Loading...
HomeMy WebLinkAboutust_1-13Johnny Urbano 12 -1 8 07 doc Page 1 State of California Department .of General Services sheet 1 of 1 sheets Real Estate Services Division Date 12 -18 -2007 Construction Services Branch VISITOR'S INSPECTION REPORT REV 12/2001) -- WORK ORDER: 121335 CONTRACT: AREA: 3 PROJECT: Tank Removal & Replacement CLIENT: California Department of Highway Patrol LOCATION: Bakersfield, Kern County, California From; DJ Nunez The following was noted on inspection of this job on this date: A final inspection was performed with the following parties in attendance: Ligaya & Beth with CHP John Urbano with CHP Michael Golden/ DGS -PSB Reginald Demery/DGS -CSS Keith Lilyquist/ West Star DJ Nunez/ DGS -CSS We verified that gas pump discharge rates are within design parameters. (6.7 gpm) Remaining items noted: 1) Repair exterior base molding on east side of kiosk. (Keith has ordered parts) 2) Submit Ohms test documentation. 3) Provide CHP with (2) spare dispenser filters, nozzle boots, & 24 rolls of paper for Healy Printer as specified in 13205 -5 "2G ". (John Urbano to receive) 4) Provide & install Morrison Clock/ level gauge as indicated on contract drawings. M Job Supervisors Comments: CONTINUED ON NEXT PAGE Inspector's Name Mechanical Inspector II, RESD Title CC: Original Job File Originator Project Manager