Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
6.9-322
I. GRADING SHALL CONFORM TO STANDARDS, SPECIFICATIONS, AND REQ UftEP,1ENTS OF ;HE LATEST EDITION OF THE CA..IFORNIA BUILDING OvGE APENDIX J GRADING, AS ADOPTED BY THE v4CAL GOVERNING AGENCY AND STANDARDS PERTAINING THEREOF AND TO THE REQUIREMENTS OF THE PRELIMINARY SOUS REPORT PREPARED FOR THIS PROJECT BY: KRAZAN & ASSOCIATES, INC GEOTECHNICAL ENGINEERING DPASION 2205 COY AVENUE BAKERSFIELD, CA 93307 (661) 837-9200 PRO,ECT NO. 022-19075 ALL GRADING WORK SHALL BE SUPERVISED AS ENGINEERED GRADING IN ACCORDANCE NTH APPENDIX J OF CALIFORNIA BUILDING CODE^ NOTE: SHOULD A CONFLICT OCCUR BETWEEN THE FO:.LOWING NOTES AND THE i ENTS SHALL PREVAIL. SOILS REPORT. THE MORE 5TR.r NOENH RE U'RE0.i= Q 2. THE CONTRAC70R SHALL REMOVE AND OR RELOCATE ALL Q$STR.IC`IONS MTHIN THE STREET RIGHT-OF-WAY AS DIRECTED BY THE LOCAL GOVFRNING ROADS DEPARTMENT. 3. ALL EXISTING IMPROVEMENTS THAT ARE REMOVED, DAMAGED, OR UNDERCUT SHALL BE REPAIRED OR REPLACED AS DIRECTED BY CITY ENGINEER OF APPLICABLE AGENCY. 4. ALL CUT SLOPES SHALL BE NO STEEPER THAN (2) TWO HORIZONTAL TO (1) ONE VERTICAL. 5. ALL FILL SLOPES SHALL BE NO STEEPER THAN (2) TWO HORIZONTAL TO (T) ONE VERTICAL. 5A.BERMS' OR DRAINAGE DEVICES ARE REQUIRED A7 IOP OF ALL FELL SLOPES. 5B. DIVERTER TERRACES (SWALES) WITH THREE (3) FEET MINIMUM WIDTH AND ONE (1) FOOT DEPTH ARE REQUIRED AT TOP OF CUT AND FILL SLOPES WHEN EXISTING TERRAIN SLOPES TOWARD TOP OF CUT. 5C. FILL AREAS SLOPING STEEPER THAN FIVE TO ONE (5:1) SHALL BE KEYED AND BENCHED TO SUPPORT FILL. 5D. ALL FILL SLOPES SHALL NOT CUT WITHIN TWELVE (12) FEET HORIZONTALLY OF THE TOP OF EXISTING ANDJCR PLANNED SLOPES, 5E. ALL SLOPES IN EXCESS OF T}TREE ',0 FEL[ MINIMUM WIDTH AND ONE (i) FOOT MINIMUM DEPTH ARE REQUIRED AT TOP OF CUT SLOPES WHEN EXISTING TERRAIN SLOPES TOWARD TOP OF CUT. 6. ALL VEGETABLE MATTER SHALL BE REMOVED FROM THE SURFACE UPON WHICH THE F131 IS TO BE PLACED, AND THE SURFACE SHALL BE PLOWED SCARFED TO A DEPTH OF AT LEAST TWELVE INCHES (12"), AND UNTIL THE SURFACE IS FREE FROM RUTS, HUMMOCKS OR OTHER UNEVEN FEATURES WHICH WOULD TEND TO PREVENT UNIFORM COMPACTION BY THE EQUIPMENT TO BE USED. 7. FILL MATERIALS: MATERIALS FOR FILL SHALL CONSIST OF MATERIAL SELECTED BY THE SOILS ENGINEER FROM SOURCES IDENTIFIED IN LABORATORY REPORTS WHICH HAVE PREVIOUSLY BEEN ACCEPTED BY TINE ROADS DEPARTMENT. THE MATERIAL USED SHALL BE FREE FROM VEGETABLE MATTER AND OTHER DELETERIOUS SUBSTANCES AND SHALL NOT CONTAIN ROCKS OR LUMPS HAYING A DIAMETER OF OR MORE THAN SIX INCHES (6`). LOCAL ENGINEERING, BUILDING, AND OR SURVEYING DEPARTMENT SHALL. BE NOTIFIED 24 FIGURE IN ADVANCE OF THE PLACEMENT OF ANY FIV:_ MATERIAL. 