Loading...
HomeMy WebLinkAbout1.8-7299 Ph 5EUnderground H Service Alert 7 T C Cal: TOLL FRSE P SL MY e11 (GAS) - lw0 ..1. WR McNew TCe qa F[NOTIFIED U.S.A. 12' 5' ATE: T M ■ C "0 "m 2 MINIMUM COVER AND CLEARANCES MINIMUM SEPARATION FROM H G 7 T C S P SL MIN. COVER G (GAS) - 12' 12' 12- 6' 12' 5' 30' T (TELEPHO@) DUCT 12' - 1- 1- 12' 12' 12' 24 T (TELEPHONE) DB 12' 1' - 1' 12' 12' 12' 24' C (CAM 12' 1' 1' - 12' 12' 12' 24' S (SECONDARY) 6' 12' 12' 12' Y 3' T b' P (PRIMARY) 12' 12' 12' ELT Y 3' Y 30' SL (STREET UGHT) 6' 12' 12' 12' 3' 3' 3' 30' BE (FORBGN ELECTRIC) 12' 12' 12' 12' 12' 10 10 b' 21 1 20 1 19 P H A S E 7 g 14 $ e 1 13 2' 10' P.U.E-� €V€RTON AVENUE 3 4 SUBSTRUCTURES RECAP BACKEILLSURFACE TSEZEH Bg $ I SURFACE e V g B $ e 1 SUBSTRUCTURE TOTAL COMPANY TRENCH AGENT PM Transformer 1 PG&E APPLICANT 6" APPLY + SECURE X So X 1 % 1 X 1 1 1 1 1 1 % 18'x54' #2 Be. 2 PG&E APPLICANT 2" I % I X I I I I I X o X I I IXIX - 275 #2E Be. 2 PG&E APPLICANT 2" X X 10 11 Z #3 Bax 1AT&T 9 APPLICANT 2" Cn X W X E 7 S w #2 Box 2 CABLE APPLICANT 2" I X X JOINT TRENCH RECAP TRENCH I INDICATES SPECIFIC UTILITIES IN TRENCH& SECTION G T C 5 P I L I I I FIG. DISTOR TSEZEH r ��C BACKFILL SURFACE e V FOOTAGE GPSTC X I % I % I X I % I I I I I X I I I 24-x54- % I I 1XI% NORROMBE IDI. DARE 318 FUTURE SERVICE COMPLETION PROVIDE + INSTALL \\ EXCAVATE 51X51X4' 100 PERMIT -ENCROACHMENT: W APPLY + SECURE PRIVATE So GSTC 1 % 1 % 1 % 1 X 1 1 1 1 1 1 % 18'x54' % 1-- X % 2B1 •GSTC I X I % I % I X I I I I I I I IXI18'x42' o IX I I IXIX - 275 *Service french on privofe properly CRT included in controcfs TYPICAL TYPICAL DISTRIBUTION TRENCH SERVICE TRENCH 18" MIN.18' MIN AI (NON PG&E) . . N C S C AAA 5 �N. P �. S 3 S N MIN PRIMARY SECONIARY/SERVICE 18 1 17 1 16 15 WORK PM: 31393564 [PHASE 7] ALONGSIDE H S 5PM: 31393565 [PHASE 5]. 1 2 3 4 U U \ d I I I I � N RI7�JWR D I I D 5 FIELD CONFLICTS CONFUCIS TO BE MANAGED IN-THE-RELD PER PG&E STANDARDS AND FINAL APPROVAL FROM PG&E INSPECTOR WET UTILITY CLEARANCES THE MINIMUM ALLOWABLE SEPARATION BETWEEN THE EDGE OF THE JOINT TRENCH AND THE EDGE OF ANY 'WEN FACILITY TRENCH IS 3' WITH THE PRESENCE OF A MINIMUM OF 1' OF UNDISTURBED FRAM OR THE INSTALLATION OF A SUITABLE BARRIER. SUBSTRUCTURE VERIFICATION STAMP PLEASE NOTE AND SIGN AL XYA& E ENCLOSURES AND BOXES HAJE BEEN SET TO N AGE ACCORDING TO GRADE A AREA BESMEAR BY DEATLOPERS ENGINEER ALL COSTS TO RELEGATE OR SUPE VERIFFY THE CORRECTED WILLBE ofaALL ENCLOSURESPAND BOXES, AND�SIGNOANSOe DATE DRAWI NA THANK SIGNED DATE PROJECT CONDITIONS STAMP Type(a) of Work: X] New Business r ��C HP PL Zulu L-� TIE-IN or ❑CONDITIONS APPLY: PERMITS ❑ TAILSOARD ❑ OTHER (Prowde addNaml Inforreatlen on Ilea II e,.,Bellntl0 ADDER, ` T_29 eQUILXE. NAME. NORROMBE IDI. DARE GAS PIPE + GAS STUBS: FUTURE SERVICE COMPLETION PROVIDE + INSTALL \\ EXCAVATE 51X51X4' 100 PERMIT -ENCROACHMENT: W APPLY + SECURE PRIVATE So PROPOSED STORM DRAIN \ BELLHOLE FOR PROPOSED SANITARY SEWER I LANDSCAPE \ UTILITY TIE-IN. PROPOSED PADMOUNT TRANSFORMER 3 LOT 'I o 17" x 30" x 26" SECONDARY BOX [T3] - / EXI cPSTC1 INDICATES TRENCH FOOTAGE & OCCUPANCY 234 10 11 Z WR g 9 to Cn I � W PHA E 7 S w m r CCD W m I w z 0 I7 6 TO SWR 25 5 FIELD CONFLICTS CONFUCIS TO BE MANAGED IN-THE-RELD PER PG&E STANDARDS AND FINAL APPROVAL FROM PG&E INSPECTOR WET UTILITY CLEARANCES THE MINIMUM ALLOWABLE SEPARATION BETWEEN THE EDGE OF THE JOINT TRENCH AND THE EDGE OF ANY 'WEN FACILITY TRENCH IS 3' WITH THE PRESENCE OF A MINIMUM OF 1' OF UNDISTURBED FRAM OR THE INSTALLATION OF A SUITABLE BARRIER. SUBSTRUCTURE VERIFICATION STAMP PLEASE NOTE AND SIGN AL XYA& E ENCLOSURES AND BOXES HAJE BEEN SET TO N AGE ACCORDING TO GRADE A AREA BESMEAR BY DEATLOPERS ENGINEER ALL COSTS TO RELEGATE OR SUPE VERIFFY THE CORRECTED WILLBE ofaALL ENCLOSURESPAND BOXES, AND�SIGNOANSOe DATE DRAWI NA THANK SIGNED DATE PROJECT CONDITIONS STAMP Type(a) of Work: X] New Business ❑PC&E Maintenance & Construction Project Conditions: E]NONE APPARENT (x Project &elan cxongee, -,loot ME) or ❑CONDITIONS APPLY: PERMITS ❑ TAILSOARD ❑ OTHER (Prowde addNaml Inforreatlen on Ilea II e,.,Bellntl0 ADDER, BABG. 10/09/18 eQUILXE. NAME. NORROMBE IDI. DARE 4'ARBO HCECK AVENUE 14 J1 22 UPHU,CH FUTURE T -7299 -PH 4 m 31393566 LLD GST( �_j 0 SWR 5 Vt- o SWR 10 9 \ PHASE 5 26 1 27 on VA W 21 29 20 7 8 NOTES: APPLICANT TRENCH 1. CALL "USA" 2 WORKING DAYS BEFORE EXCAVATING. UNDERGROUND SERVICE ALERT DIAL 811 2. SPECIFIC CONDITIONS REQUIRED BY PG&E FOR JOINT TRENCH WORK ARE OUTLINED IN PG&E'S UTIUTY OPERATIONS STANDARD 55453. 3. BACKFILL MATERIAL REQUIREMENTS ARE DETAILED IN U.O. STANDARD S5453, EXHIBIT B. 4. PG&E INSPECTOR TO APPROVE ALL EXCAVATIONS AND TRENCHES (LOCATION AND BACKFILL MATERIAL) PRIOR TO BACKFILLING. 5. TRENCHING AGENT TO DISPOSE OF ALL SPOIL. B. MINIMUM COVER FROM FINAL GRADE REQUIRED FOR ALL FACIUTIES IN THE STREET AREA. 7. TRENCHING AGENT TO SECURE ALL PERMITS. 8. CONTRACTOR IS RESPONSIBLE FOR CROSSING EXISTING WATER, SEWER, AND STORM DRAIN LINES, EITHER UNDER OR OVER, AS REQUIRED TO MEET PG&E COVER AND CLEARANCE REQUIRMENTS. REFER TO G.S. STANDARD UO -55453 9. THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE TRENCH SPOIL WITH 100% SELECT BACKFILL AS REQUIRED BY PG&E SPECIFICATIONS, AND ANY LOCAL CITY, COUNTY, OR STATE REQUIREMENTS. 10. THE CONTRACTOR WILL BE REQUIRED TO PLACE TEMPORARY AND/OR PERMANENT PAVING IN ACCORDANCE WITH ANY LOCAL CITY, COUNTY, OR STATE REQUIREMENTS. 11. APPLICANT TO PROVIDE AND INSTALL ANY PROTECTION EQUIPMENT (BARRIER POSTS, FENCES, ETC...) REQUIRED BY PG&E. 12. THE APPLICANT/CONTRACTOR WILL ACCEPT RESPONSIBILITY OF MAINTENANCE OF THE TRENCH (E.G. COMPACTION, PAVING, ETC..) FOR A PERIOD OF TWO (2) YEARS OR AS SPECIFIED IN THE PERMIT, WHICHEVER IS LONGER. 