Loading...
HomeMy WebLinkAbout1.2-7267 Phases 1 & 2 Record DrawingGENERAL NOTES 1. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT-OF-WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE RIGHT-OF-WAY AND INSURANCE AS REQUIRED SHALL BE PROVIDED PRIOR TO ISSUANCE OF BUILDING PERMIT. 2. ALL EXISTING IMPROVEMENTS, (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCING, ETC.) THAT ARE REMOVED, DAMAGED OR UNDERCUT SHALL BE REPAIRED OR REPLACED AS DIRECTED BY THE CITY ENGINEER. 3. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE WITH CITY OF BAKERSFIELD DRAWING ST -6. 4. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION THE CRY CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE (PHONE: 326-3049) FOR TESTING AND INSPECTION. 5. DPSI INC. SHALL NOT BE RESPONSIBLE OR LIABLE FOR UNAUTHORIZED CHANGES TO. OR USES OF THESE PLANS. ALL CHANGES TO THESE PLANS MUST BE APPROVED IN WRITING BY DPSI INC. 6. COMPACTION TESTS SHALL BE THE RESPONSIBILITY OF THE DEVELOPER/SUBDIVIDER/CONTRACTOR. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. 7. WHERE PROPOSED IMPROVEMENTS CONNECT TO EXISTING FACILITIES, THE CONTRACTOR SHALL, PRIOR TO THE BEGINNING OF CONSTRUCTION, VERIFY THE LOCATION (HORIZONTAL AND VERTICAL), SIZE AND TYPE OF THE EXISTING FACILITY. SHOULD THE ACTUAL LOCATION, SIZE OR TYPE DIFFER FROM THAT SHOWN ON THE PLANS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY FOR POSSIBLE DESIGN CHANGES. 8. UNDERGROUND FACILITIES KNOWN TO EXIST ARE SHOWN ON THE PLANS BASED ON AVAILABLE RECORDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION, LOCATION, PROTECTION AND REPAIR (IF DAMAGED DURING CONSTRUCTION) OF SAID FACILITIES. SHOULD UNDERGROUND FACILITIES BE ENCOUNTERED WHICH ARE NOT SHOWN ON THE PLANS OR DEVIATE FROM THE LOCATION SHOWN, THE CONTRACTOR SHALL PROMPTLY NOTIFY THE OWNER OF THAT FACILITY (IF APPROPRIATE) AND THE ENGINEER FOR POSSIBLE DESIGN CHANGES. 9. 48 HOURS PRIOR TO BEGINNING CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICES (1-800-227-2600) AND ARRANGE FOR FIELD LOCATION OF ALL EXISTING UNDERGROUND FACILITIES. 10. THE FOLLOWING CIN OF BAKERSFIELD STANDARD DETAILS, CURRENT EDITION, APPLY TO THESE PLANS: SW -1 SEWER LATERAL MARKER SW -4 TYPE "A" MANHOLES SW -5 FRAMES & COVERS FOR MANHOLES & CLEANOUTS SW -6 6" CLEANOUT SW -7 HOUSE CONNECTION D-14 STANDARD CATCH BASIN D-16 GUTTER DEPRESSIONS ST -6 PAVEMENT PATCHES ST -22 TRENCH BACKFILL & COMPACTION REQUIREMENTS 11. UNDERGROUND SERVICE ALERT SHALL BE CONTACTED TWO (2) WORKING DAYS PRIOR TO CONSTRUCTION. (1-800-642-2444) 12. 24 HOUR INSPECTION NOTICE - PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CITY CONSTRUCTION INSPECTION SECTION SHALL BE GIVEN AT LEAST 24 HOURS NOTICE. THE SECTION MAY BE NOTIFIED AT (661) 326-3049. t LEGEND: ASPHALT GB BC BEFORE CURVE GM BLDG �o E >< Il (E) PAVING BLOCK WALL GUY BRC BEGIN RETURN CURVE HB BVC BEGIN VERTICAL CURVE _ r NEW ASPHALT PAVING' yt; �5 JP (E) STORM DRAIN MANHOLE CABLE TELEVISION BOX CATCH MAX NEW STORM DRAIN MANHOLE BASIN MIN (E) SEWER MANHOLE CURB FACE Q NEW SEWER MANHOLE CENTERLINE OH (E) STREET LIGHT CHAIN LINK FENCE O—• NEW STREET LIGHT CORRUGATED METAL PIPE PB (E) SIGN CLEAN OUT (SEWER) PP (E) FIRE HYDRANT CONCRETE V (E) BLOWOFF VALVE DAYLIGHT -'- NEW SIGN DROP INLET + NEW STREET NAME SIGN DIAMETER. O (E) MONUMENT DRIVEWAY O• NEW MONUMENT END CURVE SL NEW WALL ELECTRIC + (E) STREET SIGN EDGE DIRT ROAD D STORM DRAIN EDGE OF PAVEMENT ---L-.------ (E) STORM DRAIN EDGE TRAVELED WAY S SANITARY SEWER EUCALYPTUS _ (E) SANITARY SEWER END VERTICAL CURVE TOE GRADED SLOPE (SEE GRADING PLAN) — - - — TRACT BOUNDARY FENCE TOP PROPERTY UNE / ROW LINE FINISH FLOOR DH' -- (E) OVERHEAD POWER FINISH GRADE —W— WATER LINE FIRE HYDRANT ® ® � PHASE LINE FLOW LINE CITY OF BAKERSFIELD, COUNTY OF KERN CALIFORNIA All IE PitAm 2- D ® MWN OF RECORD nLF -hiF ft_ i L. ALBERTOLOPE R.C.E. 67602 Ga of sa EXP 6130/11 n � I7 yrw Pt+AsE 1 R_ µ IF Y EC LL N 1µs1 . � y= i• L. ALBERTOLO EXP 6130/ 111 `i Tt EM i'A fi:G4D 1" �m �u n sv.\1 _....... - u Q,j7 1� J �1 nn� N. ... .�� .... _ u'T. .Cri'� t,LttC ±u^ Ci: E'LK 5F4`�E i 25 APPUM: L ALVD LOPEZ PATE R.C.e. x{4,7&R2 0 Q 0 APPRCNW. DAME-LPAVILL.A DATE a.C.E.470CS (W 0`1130/r0) �Q r APPROyED: MJt{LI'RN P• SNRW DA1T6 Rc-G # ?2118 (EXY. t24!'1116) j,� X 3/zz/r4 APP2o1/ED: L KLPOK10 LOFn ART6 RCE afolvoZ ABBREVIATIONS AC ASPHALT GB BC BEFORE CURVE GM BLDG BUILDING GRD BLKW BLOCK WALL GUY BRC BEGIN RETURN CURVE HB BVC BEGIN VERTICAL CURVE INV BW BACK OF WALK JP CAN CABLE TELEVISION BOX CATCH MAX CB BASIN MIN CF CURB FACE NG CL CENTERLINE OH CLF CHAIN LINK FENCE PL CMP CORRUGATED METAL PIPE PB CO CLEAN OUT (SEWER) PP CONC CONCRETE PVC DL DAYLIGHT RCP DI DROP INLET RR DIA DIAMETER. R/W DRV DRIVEWAY SS EC END CURVE SL ELEC ELECTRIC SW EDR EDGE DIRT ROAD SDMH EP EDGE OF PAVEMENT SSMH ETN EDGE TRAVELED WAY TC EUC EUCALYPTUS TELE EVC END VERTICAL CURVE TOE EX EXISTING TOG FNC FENCE TOP FF FINISH FLOOR TOW FG FINISH GRADE TYP FH FIRE HYDRANT VLT FL FLOW LINE WM FS FINISH SURFACE WV NOTE: ABBREVIATIONS SHOWN ABOVE MAY OR MAY NOT BE EVIDENT ON MAP. GRADE BREAK GAS METER GROUND GUY WIRE HOSE BIB INVERT ELEVATION JOINT POLE MAXIMUM MINIMUM NATURAL GRADE OVERHANG (EAVES) PIPELINE PULL BOX POWER POLE PLASTIC PIPE REINFORCED CONCRETE PIPE RAILROAD RIGHT OF WAY SANITARY SEWER STREET LIGHT T ,_ TELEPHONE V „_ i'- TOE OF SLOPE TOP OF GRATEf1; TOP OF SLOPE. ',''i . TOP OF WALL -V< s='"'fir TYPICAL VAULT WATER METER WATER VALVE --LMOND CREEK DRIVE— 9th APs Po Sill 1b s 1 z 11 z 1 ] 2b \ KEY MAP SCALE: 1"=200' QUANTITY _ROAD SHEET I SHEET TITLE ea w w x 2 a�� t 30. BERKSHIRE ROAD D 9qO 40. WILD MUSTANG DRIVE c� EA ARROWHEAD TRAIL COURT .j 6E4. WHISKEY CREEK DRIVE QUANTITY UNIT BUCKING BRONCO COURT 3764 8 DROVERS RUN ROAD 1 9 TUCKER CREEK ROAD - THUNDER MOUNTAIN LANE 3945 10 SNOWY RIVER DRIVE 1 11 ALMOND CREEK DRIVE 7 EA STANDARD MANHOLE (13'-16' DEEP) B EA 6" CLEAN OUT 6 EA RAISE MANHOLE TO GRADE y EA VIDEO SEWER 4450 LF TIE IN - MAIN 1 EA 04 N W CITY FIRE DEPARTMENT 2101 H STREET P& E PH: (877)743-7782 2 P- 06 BAKERSFIELD, CA 93301 O ~ N PH: (661)326-3911 BRIGHTHOUSE NETWORKS V V - PH: (661)323-4892 LLJ COB WATER RESOURCES DEPT. = Q W M Z N `M�'i L`_ :-�: BAKERSFIELD, CA 93311 PH: (661)616-5500 F 3' Y Lu_j PH: (661)326-3000 Z U f\\ N _ ~ UNDERGROUND UTILITY STATEMENT Ir c x Q THE EXISTENCE AND LOCATION OF ANY LLI s0 saU,J a sa Z n W ]o a a1 DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES m (fJ SHOWN AND ANY OTHER LINES NOT OF RECORD OR NOT SHOWN ON THIS DRAWING. ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF ANY SUCH y INFORMATION OR DATA. u) � w CALLING 811. ' m ¢ � DROVERS RUN R{O�AD�- u 43 �y�" TS Y .. y A 32 { N 41 p n 3e 37 Sa Q7 < D Sz 31 19 W yi d. u 0 u y 44 U 36 2] 38 +'{m d. Sa z] 31 2a 34 u eek v zi `- SNOWY RIVER DRIVE - u w u m n� r s u UJ z s a a +0 n 13 en u 13 11 +o s a ] e --LMOND CREEK DRIVE— 9th APs Po Sill 1b s 1 z 11 z 1 ] 2b \ KEY MAP SCALE: 1"=200' QUANTITIES DRAINAGE ITEMS QUANTITY DRAWING INDEX SHEET NUMBER SHEET TITLE CATCH BASIN UP TO 6' OPENING 1 TITLE SHEET CATCH BASIN 6.5' OPENING 2 NOTE SHEET 24" RCP 30. BERKSHIRE ROAD D 9qO 40. WILD MUSTANG DRIVE c� EA ARROWHEAD TRAIL COURT .j 6E4. WHISKEY CREEK DRIVE QUANTITY UNIT BUCKING BRONCO COURT 3764 8 DROVERS RUN ROAD 1 9 TUCKER CREEK ROAD - THUNDER MOUNTAIN LANE 3945 10 SNOWY RIVER DRIVE 1 11 ALMOND CREEK DRIVE QUANTITIES DRAINAGE ITEMS QUANTITY UNIT MANHOLES 5 EA CATCH BASIN UP TO 6' OPENING 4 FA CATCH BASIN 6.5' OPENING 1 EA 24" RCP F 18" RCP8' D 9qO F TIE-IN (EXISTING DRAIN INLET) c� EA TIE-IN (EXISTING STUB) 1 EA SANITARY SEWER QUANTITY UNIT 4" PVC 3764 LF 6" PVC 505 LF e" PVC 3945 LF STANDARD MANHOLE (6-8' DEEP) 1 EA STANDARD MANHOLE (9-12' DEEP) 7 EA STANDARD MANHOLE (13'-16' DEEP) B EA 6" CLEAN OUT 6 EA RAISE MANHOLE TO GRADE y EA VIDEO SEWER 4450 LF TIE IN - MAIN 1 EA REVIEWED: ENGINEERS STATEMENT I HEREBY CERTIFY THAT THESE PLANS AND a R.C.E. COMPLY HEY INCLUDE ALL pY^"'---"� I BOARD. AQE'A P. Ity NS AND ANY 1n AND DESIGN NO 26431 f2 (1 �'sp CIV\� eor CAE\f DATE APPROVED: /� \ � _ M T PUBLIC WORKS DIRECTOR� NICOLAS FIDLER-PUBLIC—CTOR R.C.E. #61069 DATE i WHITE LANE r �. DISTRICT BLVD HARRIS PANAMA o � Z O w w J W s NUMBER OF LOTS: 113 - 31.44 GROSS ACRES V o 0 a c� d OCA VICINITY MAP SCALE: N.T.S. PROJECT CONTACTS: OWNER / DEVELOPER RIVER RANCH COMMUNITY, LLC. 998 HOUSTON STREET, SUITE #C GROVER BEACH, CA 93433 (805) 481-4033 CIVIL: DIVERSIFIED PROJECT SERVICES INTERNATIONAL 1998 SANTA BARBARA AVE. SUITE 200 SAN LUIS OBISPO, CA 93401 PH: (805)250-2891 CONTACT: ALBERTO LOPEZ ALOPEZ®DPSIINC.COM SURVEY: DIVERSIFIED PROJECT SERVICES INTERNATIONAL 5351 OLIVE DRIVE SUITE 100 BAKERSFIELD, CA 93308 PH' (661)371-2800 CONTACT: ROLLAND VAN DE VALK RVANDEVALK® DPSI I NC.COM GEOTECH: KRAZAN & ASSOCIATES, INCL 2205 COY AVENUE BAKERSFIELD, CA 93307 PH: (661)837-9200 CONTACT: DAVID JAROSZ OSD: DIVERSIFIED PROJECT SERVICES INTERNATIONAL 1998 SANTA BARBARA AVE. SUITE 200 SAN LUIS OBISPO. CA 93401 PH: (805)250-2891 CONTACT: ALBERTO LOPEZ ALOPEZODPSIINC.COM LEGAL DESCRIPTION T BEING A SUBDIVISION OF LOT 18 & 23 OF SALES MAP OF THE LANDS OF KERN COUNTY LAND COMPANY FOR SEC. 29 T.30S, R.27E. ALSO BEING A PORTION OF THE S.W. 1/4 OF SEC. 29, T. 30 S., R. 27 E., M.D.B.M. IN THE CITY OF BAKERSFIELD, COUNTY OF KERN, STATE OF CALIFORNIA. BENCHMARK TOP OF CONCRETE MONUMENT AT THE INTERSECTION OF PINE FLAT DRIVE AND THE NORTH BOUNDARY OF TRACT MAP No. 6359 PHASE 2. ELEVATION = 344.54 (U.S.G.S. DATUM PER TR -6359-2 IMPROVEMENT PLANS) BASIS OF BEARINGS THE BEARING OF S 89'17'52' E FOR THE SOUTH LINE OF THE S.W. 1/4 OF SECTION 29, T.30S., R.27E. M.D.M. (AND BEING THE CENTERLINE OF McCUTCHEN ROAD) PER TRACT NO. 6359 WAS USED AS FOR THE BASIS OF BEARING SHOWN ON THIS MAP. SITE INFORMATION a < g T f Z APN: 540-010-170 & 540-010-14 w J W NUMBER OF LOTS: 113 - 31.44 GROSS ACRES V Orya✓ a PHASE I - 57 LOTS - 16.29 GROSS d PHASE II - 56 LOTS - 15.45 GROSS ACRES J a_ LL Q BEING A SUBDIVISION OF LOT 18 & 23 OF SALES MAP OF THE LANDS OF KERN COUNTY LAND COMPANY FOR SEC. 29 T.30S, R.27E. ALSO BEING A PORTION OF THE S.W. 1/4 OF SEC. 29, T. 30 S., R. 27 E., M.D.B.M. IN THE CITY OF BAKERSFIELD, COUNTY OF KERN, STATE OF CALIFORNIA. BENCHMARK TOP OF CONCRETE MONUMENT AT THE INTERSECTION OF PINE FLAT DRIVE AND THE NORTH BOUNDARY OF TRACT MAP No. 6359 PHASE 2. ELEVATION = 344.54 (U.S.G.S. DATUM PER TR -6359-2 IMPROVEMENT PLANS) BASIS OF BEARINGS THE BEARING OF S 89'17'52' E FOR THE SOUTH LINE OF THE S.W. 1/4 OF SECTION 29, T.30S., R.27E. M.D.M. (AND BEING THE CENTERLINE OF McCUTCHEN ROAD) PER TRACT NO. 6359 WAS USED AS FOR THE BASIS OF BEARING SHOWN ON THIS MAP. SITE INFORMATION a < g T MWDIAL TOLL FREE 811 OR (1-800-227-2600) AT LEAST TWO DAYS BEFORE YOU DIG RG UNDEROUND SERVICE ALERT OF CALJFORNLA CITY RECORDS NO: R T m N m H .r W � w V 0 O O u Z APN: 540-010-170 & 540-010-14 NUMBER OF LOTS: 113 - 31.44 GROSS ACRES V a PHASE I - 57 LOTS - 16.29 GROSS J PHASE II - 56 LOTS - 15.45 GROSS ACRES J Q UTILITIES: z 0 H— W S ` 04 N W CITY FIRE DEPARTMENT 2101 H STREET P& E PH: (877)743-7782 2 P- 06 BAKERSFIELD, CA 93301 O ~ N PH: (661)326-3911 BRIGHTHOUSE NETWORKS V V PH: (661)323-4892 LLJ COB WATER RESOURCES DEPT. = Q W 1000 BUENA VISTA ROAD TW TELECOM V ccJ :-�: BAKERSFIELD, CA 93311 PH: (661)616-5500 Lu_j PH: (661)326-3000 Z c _ ~ UNDERGROUND UTILITY STATEMENT Ir c x Q THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE LLI PLANS ARE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE > Z THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THIS MAP.It a THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES (fJ SHOWN AND ANY OTHER LINES NOT OF RECORD OR NOT SHOWN ON THIS DRAWING. ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF ANY SUCH INFORMATION OR DATA. UNDERGROUND SERVICE ALERT SHALL BE CONTACTED TWO WORKING DAYS PRIOR TO CONSTRUCTION BY CALLING 811. ' MWDIAL TOLL FREE 811 OR (1-800-227-2600) AT LEAST TWO DAYS BEFORE YOU DIG RG UNDEROUND SERVICE ALERT OF CALJFORNLA CITY RECORDS NO: R T m N m H .r W � w V 0 O O u STORM DRAIN NOTES: 1. CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY TO COMPLETE INSTALLATION. 2. UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST TWO (2) WORKING DAYS BEFORE COMMENCEMENT OF CONSTRUCTION . TELEPHONE 1-800-277-2600. 3. CONTRACTOR TO CALL FOR USA LOCATE AND POTHOLE ALL MARKED UTILITIES THAT CROSS OR ARE WITHIN FIVE FEET (5) HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES. VERTICAL AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY EXCAVATIONS TO VERIFY THAT THE PROPOSED DESIGN DOES NOT CONFLICT WITH ANY UTILITIES. IN THE EVENT A CONFLICT EXISTS THE ENGINEER SHALL BE NOTIFIED IN ORDER TO REDESIGN THE ALIGNMENT. IF RELOCATION OF EXISTING UTILITIES IS DEEMED NECESSARY THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF THE ALIGNMENT REQUIRES ADDITIONAL FITTINGS, PIPE OR EXCAVATION THE CONTRACTOR SHALL BE COMPENSATED FOR REVISION. IN THE EVENT A UTILITY IS DAMAGED THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ITS REPAIR. 4. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF DRAIN LINES THAT NEW SYSTEM TIES INTO PRIOR TO TRENCHING. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER SO THAT ANY NECESSARY ADJUSTMENTS MAY BE MADE. UTILITIES SHALL BE THOROUGHLY RESEARCHED AND LOCATED BY CONTRACTOR PRIOR TO TRENCHING. CROSSING UTIUTIES SHALL BE DAYUGHTED AND CHECKED FOR GRADE, BY CONTRACTOR, PRIOR TO TRENCHING. 5. ALL EXISTING IMPROVEMENTS, (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCES, ETC.) THAT ARE REMOVED, DAMAGED, OR UNDERCUT SHALL BE REPAIRED OR REPLACED AS DIRECTED BY THE ENGINEER OR CITY ENGINEER AS APPUCABLE. 6. STANDARD DETAILS: THE FOLLOWING CITY OF BAKERSFIELD STANDARDS SHALL BE CONSIDERED PART OF THESE PLANS: D-11, D-12, D-13, 0-14, D-16, D-17, SW -6, D-18, ST -17 7. ABS PIPE INSTALLATION- .. MATERIALS: PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATIONS D-2680 AND D-2751. PIPE AND FITTINGS SHALL BE HOMOGENOUS THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LINE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. b. JOIN'(S; USE ONLY SOLVENT WELDED JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS, WHERE PVC PIPE CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. c. INSTALLATION' PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS I, II, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. B. PVC PIPE INSTALLATION - a. MATERIALS: PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATION D-3034 FOR SDR35. PIPE AND FITTINGS SHALL BE HOMOGENOUS THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LINE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. b. JOINTS: USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS, WHERE PVC PIPE CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CIN OF BAKERSFIELD. c. INSTALLATION: PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION 0-2321. ONLY CLASS I, II, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 9. LRENCH EXCAVATION - THE EXCAVATION OF TRENCHES FOR PIPING LAID IN THE GROUND SHALL BE IN OPEN -CUT FROM THE SURFACE OF THE GROUND EXCEPT WHERE BORING IS REQUIRED. THE TRENCHES SHALL BE OF WIDTH AS SHOWN ON THE STANDARD ST -22 AND DETAILED SECTIONS ON THE PLANS FOR PROPER PIPE INSTALLATION. THE HOLES FOR BELLS AND FITTINGS SHALL BE EXCAVATED BY HAND, TO A WIDTH PROVIDING UNIFORM BEARING ALONG THE LENGTH OF THE PIPE. R IS THE INTENTION OF THESE REQUIREMENTS TO PROVIDE FIRM, UNIFORM BEARING FOR THE PIPE. CONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE WITH THE DETAILED SECTIONS PROVIDED IN THE PLANS. SELECTION OF TRENCH TYPES WILL BE AS REQUIRED BY THE TYPES OF PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL MEET CIN STANDARD ST -22. PIPE INSTALLATION FOR THE BUENA VISTA TRUNK SEWER, PHASE I SHALL MEET REQUIREMENTS AS OUTLINED IN THE PIPE OPTIONS, BUT IN NO CASE SHALL BE LESS THAN ASTM CLASS D TRENCH REQUIREMENTS. TRENCH LINES SHALL MEET ALL FEDERAL AND STATE SAFETY REQUIREMENTS. 10. BRACING AND SHORING - EXCAVATION SHALL BE SUPPORTED AS SET FORTH IN THE RULES, ORDERS, AND REGULATIONS OF THE STATE DIVISION OF INDUSTRIAL SAFETY. IF THE CONTRACTOR DESIRES TO DEVIATE FROM THE SAFETY ORDERS, HE SHALL SUBMIT DATA BY A REGISTERED CIVIL ENGINEER TO THE STATE DIVISION OF INDUSTRIAL SAFETY, JUSTIFYING THE ALTERNATE PROCEDURES TO BE USED. FAILURE TO COMPLY WITH ANY OF THESE RULES, ORDERS AND REGULATIONS SHALL BE SUFFICIENT CAUSE FOR THE STATE DIVISION TO IMMEDIATELY SUSPEND ALL WORK. COMPENSATION FOR LOSSES INCURRED BY THE CONTRACTOR SUCH AN EMERGENCY SUSPENSION SHALL NOT BE ALLOWED DURING BACKFILING, THE BOTTOM LINE OF THE SHORING SHALL BE KEPT ABOVE THE LEVEL OF THE BACKFILL AT ALL TIMES. SECTION 6422 OF THE CALIFORNIA LABOR CODE REQUIRED THE CONTRACTOR TO SUBMIT TO THE ENGINEER A DETAILED PLAN, DRAWING OF DESIGN OF SHORING, BRACING, SLOPING OR OTHER PROVISIONS TO BE MADE BY THE CONTRACTOR FOR THE PURPOSE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF TRENCHES NECESSARY FOR THE CONSTRUCTION OF THE PROJECT. IF SUCH PLAN VARIES FROM THE ORDERS, THE PLANS SHALL BE PREPARED AND CERTIFIED BY A REGISTERED CIVIL OR STRUCTURAL ENGINEER; HOWEVER, USE OF SYSTEMS THAT ARE LESS EFFECTIVE THEN THOSE REQUIRED BY THE CONSTRUCTION SAFETY ORDERS IS PROHIBITED ON THIS PROJECT. 11. TRENCH BACKFILL TRENCHES SHALL NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED (300) FEET IN ADVANCE OF PIPE LAYING OPERATIONS, OR TWO HUNDRED (200) FEET TO THE REAR THEREOF, UNLESS OTHERWISE PERMITTED BY THE ENGINEER. ALL WORK SHALL CONFORM TO THE APPLICABLE SECTIONS OF THE STANDARD SPECIFICATIONS, DATED JULY, 1992. BEDDING CLASS SHALL BE AS SPECIFIED IN THE PIPE OPTIONS. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL BE IN ACCORDANCE WITH CITY STANDARD ST -22, EXCEPT THAT COMPACTION SHALL BE NO LESS THAN NINETY PERCENT (909) UP TO THIRTY INCHES (30') FROM FINISHED GRADE. BACKFILL MATERIALS IN THE PIPE ZONE SHALL BE PLACED IN LAYERS NOT TO EXCEED TWELVE INCHES (12") SIMULTANEOUSLY, ON EACH SIDE OF THE PIPE, IN SUCH A MANNER AS NOT TO DAMAGE OR DISTURB THE PIPE OR ITS ALIGNMENT AND GRADE. BACKFILL MATERIAL ABOVE THE PIPE ZONE SHALL BE FREE OF DELETERIOUS MATERIALS AND LUMPS OR STONES EXCEEDING THREE INCHES (3") IN GREATEST DIMENSION AND SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN INCHES (18'). EACH LAYER SHALL BE THOROUGHLY COMPACTED BY VIBRATORY OR MECHANICAL TAMPING, OR BY A COMBINATION OF THESE METHODS FLOODING AND JETTING SHALL NOT BE ALLOWED. THERE MUST BE AT LEAST ONE FOOT OF COVER OVER THE PIPE BEFORE COMPACTION ABOVE THE PIPE ZONE WILL BE ALLOWED. IMPORTED BEDDING AND BACKFILL MATERIAL SHALL BE OBTAINED. AND ANY EXCESS BEDDING AND BACKFILL MATERIAL SHALL BE DISPOSED, BY ANY LEGAL MEANS AT THE DISPOSAL OF THE CONTRACTOR. THE CONTRACTOR MAY SUBMIT TO THE ENGINEER SIEVE ANALYSIS FOR UTILIZATION OF IN-PLACE MATERIALS. ACHIEVING FIRM BEDDING Ki.QW PIPE SPRINGLINE- CONTRACTOR INGLINECONTRACTOR SHALL PROVIDE "FIRM BEDDING" SUPPORT FOR THE PIPE BELOW THE SPRINGLINE. FIRM BEDDING MEANS THAT THE PIPE MUST REST ON THE GRANULAR MATERIAL SPECIFIED PREVIOUSLY IN THE SPECIFICATIONS. BELL OR COUPLING HOLES SHALL BE CAREFULLY EXCAVATED AT PROPER INTERVALS SO THAT NO PART OF THE LOAD IS SUPPORTED BY THE BELLS OR COUPLINGS. DURING BEDDING AND BACKFILLING, CONSOLIDATION OF MATERIAL AROUND AND UNDER BELLS AND COUPLINGS SHALL BE AVOIDED. CONTRACTOR SHALL SHOVEL -SLICE OR HAND TAMP BEDDING IN THE HAUNCH AREAS, AS THIS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS, SHOVEL -SLICING OR HAND TAMPING SHALL BE DONE BEFORE THE BEDDING BROUGHT UP TO THE QUARTER POINT OF THE PIPE. INITIAL BACKFILL "BEDDING MATERIALAS SPECIFIED BY ASTM 2321-8 SHALL BE USED IN THE PIPE ZONE FOR THE INITIAL BACKFILL AFTER THE PIPE HAS BEEN PROPERLY LAID AND INSPECTED, INITIAL BACKFILL SHALL BE PLACED ON BOTH SIDES AND OVER THE PIPE TO SUCH A DEPTH THAT, AFTER THOROUGH CONSOLIDATION, THE FINAL DEPTH SHALL BE AT LEAST TO THE ELEVATION SHOWN ON THE PLANS. THE MATERIAL SHALL BE CONSOLIDATED BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND MANNER OF TAMPING MUST BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO COMMENCING OPERATIONS. IMPACT EQUIPMENT MAY BE ALLOWED UNDER THE DIRECTION OF THE ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THE USE OF THIS EQUIPMENT. HYDRA -HAMMER WILL NOT BE PERMITTED. SUBSEQUENT BACKFILL' ABOVE THE LEVEL OF INITIAL BACKFILL, THE TRENCH MAY BE BACKFILLED WITH NATIVE MATERIAL RESULTING FROM TRENCH EXCAVATION, OR AT THE OPTION OF THE CONTRACTOR, SELECT IMPORTED MATERIALS MAY BE USED. NATIVE MATERIAL OR IMPORTED MATERIAL MAY BE COMPACTED BY TAMPING AND/OR ROLLING, USING EQUIPMENT AND METHODS APPROVED BY THE ENGINEER. WHEN THE CONTRACTOR COMPACTS BY TAMPING AND/OR ROLLING, THE BACKFILL MATERIAL SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES IN LOOSE DEPTH, EACH LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROLLING BEFORE SUBSEQUENT LAYERS ARE PLACED. COMPACTION OF SUBSEQUENT BACKFILL WITHIN TWO AND ONE-HALF (2.5) FEET OF FINISHED PERMANENT SURFACE GRADE SHALL BE ACCOMPLISHED BY TAMPING AND/OR ROLLING AS SPECIFIED ABOVE. WHERE THE TRENCH IS WITHIN THE PAVEMENT ON STREETS, THE BACKFILL WITHIN TWO AND ONE-HALF (2.5) FEET OF FINISHED PERMANENT GRADE SHALL BE COMPACTED TO NINETY PERCENT (909) MAXIMUM RELATIVE DENSITY. SUBSEQUENT BACKFILL PLACED BY TAMPING AND/OR ROLLING SHALL BE FREE FORM STONES OF LUMPS EXCEEDING THREE (3) INCHES IN GREATEST DIMENSION, VEGETABLE MATTER, OR OTHER UNSATISFACTORY MATERIALS. IN NO CASE SHALL JETTING BE ALLOWED FOR BACKFILL COMPACTION WITHIN THE STREET. WHEN APPROVED BY THE ENGINEER JETTING MAY BE USED IN NON -STREET AREAS. BACKFILL AND TESTING AND COMPACTION - TESTING OF BACKFILL MATERIALS AND COMPACTION SHALL BE INACCORDANCE WITH SECTION I19, F "EARTHWORK" AND SECTION 6-3 "TESTING" OF THE STANDARD SPECIFICATIONS, BA STATE AT CALIFORNIA DEPARTMENT IO PUBLIC WORKS DIVISION G HIGHWAYS. EACH LAYER OF BACKFILL MATERIAL K LL AERIAL SHALL MEET THE COMPACTION, SAND EQUIVALENT, AND GRADATION REQUIREMENTS BEFORE THE NEXT LAYER IS PLACED. EACH LAYER OF BACKFILL SHALL BE THOROUGHLY COMPACTED TO THE RELATIVE COMPACTION CTIO OF NOT LESS THAN IS SHOWN ON CIN OF BAKERSFIELD STANDARD DETAIL 5-39, EXCEPT THAT COMPACTION WITHIN THE ROADWAY STRUCTURAL SECTION SHALL BE NO LESS THAN NINETY PERCENT (909) MAXIMUM RELATIVE DENSITY FOR THE TOP FINISHED THIRTY INCHES (30") AND SHALL BE DETERMINED BY CALIFORNIA TEST METHODS 216 AND 231, OR ASTM (CURRENT EDITION) D1557, AND ONE OF THE FOLLOWING D2922 OR D1556. COMPACTION TESTS SHALL BE THE RESPONSIBILITY OF THE DEVELOPER / SUBDIVIDER / CONTRACTOR. