOLD 0..002002 INENDTIME12:57 PM TEST RESULT PASSEDENDDATE12/19/2011
4.3623 IN
END LEVEL 3.1802 IN
12/19/2011 1:36 PM
LEAK THRESHOLD 0.002 IN UDC5 -6TESTRESULTPASSED
UDC-5-6
TEST STARTED
TEST STARTED 1:48 PM
UDC7-8 TEST STARTED 12/19/2011
END TIME
BEGIN LEVEL 0.7179 IN
TEST STARTED 12:42 PM END TIME
END DATE
2 :%13 °M
TEST STARTED 12/19/2011
TEST RESULT
o. INBEGINLEVEL0.9303 IN LEAK THRESHOLD b.002 INENDTIME12:57 PM TEST RESULT PASSEDENDDATE12/19/2011
END LEVEL 0.9282 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT FAILED
UDC3 -4
TEST STARTED 12:24 PM
TEST STARTED 12/19/2011
BEGIN LEVEL 4.3627 IN
DELTACO MOBIL END TIME 12:40 PM
3624 CALIFORNIA AVE END DATE 12/19/2011
BAKERSFIELD CA END LEVEL 4.3623 IN
LEAK THRESHOLD 0.002 IN
12/19/2011 1:36 PM TEST RESULT PASSED
SUMP LEAK TEST REPORT
91STP
UDC9 -10
TEST STARTED 12:24 PM
TEST STARTED 1:21 PM TEST STARTED 12/19/2011
TEST STARTED 12/19/2011 BEGIN LEVEL 3.1804 IN
BEGIN LEVEL 4.0137 IN END TIME 12:40 PM
END TIME 1:36 PM END DATE 12/19/2011
END DATE 12/19/2011 END LEVEL 3.1805 IN
END LEVEL 4.0129 IN LEAK THRESHOLD 0.002 IN
LEAK THRESHOLD 0.002 IN TEST RESULT PASSED
TEST RESULT PASSE
UDC7 -8
TEST STARTED 12:24 PM
TEST STARTED 12/19/2011
BEGIN LEVEL 0.9305 IN
END TIME 12 :48 PM
END DATE 12/19/2011
END LEVEL 0.9303 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
UDC-5-6
TEST STARTED 2:16 PM
TEST STARTED 12/19/2011
BEGIN LEVEL 0.7354 IN
END TIME 2 :31 PM
END DATE 12/19/2011
END LEVEL 0.7358 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
qqicl-3 /
SB989 TESTING FAILURE REPORT
SITE NAME: DEL TACO MOBIL DATE: 12/19/11
THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE
TESTING.
REPAIRS: DISPENSER #5/6 PENETRATION ON 87 TORN. DISP #1/2 LEAKING
THROUGH A PEN -HOLE ON WHITE TCI SINGLE WALL PIPE (USING ROCK
GUARD AS SECONDARY). DISP #1/2 91 LEAKING AROUND PENETRATION
LOOKS LIKE NEWER BLUE LINE. SECONDARY FROM STP TO DISP #7/8 87
FAILED. NO SIGNS IN TURBINE SUMP OR UDC. SECONDARY FROM STP TO
DISP #7/8 91 PASSED. NO JUMPER HOSES ON GAS PRODUCTS FROM DISP
1/2 -#5/6. NO JUMPERS ON GAS PRODUCTS FROM DISP 0/849/10. DIESEL
HAS JUMPERS EIGHT (8) JUMPER HOSES MISSING. 87 -91 STP SUMP
SENSORS ON WRONG SIDE OF SUMP.
NAM: TITLE:
SIGNATURE:
THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING
THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR
THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMENTAL FOR
ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF
ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE.
A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR
CONVIENENCE.