13. TRENCHING AGENT MUST MAINTAIN A MINIMUM OF THREE (3) FEET BETWEEN THE CLOSEST EDGE OF ANY PARALLEL UTILITY TRENCH AND THE AND THE CLOSEST EDGE OF ANY WET FACILITY. 14. PG&E MUST RECEIVE THE INSPECTION CLEARANCE FROM THE CITY / COUNTY BUILDING INSPECTION DEPARTMENT, PRIOR TO THE GAS METER INSTALLATION. 15. FOR METER INSTALLATION CONTACT PG&E PROJECT REP. OR CUSTOMER CONTACT CENTER AT 1-800-743-5000 CONSTRUCTION NOTES: 1. CUSTOMER IS RESPONSIBLE FOR OBTAINING NECESSARY ENCROACHMENT PERMITS AS REQUIRED BY LOCAL CITY, COUNTY, OR STATE AUTHORITIES. 2. CUSTOMER WILL BE REQUIRED TO INSTALL APPROVED SHORING FOR ANY TRENCH ACCORDING TO STATE EXCAVATION SAFETY STANDARDS. 3. CUSTOMER WILL PERFORM ALL TRENCHING, BORING, SUBSTRUCTURE EXCAVATION, BACKFILLING, COMPACTION & PAVEMENT REPLACEMENT OPERATIONS AS NECESSARY . SCHEDULE TRENCH INSPECTION AT LEAST 48 HOURS IN ADVANCE OF TRENCHING. 4. CUSTOMER IS RESPONSIBLE FOR CROSSING EXISTING WATER, SEWER & STORM DRAINS, EITHER UNDER OR OVER, AS REQUIRED TO MEET PG&E COVER REQUIREMENTS AND 6" MINIMUM CLEARANCE. MAINTAIN AT LEAST 5' OF SEPARATION BETWEEN UTILITY TRENCH & ANY PARALLEL WATER, SEWER, OR STORM DRAIN TRENCH. 5. THE LOCATION OF ALL EXISTING OR NEWLY INSTALLED WATER, SEWER, STORM DRAIN OR OTHER LINES SHALL BE DETERMINED BY THE CUSTOMER. THE CUSTOMER SHALL NOT RELY ON PG&E TO LOCATE FACILITIES. (PG&E WILL LOCATE PG&E FACILITIES UPON PROPER USA NOTIFICATION.) CALL USA AT B11 AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 6. CUSTOMER WILL BE REQUIRED TO REMOVE & REPLACE TRENCH SPOIL WITH SELECT BACKFILL AS REQUIRED BY PG&E SPECIFICATIONS, & ANY LOCAL CITY, COUNTY, OR STATE REQUIREMENTS. 7. CUSTOMER WILL BE REQUIRED TO PLACE TEMPORARY AND/OR PERMANENT PAVING IN ACCORDANCE WITH ANY LOCAL CITY, COUNTY OR STATE REQUIREMENTS. 8. MAINTAIN MINIMUM OF 2' BETWEEN SPOIL BANK AND EDGE OF TRENCH. 9. CUSTOMER TO BACKFILL AND HAND TAMP DIRT AROUND RISER. 0 WORK SUMMARY LEGEND G qa a TRENCH -STREET AREA: nD! EXCAVATE/ TRENCH / BORE / 000 SACKFULPAW TELEPHONE TRENCH-PVT PROPERTY: CABLE TV EXCAVATE / TRENCH / BACKFILL COO GAS PIPE + GAS STUBS: FUTURE SERVICE COMPLETION PROVIDE + INSTALL 000 PERMIT -ENCROACHMENT: EXISTING UNDERGROUND FACILITY APPLY + SECURE 000 10 GAS PRIMARY ELECTRIC SECONDARY ELECTRIC TELEPHONE CABLE G PSTC gG' TRENCH FOOTAGE TRENCH IDENTIFIER CONTRACTOR CONSTRUCTION REFERENCES: 1. REFER TO GAS STANDARDS A-90 & A-91 FOR TYPICAL DIRECT BURIAL PLASTIC GAS MAIN AND SERVICE INSTALLATION. 2. REFER TO GAS STANDARDS A-90.1 & A-91.2 FOR TYPICAL PLASTIC GAS MAIN AND SERVICE INSERT CONSTRUCTION. 3. REFER TO GAS STANDARDS A-90.2 & A-90.3, D-12, D-13.1 & D-14 FOR TYPICAL ANODE & LOCATING WIRE INSTALLATION ON DIRECT BURIAL PLASTIC GAS MAIN AND SERVICES. 