8. AMOUNT OF COMPACTION! AFTER EACH LAYER (LIFT) HAS BEEN PLACED, MIXED AND SPREAD EVENLY, :1 SHALL BE THOROUGHLY COMPACTED TO THE SR.&TED DENSITY. THE SPECIFIED DENSITY WILL BE STATED AS A PERCENTAGE OF THE MAXIMUM DENSITY ATTAINABLE USING CURRENT ASTM DENSITY TEST NO. 0 1557 THE SPECIFIED DENPUY TYPICALLY WILL BE NINETY PERCENT (90%) OF THE MAXIMUM FOR MOST COHESIVE., NON-FXPANSIVF SOILS, HOWEVER IT WILL BE ESTABLISHED AS APPROPRIATE. FOR THE MATERIALS AND ENVIRONMENT D - D. -FINE FI'LL COMPACTION SHALL CONFORM TO U.B.C. STANDARDS AND LOCAL GRADING STANDARDS. 9. DEPTH AND MIXING OF FILL LAYERS! THE SELECTED FILL MATERIAL SHALL BE PLACED N LEVEL, UNIFORM LAYERS WHICH, WHEN COMPACTED, SHALL HAVE A DENSITY CONFORMING TO THAT STIPULATED IN THE SOILS REPORT SPECIFICATIONS. EACH LAYER SHALL BE THOROUGHLY BLADE MIXED DURING THE SPREADING TO INSURE UNIFORMITY OF MATERIALS IN EACH LAYER. COMPACTED LAYER THICKNESS NORMALLY ALL BE SIX (6"), HOWEVER, IT MAY BE SPECIFIED OTHERWISE IF COMPACTION EQUIPMENT OF DEMONSTRATED CAPABILITY ME[.. BE USED. THE SOILS ENGINEER AND THE INSPECTORS SHALL BE NOTIFIED AT LEAST 48 HOURS PRIOR TO THE PLACING OF ANY FILL MATERIAL 10. COMPACTING AREA TO BE FELLED: AFTER THE FOUNDATION FOR THE FILL HAS BEEN CLEARED AND PLOWED OR SCARIFIED, IT SHALL BE DISKED OR BLADED UNTIL IT IS UNIFORM .AND FREE FROM LARGE CLOGS, BROUGHT TO THE PROPER MOISTURE CONTENT, AND COMPACTED (TYPICALLY) TO NOT LESS THAN ,NINETY (90%) OF MAXIMUM DENSITY AS DETERMINED BY APPROVED METHOD PER APPENDIX J OF THE CURRENT CALIFORNIA BUILDING CODE AND CERTIFIED BY TESTS AND REPORT FROM SOILS ENG,NEER, IN ACCORDANCE WITH CURRENT ASTM DENSITY TEST NO. D 1557, OR TO SUCH OTHER DENSITY AS MAY BE DETERMINED APPROPRIATE FOR THE MATERIALS AND CONDITIONS AND ACCEPTABLE TO THE ENGINEER AND OR INS?EC-ORS. 1',. ROCK: WHEN FILL MATERIAL INCLUDES ROCK, THE MAXIMUM ROCK SIZE ACCEPTABLE SHALL BE SIX INCHES (6"), NO LARGE ROCKS SHALL BE AiEOWr'ED TO NEST AND ALL VOIDS MUST BE CAREFULLY FILLED WITH SMALL STONES OR EARTH, PROPERLY COMPACTED. NO LARGE ROCKS WILL BE PERMITTED WITHIN TWELVE INCHES (12"), OF THE FINISHED GRADE. 12 MOISTURE CONTENT: THE FILL MATERIAL SHALL BE COMPACTED AT THE APPROPRIATE MOISTURE'. CONTENT SPECIFIED FOR THE SOILS BEING USED, AS IDENTIFIED IN LABORATORY AND SOILS REPORT. MOISTURE CONTENT TOLERANCES SHOULD BE CLEARLY DEFINED FOR PLACEMENT OF EACH MATERIAL PROPOSED FOR USE IN A FILL. APPROPRIATE MOISTURE CONTENT IS DEFINED TYPICALLY, AS OPTIMUM MOISTURE CONTENT, HOWEVER FOR EXPANSIVE SOILS IT MAY BE GREATER THAN OPTIMUM MOISTJRF CONTENT, AND OTHER MOISTURE CONTENTS MAY BE NECESSARY TO PRODUCE THE DESIRED RESULTS WITH SPECIFIC SOILS. 