Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
3.2-579 Record Drawing
GENERAL LEGEND - - - --- CENTERLINE AND/OR SECDON LINE --- - - --- RIGHT-OF-WAY CAL TRANS 2010 STANDARD PLANS RSP SIGNAL LEGEND ES -JE ° SIGNAL STANDARD (REFER 70 POLE SCHEDULE) ZL CONDUIT RUN (REFER TO CONDUCTOR SCHEDULE) 04 SIGNAL HEAD (WITH PHASE JJ) LUMINAIRE - MOUNTED ON SIGNAL STANDARD 04P 8 PEDESTRIAN SIGNAL HEAD (W IH PHASE J/) PREEMPTION DEVICE OPTICAL DETECTOR ES -6A (OP77COM 711 - SINGLE UNIT) O PULL BOX ® SIGNAL CONTROLLER G, ELECTRICAL SERVICE PEDESTAL GENERAL LEGEND - - - --- CENTERLINE AND/OR SECDON LINE --- - - --- RIGHT-OF-WAY CAL TRANS 2010 STANDARD PLANS RSP ES -IA ES -JE RSP ES -5C ES -8A RSP ES -1B ES -JD ES -6A RSP ES-IOA a ES -2C RSP ES -4A RSP ES -7A RSP ES -11 ES -2E RSP ES -4B ES -7B ES- 1JA i ES -JA RSP ES -4C RSP ES -7E RSP T-11 ES -JB RSP ES -4E RSP ES -7G RSP T 12 ES -JC co RSP ES -5B 1 o S 5 4 o i! r 12 N W ITE z ie �6 U) 13 m o � — �. 24 19 ao �� : _ T; 21 j Mrs VICINITY MAP WHITE LANE/ VIA IGLESIA STOCKDALE HIGH SCHOOL BAKERSFIELD , CALIFORNIA STATE OF CALIFORNIA SACRAMENTO • FRANCISCO •FRESNO LOS ANGELES PROJECT SITE SAN DIEGO STOCKDALE HIGH SCHOOL TRACT N0. 5429-A SHEET No. INDEX TS -1 RILE SHEET TS -2 TRAFFIC SIGNAL & LIGH ING - WHITE LANE AT VIA IGLESIA PROJECT L OCA TION ENGINEERS STATEMENT THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECRON, AND, TO THE BEST OF MY KNOIKEOCF AND BELIEF, COMPLY W17H CITY Of BAKERSFIELD ORDINANCES, STANDARDS AND DESIGN CRIlER7A, AND THEY INCLUDE ALL IMPROWMENT REQUIREMENTS OF THE AD WSORY AGENCY OR OTHER RE WEAL B64RD. ANY ERRORS OMISSIONS OR WOLARONS OF INOSE ORDINANCES STANDARDS OR DESIGN CRITERIA ENCOUNTERED DURING CONSTRUCTION SHALL BE CORRECTED AND SUCH CORREC17ONS REFLECTED ON CORRECTED PLANS SUBMI T TED TOO THE TCITY CENGINEER APPROVED BY.- ROBERT T. SWANSON DATE R.C.E. 43032 (EXP. 03/31/18) APPROVED BY. PUBLIC WORKS DIRECTOR DATE NICOLAS FIDLER R.C.E. 61069 (EXP. 72/31/18) 5AIZ01 -7 REVIEWED BY.- ASSISTANT PUBLIC WORKS DIRECTOR DATE CITY OF BAKERSFIELD REVIEWED BY: 77?AMC ENGINEER DATE RYAN STARBUCK RECORD DRAWING SEE STR££T IMPROVEMENT PLANS FOR WHILE LANE & NA IGLESIA, STOCKDALE HIGH SCHOOL, FOR STREET, SIGN, & STRIPING IMPRObEMENTS >Siq ff 4 � W 0 z � o V s o a U C� ypaF, oWx 0 i �! � cn co J W Z C7ULu l' - I--1 w n s W Y Q � SII J a �P 4 SECTIONT 6 R3-4 03 HEAD 05 6J2'_ 06 I r I I r I --- Y1 05 � 01 05&01 02 & 05 05 e2 Lie 06P 06 01 01&06 k 2 (E) STREET LIGHT TU REMAIN UTILITY NOTE NOT ALL UAL/T/LS WERE LOCAYED BY 7/N5 SURVEY AND SWANSON LNCINTERV06, INC ASSUMES NO RCSPONSIB/Ll/Y FOR UNDERGROUND URLIBES OR FACIUAES NOT SHOWN OR FOR INFORMANON OBTAINED FROM OUTSIDE SOURCES — 06P� LTJ a es I a2 - win �azP 02 & 06 03 04 PHASE DIAGRAM CONTROLLER DETAIL SOUTHEAST CORNER SCALE 1" = 10' &TORE EXCAVA RNG CALL USA. UNDERGROUND TRNCE ALERT 600-227--2600 48 -HOURS BEFORE ALL PLANNED NORK OPERA77ONS SIGN LEGEND R3-4 - NO U-NRN R61 -MICA) - LfFT ONLY, LEFT-THRU-WNT UNC CON/ROL R9 -3a - NO P£OLSTRIAN CROSSING R9-36(L/R) - USE CROSSWALK (LEFT/MV ARROW) k.a emu 4 -SECTION HEAD W DW No 4303 LUMINAIRE (NI WS) REMARKS swiss 0 ARROW Re -Use ExlstingT oe AV -BF, 120v/140v (Aluminum Tjpe) Saralee Eyvgnment 2 lLw/XE DONT WALK 0 ❑J Construct Concrete Pad kr New Cantraller docent to Existing Concrete Service Pad AO 19-J-100 5' SV -I -T -1-T - 06 -- TYPE T CED MHITf LANE o El 3 Bold /ace plop electrical symbols me new construction. Nd/-tone/dashed symbols are existing. 20" MAS -4B ❑5 Famish ond Install Nm-lilumnated Street Name Signs (N/SNS) and hangers Street none signs shall be per 4. The locations of all electrical equipment to be installed by the Contmctar shall be approved by the fogfneo prier to - - © 7A 0 nN N"NW"W"A❑0' 06 - 5. - - T1PE E" LOOP DETECTOR (6' DIA.) "A IMI","TNI"I" 15' SV -1-T -- - _- Ink and grounded as repaired by the Standard Specifications and the Cade. © 29-5-1017 50 2 -MAS SP -1-T 02 - - NA 16LEYA 5l © ❑7 ® LT MAT and replaced n complete ponds. two o9h for two signal /acations On, radio spten shill be installed of this ton{fie signal the other system .droll be nal the Dothan 7 OM STOP BAR WALK �- - TV -2-1 SP -1 -T - 02 --- - - at this nteseetfon and the other one at Mite LmeAma Vsto. the exact antenna placement shall OE 19-3-100 ASl-48 04 01 TYPE 3 CED NHHE LANE E from, the 332 cabinet to the amenna. The system shall include v Pd)Phasa- /S-50YX-C2 /ighMM9 protector 2g, TYPICAL LOOP LAYOUT and a GD/ 404SA modem that will be mstd/ed in each trvfffc signal cabinet Tech support shall be provided by OIA an avthcw¢ed Encon radio teseausen. - TV -2-T Sp -1-T- 02 04 — - - _ SV -I -T © 26-5-107 1 -MAS SP -1-T 06 04 — TYPE 3 LED NA lIXE9A Q © Q '0 LT-MAT OlA - TV -2-7 04 06 SIGN LEGEND R3-4 - NO U-NRN R61 -MICA) - LfFT ONLY, LEFT-THRU-WNT UNC CON/ROL R9 -3a - NO P£OLSTRIAN CROSSING R9-36(L/R) - USE CROSSWALK (LEFT/MV ARROW) ..= 01 1E C E SHE 3AE-.r- RIV RED— O m YELLOW— SIGNALS GREEN— O g GREEN - k.a emu 4 -SECTION HEAD RE;ORD DRAWING .��• +'2:`'%0-!9'/6 POLE AND EQUIPMENT SCHEDULE m "`bw SIGNALS LED ST. NAME SIGN g LOC k.a emu All soa/ and lighting work shall canton, to the State of Co/ilamin Department of Trarsperldhon Standard Specifications WALK W DW No 4303 LUMINAIRE .��• +'2:`'%0-!9'/6 POLE AND EQUIPMENT SCHEDULE m "`bw SIGNALS LED ST. NAME SIGN g LOC STANDARD emu All soa/ and lighting work shall canton, to the State of Co/ilamin Department of Trarsperldhon Standard Specifications WALK W DW PPB LUMINAIRE (NI WS) REMARKS swiss 0 ARROW Re -Use ExlstingT oe AV -BF, 120v/140v (Aluminum Tjpe) Saralee Eyvgnment 2 lLw/XE DONT WALK 0 ❑J Construct Concrete Pad kr New Cantraller docent to Existing Concrete Service Pad AO 19-J-100 5' SV -I -T -1-T - 06 -- TYPE T CED MHITf LANE o El 3 Bold /ace plop electrical symbols me new construction. Nd/-tone/dashed symbols are existing. 