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. IF THE RELATIVE COMPACTION, AS DETERMINED BY TESTING, FAILS TO MEET THE SPECIFIED PERCENTAGE, THE TRENCH SHALL BE RE -EXCAVATED AND RE -COMPACTED. 12. STORM DRAIN PIPE CONTRACTOR SHALL UTILIZE REINFORCED CONCRETE PIPE (RCP), CLASS III WITH RUBBER GASKET JOINTS, UNLESS OTHERWISE NOTED ON THE PLANS. REINFORCED CONCRETE PIPE REINFORCED CONCRETE PIPE SHALL CONFORM TO THE PROVISIONS IN SECTION 65, "REINFORCED CONCRETE PIPE', OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. EXCEPT AS OTHERWISE DESIGNATED BY CLASSIFICATION ON THE PLANS OR IN THE SPECIFICATIONS, JOINTS FOR CULVERT AND DRAINAGE PIPES SHALL CONFORM TO THE PLANS OR SPECIFICATIONS FOR STANDARD JOINTS. HYDROSTATIC TESTS SPECIFIED BY SECTION 65-1.08 "LAYING SIPHON AND PRESSURE PIPE', OF THE STANDARD SPECIFICATIONS WILL NOT BE REQUIRED. REINFORCED CONCRETE PIPE SHALL HAVE RUBBER GASKETED JOINTS CONFORMING TO SECTION 65-1.06B, "RUBBER GASKETED JOINTS', OF THE STANDARD SPECIFICATIONS. HANDLING OF MATERIALS: ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS. SPECIAL CARE SHALL BE EXERCISED SO THAT PERFORMED RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING: NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE PIPE MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE STORM DRAIN OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE AND TO PREVENT CLOSE SUDDEN OFFSETS IN THE FLOWLINE. AS THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL FIRST AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE. AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY SUFFICIENT SIZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING STORM DRAIN LINE. CUTTING PIPE, THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SPECIAL CASTING IF NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. 13. BORED/JACKED PIPE - CASING OR SMOOTH OUTSIDE WALLED PIPE FOR BORED/JACKED PIPE SHALL BE INSTALLED. IT SHALL HAVE EVEN BEARING THROUGHOUT ITS LENGTH AND SHALL SLOPE TOWARD ONE END. SPACE BETWEEN CASING AND PIPELINE SHALL BE BACKFILLED WITH SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE CASING ALSO SHALL BE BACKFILLED WITH GROUT OR SAND. THE ENDS OF SPACE BETWEEN THE CASING AND THE PIPE SHALL BE SEALED WITH GROUT. THE STRENGTH OF PIPE DESIGNATEDSTRENGTH IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL LOAD ONLY. ANY ADDITIONAL STRENGTH REQUIRED BY BORING/JACKING OPERATIONS SHALL BE FURNISHED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OR BORING/JACKING OPERATIONS PRIOR T MM BORING KI OPERATIONS. 0 COMMENCING NG BO i G AND JACKING 0 E ONS. BORING/JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER, CONSISTENT WITH CURRENT ACCEPTED PROCEDURES. WATER BORING SHALL NOT BE PERMITTED. THE CASING PIPE SHALL BE JACKED WITH SUCH PRECISION THAT WILL ALLOW THE REPLACEMENT OF THE PIPELINE TO THE LINE AND GRADE AS INDICATED ON THE PLANS. UPON COMPLETION OF THE INSTALLATION OF THE CASING AND INSTALLATION OF THE PIPELINE TO GRADE. THE VOID BETWEEN THE CASING OR RC PIPE AND EXCAVATION SHALL BE COMPLETELY FILLED WITH SAND, COMPACTED BY THE USE OF AIR -BLOWING SAND EQUIPMENT, OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HER APPROVAL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERATION AT ALL TIMES. SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DANGEROUS OR UNREASONABLE SLOUGHING OF ANY MATERIAL WHICH MAY JEOPARDIZE THE SAFETY OF WORKERS OR THE STABILITY OF THE SOIL AND ROADWAY ABOVE, THE CONTACTOR SHALL FURNISH AND INSTALL BREASTBOARDING AND/OR FACE -CLOSURE WITH SUFFICIENT JACKS TO INHIBIT THE SLOUGHING AND/OR CLOSING OF THE WORK FACE. THE CONTRACTOR, BEFORE RESUMING WORK, SHALL FURNISH THE ENGINEER WITH A DETAILED PLAN OF PROCEEDING WITH THE WORK, FOR HER REVIEW AND APPROVAL. ANY AND ALL EXPENSES THEREFORE WILL BE CONSIDERED INCLUDED IN THE BID PRICE AND NO ADDITIONAL COMPENSATION WILL BE MADE. 14. MINOR STRUCTURES PORTLAND CEMENT CONCRETE MINOR STRUCTURES SHALL CONFORM IN DESIGN, MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF SECTIONS 70-1.02 H OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. MANHOLES SHALL CONFORM TO THE CIN OF BAKERSFIELD STANDARDS D-18 AND D-19. DROP INLET SHALL CONFORM TO THE CIN OF BAKERSFIELD STANDARD D-14. TEMPORARY GRATED INLETS SHALL CONFORM TO DETAILS ON THE PLANS. THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE STRENGTH REQUIREMENT OF ASST. C-478. EACH SUCCESSIVE MANHOLE SECTION SHALL BE SET ON A BED OF PORTLAND CEMENT GROUT OR "KENT SEAL' TO MAKE A WATERTIGHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET PLUMB. 15. AQJUST SURVEY MONUMENT ENCASEMENTS- SURVEY NCASEMENTSSURVEY MONUMENT AND FRAME AND COVER WITH ENCASEMENTS SHALL BE ADJUSTED OR INSTALLED NEW TO FINISH GRADE AT THE LOCATIONS SHOWN ON THE PLANS, IN ACCORDANCE WITH THESE SPECIAL PROVISIONS, AND CITY STANDARDS ST -13. THE SURFACE OF THE CONCRETE SHALL BE PROTECTED FROM PUBLIC TRAFFIC FOR A MINIMUM OF THREE DAYS. AT THE OPTION OF THE CONTRACTOR, MINOR CONCRETE CONTAINING A MINIMUM OF SEVEN STACKS OF CEMENT PER CUBIC YARD MAY BE USED, AND THE TIME REQUIRED FOR PROTECTION OF THE CONCRETE SURFACE FROM PUBLIC MAY BE REDUCED TO A MINIMUM OF ONE DAY. THE MONUMENT WILL BE SET BY OTHERS. THE OWNER WILL PROVIDE BOUNDARY AND CONSTRUCTION SURVEYING. CONTRACTOR SHALL GIVE THE OWNER 24 HOURS NOTICE WHEN SURVEYING IS REQUIRED. ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HIS OPERATIONS SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER. 16. DUST CONTROL: CONTRACTOR SHALL OBTAIN A COPY OF THE DUST CONTROL PLAN (DCP) FOR THIS PROJECT FROM THE DEVELOPER, AND SHALL KEEP A COPY ON SITE AT ALL TIMES. FOR THE DURATION OF CONTRACTOR'S OCCUPANCY OF THE SITE, CONTRACTOR IS REQUIRED TO COMPLY WITH THE PROVISIONS OF SAID PLAN. 17. STORM WATER POLLUTION PREVENTION - CONTRACTOR SHALL OBTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR THIS PROJECT FROM THE DEVELOPER, AND SHALL KEEP A COPY ON SITE AT ALL TIMES. FOR THE DURATION OF CONTRACTOR'S OCCUPANCY OF THE SITE, CONTRACTOR IS REQUIRED TO COMPLY WITH THE PROVISIONS OF SAID PLAN. 18. NO CIN INSPECTIONS WILL BE GIVEN FOR THE WORK IN THIS AREA UNTIL A SUBDIVISION PERMIT WITH APPROPRIATE SECURITY AND INSURANCE HAVE BEEN OBTAINED. 19. ANY ITEMS IN PUBLIC RIGHT-OF-WAY THAT ARE DAMAGED OR DO NOT MEET CURRENT STANDARDS SET BY PUBLIC WORKS WILL REQUIRE REPAIRING AND/OR UPGRADING AS PER CITY ENGINEER. ;'x,` 2 cl ,j2 0 I WI�"� ®t� RECORD ,, � Oi-0 L T G 2 +rf7FC� I. LBEATO LO 3' R.C.E. 67SD� EXP fg01A SEWER NOTES: 1. CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY TO COMPLETE INSTALLATION, 2. UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST TWO (2) WORKING DAYS BEFORE COMMENCEMENT OF CONSTRUCTION. TELEPHONE 1-800-277-2600. 3. CONTRACTOR TO CALL FOR USA TO LOCATE AND POTHOLE ALL MARKED UTILITIES THAT CROSS OR ARE WITHIN FIVE FEET (5') HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES. VERTICAL AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY EXCAVATIONS TO VERIFY THAT THE PROPOSED DESIGN DOES NOT CONFLICT WITH ANY UTILITIES. IN THE EVENT A CONFLICT EXISTS, DPSI SHALL BE NOTIFIED IN ORDER TO REDESIGN THE ALIGNMENT. IF RELOCATION OF EXISTING UTILITIES IS DEEMED NECESSARY, THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF THE ALIGNMENT REQUIRES ADDITIONAL FITTINGS, PIPE OR EXCAVATION, THE CONTRACTOR SHALL BE COMPENSATED FOR REVISION. IN THE EVENT A UTILITY IS DAMAGED, THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ITS REPAIR. 4. SYSTEM TIES NECESSARY CONTRACTOR BY 5. ALL EXISTING IMPROVEMENTS, (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCES, ETC.) THAT ARE REMOVED, DAMAGED OR UNDERCUT SHALL BE REPAIRED OR REPLACED AS DIRECTED BY DPSI OR CITY ENGINEER AS APPLICABLE. 6. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DETAILS ST -6, EXCEPT AS NOTED ON THE PLANS. 7. STANDARD DETAILS: THE FOLLOWING CITY OF BAKERSFIELD STANDARDS SHALL BE CONSIDERED PART OF THESE PLANS: SW -1 AND SW -5. 8. VCP INSTALLATION - 8' 1 NSTALLATION:8.1 MATERIALS: THE PIPE AND FITTINGS SHALL BE EXTRA STRENGTH VITRIFIED CLAY CONFORMING TO CURRENT ASTM SPECIFICATION C-700 AND SHALL BE INSTALLED IN CONFORMANCE WITH THE PROVISIONS OF SECTION 71 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION AND THE CURRENT ASTM SPECIFICATIONS C-12. 8.2 JOINTS; THE PIPE AND FITTINGS SHALL HAVE A SOCKET END AND A SPIGOT END WITH COMPRESSION JOINTS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. 8.3 FITTINGS: THE PIPE AND FITTINGS FOR 6 8, 10", AND 12" SANITARY SEWER MAINS MAY BE PLAIN -ENDED WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425, EXCEPTING THAT A STAINLESS STEEL SHEAR RING AS MANUFACTURED BY MISSION CLAY PRODUCTS CORPORATION FOR THEIR "MAINLINE" BANDSEAL COMPRESSION COUPLING, OR APPROVED EQUAL SHALL BE REQUIRED. THE PIPE AND FITTINGS FOR PRIVATE SANITARY SEWER HOUSE OR BUILDING MATERIALS MAY BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. (STAINLESS STEEL, SHEAR RINGS ARE NOT REQUIRED). 9. ABS PIPE INSTALLATION: 9.1 MATERIALS: PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATIONS D-2680 AND D-2751. PIPE AND FITTINGS SHALL BE HOMOGENOUS THROUGHOUT AND FREE FROM CRACKS, HOLES, AND FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LINE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. 9.2 JOINTS: USE ONLY SOLVENT WELDED JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS, WHERE PVC PIPE CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. 