4. REFER TO GAS STANDARDS A-91.3 & A-91.4 FOR TYPICAL GAS SERVICE RISER INSTALLATION. 5. REFER TO GAS STANDARD A-34 FOR TEST CRITERIA ON GAS MAIN AND SERVICES. 6. PG&E TO PERFORM ALL HOT TIE-INS AND PURGING OF GAS PIPING PERGAS STANDARD A-38. ED, N VICINITY MAP CONSTRUCTION NOTE: GAS PIPELINE UNDERGROUND WARNING TAPE TO BE INSTALLED ABOVE GAS PIPE IN ALL TRENCHES AS SHOWN IN DETAIL BELOW. CAUTION CAUTION GAS LINE BURIED BELOW GAS PIPELINE UNDERGROUND WART NG TAPE CODE #578847. YELLOW TAPE WITH BLACK LETTERING. FINISH GRADE MIN. 12" WARNING TAPE INSTALLATION ZONE WARNING TAPE GAS PIPELINE ----,,MIN. 12" G PG&E REP. LARRY HOFF PHONE: 661-398-5712 ALL FIELD CHANGES REQUIRE PRIOR APPROVAL FROM: LEGEND G GAS P ELECTRIC PRIMARY S ELECTRIC SECONDARY/SERVICE T TELEPHONE C CABLE TV ------- SERVICE TRENCH ------- FUTURE SERVICE COMPLETION - - MAIN LINE TRENCH EXISTING UNDERGROUND FACILITY WTR PROPOSED OR EXISTING DOMESTIC WATER So PROPOSED STORM DRAIN -SWR- PROPOSED SANITARY SEWER I PROPOSED BELLHOLE 5'x 5'x 4' � PROPOSED PADMOUNT TRANSFORMER L 17" x 30" x 18" SECONDARY BOX CC 17" x 30" x 26" SECONDARY BOX [T3] 24" x 36" x 18" SECONDARY BOX / SLASH INDICATES CHANGE IN OCCUPANCY cPSTC1 INDICATES TRENCH FOOTAGE & OCCUPANCY 234 CONTRACTOR CONSTRUCTION REFERENCES: 1. REFER TO GAS STANDARDS A-90 & A-91 FOR TYPICAL DIRECT BURIAL PLASTIC GAS MAIN AND SERVICE INSTALLATION. 2. REFER TO GAS STANDARDS A-90.1 & A-91.2 FOR TYPICAL PLASTIC GAS MAIN AND SERVICE INSERT CONSTRUCTION. 3. REFER TO GAS STANDARDS A-90.2 & A-90.3, D-12, D-13.1 & D-14 FOR TYPICAL ANODE & LOCATING WIRE INSTALLATION ON DIRECT BURIAL PLASTIC GAS MAIN AND SERVICES. 4. REFER TO GAS STANDARDS A-91.3 & A-91.4 FOR TYPICAL GAS SERVICE RISER INSTALLATION. 5. REFER TO GAS STANDARD A-34 FOR TEST CRITERIA ON GAS MAIN AND SERVICES. 6. PG&E TO PERFORM ALL HOT TIE-INS AND PURGING OF GAS PIPING PERGAS STANDARD A-38. ED, N VICINITY MAP CONSTRUCTION NOTE: GAS PIPELINE UNDERGROUND WARNING TAPE TO BE INSTALLED ABOVE GAS PIPE IN ALL TRENCHES AS SHOWN IN DETAIL BELOW. CAUTION CAUTION GAS LINE BURIED BELOW GAS PIPELINE UNDERGROUND WART NG TAPE CODE #578847. YELLOW TAPE WITH BLACK LETTERING. FINISH GRADE MIN. 12" WARNING TAPE INSTALLATION ZONE WARNING TAPE GAS PIPELINE ----,,MIN. 12" G PG&E REP. LARRY HOFF PHONE: 661-398-5712 ALL FIELD CHANGES REQUIRE PRIOR APPROVAL FROM: UTILITY CONTACT TELEPHONE PG&E GAS BELINDA GURSKY (559) 347-5038 PG&E ELECTRIC NICK DENNISON (559) 347-5152 AT&TTELEPHONE DALEYOUNGBLOOD (661)631-3330 CHARTER GREG EOFF (661) 395-3351 6 5 4 3 2 1.8-7299 1.8-7299 Ph 5 rr� 0 1 INICH IO W Cn » Z W C\2 0 U InWin c M1a. =aW � a z ILL - (") U rn aD=w C' Z n W � to Cn W E --r w m r CCD m Gy w z 0 6 1.8-7299 1.8-7299 Ph 5 rr� 0 1 INICH IO E- » 0 InWin o =aW � a z ILL - (") U rn aD=w C' W n W Y E --r w m E- 1.8-7299 1.8-7299 Ph 5 rr� 0 1 INICH IO