HomeMy WebLinkAbout1.8-7299 Ph 5EUnderground
H
Service Alert
7
T
C
Cal: TOLL FRSE
P
SL
MY
e11
(GAS)
-
lw0 ..1. WR
McNew TCe qa
F[NOTIFIED
U.S.A.
12'
5'
ATE:
T
M ■
C
"0
"m
2
MINIMUM COVER AND CLEARANCES
MINIMUM SEPARATION FROM
H
G
7
T
C
S
P
SL
MIN. COVER
G
(GAS)
-
12'
12'
12-
6'
12'
5'
30'
T
(TELEPHO@) DUCT
12'
-
1-
1-
12'
12'
12'
24
T
(TELEPHONE) DB
12'
1'
-
1'
12'
12'
12'
24'
C
(CAM
12'
1'
1'
-
12'
12'
12'
24'
S
(SECONDARY)
6'
12'
12'
12'
Y
3'
T
b'
P
(PRIMARY)
12'
12'
12'
ELT
Y
3'
Y
30'
SL
(STREET UGHT)
6'
12'
12'
12'
3'
3'
3'
30'
BE
(FORBGN ELECTRIC)
12'
12'
12'
12'
12'
10
10
b'
21 1 20 1 19
P
H
A
S
E
7
g
14
$
e
1
13
2'
10' P.U.E-�
€V€RTON AVENUE
3 4
SUBSTRUCTURES RECAP
BACKEILLSURFACE
TSEZEH
Bg
$
I
SURFACE
e V
g
B
$
e
1
SUBSTRUCTURE
TOTAL
COMPANY
TRENCH AGENT
PM Transformer
1
PG&E
APPLICANT
6"
APPLY + SECURE
X
So
X
1 % 1 X 1 1 1 1 1
1 %
18'x54'
#2 Be.
2
PG&E
APPLICANT
2"
I % I X I I I I I
X
o
X
I I IXIX
-
275
#2E Be.
2
PG&E
APPLICANT
2"
X
X
10
11
Z
#3 Bax
1AT&T
9
APPLICANT
2"
Cn
X
W
X
E 7
S
w
#2 Box
2
CABLE
APPLICANT
2"
I
X
X
JOINT TRENCH RECAP
TRENCH I INDICATES SPECIFIC UTILITIES IN TRENCH&
SECTION G T C 5 P I L I I I FIG.
DISTOR
TSEZEH
r ��C
BACKFILL
SURFACE
e V
FOOTAGE
GPSTC X I %
I % I X I % I I I I
I X I I I
24-x54-
%
I I 1XI%
NORROMBE IDI. DARE
318
FUTURE SERVICE COMPLETION
PROVIDE + INSTALL
\\ EXCAVATE 51X51X4' 100
PERMIT -ENCROACHMENT:
W
APPLY + SECURE
PRIVATE
So
GSTC 1 % 1 %
1 % 1 X 1 1 1 1 1
1 %
18'x54'
%
1-- X
%
2B1
•GSTC I X I %
I % I X I I I I I
I I IXI18'x42'
o
IX
I I IXIX
-
275
*Service french on privofe properly CRT included in controcfs
TYPICAL TYPICAL
DISTRIBUTION TRENCH SERVICE TRENCH
18" MIN.18' MIN
AI
(NON PG&E) . .
N
C S C
AAA
5 �N.
P �. S 3 S
N MIN
PRIMARY SECONIARY/SERVICE
18 1 17 1 16 15
WORK PM: 31393564 [PHASE 7] ALONGSIDE H S 5PM: 31393565 [PHASE 5].
1 2 3 4
U U
\ d
I
I I
I � N RI7�JWR
D I I D
5
FIELD CONFLICTS
CONFUCIS TO BE MANAGED IN-THE-RELD PER PG&E STANDARDS AND
FINAL APPROVAL FROM PG&E INSPECTOR
WET UTILITY CLEARANCES
THE MINIMUM ALLOWABLE SEPARATION BETWEEN THE EDGE OF THE JOINT
TRENCH AND THE EDGE OF ANY 'WEN FACILITY TRENCH IS 3' WITH THE
PRESENCE OF A MINIMUM OF 1' OF UNDISTURBED FRAM OR THE
INSTALLATION OF A SUITABLE BARRIER.