9.3 INSTALLATION: PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS 1. II AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 10. PVC PIPE INSTALLATION: 10.1 MATERIALS: PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT A Q E SM SPECIFICATION D-3034 FOR SDR35. PIPE AND FITTINGS SHALL S HOMOGENOUS THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. Ff1ARE SHALL MI INJECTION MOLDED AND SHALL BE INSTALLED IN UNE ON NEW PIPELINES: CUT -IN FITTINGS ARE NOT PERMITTED. 10.2 JOINTS, USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS, WHERE PVC PIPE CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CIN OF BAKERSFIELD. 10.3 INSTALLATION: PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321, ONLY CLASS I, II, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 11. TRENCH EXCAVATION: THE EXCAVATION OF TRENCHES FOR PIPING LAID IN THE GROUND SHALL BE IN OPEN -CUT FROM THE SURFACE OF THE GROUND EXCEPT WHERE BORING IS REQUIRED. THE TRENCHES SHALL BE OF WIDTH AS SHOWN ON THE STANDARDS ST -22 AND DETAILED SECTIONS ON THE PLANS FOR PROPER PIPE INSTALLATION. THE HOLES FOR BELLS AND FIRINGS SHALL BE EXCAVATED BY HAND, TO A WIDTH PROVIDING UNIFORM BEARING ALONG THE LENGTH OF THE PIPE. IT IS THE INTENTION OF THESE REQUIREMENTS TO PROVIDE FIRM, UNIFORM BEARING FOR THE PIPE. CONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE WITH THE DETAILED SECTIONS PROVIDED IN THE PLANS. SELECTION OF TRENCH TYPES WILL BE AS REQUIRED BY THE TYPES OF PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN AND UTILITY CONDUIT INSTALLATION SHALL MEET CITY STANDARD ST -22. PIPE INSTALLATION FOR THE BUENA VISTA TRUNK SEWER, PHASE I SHALL MEET REQUIREMENTS AS OUTLINED IN THE PIPE OPTIONS, BUT IN NO CASE SHALL BE LESS THAN ASTM CLASS D TRENCH REQUIREMENTS. TRENCH LINES SHALL MEET ALL FEDERAL AND STATE SAFETY REQUIREMENTS. 12. BRACING AND SHORING: EXCAVATION SHALL BE SUPPORTED AS SET FORTH IN THE RULES, ORDERS, AND REGULATIONS OF THE STATE DIVISION OF INDUSTRIAL SAFETY. IF THE CONTRACTOR DESIRES TO DEVIATE FROM THE SAFETY ORDERS, HE SHALL SUBMIT DATA BY A REGISTERED CIVIL ENGINEER TO THE STATE DIVISION OF INDUSTRIAL SAFETY, JUSTIFYING THE ALTERNATE PROCEDURES TO BE USED. FAILURE TO COMPLY WITH ANY OF THESE RULES, ORDERS, AND REGULATIONS SHALL BE SUFFICIENT CAUSE FOR THE STATE DIVISION TO IMMEDIATELY SUSPEND ALL WORK. COMPENSATION FOR LOSSES INCURRED BY THE CONTRACTOR, SUCH AS AN EMERGENCY SUSPENSION, SHALL NOT BE ALLOWED. DURING BACKFILLING, THE BOTTOM LINE OF THE SHORING SHALL BE KEPT ABOVE THE LEVEL OF THE BACKFILL AT ALL TIMES. SECTION 6422 OF THE CALIFORNIA LABOR CODE REQUIRED THE CONTRACTOR TO SUBMIT TO DPSI A DETAILED PLAN, DRAWING OF THE DESIGN OF SHORING, BRACING, SLOPING OR OTHER PROVISIONS TO BE MADE BY THE CONTRACTOR FOR THE PURPOSE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF TRENCHES NECESSARY FOR THE CONSTRUCTION OF THE PROJECT. IF SUCH PLAN VARIES FROM THE ORDERS, THE PLANS SHALL BE PREPARED AND CERTIFIED BY A REGISTERED CIVIL OR STRUCTURAL ENGINEER; HOWEVER, USE OF SYSTEMS THAT ARE LESS EFFECTIVE THAN THOSE REQUIRED BY THE CONSTRUCTION SAFETY ORDERS IS PROHIBITED ON THIS PROJECT. 13. TRENCH BACKFILL: TRENCHES SHALL NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED (300) FEET IN ADVANCE OF PIPE LAYING OPERATIONS, OR TWO HUNDRED (200) FEET TO THE REAR THEREOF, UNLESS OTHERWISE PERMITTED BY DPSI. ALL WORK SHALL CONFORM TO THE APPLICABLE SECTIONS OF THE STANDARD SPECIFICATIONS, DATED JULY, 1992. BEDDING CLASS SHALL BE AS SPECIFIED IN THE PIPE OPTIONS. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL BE IN ACCORDANCE WITH CITY STANDARDS ST -22, EXCEPT THAT COMPACTION SHALL BE NO LESS THAN NINETY PERCENT (909.) UP TO THIRTY INCHES (30") FROM FINISHED GRADE. BACKFILL MATERIALS IN THE PIPE ZONE SHALL BE PLACED IN LAYERS NOT TO EXCEED TWELVE INCHES (12") SIMULTANEOUSLY, ON EACH SIDE OF THE PIPE, IN SUCH A MANNER AS NOT TO DAMAGE OR DISTURB THE PIPE OR ITS ALIGNMENT AND GRADE. BACKFILL MATERIAL ABOVE THE PIPE ZONE SHALL BE FREE OF DELETERIOUS MATERIALS AND LUMPS OR STONES EXCEEDING THREE INCHES (3") IN GREATEST DIMENSION AND SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN INCHES (18'). EACH LAYER SHALL BE THOROUGHLY COMPACTED BY VIBRATORY OR MECHANICAL TAMPING, OR BY A COMBINATION OF THESE METHODS. FLOODING AND JETTING SHALL NOT BE ALLOWED. THERE MUST BE AT LEAST ONE F00T OF COVER OVER THE PIPE BEFORE COMPACTION ABOVE THE PIPE ZONE WILL BE ALLOWED. IMPORTED BEDDING AND BACKFILL MATERIAL SHALL BE OBTAINED, AND ANY EXCESS BEDDING AND BACKFILL MATERIAL SHALL BE DISPOSED, BY ANY LEGAL MEANS, AT THE DISPOSAL OF THE CONTRACTOR. THE CONTRACTOR MAY SUBMIT TO DPSI SIEVE ANALYSIS FOR UTILIZATION OF IN-PLACE MATERIALS. ACHIEVING FIRM BEDDING BELOW PIPE SPRINGLINE: CONTRACTOR SHALL PROVIDE 'FIRM BEDDING" SUPPORT FOR THE PIPE BELOW THE SPRINGLINE FIRM BEDDING MEANS THAT THE PIPE MUST REST ON THE GRANULAR MATERIAL SPECIFIED PREVIOUSLY IN THE SPECIFICATIONS. BELL OR COUPLING HOLES SHALL BE CAREFULLY EXCAVATED AT PROPER INTERVALS SO THAT NO PART OF THE LOAD IS SUPPORTED BY THE BELLS OR COUPLINGS. DURING BEDDING AND BACKFILLING, CONSOLIDATION OF MATERIAL AROUND AND UNDER BELLS AND COUPLINGS SHALL BE AVOIDED. CONTRACTOR SHALL SHOVEL -SLICE OR HAND TAMP BEDDING IN THE HAUNCH AREAS, AS THIS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS, SHOVEL -SLICING OR HAND TAMPING SHALL BE DONE BEFORE THE BEDDING IS BROUGHT UP TO THE QUARTER POINT OF THE PIPE. INITIAL BACKFILL- 'BEDDING ACKFILL "BEDDING MATERIAL" AS SPECIFIED BY ASTM 2321-8 SHALL BE USED IN THE PIPE ZONE FOR THE INITIAL BACKFILL. AFTER THE PIPE HAS BEEN PROPERLY LAID AND INSPECTED, INITIAL BACKFILL SHALL BE PLACED ON BOTH SIDES AND OVER THE PIPE TO SUCH A DEPTH THAT, AFTER THOROUGH CONSOLIDATION, THE FINAL DEPTH SHALL BE AT LEAST TO THE ELEVATION SHOWN ON THE PLANS. THE MATERIAL SHALL BE CONSOLIDATED BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND MANNER OF TAMPING MUST BE APPROVED IN WRITING BY DPSI PRIOR TO COMMENCING OPERATIONS. IMPACT EQUIPMENT MAY BE ALLOWED UNDER THE DIRECTION OF DPSI. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THE USE OF THIS EQUIPMENT. HYDRA -HAMMER WILL NOT BE PERMITTED. SUBSEQUENT BACKFILL.- ABOVE ACKFILL:ABOVE THE LEVEL OF INITIAL BACKFILL, THE TRENCH MAY BE BACKFILLED WITH NATIVE MATERIAL RESULTING FROM TRENCH EXCAVATION, OR AT THE OPTION OF THE CONTRACTOR, SELECT IMPORTED MATERIALS MAY BE USED. NATIVE MATERIAL OR IMPORTED MATERIAL MAY BE COMPACTED BY TAMPING AND/OR ROLLING, USING EQUIPMENT AND METHODS APPROVED BY DPSI. WHEN THE CONTRACTOR COMPACTS BY TAMPING AND/OR ROLLING, THE BACKFILL MATERIAL SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES IN LOOSE DEPTH, EACH LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROLLING BEFORE SUBSEQUENT LAYERS ARE PLACED. COMPACTION OF SUBSEQUENT BACKFILL WITHIN TWO AND ONE-HALF2.5 FEET OF FINISHED PERMANENT ONE-HALF(2.5) SURFACE GRADE SHALL BE ACCOMPLISHED BY TAMPING AND/OR ROLLING AS SPECIFIED ABOVE. WHERE THE TRENCH IS WITHIN THE PAVEMENT ON STREETS, THE BACKFILL WITHIN TWO AND ONE-HALF (2.5) FEET OF FINISHED PERMANENT GRADE SHALL BE COMPACTED TO NINETY PERCENT909 MAXIMUM RELATIVE PERCENT(90%) DENSITY. SUBSEQUENT BACKFILL PLACED BY TAMPING AND/OR ROLLING SHALL BE FREE FROM STONES OR LUMPS EXCEEDING THREE (3) INCHES IN GREATEST DIMENSION, VEGETABLE MATTER, OR OTHER UNSATISFACTORY MATERIALS. IN NO CASE SHALL JETTING BE ALLOWED FOR BACKFILL COMPACTION WITHIN THE STREET. WHEN APPROVED BY DPSI, JETTING MAY BE USED IN NON -STREET AREAS. BACKFILL TESTING AND COMPACTION: TESTING OF BACKFILL MATERIALS AND COMPACTION SHALL BE IN ACCORDANCE WITH SECTION 19, 'EARTHWORK" AND SECTION 6-3, "TESTING", OF THE STANDARD SPECIFICATIONS, STATE OF CALIFORNIA, DEPARTMENT OF PUBLIC WORKS, DIVISION OF HIGHWAYS. EACH LAYER OF BACKFILL MATERIAL SHALL MEET THE COMPACTION, SAND EQUIVALENT, AND GRADATION REQUIREMENTS BEFORE THE NEXT LAYER IS PLACED. EACH LAYER OF BACKFILL SHALL BE THOROUGHLY COMPACTED TO THE RELATIVE COMPACTION OF NOT LESS THAN IS SHOWN ON CITY OF BAF.ERSFIELD STANDARD DETAIL 5-39, EXCEPT THAT COMPACTION WITHIN THE ROADWAY STRUCTURAL SECTION SHALL BE NO LESS THAN NINETY PERCENT (909) MAXIMUM RELATIVE DENSITY FOR THE TOP FINISHED THIRTY INCHES (3P), AND SHALL BE DETERMINED BY CALIFORNIA TEST METHODS 216 OR 231, OR ASTM (CURRENT EDITION) D1557 AND ONE OF THE FOLLOWING: D2922 OR D1556. COMPACTION TESTS SHALL BE THE RESPONSIBILITY OF THE DEVELOPER / SUBDIVIDER / CONTRACTOR. THE NUMBER AND LOCATION OF THE REQUIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. IF THE RELATIVE COMPACTION, AS DETERMINED BY TESTING, FAILS TO MEET THE SPECIFIED PERCENTAGE, THE TRENCH SHALL BE RE -EXCAVATED AND RE -COMPACTED. 14. SEWER PIPE INSTALLATION SEWER PIPE SHALL CONFORM TO THE PLANS, AND THESE SPECIAL PROVISIONS. THE PRICE PER LINEAR FOOT SHALL INCLUDE, BUT NOT BE LIMITED TO, EXCAVATION, BEDDING AND BACKFILL. HANDLING OF MATERIALS: ALL PIPE FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS. SPECIAL CARE SHALL BE EXERCISED 50 THAT PERFORMED RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING: NO PIPE SHALL BE LAID UNTIL DPSI INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE PIPE MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE TRUNK SEWER, OR AS DIRECTED BY DPSI. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE, AND TO PRESENT SUDDEN OFFSETS IN THE FLOW LINE. AS THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE. AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY SUFFICIENT SIZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS CUTTING PIPE: THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SPECIAL CASTING IF NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF WORK. ALL PIPE SHALL BE CUT TO FR ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. PIPELINE TESTING: ALL SEWERS SHALL BE TESTED FOR TIGHTNESS WHEN COMPLETED AND READY FOR SERVICE. TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE UNIFORM PLUMBING CODE AIR TEST METHOD UPC SEC. 318-6(4), OR THE WATER EXFILTRATION TEST OR AIR PRESSURE TEST PER SECTION 306-1.4, "TESTING PIPELINES" OF THE 1994 EDITIONS, "STANDARDS SPECIFICATIONS" FOR PUBLIC WORKS CONSTRUCTION, AND CHAPTER 13 OF THE CIN OF BAKERSFIELD SUBDIVISION DESIGN MANUAL, AND THE PIPE MANUFACTURER'S REQUIREMENTS. THE CONTRACTOR SHALL NOTIFY DPSI 24 -HOURS PRIOR TO ANY TESTING. CLEANING PIPE LINES: CARE SHALL BE EXERCISED IN LAYING OF PIPE LINES TO EXCLUDE DIRT AND ANY OTHER FOREIGN P INTERRUPTED AS AT NIGHT THE PIPE ENDS SHALL BE SUITABLY CLOSED.. MATERIAL. WHEN PIPE LAY UPON COMPLETION AND BEFORE S EFORE PLACING INTO SERVICE, ALL LINES SHALL FLUSHED AND MA D REMOVE ANY DIRT OR FOREIGN MATERIALS WHICH WOULD CLOG PUMPS, EQUIPMENT, SPRAY HEADS,EARS, ETC. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED IN TO AN EXISTING SEWER LINE. SEWER LATERALS: SEWER LATERALS SHALL CONFORM TO THIS PARAGRAPH IN EVERY REGARD. EXISTING SEWER LATERALS SHALL BE LOCATED BY THE CONTRACTOR, CONNECTED TO, AND EXTENDED OR RECONSTRUCTED ACCORDING TO THE PLANS. COMPRESSION COUPLINGS MAY BE UTILIZED FOR CONNECTING TO EXISTING LATERALS. POSITIVE GRADE TO THE TRUNK SEWER SHALL BE MAINTAINED AND INVERT GRADES SET AS CALLED ON THE PLANS SEWER WYES SHALL BE INSTALLED ON THE TRUNK IN ACCORDANCE WITH THE PIPE MANUFACTURER'S RECOMMENDATIONS. PAYMENT FOR SEWER LATERALS WILL BE PAID AS SEWER FOR THE APPROPRIATE DIAMETERS. 15. SYSTEM TESTING: A MANDREL TEST AND PRESSURE TEST SHALL BE PERFORMED ON INSTALLED PIPE IN ACCORDANCE WITH THE CITY OF BAKERSFIELD SUBDIVISION MANUAL AND THE RECOMMENDATIONS OF THE MANUFACTURER. PRIOR TO FINAL ACCEPTANCE, ALL SEWER LINES SHALL BE INSPECTED WITH VIDEO EQUIPMENT DESIGNED FOR THIS PURPOSE. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING 360' IN ORDER TO VIEW AND RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED. THE VIDEO INSPECTION SHALL BE WITNESSED BY THE CITY'S CONSTRUCTION INSPECTOR, WHO WILL ALSO INITIAL AND DATE THE "CHAIN OF CUSTODY FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY THE CIN OF ANY PIPE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED VIDEO CASSETTE, THE COMPLETED 'CHAIN OF CUSTODY' FORM AND A WRITTEN LOG, WHICH INCLUDES THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CONNECTED LATERALS OF THE INSPECTION SHALL BE PROVIDED FOR VIEWING, AND SHALL BE APPROVED BY THE CIN ENGINEER PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE, THE VIDEO CASSETTE SHALL BECOME THE PROPERTY OF THE CIN. 16. WYE FITTINGS SHALL BE INJECTION MOLDED IN-LINE TYPE AND SHALL BE USED FOR ALL LATERAL CONNECTIONS AND SHALL BE ROTATED A MINIMUM OF 23 DEGREES ABOVE THE HORIZONTAL PLAN RUNNING THROUGH THE CENTERLINE OF THE MAIN, ALL LATERALS SHALL BE FOUR INCHES (4") IN DIAMETER UNLESS NOTED OTHERWISE ON THE PLANS, EXTENDING A MINIMUM OF 4' BEYOND THE PROPERTY LINE WITH 30' OF COVER AT FLOWUNE. SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY LINE AS SHOWN IN THE "SEWER LATERAL MARKER" DETAIL, C.O.B. STD. DETAIL SW -1. LATERALS SHALL BE A MINIMUM OF 2.25' DEEP AND A MAXIMUM OF 7' DEEP AT PROPERTY LINE AND A MINIMUM OF 2.5' DEEP AT FLOWLINE. 17. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG AND SOLVENT WELDED. 18. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWINGS D-18 AND D-19 AND SECTIONS 70-1.02H AND 71-1.07 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION. ALL CLFANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARDS DETAIL SW -6. 19. BORED/JACKED PIPE: CASING OR SMOOTH OUTSIDE WALLED PIPE FOR BORED/JACKED PIPE SHALL BE INSTALLED. IT SHALL HAVE EVEN BEARING THROUGHOUT ITS LENGTH AND SHALL SLOPE TOWARD ONE END. SPACE BETWEEN CASING AND PIPELINE SHALL BE BACKFILLED WITH SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE CASING ALSO SHALL BE BACKFILLED WITH GROUT OR SAND. THE ENDS OF SPACE BETWEEN THE CASING AND THE PIPE SHALL BE SEALED WITH GROUT. THE STRENGTH OF PIPE DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL LOAD ONLY. ANY ADDITIONAL STRENGTH REQURIED BY BORING/JACKING OPERATIONS SHALL BE FURNISHED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL SUBMIT TO DPSI, FOR APPROVAL, ALL PLANS OR BORING/JACKING OPERATIONS PRIOR TO COMMENCING BORING AND JACKING OPERATIONS. BORING/JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER, CONSISTENT WITH CURRENT ACCEPTED PROCEDURES. WATER BORING SHALL NOT BE PERMITTED. THE CASING PIPE SHALL BE JACKED WITH SUCH PRECISION THAT WILL ALLOW THE REPLACEMENT OF THE PIPELINE TO THE LINE AND GRADE AS INDICATED ON THE PLANS. . UPON COMPLETION OF THE INSTALLATION OF THE CASING AND INSTALLATION OF THE PIPELINE TO GRADE, THE VOID BETWEEN THE CASING OR RC PIPE AND EXCAVATION SHALL BE COMPLETELY FILLED WITH SAND, COMPACTED BY THE USE OF AIR -BLOWING SAND EQUIPMENT, OR ANY OTHER MEANS ACCEPTABLE TO DPSI UPON APPROVAL. IT 15 THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERATION AT ALL TIMES. SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DANGEROUS OR UNREASONABLE SLOUGHING OF ANY MATERIAL WHICH MAY JEOPARDIZE THE SAFETY OF WORKERS OR THE STABILITY OF THE SOIL AND ROADWAY ABOVE, THE CONTRACTOR SHALL FURNISH AND INSTALL BREASTBOARDING AND/OR FACE -CLOSURE WITH SUFFICIENT JACKS TO INHIBIT THE SLOUGHING AND/OR CLOSING OF THE WORK FACE. THE CONTRACTOR, BEFORE RESUMING WORK, SHALL FURNISH DPSI WITH A DETAILED PLAN OF PROCEEDING WITH THE WORK, FOR DPSI'S REVIEW AND APPROVAL. ANY AND ALL EXPENSES, THEREFORE, WILL BE CONSIDERED INCLUDED IN THE BID PRICE AND NO ADDITIONAL COMPENSATION WILL BE MADE. 20. MINOR STRUCTURES: PORTLAND CEMENT CONCRETE MINOR STRUCTURES SHALL CONFORM IN DESIGN, MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF SECTIONS 70-1.02 H OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. MANHOLES SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS D-18 AND D-19. DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARD D-14. TEMPORARY GRATED INLETS SHALL CONFORM TO DETAILS ON THE PLANS. THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE STRENGTH REQUIREMENT OF ASST. C-478. EACH SUCCESSIVE MANHOLE SECTION SHALL BE SET ON A BED OF PORTLAND CEMENT GROUT OR "KENT SEAL' TO MAKE A WATERTIGHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET PLUMB. 21. ADJUST SURVEY MONUMENT ENCASEMENTS: SURVEY MONUMENT AND FRAME AND COVER WITH ENCASEMENTS SHALL BE ADJUSTED OR INSTALLED NEW TO FINISH GRADE AT THE LOCATIONS SHOWN ON THE PLANS, IN ACCORDANCE WITH THESE SPECIAL PROVISIONS, AND CITY STANDARDS ST -13. THE SURFACE OF THE CONCRETE SHALL BE PROTECTED FROM PUBLIC TRAFFIC FOR A MINIMUM OF THREE DAYS. AT THE OPTION OF THE CONTRACTOR, MINOR CONCRETE CONTAINING A MINIMUM OF SEVEN STACKS OF CEMENT PER CUBIC YARD MAY BE USED, AND THE TIME REQUIRED FOR PROTECTION OF THE CONCRETE SURFACE FROM PUBLIC MAY BE REDUCED TO A MINIMUM OF ONE DAY. THE MONUMENT WILL BE SET BY OTHERS. THE OWNER WILL PROVIDE BOUNDARY AND CONSTRUCTION SURVEYING. CONTRACTOR SHALL GIVE THE OWNER 24 HOURS NOTICE WHEN SURVEYING IS REQUIRED. ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HIS OPERATIONS SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER. 22. DUST CONTROL: CONTRACTOR SHALL OBTAIN A COPY OF THE DUST CONTROL PLAN (DCP) FOR THIS PROJECT FROM THE DEVELOPER, AND SHALL KEEP A COPY ON SITE AT ALL TIMES. FOR THE DURATION OF CONTRACTOR'S OCCUPANCY OF THE SITE, CONTRACTOR IS REQUIRED TO COMPLY WITH THE PROVISIONS OF SAID PLAN. 23. STORM WATER POLLUTION PREVENTION: CONTRACTOR SHALL OBTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR THIS PROJECT FROM THE DEVELOPER, AND SHALL KEEP A COPY ON SITE AT ALL TIMES. FOR THE DURATION OF CONTRACTOR'S OCCUPANCY OF THE SITE, CONTRACTOR IS REQUIRED TO COMPLY WITH THE PROVISIONS OF SAID PLAN. 24. SEWER LATERALS: I CONTRACTOR TO STAMP AN "S" INTO CURB FACE OVER EACH SEWER LATERAL. 25. NO CIN INSPECTIONS WILL BE GIVEN FOR THE WORK IN THIS AREA UNTIL A SUBDIVISION PERMIT WITH APPROPRIATE SECURITY AND INSURANCE HAVE BEEN OBTAINED. 26. ANY ITEMS IN PUBLIC RIGHT-OF-WAY THAT ARE DAMAGED OR DO NOT MEET CURRENT STANDARDS SET BY PUBLIC WORKS WILL REQUIRE REPAIRING AND/OR UPGRADING AS PER CITY ENGINEER. '�41V TVIN ®F RE CRUD -WArEi L. XLBER716LOPEZ R.C.E. 67602 /. C 667602 2 -?2(7 �w 0 M I n U w iy$ r; iN a a � > & z V/ a h k I'l a ^a s I r. N Y w U S w U o > U z N 0 � rc w n 0 a rc tt I 0 0 0 o 0 0 �w w J J w w 0 0 0 `.' J J F_ z 2 O U U Z Q cc cc Lu cc Z Q m 0 cc I- O N (o U) r Oa c. U w Q c W N cc Q z Q V) W W N W O Z N .S m wv ma e I > � ba w 1. F" z o .:. a= U.... m . 'OQ"FC_ i2z z"-0 d IT e-' v o w m 3 w w Z 0- 3 LL ; N w V w - z c5 �i „`S a h k I'l a ^a s I r. N Y w U S w U o > U z N 0 � rc w n 0 a rc tt I 0 0 0 o 0 0 �w w J J w w 0 0 0 `.' J J F_ z 2 O U U Z Q cc cc Lu cc Z Q m 0 cc I- O N (o U) r Oa c. U w Q c W N cc Q z Q V) W W N W O Z m I F w N w V I z �i I- w w - {: _ w. o w O 0 370 360 350 340 330 320 8+25 8+50 N86'37'17"W L=120. 18" RCP L=307.40' TRACT BOUNDARY - -= uuu.uu v `� 1 14+00 D=008'48'22" 13+00 �� D D _ p L--313.18. R=2004.05' 5, B" RCP 55 47 48 34 T a r WILD MUSTANG DRIVE BERKSHIRE ROAD SEE SHEET 4 5+00 _ 0 - D —X58044'33 6.59' RCP 56 --D 80' 44' 33"E 1371[6' BOUNDARY — A_ ZB 2 18+00 30' WIDE SEWER EASEMENT PER DOCUMENT 0207084777 + R/W 66 � I I �I 65 I� 67 WHISKEY CREEK DRIVE SEE SHEET 6 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 BERKSHIRE ROAD SCALE: 1" = 10' VERT. Y = 40' HORZ. 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 ZL KID J67O�2 /�! L / JIou)(C A PROVED�BE f'Z1/OL6PEZ DATE R.C.E. #67602 1 -nn ��1 APPROVED: DANIEL PADILLA DATE R.C.E. #67008 (EXP. 09/30/18) 4 i %v N OF RECO C -PIAM 1 n )—LALWRTOLOPEZ RCE 67602 EXP 6/30/ 1' my W H Q Z fL N Z � p mJ=4 w �M ° +x � W J Y 0 ¢ o nw Qm a3 = ¢ Ww V LEGEND: ttIW VU) x_m oa 0 (E) STORM DRAIN MANHOLE Y N 0 O NEW STORM DRAIN MANHOLE Q U Lj Z O O (E) SEWER MANHOLE ; W PP N o ¢ am a3 L=148.90' 6 O ¢ a a 0 LL a > W W w > o Pp (i) D=004'15' 0 c , J '04' 9" _ = 0 .0 Ld R/W (E) STREET LIGHT R=199526 W 18" RCP a Q C.' NEW STREET LIGHT L=307.40' TRACT BOUNDARY - -= uuu.uu v `� 1 14+00 D=008'48'22" 13+00 �� D D _ p L--313.18. R=2004.05' 5, B" RCP 55 47 48 34 T a r WILD MUSTANG DRIVE BERKSHIRE ROAD SEE SHEET 4 5+00 _ 0 - D —X58044'33 6.59' RCP 56 --D 80' 44' 33"E 1371[6' BOUNDARY — A_ ZB 2 18+00 30' WIDE SEWER EASEMENT PER DOCUMENT 0207084777 + R/W 66 � I I �I 65 I� 67 WHISKEY CREEK DRIVE SEE SHEET 6 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 BERKSHIRE ROAD SCALE: 1" = 10' VERT. Y = 40' HORZ. 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 ZL KID J67O�2 /�! L / JIou)(C A PROVED�BE f'Z1/OL6PEZ DATE R.C.E. #67602 1 -nn ��1 APPROVED: DANIEL PADILLA DATE R.C.E. #67008 (EXP. 09/30/18) 4 i %v N OF RECO C -PIAM 1 n )—LALWRTOLOPEZ RCE 67602 EXP 6/30/ 1' my W H Q Z fL N Z AR/W mJ=4 w �M ° +x � W J Y 0 � Qm a3 = w V LEGEND: W x_m oa 0 (E) STORM DRAIN MANHOLE Y N 0 O NEW STORM DRAIN MANHOLE Q U Lj Z O O (E) SEWER MANHOLE ; W N o W S U LL 0 W L=148.90' 6 O ¢ a a 0 LL a > W W w > o =2000.0(10 (i) D=004'15' 0 c , J '04' 9" = 0 .0 Ld L=139.24' (E) STREET LIGHT R=199526 W 18" RCP L=307.40' TRACT BOUNDARY - -= uuu.uu v `� 1 14+00 D=008'48'22" 13+00 �� D D _ p L--313.18. R=2004.05' 5, B" RCP 55 47 48 34 T a r WILD MUSTANG DRIVE BERKSHIRE ROAD SEE SHEET 4 5+00 _ 0 - D —X58044'33 6.59' RCP 56 --D 80' 44' 33"E 1371[6' BOUNDARY — A_ ZB 2 18+00 30' WIDE SEWER EASEMENT PER DOCUMENT 0207084777 + R/W 66 � I I �I 65 I� 67 WHISKEY CREEK DRIVE SEE SHEET 6 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 BERKSHIRE ROAD SCALE: 1" = 10' VERT. Y = 40' HORZ. 