20" MAS -4B ❑5 Famish ond Install Nm-lilumnated Street Name Signs (N/SNS) and hangers Street none signs shall be per 4. The locations of all electrical equipment to be installed by the Contmctar shall be approved by the fogfneo prier to - - © 7A - TV -2-T SP -1-T 06 - 5. - - T1PE E" LOOP DETECTOR (6' DIA.) ❑7 Famish ond instil/ Optkom 711(S)grid Unit) preenphin devices as Indicated an plans indudng dl cables 15' SV -1-T -- - _- and mmntin hardware PECCO AS -121. The embecter shall also famish and instal/ two 2 9 ( ) O Potkan 7te and grounded as repaired by the Standard Specifications and the Cade. © 29-5-1017 50 2 -MAS SP -1-T 02 - - NA 16LEYA 5l © ❑7 ® LT MAT and replaced n complete ponds. two o9h for two signal /acations On, radio spten shill be installed of this ton{fie signal the other system .droll be nal the Dothan 7 OM STOP BAR WALK �- - TV -2-1 SP -1 -T - 02 --- - - at this nteseetfon and the other one at Mite LmeAma Vsto. the exact antenna placement shall OE 19-3-100 ASl-48 04 01 TYPE 3 CED NHHE LANE E from, the 332 cabinet to the amenna. The system shall include v Pd)Phasa- /S-50YX-C2 /ighMM9 protector 2g, TYPICAL LOOP LAYOUT and a GD/ 404SA modem that will be mstd/ed in each trvfffc signal cabinet Tech support shall be provided by OIA an avthcw¢ed Encon radio teseausen. - TV -2-T Sp -1-T- 02 04 — - - _ SV -I -T © 26-5-107 1 -MAS SP -1-T 06 04 — TYPE 3 LED NA lIXE9A Q © Q '0 LT-MAT OlA - TV -2-7 04 06 After homing �fgnai JWdards ensure compllvnre wph General Note 4. Al/ traffic signal faces shod be 12 -inch, Tips 7' CED modules. Al/ pedestrian indicatims shat/ be new, TAe A' CED, fntcmehara/ synbal type ('Nand' and 'Walking Perm -) countdown, as detailed in CO.B. specifications. All pedestrian push buttons shall be ADA per Standard Specificabors. Luminakes shot/ be Type 3' LLD as indicated, per City of Bakesfidd Standards and shall be as Specirmd in Special Prowsfms Section 86-6.01 20 10 0 20 40 LEGEND: EMSRNG STORM DRAINLLNE DIVING FIBER OPTIC LINE DIS77NG WATER LINE EXISTING SEWER LINE EXISTING GAS LINE DISRNG FENCEZINE EXISTING ELECIRIC UNE EXISTING OV2RHEAD ELECTRIC LINE EXISTING PROPERTY LINE £XrSBNG R16HTO°-WAY U z I� z z_ rO VJ zz �z �z cin w e m INSTALLATION NOTES Q \ GENERAL SIGNAL NOTES g Q Remove and Salvage to the City of BakesAdd Edstbig Central/a• and Cabmet AssanMy. Fum/sh and /nsld/ 1. All soa/ and lighting work shall canton, to the State of Co/ilamin Department of Trarsperldhon Standard Specifications z Tape 17L Control/e- and 332 Cadhet A.ssmaxy. p )� and Standard Plans dated 2010 and the Cly of Bakersfield DeMapment Standards Q Re -Use ExlstingT oe AV -BF, 120v/140v (Aluminum Tjpe) Saralee Eyvgnment 2 The oppmxknate locations of utilities shown hereon ore as shown an city, state and ubhy company records Other 10' ❑J Construct Concrete Pad kr New Cantraller docent to Existing Concrete Service Pad fmdities may exist in the area of construction. The Contractor shall vaffy the location of all underground utilities RIGHT LANE ® PGnE Powe Pont.Cmtmctor .olid/ coordinate cmnertkns with PG&E one provide any required which may cmAkt with facilities to be constructed prior to commencing the walk. materia mrfaia's n,010601. 