SUBSTRUCTURE VERIFICATION STAMP
PLEASE NOTE AND SIGN
AL XYA& E ENCLOSURES AND BOXES HAJE BEEN SET TO N AGE ACCORDING TO GRADE
A AREA BESMEAR BY DEATLOPERS ENGINEER ALL COSTS TO RELEGATE OR SUPE VERIFFY THE CORRECTED WILLBE
ofaALL ENCLOSURESPAND BOXES, AND�SIGNOANSOe
DATE DRAWI NA
THANK SIGNED
DATE
PROJECT CONDITIONS STAMP
Type(a) of Work:
X] New Business
r ��C
HP PL Zulu
L-�
TIE-IN
or
❑CONDITIONS APPLY:
PERMITS ❑ TAILSOARD ❑ OTHER
(Prowde addNaml Inforreatlen on Ilea II
e,.,Bellntl0 ADDER,
` T_29
eQUILXE. NAME.
NORROMBE IDI. DARE
GAS PIPE + GAS STUBS:
FUTURE SERVICE COMPLETION
PROVIDE + INSTALL
\\ EXCAVATE 51X51X4' 100
PERMIT -ENCROACHMENT:
W
APPLY + SECURE
PRIVATE
So
PROPOSED STORM DRAIN
\ BELLHOLE FOR
PROPOSED SANITARY SEWER
I
LANDSCAPE
\ UTILITY TIE-IN.
PROPOSED PADMOUNT TRANSFORMER
3
LOT 'I
o
17" x 30" x 26" SECONDARY BOX
[T3]
-
/
EXI
cPSTC1
INDICATES TRENCH FOOTAGE & OCCUPANCY
234
10
11
Z
WR
g
9
to
Cn
I
�
W
PHA
E 7
S
w
m
r
CCD
W
m
I
w
z
0
I7
6
TO
SWR
25
5
FIELD CONFLICTS
CONFUCIS TO BE MANAGED IN-THE-RELD PER PG&E STANDARDS AND
FINAL APPROVAL FROM PG&E INSPECTOR
WET UTILITY CLEARANCES
THE MINIMUM ALLOWABLE SEPARATION BETWEEN THE EDGE OF THE JOINT
TRENCH AND THE EDGE OF ANY 'WEN FACILITY TRENCH IS 3' WITH THE
PRESENCE OF A MINIMUM OF 1' OF UNDISTURBED FRAM OR THE
INSTALLATION OF A SUITABLE BARRIER.
SUBSTRUCTURE VERIFICATION STAMP
PLEASE NOTE AND SIGN
AL XYA& E ENCLOSURES AND BOXES HAJE BEEN SET TO N AGE ACCORDING TO GRADE
A AREA BESMEAR BY DEATLOPERS ENGINEER ALL COSTS TO RELEGATE OR SUPE VERIFFY THE CORRECTED WILLBE
ofaALL ENCLOSURESPAND BOXES, AND�SIGNOANSOe
DATE DRAWI NA
THANK SIGNED
DATE
PROJECT CONDITIONS STAMP
Type(a) of Work:
X] New Business
❑PC&E Maintenance & Construction
Project Conditions:
E]NONE APPARENT (x Project &elan cxongee, -,loot ME)
or
❑CONDITIONS APPLY:
PERMITS ❑ TAILSOARD ❑ OTHER
(Prowde addNaml Inforreatlen on Ilea II
e,.,Bellntl0 ADDER,
BABG. 10/09/18
eQUILXE. NAME.
NORROMBE IDI. DARE
4'ARBO HCECK AVENUE
14 J1 22
UPHU,CH
FUTURE
T -7299 -PH 4
m 31393566
LLD GST(
�_j
0 SWR
5
Vt-
o
SWR
10 9 \
PHASE 5
26 1 27
on
VA
W
21
29
20
7 8
NOTES: APPLICANT TRENCH
1. CALL "USA" 2 WORKING DAYS BEFORE EXCAVATING.
UNDERGROUND SERVICE ALERT DIAL 811
2. SPECIFIC CONDITIONS REQUIRED BY PG&E FOR JOINT TRENCH
WORK ARE OUTLINED IN PG&E'S UTIUTY OPERATIONS
STANDARD 55453.