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 ZL KID J67O�2 /�! L / JIou)(C A PROVED�BE f'Z1/OL6PEZ DATE R.C.E. #67602 1 -nn ��1 APPROVED: DANIEL PADILLA DATE R.C.E. #67008 (EXP. 09/30/18) 4 i %v N OF RECO C -PIAM 1 n )—LALWRTOLOPEZ RCE 67602 EXP 6/30/ 1' my W H Q Z fL N Z p�O � W ria m w �M ° +x � W J Y 0 � Qm a3 L=307.40' TRACT BOUNDARY - -= uuu.uu v `� 1 14+00 D=008'48'22" 13+00 �� D D _ p L--313.18. R=2004.05' 5, B" RCP 55 47 48 34 T a r WILD MUSTANG DRIVE BERKSHIRE ROAD SEE SHEET 4 5+00 _ 0 - D —X58044'33 6.59' RCP 56 --D 80' 44' 33"E 1371[6' BOUNDARY — A_ ZB 2 18+00 30' WIDE SEWER EASEMENT PER DOCUMENT 0207084777 + R/W 66 � I I �I 65 I� 67 WHISKEY CREEK DRIVE SEE SHEET 6 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 BERKSHIRE ROAD SCALE: 1" = 10' VERT. Y = 40' HORZ. 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 ZL KID J67O�2 /�! L / JIou)(C A PROVED�BE f'Z1/OL6PEZ DATE R.C.E. #67602 1 -nn ��1 APPROVED: DANIEL PADILLA DATE R.C.E. #67008 (EXP. 09/30/18) 4 i %v N OF RECO C -PIAM 1 n )—LALWRTOLOPEZ RCE 67602 EXP 6/30/ 1' my W H Q L 40' 0' 40' 80' HORZ SCALER "=40' CONSTRUCTION NOTES Oi INSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. O2 INSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7. O3 INSTALL SANITARY SEWER CLEAN OUT PER BAKERSFIELD STD. SW -5, SW -6. O4 INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. D-14, D-16. OINSTALL TYPE 'B' STORM DRAIN MH PER BAKERSFIELD STD. D-18. OPROTECT IN PLACE. ADJUST TO FINAL GRADE. O7 INSTALL CONCRETE CAP ON SO LINE FOR FUTURE CONNECTION. NOTES: ALL STATION LABELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. CONTRACTOR NOTES 1. CONTRACTOR TO POTHOLE AND FIELD VERIFY ALL TIES INTO EXISTING STUBS PRIOR TO CONSTRUCTION. 2. ALL STORM DRAIN SHALL BE CLIII RCP-RGJ. SEE STORM DRAIN NOTE 12, SHEET 2. 3. ALL SANITARY SEWER SHALL BE PVC SDR 35. SEE SEWER NOTE 10, SHEET 2. PE4ASE 2 MfaWINrFRECORD LBERTOLOP R.C.E. 67602 EXP. 6130/1 0 a O Z J m w �M � W J U W = w V LEGEND: W oa 0 (E) STORM DRAIN MANHOLE Y N 0 O NEW STORM DRAIN MANHOLE Q U Lj Z O O (E) SEWER MANHOLE ; W N o W S U LL 0 W U Z O w w W 2 6 O ¢ a a 0 LL a > W W w > o p W rq 0 o 0 (i) NEW SEWER MANHOLE 0 c , J Ld t—� (E) STREET LIGHT 0- W m a Q C.' NEW STREET LIGHT ¢ J a (E) SIGN i NEW SIGN -}- NEW STREET SIGN `C1VEER 4 b O (E) MONUMENT 0� o a > U < NEW MONUMENT � NEW WALL �fs1038 (E) FIRE HYDRANT �t 5 V (E) BLOWOFF VALVE + (E) STREET SIGN w §g3 w m •' U n D STORM DRAIN w 0 (E) STORM DRAIN ${,` ,. r Z o U 3100 w 0 S SANITARY SEWERo S (E) SANITARY SEWER w mv-a o a - STEEP SLOPE (SEE GRADING PLAN) 8d ---- TRACT BOUNDARY j 3N PROPERTY LINE S$ — OVERHEAD POWER a a s x 5 5 3 —W— WATER LINE L 40' 0' 40' 80' HORZ SCALER "=40' CONSTRUCTION NOTES Oi INSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. O2 INSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7. O3 INSTALL SANITARY SEWER CLEAN OUT PER BAKERSFIELD STD. SW -5, SW -6. O4 INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. D-14, D-16. OINSTALL TYPE 'B' STORM DRAIN MH PER BAKERSFIELD STD. D-18. OPROTECT IN PLACE. ADJUST TO FINAL GRADE. O7 INSTALL CONCRETE CAP ON SO LINE FOR FUTURE CONNECTION. NOTES: ALL STATION LABELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. CONTRACTOR NOTES 1. CONTRACTOR TO POTHOLE AND FIELD VERIFY ALL TIES INTO EXISTING STUBS PRIOR TO CONSTRUCTION. 2. ALL STORM DRAIN SHALL BE CLIII RCP-RGJ. SEE STORM DRAIN NOTE 12, SHEET 2. 3. ALL SANITARY SEWER SHALL BE PVC SDR 35. SEE SEWER NOTE 10, SHEET 2. PE4ASE 2 MfaWINrFRECORD LBERTOLOP R.C.E. 67602 EXP. 6130/1 0 a O W Z J m 0 O �M � W J =w W = w V W oa 0 MC Y N 0 0 G U Lj Z O W m CCM Y W LLI W S U LL 0 W U Z O w w W 2 6 O ¢ a a 0 LL a > W W w > o p W rq 0 o 0 c , W Z J m Q �M � J =w W = w V m oa 0 MC N N 0 0 G od Lj O F CCM LLI Z ~ c Y Ld O[ a m W I— N w m �M =w W = w V m 0 0 a LEGEND: SEE SHEET 3 LLI 0 (E) STORM DRAIN MANHOLE BERKSHIRE ROAD O/ J o O NEW STORM DRAIN MANHOLE I m �, � I U ESEWER MANHOLE 43 44 45 46 4.7 i LLZ=g 3 3 Ul qAq @ NEWSEWER MANHOLE N w > w 0 0 w 00 WILD MUSTANG DRIVE (E) STREET LIGHT N 0 m 0 0 Y K t- Z V1 fL REET LIGHT v o m N ui + w f m O6 PROTECT IN PLACE. ADJUST TO FINAL GRADE. I - oz ott �w� ~ (E) SIGN42 O d- z O a w rc x IL W m NOTES: 0 Q m - NEW SIGN U o ¢ Oo R/n SEPARATION TABLE W 340ALL STATION LABELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. Q opgOE RTO Y�Fyc o Ny+ . SEWER L 1 O Q I m .6 W ; 2 Z NEW STREET SIGN¢ 00oie ...,:- - ".:.;., 4' TYP 341.59 INV. 341.83 INV. CONTRACTOR NOTES 0.24 Mo II Q El (E) MONUMENT +- /V ,p ,5 I :"-' OO' 03 70.97 11= 7' r3 mc�mc+� W �m N Q" NEW MONUMENT a3 Qo m ~ 10+00 n_UF 18 RCP 5• I Z NEW WALL STUBS PRIOR TO CONSTRUCTION. 4 42' 2 "E 6 8 11+00 12+00 13+00— NOO m 330 ¢ Cg (E) FIRE HYDRANT - 50' N00'38'58"E L=166.30'jl�ll N00'18?40"W Lw 100.0094 8" PVC SDR 35 n 6" PVC SDR 35 18 RCP o 13+64 m b (E) BLOWOFF VALVE .. .: r .. 89'33'36"Y! L=26.33' a a. 40' 0' 40' 80, + (E) STREET SIGN 'uooiom 3. ALL SANITARY SEWER SHALL BE PVC SDR 35. SEE SEWER NOTE 10, R " ,omw 320 D— STORM DRAIN O OWN Oi / O m3m O Lq M'vkm Nd' MN } p (E) STORM DRAIN n w + a ± + �: o m -. N I HORZ SCALE:1 "=40' Q2 o + f w N ,* +Oi° Na. +o ( IT :., —S— SANITARY SEWER 40 1 NN II Q II �' II NN 5— (E) SANITARY SEWER m m N N N m 9 �� R/W Ir 1-i�x- STEEP SLOPE (SEE GRADING PLAN) 51 50 49 M 48 — -- — TRACT BOUNDARY L=40.41, R=2000.0i .. } �ih �I PROPERTY LINE — OVERHEAD POWER SEE SHEET 8 SEE SHEET 3 DROVERS RUN ROAD WILD MUSTANG DRIVE BERKSHIRE ROAD —W— WATER LINE 370 360 350 340 330 320 370 360 350 340 330 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 0 370 360 350 340 330 320 t w w �JornNw ( wz; w0mN3: �OMM`v4 �M' WOI O) NOOMN mN�M�a m. n000 m�\neo , a o ava v Nv�'1111 '� Nm aMMM NM31111M __OmQLL�z II II�Z� aQJ M z Z m' WIJLLZ .IQI=mm F N..FJ Tdowm 13K-« ?—EXISTING GROUND r I PROPOSED STREET i I PROFILE AT �-- I CENTERLINE i 1 16.33 LF 18"I 7 i j RCP 0 0.30%, i? t 26.3 LF 18, ..) RCP ®0.30% I z I 0 LLI w > -0J O/ J o LL K � m �, � I U QJ oafs c a5�l�g lg 370 CONSTRUCTION NOTES m y om W mJ Z O m� CB#3 - CB#4 O1 INSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. J w J mQ E R U ZO �, � I U INSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7. O oafs c In a W r. C � .. 3 LLZ=g 3 3 Ul qAq SCALE: 1" = 10' VERT. 1" = 40' HORZ. 12+87.25 - 12+87.47 j 3 Z o a5�l�g lg 370 CONSTRUCTION NOTES m Z m CB#3 - CB#4 O1 INSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. J R WILD MUSTANG DRIVE A STORM DRAIN LATERAL INSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7. O In > w N� 360 SCALE: 1" = 10' VERT. 1" = 40' HORZ. 12+87.25 - 12+87.47 Z 0 O3 INSTALL SANITARY SEWER CLEAN OUT PER BAKERSFIELD STD. SW -5, SW -6. 0 0 w 00 WILD MUSTANG DRIVE N N O4 INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. D-14, 0-16. W a Y K t- Z V1 fL O INSTALL TYPE 'B' STORM DRAIN MH PER BAKERSFIELD STD. D-18. v o m 350 ui Y w f O6 PROTECT IN PLACE. ADJUST TO FINAL GRADE. U �w� ~ O7 INSTALL CONCRETE CAP ON SO LINE FOR FUTURE CONNECTION. O z O a w rc x IL W a w m NOTES: 0 0 0 Ess/ On,, SEPARATION TABLE W 340ALL STATION LABELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. w opgOE RTO Y�Fyc o 0 WATER SEWER L w > Z QA 341.59 INV. 341.83 INV. CONTRACTOR NOTES 0.24 Q KQmO NO 67602 * /V ,p ,5 I T� - N N s�9 APVRO DATE 1. CONTRACTOR TO POTHOLE AND FIELD VERIFY ALL TIES INTO EXISTING MTV Fck�\P #67602ALBERTO STUBS PRIOR TO CONSTRUCTION. "+ m 330 ¢ o o N o 2. ALL STORM DRAIN SHALL BE CLIO RCP-RGJ. SEE STORM DRAIN NOTE o m 12, SHEET 2. 3. ALL SANITARY SEWER SHALL BE PVC SDR 35. SEE SEWER NOTE 10, SHEET 2. 320 —0+50 0+00 0+50 1+00 D_mtp p4sg 10/13/(. APPROVED: DANIEL PADILLA DATE R.C.E. #67008 (EXP. 09/30/18) OF RECORD-FttArei L. ALBERTO LOPEZ RCE. 67602 EXP. E30111 L.ABERTO LOPS" / / R.C.E.67602 V EXP. 6/30/111 m Z m CB#3 - CB#4 J R WILD MUSTANG DRIVE A STORM DRAIN LATERAL > In > w N� x SCALE: 1" = 10' VERT. 1" = 40' HORZ. 12+87.25 - 12+87.47 Z w 00 WILD MUSTANG DRIVE N N a SCALE: 1" = 10' VERT. t- Z 1" = 40' HORZ. ui s0 U �w� ~ M IL Ess/ On,, SEPARATION TABLE W opgOE RTO Y�Fyc LOCATION STORM WATER SEWER SEPARATION (FT) > Z QA 341.59 INV. 341.83 INV. 0.24 Q * NO 67602 * /V ,p ,5 I T� - N s�9 APVRO DATE MTV Fck�\P #67602ALBERTO D_mtp p4sg 10/13/(. APPROVED: DANIEL PADILLA DATE R.C.E. #67008 (EXP. 09/30/18) OF RECORD-FttArei L. ALBERTO LOPEZ RCE. 67602 EXP. E30111 L.ABERTO LOPS" / / R.C.E.67602 V EXP. 6/30/111 m m w N� x w 0 O a SEE SHEET 8 DROVERS RUN ROAD SEE SHEET 8 DROVERS RUN ROAD ARROWHEAD TRAIL COURT Z m 370 360 350 340 HORZ SCALE:1 "=40' 370 360 350 340 LEGEND: U (E) STORM DRAIN MANHOLE O NEW STORM DRAIN MANHOLE Q (E) SEWER MANHOLE O NEW SEWER MANHOLE (E) STREET LIGHT C • NEW STREET LIGHT (E) SIGN 1 NEW SIGN + NEW STREET SIGN p (E) MONUMENT Q NEW MONUMENT NEW WALL (E) FIRE HYDRANT b (E) BLOWOFF VALVE + (E) STREET SIGN D STORM DRAIN -;: --- (E) STORM DRAIN S SANITARY SEWER --5 --- (E) SANITARY SEWER STEEP SLOPE (SEE GRADING PLAN) TRACT BOUNDARY PROPERTY LINE OHP OVERHEAD POWER —W— WATER LINE CONSTRUCTION NOTES Ol INSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. OINSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7. O3 INSTALL SANITARY SEWER CLEAN OUT PER BAKERSFIELD STD. SW -5, SW -6. O4 INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. D-14, D-16. OS INSTALL TYPE 'B' STORM DRAIN MH PER BAKERSFIELD STD. D-18. OPROTECT IN PLACE. ADJUST TO FINAL GRADE. O7 INSTALL CONCRETE CAP ON SO LINE FOR FUTURE CONNECTION. NOTES: ALL STATION LABELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. CONTRACTOR NOTES 1. CONTRACTOR TO POTHOLE AND FIELD VERIFY ALL TIES INTO EXISTING STUBS PRIOR TO CONSTRUCTION. 2. ALL STORM DRAIN SHALL BE CLIII RCP -RG,. SEE STORM DRAIN NOTE 12, SHEET 2. 3. ALL SANITARY SEWER SHALL BE PVC SDR 35. SEE SEWER NOTE 10, SHEET 2. W O Q W F Q 3 MEW 0'N 0 { . _ - . _ -_ . - - 330 �) w m o w F u C 711 w LL ¢m 3 3 a 330 '- _. { . _ - . _ -_ . - - 330 �) Z 7 v 711 r 181.17 LF 8" PVC SDR 35 0 0.359. y 100.00 LF 6" PVC SDR 35 0 1.00% : 329+75 0 U 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 13+75 Z I� 0O J N N Q ARROWHEAD TRAIL COURT v w ~ SCALE: 1" = 10' VERT. = ado cc 1" = 40' HORZ. U ~ WQ Z (n W a }_ c� �� w NAM i �® T U CG is m n L. LBERTO LOPEZ R.C.E. 67602 EXP. 6;301 ?2 WING OF RECORD R.C.E. 67602 EXP. 6/30/li /, z - i 2b7 U�) 33 32 31 SEE SHEET 8 DROVERS RUN ROAD p )if -NOD'. 42' ?5-E 10+00 1 �I 11 I I li'I SEE SHEET 8 DROVERS RUN ROAD 370 360 350 340 330 320 9+75 10+00 W 11+00 145 M N I 70 S R/W WHISKEY CREEK DRIVE SEE SHEET BERKSHIRE ROAD 10+50 11+00 11+50 12+00 12+50 13+00 WHISKEY CREEK DRIVE SCALE: 1" = 10' VERT. 1" = 40' HORZ. 13+50 14+00 14+50 370 360 350 340 330 320 15+00 15+25 370 360 350 C 1 ®P 370 360 350 .uv v .,.� , 340 18" RCP8" RCP 340 0 0.315=F 0.30.°6 335 ( � 335 —0+50 0+00 0+50 1+00 1+25 B CB#2- CB#1 STORM DRAIN LATERAL STATION 13+66.06 WHISKEY CREEK DRIVE SCALE: 1" = 10' VERT. 1' = 40' HORZ. A A J NO 67602 * n 10 S 1(p ��' L ALBER LOPEZ DATE y�C V 1 f R.C.E. #67602 OF CRL7 APPROVED: DANIEL PADILLA DATE R.C.E. #67008 (EXP. 09/30/18) Cbz.