Loading...
HomeMy WebLinkAbout3221 TAFT HWY INSP 9.17.14Facility Name: Happy Gas-15-021-87119 Date of Inspection:9 /1712014 Time In: 90 0 Time Out: 1 _30C�5 Address: 3221 Taft EPA ID Inspected by: Shane Gardner ICC# 8248557 Contact: jta Budiyan Type of Inspection: nnual Compliance ❑Re- inspection ❑ Complaint Phone: (661) 831-2323/(661) -275 (24-hour) rPermission for Inspection Granted by: ( y e X Tank ID #1 #2 #3 Size 12000 3000 5000 Contents REG PRIM DSL Construction DW DW DW Tank Monitoring: DW: Continuous Interstitial Monitoring ❑ Dry ❑ Brine/Hydrostatic DCVacuum /Pressure. E SW: SIR and Line Test every 2 years. ❑ ❑ ❑ ❑ .. SW: ATG 0.1 annual. ❑ ❑ ❑ ❑ SW: ATG 0.2 monthly. ❑ ❑ ❑ ❑ SW: Continuous In -Tank Leak Detection (CITLD). ❑ ❑ ❑ ❑ SW: Tank Gauging. ❑ ❑ ❑ ❑ SW: Vadose /GW Monitoring. ❑ ❑ ❑ El Other Description: ❑ ❑ ❑ ❑ Piping; Monitoring: DW Suction: Continuous Interstitial at UDC and Tank Sump. ❑ ❑ ❑ DW Pressurized: Interstitial at UDC and Turbine Sump and 3.0 gph LLD, ❑ Annual Line Test or 4kAuto- shutdown and Failsafe. ❑ DW VPH Monitoring: Includes lines, sumps, fill pipe, vapor lines, etc. ❑ ❑ ❑ ❑ SW Conventional Suction: Triennial 0.1 gph line test., and daily monitoring. ❑ El ❑ ❑ SW Pressurized: Line 0.1 gph annual or 0.2 gph monthly tine test and LLD with Auto - Shutdown. ❑ 0 ❑ ❑ SW or DW Safe Suction. ❑ ❑ ❑ ❑ SW: Vadose Zone or GW Monitoring. ❑ ❑ ❑ ❑ DW or SW: Gravity Flow Pipe. ❑ ❑ ❑ ❑ Other Description: ❑ ❑ ❑ ❑ References to the Health and Safety Code, the California Code of Regulations and the Code of Federal Regulations throughout this Appendix are intended to be useful but are not necessarily exhaustive of all legal references that might apply or be relevant to a specific compliance determination. Laws and regulations are subject to change, so the references contained herein may not be up to date. It is the responsibility of the owner and operator to know and comply with all applicable legal requirements.