3. BACKFILL MATERIAL REQUIREMENTS ARE DETAILED
IN U.O. STANDARD S5453, EXHIBIT B.
4. PG&E INSPECTOR TO APPROVE ALL EXCAVATIONS AND TRENCHES
(LOCATION AND BACKFILL MATERIAL) PRIOR TO BACKFILLING.
5. TRENCHING AGENT TO DISPOSE OF ALL SPOIL.
B. MINIMUM COVER FROM FINAL GRADE REQUIRED
FOR ALL FACIUTIES IN THE STREET AREA.
7. TRENCHING AGENT TO SECURE ALL PERMITS.
8. CONTRACTOR IS RESPONSIBLE FOR CROSSING EXISTING WATER, SEWER,
AND STORM DRAIN LINES, EITHER UNDER OR OVER, AS REQUIRED
TO MEET PG&E COVER AND CLEARANCE REQUIRMENTS.
REFER TO G.S. STANDARD UO -55453
9. THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE
TRENCH SPOIL WITH 100% SELECT BACKFILL AS REQUIRED BY
PG&E SPECIFICATIONS, AND ANY LOCAL CITY, COUNTY, OR
STATE REQUIREMENTS.
10. THE CONTRACTOR WILL BE REQUIRED TO PLACE TEMPORARY AND/OR
PERMANENT PAVING IN ACCORDANCE WITH ANY LOCAL CITY, COUNTY,
OR STATE REQUIREMENTS.
11. APPLICANT TO PROVIDE AND INSTALL ANY PROTECTION EQUIPMENT
(BARRIER POSTS, FENCES, ETC...) REQUIRED BY PG&E.
12. THE APPLICANT/CONTRACTOR WILL ACCEPT RESPONSIBILITY
OF MAINTENANCE OF THE TRENCH (E.G. COMPACTION, PAVING,
ETC..) FOR A PERIOD OF TWO (2) YEARS OR AS SPECIFIED IN THE
PERMIT, WHICHEVER IS LONGER.
13. TRENCHING AGENT MUST MAINTAIN A MINIMUM OF THREE (3) FEET
BETWEEN THE CLOSEST EDGE OF ANY PARALLEL UTILITY TRENCH AND
THE AND THE CLOSEST EDGE OF ANY WET FACILITY.
14. PG&E MUST RECEIVE THE INSPECTION CLEARANCE FROM THE CITY /
COUNTY BUILDING INSPECTION DEPARTMENT, PRIOR TO THE
GAS METER INSTALLATION.
15. FOR METER INSTALLATION CONTACT PG&E PROJECT REP.
OR CUSTOMER CONTACT CENTER AT 1-800-743-5000
CONSTRUCTION NOTES:
1. CUSTOMER IS RESPONSIBLE FOR OBTAINING NECESSARY ENCROACHMENT PERMITS AS
REQUIRED BY LOCAL CITY, COUNTY, OR STATE AUTHORITIES.
2. CUSTOMER WILL BE REQUIRED TO INSTALL APPROVED SHORING FOR ANY TRENCH
ACCORDING TO STATE EXCAVATION SAFETY STANDARDS.
3. CUSTOMER WILL PERFORM ALL TRENCHING, BORING, SUBSTRUCTURE EXCAVATION,
BACKFILLING, COMPACTION & PAVEMENT REPLACEMENT OPERATIONS AS NECESSARY .
SCHEDULE TRENCH INSPECTION AT LEAST 48 HOURS IN ADVANCE OF TRENCHING.
4. CUSTOMER IS RESPONSIBLE FOR CROSSING EXISTING WATER, SEWER & STORM DRAINS,
EITHER UNDER OR OVER, AS REQUIRED TO MEET PG&E COVER REQUIREMENTS AND 6"
MINIMUM CLEARANCE. MAINTAIN AT LEAST 5' OF SEPARATION BETWEEN UTILITY TRENCH &
ANY PARALLEL WATER, SEWER, OR STORM DRAIN TRENCH.