%WI7G OF REC";eD-PI+AZ1 1. RTOLOPEZ R.C.E. 67602 EXP s/3D; 19 LEGEND: SEPARATION TABLE © (E) STORM DRAIN MANHOLE STORM O NEW STORM DRAIN MANHOLE SEE SHEET 3 OO (E) SEWER MANHOLE 354.56 INV. Q NEW SEWER MANHOLE a.� 0 BERKSHIRE ROAD D, NEW STREET LIGHT 64 (E) SIGN G 65 w 8� NEW SIGN l ro W NEW STREET SIGN N (E) MONUMENT Y Q N TRACT Ld W NEW WALL U (E) FIRE HYDRANT Z O b (E) BLOWOFF VALVE BOUNDARY 0 (E) STREET SIGN D w w w ¢ z w o O D a (E) STORM DRAIN —S— a a SANITARY SEWER S (E) SANITARY SEWER 3 _,(` a = STEEP SLOPE (SEE GRADING PLAN) -- m TRACT BOUNDARY W PROPERTY LINE — > OVERHEAD POWER —W— WATER LINE co 2 m U ¢ II M II o N n +x N u' �wvi Qa Nom a N 18' RCP ¢� 3 4• TYP. + NOB'48'29'W N m0 R/W - L=41.10' 18" RCP N79'52'07"E C L=16.35' I I '1 5 CL WHISKEY CREEK DRIVE _ T-14+00 STA = 17+37.88 BERKSHIRE ROAD =2 =250.71' S C N00'39'13'V/ L=130.00' R 35 E 6' PVC SDR 35 09' 15f1271'1W 43.76 1 `, #8-., , 18" RCP N0648'29'W L=72.21' _ M I STA=13+99.80 N o a n o n C_ WHISKEY CREEK DRIVE h M +2 N + N no '�oM Nom¢ MN f 2; ((ff II ¢ W II Q Fw.-II NNS¢ QS � I dOiO el � F (MO, 46 R t 1g4i� 68 67 66.': 3011WWID SEWER EASEMENT AAA PE ADO MENT 0207084777 WHISKEY CREEK DRIVE SEE SHEET BERKSHIRE ROAD 10+50 11+00 11+50 12+00 12+50 13+00 WHISKEY CREEK DRIVE SCALE: 1" = 10' VERT. 1" = 40' HORZ. 13+50 14+00 14+50 370 360 350 340 330 320 15+00 15+25 370 360 350 C 1 ®P 370 360 350 .uv v .,.� , 340 18" RCP8" RCP 340 0 0.315=F 0.30.°6 335 ( � 335 —0+50 0+00 0+50 1+00 1+25 B CB#2- CB#1 STORM DRAIN LATERAL STATION 13+66.06 WHISKEY CREEK DRIVE SCALE: 1" = 10' VERT. 1' = 40' HORZ. A A J NO 67602 * n 10 S 1(p ��' L ALBER LOPEZ DATE y�C V 1 f R.C.E. #67602 OF CRL7 APPROVED: DANIEL PADILLA DATE R.C.E. #67008 (EXP. 09/30/18) Cbz.%WI7G OF REC";eD-PI+AZ1 1. RTOLOPEZ R.C.E. 67602 EXP s/3D; 19 LEGEND: SEPARATION TABLE © (E) STORM DRAIN MANHOLE STORM O NEW STORM DRAIN MANHOLE SEPARATION (FT) OO (E) SEWER MANHOLE 354.56 INV. Q NEW SEWER MANHOLE a.� 0 (E) STREET LIGHT D, NEW STREET LIGHT 3 (E) SIGN w 8� NEW SIGN + NEW STREET SIGN p (E) MONUMENT Y Q NEW MONUMENT ad Ld W NEW WALL U (E) FIRE HYDRANT Z O b (E) BLOWOFF VALVE Y U LL 0 + (E) STREET SIGN D w w w ¢ z w STORM DRAIN D N (E) STORM DRAIN —S— j SANITARY SEWER S (E) SANITARY SEWER 3 _,(` a = STEEP SLOPE (SEE GRADING PLAN) -- m TRACT BOUNDARY W PROPERTY LINE — > OVERHEAD POWER —W— WATER LINE CONSTRUCTION NOTES OINSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. OINSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7. O3 INSTALL SANITARY SEWER CLEAN OUT PER BAKERSFIELD STD. SW -5, SW -6. 04 INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. D-14, D-16. OINSTALL TYPE 'B' STORM DRAIN MH PER BAKERSFIELD STD. D-18. O6 PROTECT IN PLACE. ADJUST TO FINAL GRADE. 7O INSTALL CONCRETE CAP ON SO UNE FOR FUTURE CONNECTION. NOTES: ALL STATION LABELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. CONTRACTOR NOTES 1. CONTRACTOR TO POTHOLE AND FIELD VERIFY ALL TIES INTO EXISTING STUBS PRIOR TO CONSTRUCTION. 2. ALL STORM DRAIN SHALL BE CLIII RCP-RGJ. SEE STORM DRAIN NOTE 12, SHEET 2. 3. ALL SANITARY SEWER SHALL BE PVC SDR 35. SEE SEWER NOTE 10, SHEET 2. PHASE 2- D AWI OF RECORD �JLBEkOLOkgi R.C.E 67602 EXP. 6/30/m r,706, `7 0 LL] > u Q W r 0 T w 0 0 m Z SEPARATION TABLE Z LOCATION STORM WATER SEWER SEPARATION (FT) © 353.37 INV. 354.56 INV. Uzo S�o WW'zc 1.19 PHASE 2- D AWI OF RECORD �JLBEkOLOkgi R.C.E 67602 EXP. 6/30/m r,706, `7 0 LL] > u Q W r 0 T w 0 0 m Z ¢IgIgNNI z Z w §� N U U qi W 9$ J F¢ VE � Uzo S�o WW'zc . I ti 0 H aw my �r W 3 W�$q3 w 8� W w 0 �m ¢IgIgNNI z Z U p 0 o m J � w � y 0 , x W 0 W w Y Y N ti ad Ld W U Z O W m UJ Y U LL 0 W O z O w w 0 o � a ¢ 0O W J w w 0 w w w ¢ z w Z N N N j j Z U R m J � W 0 , ry 0 W w po N Y N ti ad Ld W U < UJ S : Z cr ~ N W m W H _N _ > Z co m w m ry W w 0 g SEE SHEET 8 DROVERS RUN ROAD 3Z m "I rn U d R/W J ( a �4' 1YP. / .'. MAY 12, IN BOOK 2079, PAGE 544, MAY 1953, IN BOOK 2081, O.R., AND MAY 15, O2 INSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7. UZa-o W 0 V O Q it a �, ❑ w „v rvT Z i PAGE 223, O.R. w a + Y W ± 6" PVC SDR 35 360 " + 0 4 O5 INSTALL TYPE 'B' STORM DRAIN MH PER BAKERSFIELD STD. D-18. N40'41'45"E L=15.91' 0 CITY WELL � o n U U a O6 PROTECT IN PLACE. ADJUST TO FINAL GRADE. LOT 37 33 " " K 0 0 0 0 0 34 35 ❑ 350 36 / NOTES: N N ALL STATION LIBELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. w ¢ m pi Dili, rc CONTRACTOR NOTES 340 w 1. CONTRACTOR TO POTHOLE AND FIELD VERIFY ALL TIES INTO EXISTING o BUCKING BRONCO STUBS PRIOR TO CONSTRUCTION. COURT 370 360 350 340 330 HORZ SCALE:1 "=40' LEGEND: (E) STORM DRAIN MANHOLE O NEW STORM DRAIN MANHOLE Q (E) SEWER MANHOLE (' NEW SEWER MANHOLE 44X1 (E) STREET LIGHT C NEW STREET LIGHT — (E) SIGN NEW SIGN + NEW STREET SIGN ZI (E) MONUMENT Q NEW MONUMENT NEW WALL (� (E) FIRE HYDRANT V (E) BLOWOFF VALVE + (E) STREET SIGN 0 STORM DRAIN —L ---- (E) STORM DRAIN 5 SANITARY SEWER (E) SANITARY SEWER STEEP SLOPE (SEE GRADING PLAN) TRACT BOUNDARY PROPERTY LINE — OHP OVERHEAD POWER —Y/— WATER LINE b w 0 Q W H Q CONSTRUCTION NOTES "I rn U d 370 Ol INSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. O2 INSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7. UZa-o W 0 V O Q w m ❑ w „v rvT Z w w m �i O4 INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. D-14, D-16. .. Y W 360 CONSTRUCTION NOTES 370 Ol INSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. O2 INSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7. y z 3 INSTALL SANITARY SEWER CLEAN OUT PER BAKERSFIELD STD. SW -5, SW -6. w m w w Y O4 INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. D-14, D-16. .. Y W 360 w U 4 O5 INSTALL TYPE 'B' STORM DRAIN MH PER BAKERSFIELD STD. D-18. 0 0 � o n U U a O6 PROTECT IN PLACE. ADJUST TO FINAL GRADE. y ¢ 7 INSTALL CONCRETE CAP ON SD LINE FOR FUTURE CONNECTION. O K 0 0 0 0 0 0 0 ❑ 350 > NOTES: N N ALL STATION LIBELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. w ¢ m o rc CONTRACTOR NOTES 340 w 1. CONTRACTOR TO POTHOLE AND FIELD VERIFY ALL TIES INTO EXISTING o STUBS PRIOR TO CONSTRUCTION. 2. ALL STORM DRAIN SHALL BE CUII RCP-RGJ. SEE STORM DRAIN NOTE 12, SHEET 2. 330 3. ALL SANITARY SEWER SHALL BE PVC SDR 35. SEE SEWER NOTE 10, SHEET 2. % 279.86 LF B" PVC SDR 35 ® 0.35.':6 ® L00°C z 320 L ....— ! ,1 . - -� --- �.....}?--- .... = ._. 320 J 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 J 0 BUCKING BRONCO COURTN o SCALE: 1" = 10' VERT. N ca Z 1" = 40' HORZ. L) Q W m Pl+ASB 2 ZCC N U LAI qpE C E O D'<(z �' . ALBS � Q R.C.E. 6ZF,�72 LJJ � m EXP. 6/3�?; �q _ >_ z PRASEL .. �w'�CV F RE CCa7'y2 [w c L LBERTOL04Z RG.E.67602 O" CFLfti EXP. 6100/ m w w x .. w w f o (n � o n SEE SHEET 4 SEE SHEET 5 SEE SHEET 6 WILD MUSTANG DRIVE ARROWHEAD TRAIL COURT WHISKEY CREEK DRIVE 0 Q U N — O O O Y R OyO O DO O O m oz'.. 51 52 O= p¢ 60 0� U 61 R/W R/W J W J N f_ K II W W J K O } toIW/I � N N s?' 8" PVC SDR 35 0 o I,I 8 PVC SDR 35 8" PVC SOR 35 p N89'17'35"W L-291 .00' M c'� B Ni L 161 A0' S89'17'35"E L=150.00' �S a S 5 S I S a a 5 o S S 71 10+00 Ll I 17"35"E_ — — - _. - - _ - _ 589' 301.00' 1 �~ - - + — — �o -'__ 11+00 12+00 S89' 17' 35"E 157.00' L N89' 17' 35"W 135.00' 13+00 14+00 15+00 _ _ T 16+00 17+00 O N N 42 /NK I JN ysP � R W � W O O Q Q Q Q N N 41 40 39 38 37 36 370 360 350 340 330 320 315 9- II O��V. m II ¢ NV1+ F 1~/1 +KMLL. VI N V O U N ¢ O ¢ F 34 35 I1r 30' WIDE SEWER CASEMENT PER DOCUMENT 0207084777 SEE SHEET 9 TUCKER CREEK ROAD DROVERS RUN ROAD SEE SHEET 7 BUCKING BRONCO COURT k 1'141 w ik 11 42 a ax +E m rc J/ II G2W 1 N 8"PVC SDR 35 S S89'17'35"E L=293.00'S -17 6 N89' 8 n W L 32 h -75 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 DROVERS RUN ROAD SCALE: 1" = 10' VERT. SEWER 1" = 40' HORZ. 330.39 TOP 16.10 m J 346.05 INV. 337.99 TOP 8.06 p II }w cc O II O INSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7: m �0x H y ^ O IIo N I - N 3O INSTALL SANITARY SEWER CLEAN OUT PER BAKERSFIELD STD. SW -5, SW -6. Y r W N Q U � N O4 INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. D-74, D-16. W N o W w � w 29 O INSTALL TYPE 'B' STORM DRAIN MH PER BAKERSFIELD STD. D-18. z W ¢ W ¢ ¢ 350 cc 0 N 0 O6 PROTECT IN PLACE. ADJUST TO FINAL GRADE. a a p n W L 32 h -75 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 DROVERS RUN ROAD SCALE: 1" = 10' VERT. SEWER 1" = 40' HORZ. 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 194 LEGEND: W U K Q' (E) STORM DRAIN MANHOLE O NEW STORM DRAIN MANHOLE G (E) SEWER MANHOLE (' NEW SEWER MANHOLE (E) STREET LIGHT Q w O NEW STREET LIGHT ; �- (E) SIGN 0 a �- NEW SIGN Q. LL NEW STREET SIGN Q w O (E) MONUMENT 18> NEW MONUMENT SNEER b7 NEW WALL (E) FIRE HYDRANT , ¢ W LL N > U b (E) BLOWOFF VALVE d � (E) STREET SIGN o"ld,,ls33a> SSP~ D STORM DRAIN --- (E) STORM DRAIN 5 SANITARY SEWER "' w m > ^ ... .... (E) SANITARY SEWER STEEP SLOPE (SEE GRADING PLAN) U Z 0g o W O dm � -- TRACT BOUNDARY [ 4 6 2, <z PROPERTY LINE w e v — ONP OVERHEAD POWER tF F —W— WATER LINE t',1 > 3 a5gg 370 LOCATION STORM WATER SEWER CONSTRUCTION NOTES BQ 346.49 INV. 330.39 TOP 16.10 m J 346.05 INV. 337.99 TOP 8.06 p 0 INSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. w cc O O INSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7: m �0x 360 N N 3O INSTALL SANITARY SEWER CLEAN OUT PER BAKERSFIELD STD. SW -5, SW -6. Y r W 0 Uc� U � O4 INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. D-74, D-16. W N o W w � w d O INSTALL TYPE 'B' STORM DRAIN MH PER BAKERSFIELD STD. D-18. z W ¢ a ¢ ¢ 350 cc 0 0 0 O6 PROTECT IN PLACE. ADJUST TO FINAL GRADE. p p p 0 w w O7 INSTALL CONCRETE CAP ON SO LINE FOR FUTURE CONNECTION. N m NOTES: ¢ m 340 ALL STATION LABELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. CONTRACTOR NOTES 1. CONTRACTOR TO POTHOLE AND FIELD VERIFY ALL TIES INTO EXISTING 330 STUBS PRIOR TO CONSTRUCTION. 2. ALL STORM DRAIN SHALL BE Cl RCP-RGJ. SEE STORM DRAIN NOTE 12, SHEET 2. 3. ALL SANITARY SEWER SHALL BE PVC SDR 35. SEE SEWER NOTE 10, SHEET 2. 320 315 75 m§IN OF REQ . ALBERTO L R.C.E. 67602 EXP. 111 SEPARATION TABLE LOCATION STORM WATER SEWER SEPARATION (FT) BQ 346.49 INV. 330.39 TOP 16.10 QD J 346.05 INV. 337.99 TOP 8.06 PHASE 7- R IN 0 RECE»' L. LBERTO LOPE R.C.E. 67602m EXP.1�.SQ'.19.-<— m m w w z x w _ w w Z LL a � 2720-7 W 0a� Z J R J 0 0 N cc O �0x N N Z ti c 0 Uc� W U Q w z W Ld cc O or a Lu t 0 Z Q PHASE 7- R IN 0 RECE»' L. LBERTO LOPE R.C.E. 67602m EXP.1�.SQ'.19.