HomeMy WebLinkAboutJim Burke Ford Overfill Results 11-14-2019CERS = California Environmental Reporting System, ID = Identification, UST = Underground storage tank, ICC = International Code Council, A/V = Audible and visual
UNDERGROUND STORAGE TANK
OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1)
Type of Action Installation Inspection Repair Inspection 36 Month Inspection
I. FACILITY INFORMATION
CERS ID
10023232
Date of Overfill Prevention Equipment Inspection
11/14/209
Business Name (Same as Facility Name or DBA-Doing Business As.)
Jim Burke Ford
Business Site Address
2001 Oak St
City
Bakersfield
ZIP Code
93301
II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION
Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification.)
Bradley Hinsley
Phone #
(661) 706 - 4321 Ext.
Contractor/Tank Tester License #
971259
ICC Certification #
8373948
ICC Certification Expiration Date
8/10/2021
Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.)
Veeder-root
III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION
Inspection Method Used: Manufacturer Guidelines (Specify) Veeder-root
Industry Code or Engineering Standard (Specify)
Engineered Method (Specify)
Attach the inspection procedures and all documentation required to determine the results. # of Attached Pages:
Tank ID: (By tank number, stored product, etc.) 87
What is the tank inside diameter? (Inches) 96
Is the fill piping secondarily contained? Yes No Yes No Yes No Yes No
Is the vent piping secondarily contained? Yes No Yes No Yes No Yes No
Overfill Prevention Equipment Manufacturer(s) Veeder-Root
What is the overfill prevention equipment
response when activated? (Check all that apply.)
Shuts Off Flow Shuts Off Flow Shuts Off Flow Shuts Off Flow
Restricts Flow Restricts Flow Restricts Flow Restricts Flow
A/V Alarm A/V Alarm A/V Alarm A/V Alarm
Are flow restrictors installed on vent piping? Yes No Yes No Yes No Yes No
At what level in the tank is the overfill prevention
set to activate? (Inches from bottom of tank.) 81
What is the percent capacity of the tank at which the overfill prevention equipment activates? 90
Is the overfill prevention in proper operating
condition to respond when the substance
reaches the appropriate level?
Yes Yes Yes Yes
No (Specify in section V.) No (Specify in section V.) No (Specify in section V.) No (Specify in section V.)
IV. SUMMARY OF INSPECTION RESULTS
Overfill Prevention Inspection Results Pass Fail Pass Fail Pass Fail Pass Fail
V. COMMENTS
All items marked “Fail” must be explained in this section. Any additional comments may also be provided here.
VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION
I hereby certify that the overfill prevention equipment was inspected in accordance with California Code of Regulations, title 23, division 3,
chapter 16, section 2637.2 and all the information contained herein is accurate.
UST Service Technician Signature
If the facility has more components than this form accommodates, additional copies of this page may be attached.