5. THE LOCATION OF ALL EXISTING OR NEWLY INSTALLED WATER, SEWER, STORM DRAIN OR
OTHER LINES SHALL BE DETERMINED BY THE CUSTOMER. THE CUSTOMER SHALL NOT RELY
ON PG&E TO LOCATE FACILITIES. (PG&E WILL LOCATE PG&E FACILITIES UPON PROPER USA
NOTIFICATION.) CALL USA AT B11 AT LEAST 48 HOURS PRIOR TO CONSTRUCTION.
6. CUSTOMER WILL BE REQUIRED TO REMOVE & REPLACE TRENCH SPOIL WITH SELECT
BACKFILL AS REQUIRED BY PG&E SPECIFICATIONS, & ANY LOCAL CITY, COUNTY, OR STATE
REQUIREMENTS.
7. CUSTOMER WILL BE REQUIRED TO PLACE TEMPORARY AND/OR PERMANENT PAVING IN
ACCORDANCE WITH ANY LOCAL CITY, COUNTY OR STATE REQUIREMENTS.
8. MAINTAIN MINIMUM OF 2' BETWEEN SPOIL BANK AND EDGE OF TRENCH.
9. CUSTOMER TO BACKFILL AND HAND TAMP DIRT AROUND RISER.
0
WORK SUMMARY
LEGEND
G
qa a
TRENCH -STREET AREA:
nD!
EXCAVATE/ TRENCH / BORE /
000
SACKFULPAW
TELEPHONE
TRENCH-PVT PROPERTY:
CABLE TV
EXCAVATE / TRENCH / BACKFILL
COO
GAS PIPE + GAS STUBS:
FUTURE SERVICE COMPLETION
PROVIDE + INSTALL
000
PERMIT -ENCROACHMENT:
EXISTING UNDERGROUND FACILITY
APPLY + SECURE
000
10
GAS
PRIMARY ELECTRIC
SECONDARY ELECTRIC
TELEPHONE
CABLE
G PSTC
gG' TRENCH FOOTAGE
TRENCH IDENTIFIER
CONTRACTOR CONSTRUCTION REFERENCES:
1. REFER TO GAS STANDARDS A-90 & A-91 FOR TYPICAL DIRECT BURIAL PLASTIC GAS
MAIN AND SERVICE INSTALLATION.
2. REFER TO GAS STANDARDS A-90.1 & A-91.2 FOR TYPICAL PLASTIC GAS MAIN AND
SERVICE INSERT CONSTRUCTION.
3. REFER TO GAS STANDARDS A-90.2 & A-90.3, D-12, D-13.1 & D-14 FOR TYPICAL
ANODE & LOCATING WIRE INSTALLATION ON DIRECT BURIAL PLASTIC GAS MAIN AND SERVICES.
4. REFER TO GAS STANDARDS A-91.3 & A-91.4 FOR TYPICAL GAS SERVICE RISER INSTALLATION.
5. REFER TO GAS STANDARD A-34 FOR TEST CRITERIA ON GAS MAIN AND SERVICES.
6. PG&E TO PERFORM ALL HOT TIE-INS AND PURGING OF GAS PIPING PERGAS STANDARD A-38.
ED,
N
VICINITY MAP
CONSTRUCTION NOTE:
GAS PIPELINE UNDERGROUND WARNING TAPE TO BE INSTALLED ABOVE
GAS PIPE IN ALL TRENCHES AS SHOWN IN DETAIL BELOW.
CAUTION CAUTION
GAS LINE BURIED BELOW
GAS PIPELINE UNDERGROUND
WART NG TAPE CODE #578847.
YELLOW TAPE WITH BLACK LETTERING.