-<— m m w w z x w _ w w Z LL a � 2720-7 W 0a� 13 14 SEE SHEET STORM 10 SNOWY RIVER (E) DRIVE i 'v` 16.10 OWU — OVERHEAD POWER LEGEND: —Y1— WATER LINE o = Z a w v W it O O M N Y m W NR (E) STORM DRAIN MANHOLE N f Z CONSTRUCTION NOTES m off$ Y 0 ++ a w w L) O NEW STORM DRAIN MANHOLE Lu cc Z Z 35 U) OO (E) SEWER MANHOLE t Oi INSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. �?a m All, LLJ N00 '42i 25"E 320.00' 11_11+00S 5 — SEE SHEET 8 DROVERS RUN ROAD j 0 0 tt o ow oz RU Nm s.i' 29+w w ISI 35 « 60 R/W ,, m o n - 0 12+00 `o 13+00 S SEE SHEET 11 ALMOND CREEK DRIVE fII 1 w 5 w z Z �Y J O Ow �E NK OU oK + Nw ao g OZ O ky 5= 13 0 11+00 SEE SHEET 10 SNOWY RIVER DRIVE HT I I i r, 16 12+0013+00 i N00' 4225"E 320.00'_ _ —S S 5 R/W FEASEMENT R/W R/W61 R/1Y15 30 1430' WIDE SEWER 34 ' -DEMENT TER m m 0207084777. PHASE 1 ® PHASE i .'. PHASE 27-1 ., PHASE 2 SEE SHEET 10 SEE SHEET 8 SEE SHEET 11 SNOWY RIVER DRIVE DROVERS RUN ROAD ALMOND CREEK DRIVE TUCKER CREEK ROAD THUNDER MOUNTAIN LANE Z m 40' 0' 40' 80' 6m m m4 illlllmmm� HORZ SCALE: 1'=40' 370 360 350 340 330 320 9+75 10+00 10+50 11+00 11+50 12+00 12+50 TUCKER CREEK ROAD SCALE: 1" = 10' VERT. 1" = 40' HORZ. 13+00 13+50 370 360 350 340 330 320 14+00 14+25 370 360 350 340 330 320 9+75 10+00 10+50 11+00 11+50 12+00 12+50 13+00 THUNDER MOUNTAIN LANE SCALE: 1" = 10' VERT. 1" = 40' HORZ. 13+50 APPROVED: L. STEEP SLOPE (SEE GRADING PLAN) w STORM 8$ mY W O (E) ;^ PROPERTY LINE 'v` 16.10 OWU — OVERHEAD POWER LEGEND: —Y1— WATER LINE a Z a w v W m m OLLz O M N cm3 (E) STORM DRAIN MANHOLE N f Z CONSTRUCTION NOTES O off$ Y 0 U L) O NEW STORM DRAIN MANHOLE Lu cc a Z 35 U) OO (E) SEWER MANHOLE Oi INSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. �?a m CCw LLJ (i) NEW SEWER MANHOLE W w Z (E) STREET LIGHT OINSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -i, SW -7. O3 INSTALL SANITARY SEWER CLEAN OUT PER BAKERSFIELD STD. SW -5, SW -6. N z NEW STREET LIGHT 4O INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. D-14, D-16. o N �- (E) SIGN om ^- om +m aw N NEW SIGN Q +o w O7 INSTALL CONCRETE CAP ON SD LINE FOR FUTURE CONNECTION. II+ NEW STREET SIGN a0 a� ¢0 m N �y O0 (E) MONUMENT 0 O w Q NEW MONUMENT d w NOTES: NEW WALL Q J CZ (E) FIRE HYDRANT U V (E) BLOWOFF VALVE rN[FR r b ALL STATION LABELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. —R/W (E) STREET SIGN E o w D— STORM DRAIN 4 y CONTRACTOR NOTES _'. (E) STORM DRAIN 0 S SANITARY SEWER ......... ,. _._.._ (E) SANITARY SEWER 10+50 11+00 11+50 12+00 12+50 13+00 THUNDER MOUNTAIN LANE SCALE: 1" = 10' VERT. 1" = 40' HORZ. 13+50 APPROVED: L. STEEP SLOPE (SEE GRADING PLAN) w STORM 8$ mY �- - TRACT BOUNDARY O (E) ;^ PROPERTY LINE w 16.10 OWU — OVERHEAD POWER zz g o —Y1— WATER LINE w ¢ z Z a w v W m m OLLz O N cm3 (n ^ N f Z CONSTRUCTION NOTES O off$ Y U L) Lu cc a Z 35 U) Oi INSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. �?a m CCw LLJ W OINSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -i, SW -7. O3 INSTALL SANITARY SEWER CLEAN OUT PER BAKERSFIELD STD. SW -5, SW -6. N 4O INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. D-14, D-16. O5 INSTALL TYPE 'B' STORM DRAIN MH PER BAKERSFIELD STD. D-18. O PROTECT IN PLACE. ADJUST TO FINAL GRADE. O7 INSTALL CONCRETE CAP ON SD LINE FOR FUTURE CONNECTION. m p m w NOTES: m U O ALL STATION LABELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. o w z U 4 ¢ > CONTRACTOR NOTES -o¢w LL�aw 1. CONTRACTOR TO POTHOLE AND FIELD VERIFY ALL TIES INTO EXISTING ¢ ¢ ¢ 370 STUBS PRIOR TO CONSTRUCTION. o 0 0 o LIJ A � a I' 2. ALL STORM DRAIN SHALL BE CLIA RCP -RG,. SEE STORM DRAIN NOTE 12, SHEET 2. 3. ALL SANITARY SEWER SHALL BE PVC SDR 35. SEE SEWER NOTE 10, SHEET 2. 360 � Z I ��eH OSIraA IN RECORD 350 .ALBERTOL EZ R.C.E. 67602 PNAS� 1 340 DelAii i G OF REU" y > .I L. LBERTOLOP R.C.E. 67602 330 EXP. 6/30( 1 320 14+00 14+25 APPROVED: MARIAN P. SHAW SEPARATION TABLE LOCATION STORM WATER SEWER SEPARATION (FT) (E) ccQ o 346.49 INV. 330.39 TOP 16.10 © 346.16 INV. 328.36 TOP 17.80 R.C.E. #67602 DATE - 2 "!.^1i R.C.E. 32178 (EXP 12/31/16) DATE ,a-7aV7 zow w J ccQ o o Z g 0 z Z 00— W � O N N f Z O off$ Y U L) Lu cc Q/ Z ~ U) 0 m CCw LLJ W cc N w m F o W Z W � O O o z SEE SHEET 9 LEGEND: TUCKER CREEK ROAD 4 30' WIDE SEWER EASEMENT Q" (E) STORM DRAIN MANHOLE III IBJ I' PER DOCUMENT 0207084777 O NEW STORM DRAIN MANHOLE 89'117' 35"W 90.00' O (E) SEWER MANHOLE 23 0 24 25 26 s 27 28 29 Q 30 28 27 26 25 0 24 o NEW SEWER MANHOLE M oN >0- 22 p_a, �N (E) STREET LIGE + N W K m .. _. NEW STREET LIGHT 6 > 0 03 a a °� mw oo m m `° row ow r w y K v� ry o mt5 a 23 >' N> �U w N 3 <> o a ry r o w- (E) SIGN 0 Ma N M + K Ow d m mp ++ F F II II N fz II II ¢ <p �Y II Ir+j II II II II '�� II �- NEW SIGN LL N m a m 4' TYP. v~i I ¢ N N <'z a r N n? N N _ ._. N + NEW STREET SIGN Q w NmCi mcg �% UI Ci v '��� po (E) MONUMENT _ i.. ' ,y9 O• NEW MONUMENT �NLER 21 / ��)i 5 TYP. n _ 9d NEW WALL 10+00 11+00 12+00 1}+00 ' 14+00 15+00 I 16+00 17+004 5' iYP. 18+00 ? �, 18+68 44' 59' 34"E 'L�yyM rn 58.9' 17 35'E 225.56' 889' 1T 35 E 200.72' N89' 17 35"W `,. I $I I i ('` - 1- Ct (E) FIRE HYDRANT in ¢ C $ 5 S C $ C—+—H—C 5 5 S W p N > U N89'17'35W L=15726' 58917'35"E L=200.77 589'1735"E L 28267 STA=18+79.88 2 8" PVC SDR 35 ( --� B" PVC SDR 35 F n 8" PVC SDR 35 r b (E) BLOWOFF VALVEy z p "� _. 44' 59' 34"E /S75' S3' 03"W ^ — .4 _. ,; L ,..' .y -.. .-i^Jill- _..a 4' TYP. M D STORM DRAIN I, ^ (E) STORM DRAIN SEWER aH3ww o fNII aII '>i Q mImn m+o3 m¢ S SANITARY w¢HQ (E) SANITARY SEWER J m- i(1(N J wmN 21 "' N STEEP SLOPE (SEE GRADING PLAN) U z :S F br6i 17'3sw 1100.00' 1 5 1 6 1 7 1 8 1 9 20 --- x z; p1 v+i w TRACT BOUNDARY p Q an - 19 N I 1 5 1 3 14 PROPERTY LINE s Wow v 18 1 7 1 6 6" PVC SDR 35 N F ; V L. S89i17'35"E L=100.00' w z o_ OHP — OVERHEAD POWER —111— WATER LINE THUNDER MOUNTAIN LANE SEE SHEET 9 SNOWY RIVER DRIVE a < CONSTRUCTION NOTES m o I = 0 � Oj INSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. w O w OINSTALL 4" SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7. K "I w Y w O3 INSTALL SANITARY SEWER CLEAN OUT PER BAKERSFIELD STD. SW -5, SW -6. w z o o 11 O U Z O O4 INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. 0-14, D-16. of 0 a OS INSTALL TYPE 'B' STORM DRAIN MH PER BAKERSFIELD STD. D-18. m w w m a m 0 0 0 O PROTECT IN PUCE. ADJUST TO FINAL GRADE. o w 0 0 O7 INSTALL CONCRETE CAP ON SO LINE FOR FUTURE CONNECTION. w w w ¢ m NOTES: m ALL STATION LABELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. rrf)MTR®rTnR runTF� 1. CONTRACTOR TO POTHOLE AND FIELD VERIFY ALL TIES INTO EXISTING STUBS PRIOR TO CONSTRUCTION. 2. ALL STORM DRAIN SHALL BE CLIII RCP-RGJ. SEE STORM DRAIN NOTE 12, SHEET 2. 3, ALL SANITARY SEWER SHALL BE PVC SDR 35. SEE SEWER NOTE 10, SHEET 2. Z J Q J cc 0 W as °" MW cc, o0 c%1 N� CIO. LLJ O h > C) aLL,� z il L SNOWY RIVER DRIVE ��g��gz ^ ® < > o SCALE: 1" = 10' VERT. G,dC� W1 F RECORD L. BERTOLOPEZ U R.C.E.6io^U2 oC <Z 1" = aD' noRz. n EXP. WLl Lu H_ V) � Z L. ALBERTO L04ZI R.C.E. 67602 Q EXP 6/3011q SEPARATION TABLE N LOCATION STORM WATER SEWER SEPARATION (FT) QF 347.76 INV. 336.75 TOP 10.01 m o I � O w w "I w � w w W o 11 O c SEE SHEET 9 THUNDER MOUNTAIN LANE W YI w g 9 10 11 12 13 g' '� 14 12 11 10 9 8 ? m z w ry O 6 N N N ❑ N N N y Z N N N N y I O W TRACT'loz o + + + + " o❑+"'' + + + + n m ❑ 43 �I o o N N - + +z i a a a F F a aom uF it n it a awo m R/W 72 a a r' ¢ m m v, 4' TYP. w m viivii cam' ! ¢ a a m ✓¢i m vi Ci R/W rn vi �- _. -. TRACT— o ill a® =--BOUNDARY ':_. : ,,,. g 10+00_' 11+00 I) N 12+00 13+00 H 15+00 ( 16+00 17+00 18+00 J7 S89 17 35"E 385.93' N89' 1T 35'W 8907 N89'17' 35"W 343.04' S I j- 5 S S N89' 1T —i�^--�— s s s s 35"W 16.15' _ _ 0 589'19'15"E L 378.50" I S891735E L 245.43' 589'1 T35"E L-245.43' 8" PVC SDR 35 74+00 _ 6�� _8" PVC SDR 35 8" PVC SDR 35 �Wi a R/W w`4'TYP. rn y,Na „rn r w - ---_ , "' to ,"o + + 30' WIDE SEWER + �+ maE + + + a + + EASEMENT PER M c a m w m `° u n f R/W cmi m w< m Q_ a a ¢ n DOCUMENT II II Q 3 o a II II II F w o it II ,6 ❑ + m m w � , i I- a 0207084777 a a rj vwi o 16 +Z�W E II > W 10 d d N N N N N N r N N N N N N `p N 6 54 3 2 1 1 2 3 4 5 RIO VERDE DRIVE ALMOND CREEK DRIVE 7 0 � 1 — ea ns rn� °?wm w ¢wo � r yw� TRACT BOUNDARY w N " W E W r LEGEND: U 6 (E) STORM DRAIN MANHOLE O NEW STORM DRAIN MANHOLE C (E) SEWER MANHOLE NEW SEWER MANHOLE -.'F o (E) STREET LIGHT Q CD— NEW STREET LIGHT > o �- (E) SIGN O a -+- NEW SIGN a LL + NEW STREET SIGN Q ED (E) MONUMENT Q NEW MONUMENT�NEER b7 NEW WALL (E) FIRE HYDRANT �� b (E) BLOWOFF VALVE 6 o V a z -�- (E) STREET SIGN D STORM DRAIN -- > (E) STORM DRAIN c gg V m S SANITARY SEWER r U and -.- --- (E) SANITARY SEWER w �n STEEP SLOPE (SEE GRADING PLAN) L Z S' o -� TRACT BOUNDARY v O ¢ a¢y„ a PROPERTY LINE — OHP — OVERHEAD POWER 1' O z ^m X` s . 3 —Y/— WATER LINE w �� F m2 > 3 ❑ �S W 40 ° S 40 80Emi CONSTRUCTION NOTES D OINSTALL TYPE 'A' SANITARY SEWER MANHOLE PER BAKERSFIELD STD. SW -4, SW -5. j HORZ SCALE:1"=40' O INSTALL 4° SANITARY SEWER LATERAL PER BAKERSFIELD STD. SW -1, SW -7. Y U Y W 370- -- N OINSTALL SANITARY SEWER CLEAN OUT PER BAKERSFIELD STD. SW -5, SW -6. 370 i U z o INSTALL TYPE 'A' CATCH BASIN PER BAKERSFIELD STD. D-14, INSTALL. TYPE 'B' STORM DRAIN MH PER BAKERSFIELD STD. D-18. ¢ a z m¢lo In F.3 N� rN nm,o M " PROTECT IN PLACE. ADJUST TO FINAL GRADE. o w o 360 360 ] INSTALL CONCRETE CAP ON SO LINE FOR FUTURE CONNECTION. �y y y � a in II Frnza zm zzz II waZZ i II wnz - > vri wa¢�tgo ron i �N uwimmw W ` .. 4 'aro1. ( STREET PROFILE' i 1 Nm� NOTES: ¢ m ° - f- AT CENTERLINE - STREET PROFILE _,. EXISTING GROUND ! : ALL STATION LABELS ARE C/L STATIONING UNLESS OTHERWISE INDICATED. N - - AT CENTERLINE - - -- - - _ 350 .._. _ — .^^^.,.�—^s--'• - — - - 50 0 _ CONTRACTOR NOTES i 7EXISTING1. COMR CTOR POTHOLE AND FIELD VERIFY ALL TIES INTO EXISTING GROUND 1 A TO n N o STUBS PRIOR TO CONSTRUCTION. 2. ALL STORM DRAIN SHALL BE CLIII RCP-RGJ. SEE STORM DRAIN NOTE 340 - ! .� �. _. _ .. _ - _ �_ -_. _ ... _ !..._ a ". , - . " -.- . " - - . 1 _ i 340 12, SHEET 2. 3. ALL SANITARY SEWER SHALL BE PVC SDR 35. SEE SEWER NOTE 10, SHEET 2. 330 (E) 1 z ss -rt (E) 15" STUB ABANDON ' N �— _ � _. ! ... r_ .. ! ....." _ - I _ ..._f + - �.. - - - - 330 G °k"""":,;� J W ®0 237 ( PLACE WITH CEMENT (PLUG (- - , b 325.19 325-19 INV... INV.... Ca6Lm-.. y '- .... ". .. .. ...... �.. r 320 -> " ..-_... " . -. .. .. 7 - — . - (- — -� 320 o N dal _ - 378.50 LF 8" PVC SDR 35 ® 0.357, _. P-45.4 Lf S PVG .+ R'�S5@ 0!5 � 24o.4 ora Pv[." o R g, @ ©3� ca Ld 31CC W s+7s .o+oo::.. - 10+so -- 11+00: 11+50 12+00 2+ r_-. .:.:. 1 .::- _ ..-- _. ._--.=_ , _. .. .:::. i. __ -_�:: ± _:_: I .._. __._ _. ..... .. _. ...---_1 31s PMASEI A�,,E� O r 1 00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50G I „ q,,, - U (� ALMOND CREEK DRIVE PHASE 2 ------- z � N � SCALE: i" = 10' VERT. ,�+'� OF ��1®�� L.ALBERTOLO _ Z 1" = ao' HORz. f/ij �\,,// EX:�a,=:,' � � O CC W H _j bALBERT0 L.OpkI R.C.E. 67602 > Z Q EXP. 6/30/l9 It Q N SEPARATION TABLE LOCATION STORM WATER I SEWER SEPARATION (FT) © 343.81 INV. 1 333.06 TOP 10.75 m m � � r w " W 2 W LL O n 0 w