HomeMy WebLinkAbout1200 COFFEE RD INSP 9.30.14Facility Name:
FAST 9 P 7705
Date of Inspection:9 /30/2014
Time In: I Time Out:
Address:
1200 Co ee .
Inspected by: Shane Gardner
ICC# 8248557
Contact:
. Craig Lincoln
Type of Inspection:
❑ Annual Compliance ❑Re- inspection ❑ Complaint
Phone:
(661) 633 - 7555/(661) - 5454 (24-hour)
Permission for Inspection Granted by:
Tank ID
#1
#2
#3
#4
Size
12000
12000
12000
Contents
REG
PRM
DSL
Construction
DW
DW
DW
Tank Monitoring:_
DW: Continuous Interstitial Monitoring
❑ Brine/Hydrostatic ❑ Vacuum /Pressure.
❑
SW: SIR and Line Test every 2 years.
❑
❑
❑
❑
SW: ATG 0.1 annual.
❑
❑
❑
❑
SW: ATG 0.2 monthly.
❑
❑
❑
El
SW: Continuous In -Tank Leak Detection (CITLD).
❑
❑
❑
❑
SW: Tank Gauging.
❑
❑
❑
❑
SW: Vadose /GW Monitoring.
❑
❑
❑
❑.
Other Description:
❑
❑
❑
❑
Piping Monitoring:
DW Suction: Continuous Interstitial at UDC and Tank Sump.
❑
❑
❑
❑
DW Pressurized: Interstitia at UDC and Turbine Sump and 3.0 gph LLD,-
El Annual Line Test or Auto - shutdown and Failsafe.
Zr-
�-- --�
DW VPH Monitoring: Includes lines, sumps, fill pipe, vapor lines, etc.
❑
❑
❑
El
SW Conventional Suction: Triennial 0.1 gph line test., and daily
monitoring.
❑
❑
❑
El
SW Pressurized: Line 0.1 gph annual or 0.2 gph monthly line test and
LLD with Auto - Shutdown.
❑
El'
❑
❑
SW or DW Safe Suction.
❑
❑
❑
❑
SW: Vadose Zone or GW Monitoring.
❑
❑
❑
El
DW or SW: Gravity Flow Pipe.
❑
❑
❑
❑
Other Description:
❑
❑
❑
❑
References to the Health and Safety Code, the California Code of Regulations and the Code of Federal Regulations throughout this Appendix are
intended to be useful but are not necessarily exhaustive of all legal references that might apply or be relevant to a specific compliance determination.
Laws and regulations are subject to change, so the references contained herein may not be up to date. It is the responsibility of the owner and operator
to know and comply with all applicable legal requirements.