HomeMy WebLinkAboutRES NO 115-19RESOLUTION NO. 1 1 5— 17
A RESOLUTION DISPENSING WITH BIDDING UNDER
SECTION 3.20.060.D.6 OF THE BAKERSFIELD
MUNICIPAL CODE RELATING TO DESIGN/BUILD
CONSTRUCTION PROCUREMENT PROCESS FOR
THE SCADA SYSTEN WHICH WILL PROVIDE REAL-
TIME MONITORING OF RIVER WATER FLOWS AND
ALLOWS FOR THE DATA TO BE ARCHIVED.
RECITALS
WHEREAS, the use of design/build methodologies has been shown to be an effective
method of reducing construction costs; and
WHEREAS, the use of design/build joins the construction and design of a project under
one single legal entity thereby reducing conflicts; and
WHEREAS, the City Council believes the use of design/build is appropriate for certain
unique projects where specialized design or construction methods are necessary or special
design expertise must be employed; and
WHEREAS, the City Council believes the public and the procurement process can be
adequately protected through the use of a fair competitive process for choosing a
design/build entity which best serves the interests of the City; and
WHEREAS, the Water Board approved the Resolution to be referred to full council on
July 10t°, 2019.
NOW, THEREFORE, BE IT RESOLVED, by the Council of the City of Bakersfield as follows:
1. The above recitals are true and correct and are incorporated herein by
reference.
2. The SCADA project is appropriate for design/build because of the specialized
nature of the design or construction or because specialized design expertise
must be employed.
3. The SCADA project justifies an exception to the bidding process and the City
Council hereby determines that the work, supplies, equipment and material
can best be obtained through the design/build construction procurement
process.
4. Upon adoption of this Resolution, the Water Department Manager is authorized
to proceed with the design/build procurement process, as set forth in the
Bakersfield Municipal Code Section 3.20.060D.5, at al, for the SCADA project.
5. The Water Department Manager shall recommend a design/build entity that
combines appropriately licensed contracting, architectural and engineering
services, as needed, into one legal entity.
& The Water Department Manager shall invite no less than three appropriate
design/build entities to participate in the selection process.
The Water Department Manager shall, in a timely manner, bring the contract
for award of the project to the City Council for approval with a report setting
forth the reasons the award is recommended to the chosen design/build entity.
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted, by the Council
of the City of Bakersfield at a regular meeting thereof held on August 14", 2019 by the
following vole:
AYES
5
ABSTAIN'.
ABSENT
✓ ✓ ✓ ✓ ✓ ✓ ✓
GOUNGILMEMBER RIVERA, GONZALES,WEIR, SMITH, FREEMAN, SULLIVAN, PARLIER
;H�PP.[NI�dIq:JNg3
Y"k/ 3
JULIE DRIMAKIS, CMC
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED: AUG 14 2019
By AA &4M A
KA N G 1
Mayor
APPROVED AS TO FORM:
VIRGINIA G ARO
City Attorne
By
VIRGINIA GENNARO
City Attorney