Loading...
HomeMy WebLinkAboutMINOR BILLING APP 8.13.19BILLING & PERMIT STATEMENT ,:N PERMIT # BAKERSFIELD FIRE DEPARTMENT Prevention Services 2101 H Street Bakemfleld, CA 93301 Please make checks payable to I.AE T car oARncrvrACw. ,....a.. --•• • •• -•. ❑ Alarm - New 6 Modification (minimum charge) FA SITE INFORMATION L000MON OF WMECT GASKO 1-1.1 owNEa GILL scomotwaRR REPLACE GASOLINE DISPENSERS AND UPGRADE NAME FUEL MONITOR TO LATEST SOFTWARE $ 0 .0288 x sq IT 4xUECT NMIE PODRESS MME F 661- 805 -6963 GASOLINE DISPENSERSIVEEDER -ROOT SOFTWARE UPGRADE Me. - Minor Modification (Add 1 device/Relocation of 2 devices) $ 98 /hr (2 him minimum) = $196 111PODRE55 430 E. CALIFORNIA AVE Qty 'gRIC6R,SHIELD aAIE CA LPCODE993304 CONTRACTOR INFORMATION Sprinkler - New a Modification (minimum charge) FIRE $ 288 cIXini,ii N E CP'67"2E i FIDEL CARRILLO 672812 NFE OF LICENSE E %PMATION 21 C61ID- 40 /HAZ r>/3ono21 BBI see 2nT FM; 4 CIXRRACm0. NMPAW NNME BSSR INC, PA"j661 -588 -2786 ` '6630 ROSEDALE HWY#6 �BAKERSFIELD Pooreqnng ❑ Sprinkler - Minor Modification I<10 heads) Please make checks payable to I.AE T car oARncrvrACw. ,....a.. --•• • •• -•. ❑ Alarm - New 6 Modification (minimum charge) FA $ 288 ❑ Over 10100D sq R $ 0 .0288 x sq IT ❑ Me. - Minor Modification (Add 1 device/Relocation of 2 devices) $ 98 /hr (2 him minimum) = $196 84 ❑ Sprinkler - New a Modification (minimum charge) FIRE $ 288 ❑ Over 10,000 sq R $ 0 .028 x sq R ❑ Sprinkler - Minor Modification I<10 heads) $ 98 /hr (2 him minimum) _ $196 84 ❑ Commercial Hood (New a UL 300 Upgrade Modification) FMD Additional Hood $ 241 $ 59 1hood 13 Commercial Hood - Minor Modification (add /move nozzle) $ 98 /hr (2 him minimum) _ $196 84 ❑ Spray Booth (New a Modification) SO $ 241 ❑ Aboveground Storage Tank (1 inspection per installation) AST $ 185/tank ❑ Each Additional Tank $ 98/Tank ❑ Aboveground Storage Tank (Removal, Mod, or Inspection) ATR $ 112 / tank ❑ Underground Storage Tank (Installation/Inspection) NI Underground Storage Tank (Modification) MOD $ 900 /tank $ 900 1site ❑ 11 Underground Storage Tank (Minor Modification) MTM $ 171 /site ❑ Underground Storage Tank (Removal) TR $ 587 /tank ❑ Mandated USTTesting: Fuel Mont Cert/SB989 /Cath. Prot NOTE: $98 /hr for each [c UST system even if scheduled at the s= TT $ 96 /hr (2 him minimum) _ $196 ❑ Oil well (Installation, Inspection, or re- Inspection) X $ 98 /hr 84 ❑ Tent TENT $ 98 1hr • After-hours Inspection fee 124 hr 2 him minimum = 248 • Pyrotechnic (1 permit per event, plus an Inspection fee of $98 /hr during business hours) PYRO NOTE: Aft, _- $124 /hr $ 9811hr + (5 him min standby fee/insp) _ $58 5 him min stendb fee ins = 620 ❑ Re- Inspection /Follow -up Inspection $ SEAT 84 ❑ Portable LPG (Propane): # of Cages? _ $ 98 /hr 84 O Explosive Storage $ 241 84 ❑ Copying a File Research (File Research fee $51 /hr) $ 0.02/page 84 13 _nIsdavi'Moboop-t Miscellaneous Site Plan Review (Carnival a FairsNehicle .) $ 98 1hr rD2021 84 ffi v07 /161