FINISH GRADE
MIN. 12"
WARNING TAPE
INSTALLATION ZONE
WARNING TAPE
GAS PIPELINE ----,,MIN. 12"
G
PG&E REP. LARRY HOFF
PHONE: 661-398-5712
ALL FIELD CHANGES REQUIRE PRIOR APPROVAL FROM:
LEGEND
G
GAS
P
ELECTRIC PRIMARY
S
ELECTRIC SECONDARY/SERVICE
T
TELEPHONE
C
CABLE TV
-------
SERVICE TRENCH
-------
FUTURE SERVICE COMPLETION
- -
MAIN LINE TRENCH
EXISTING UNDERGROUND FACILITY
WTR
PROPOSED OR EXISTING DOMESTIC WATER
So
PROPOSED STORM DRAIN
-SWR-
PROPOSED SANITARY SEWER
I
PROPOSED BELLHOLE 5'x 5'x 4'
�
PROPOSED PADMOUNT TRANSFORMER
L
17" x 30" x 18" SECONDARY BOX
CC
17" x 30" x 26" SECONDARY BOX
[T3]
24" x 36" x 18" SECONDARY BOX
/
SLASH INDICATES CHANGE IN OCCUPANCY
cPSTC1
INDICATES TRENCH FOOTAGE & OCCUPANCY
234
CONTRACTOR CONSTRUCTION REFERENCES:
1. REFER TO GAS STANDARDS A-90 & A-91 FOR TYPICAL DIRECT BURIAL PLASTIC GAS
MAIN AND SERVICE INSTALLATION.
2. REFER TO GAS STANDARDS A-90.1 & A-91.2 FOR TYPICAL PLASTIC GAS MAIN AND
SERVICE INSERT CONSTRUCTION.
3. REFER TO GAS STANDARDS A-90.2 & A-90.3, D-12, D-13.1 & D-14 FOR TYPICAL
ANODE & LOCATING WIRE INSTALLATION ON DIRECT BURIAL PLASTIC GAS MAIN AND SERVICES.
4. REFER TO GAS STANDARDS A-91.3 & A-91.4 FOR TYPICAL GAS SERVICE RISER INSTALLATION.
5. REFER TO GAS STANDARD A-34 FOR TEST CRITERIA ON GAS MAIN AND SERVICES.
6. PG&E TO PERFORM ALL HOT TIE-INS AND PURGING OF GAS PIPING PERGAS STANDARD A-38.
ED,
N
VICINITY MAP
CONSTRUCTION NOTE:
GAS PIPELINE UNDERGROUND WARNING TAPE TO BE INSTALLED ABOVE
GAS PIPE IN ALL TRENCHES AS SHOWN IN DETAIL BELOW.
CAUTION CAUTION
GAS LINE BURIED BELOW
GAS PIPELINE UNDERGROUND
WART NG TAPE CODE #578847.
YELLOW TAPE WITH BLACK LETTERING.
FINISH GRADE
MIN. 12"
WARNING TAPE
INSTALLATION ZONE
WARNING TAPE
GAS PIPELINE ----,,MIN. 12"
G
PG&E REP. LARRY HOFF
PHONE: 661-398-5712
ALL FIELD CHANGES REQUIRE PRIOR APPROVAL FROM:
UTILITY
CONTACT
TELEPHONE
PG&E GAS
BELINDA GURSKY
(559) 347-5038
PG&E ELECTRIC
NICK DENNISON
(559) 347-5152
AT&TTELEPHONE
DALEYOUNGBLOOD
(661)631-3330
CHARTER
GREG EOFF
(661) 395-3351
6 5 4 3 2
1.8-7299
1.8-7299 Ph 5
rr� 0
1 INICH IO
W
Cn
»
Z
W
C\2
0
U
InWin
c
M1a.
=aW
�
a
z
ILL -
(")
U
rn
aD=w
C'
Z
n
W
�
to
Cn
W
E --r
w
m
r
CCD
m
Gy
w
z
0
6
1.8-7299
1.8-7299 Ph 5
rr� 0
1 INICH IO
E-
»
0
InWin
o
=aW
�
a
z
ILL -
(")
U
rn
aD=w
C'
W
n
W
Y
E --r
w
m
E-
1.8-7299
1.8-7299 Ph 5
rr� 0
1 INICH IO