3 Bold /ace plop electrical symbols me new construction. Nd/-tone/dashed symbols are existing. BIKE LANE MODIELED TYPE D" LOOP DETECTOR (3"x3) ❑5 Famish ond Install Nm-lilumnated Street Name Signs (N/SNS) and hangers Street none signs shall be per 4. The locations of all electrical equipment to be installed by the Contmctar shall be approved by the fogfneo prier to - - City of Bakersfield Standards Message as shown an Pole and Equipment Schedule. construction of fmndehais. Centurion of standards shall be at less thor 3 feet bock of the fare of curb ar edge THRU LANE 10 15" © Proade traffic central sign mounted an most mm/signd stmdmd adjecent to signal head (r)pe as ndfmted) 5. of pmenrent. Bonding and grounding emductm, required by the Notional Electric Code and by the Samford .Specacetims me at T1PE E" LOOP DETECTOR (6' DIA.) ❑7 Famish ond instil/ Optkom 711(S)grid Unit) preenphin devices as Indicated an plans indudng dl cables shown an the Conductor Sahedu/e. The Contactor shill ensure that the en Ike new skim' and lighting system is banded 9 Is -- - _- and mmntin hardware PECCO AS -121. The embecter shall also famish and instal/ two 2 9 ( ) O Potkan 7te and grounded as repaired by the Standard Specifications and the Cade. phase nits n the ronhalle cabinet. Cpatimtm shall proddb a fullyef operotf system 6. LEFT -TURN LANE 10 10 70, ieenaar Exert preemption hardware mounting p/orement shall/ be determined by the Traffic Engineer in the field gin ereamthe h Existing sidewalk she// be removed and replaced as necessmy to complete d/ constructer. Skews/k may m/y be removed ® The ar shall famish n,0 instal/ me complete Encore 51008 900 MHsi radio splen and replaced n complete ponds. two o9h for two signal /acations On, radio spten shill be installed of this ton{fie signal the other system .droll be nal the Dothan 7 Pull box in front of cmtrdla shall be A6. All others shall be 15 with extorsion, unless otAenrise noted. STOP BAR WALK �- installed at Mite Ime /Buena Kilo, by Me contractor. The emtrmtor shall nstoil ane 15abi Yogi Cushcmft Antenna TYPE D" LOOP DETECTOR (6"x6 J at this nteseetfon and the other one at Mite LmeAma Vsto. the exact antenna placement shall be determined by the engineer n the field Me contractor shill install and sparest the LMR -400 cooxid cable from, the 332 cabinet to the amenna. The system shall include v Pd)Phasa- /S-50YX-C2 /ighMM9 protector TYPICAL LOOP LAYOUT and a GD/ 404SA modem that will be mstd/ed in each trvfffc signal cabinet Tech support shall be provided by an avthcw¢ed Encon radio teseausen. U z I� z z_ rO VJ zz �z �z cin w e m Q \ e Y g � I W z p )� m I O g � I W z