13. DENSITY TESTS: FIELD DENSITY TEST SHALL BE MADE BY THE SOILS ENGINEER OF THE COMPACTION OF EACH LAYER OF FILL. DENSITY TEST SHALL BE TAKEN IN THE COMPACED MATERIAL BELOW THE DISTURBED SURFACE. WHEN THESE TESTS INDICATE THAT THE DENSITY OF ANY LAYER OF FILL OR PORTION THEREOF IS BELOW THE REQUIRED DENSITY, THE PARTICULAR LAYER OF PORTION SHALL BE REWORKED UNTIL THE REQUIRED DENSITY HAS BEEN OBTAINED. SUFFICIENT DENSITY PESTS SHALL BE MADE TO SUPPORT `HE SOILS ENGINEER'S CERTIFICATION OF EACH FILL LAYER. 14. REPRESENTATIVES OF THE SOILS ENGCNEER WILL OBSERVE THE WORN IN PROGRESS MAKE TESTS OF THE SOIL AND REVIEW THEX AV T( E C A ONS AND TRENCHES. THE CIVIL ENGINEER WILL OBSERVE GRADING OPERATIONS TO FAC:UTATE SUBSTANTIAL COMPLIANCE WITH THE PLANS SPECIFICATIONS AND CODES WITHIN HIS PURVIEW. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND TECHNIQUES, SEQUENCES AND PROCEDURES. THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE J09 SITE, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY DURING 111E PERFORMANCE OF THE WORK, INTERMITTENT VISITS BY THE SOILS ENGINEER OR THE CIVIL ENGINEER DO NOT INCLUDE REVIEW OF THE CONTRACTOR'S SAFETY MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE. 15. GRADING WORK SHALL BE DONE IN A MANNER TO PREVENT STORM DAMAGE TO PUBLIC OR PRIVATE: PROPERTY OF OTHERS BY FLOODING, EROSION, DEPOSITION, DEBRIS, OR ANY OTHER DAMAGE RESULTING FROM THE GRADING WORK 16. SURFACE DRAINAGE ON DIRT SHALL HAVE A MINIMUM SLOPE OF 2% PERCENT AWAY FROM ALL STRUCTURES FOR A MINIMUM DISTANCE OF 5 FEET. 16A. SURFACE DRAINAGE TO BE ONE (17) MINIMUM TO APPROVED DRAINAGE FACILITY, EXCEPT AS WAIVED BY BUILDING OFFICIAL. 17. CIVIL ENGINEER, GEOTECHNICAL, ENGINEER, AND BUILDING OFFICAL WILL BE NOTIFIED FORTY EIGHT (48) HOURS TO PLACi.N., ANY FILL. 17A, THE CIVIL ENGINEER, GEOTECHNICAL ENGINEER, BUILDING OFFICIAL AND ANY GOVERNMENTAL. AGENCIES HAVING JURISDICTION OVER THE PROJECT SHALL BE Y N T I e NOTIFIED B THE CONTRACTOR OR HE OWNER A MINIMUM OF 8 HOURS PRIOR TO THE TIME THAT GRADING IS TO COMMENCE AND THE CONTRACTOR OR THE OWNER SHALL MAKE ALL NECESSARY ARRANGEMENTS FOR THEIR INSPECTIONS. 18, THE SOILS ENGINEER SHALL BE NOTIFIED SUFFIUENTLY IN ,ADVANCE I.0 PERMIT EXAMINATION OF SUBGRADE AND TESTING OF FILL AND FINAL GRADES. THE SCiLS ENGINEER SHALL BE NOTIFIED 01' ANY CONUPiUN THAT MAY EFFECT THE PROJECT. iO THE CONTRACTOR SHALL OBTAIN ANY PERMITS NECESSARY FOR ANY CONSTRUCTION WITHIN STREET RIGHT-OF-WAY FROM T!1E LOCAL GOVERNING AGENCY. 20. AN OSHA PERMIT IS REQUIRED WHEN WORKERS MUS' ENTER TRENCHES OR EXCAVATIONS FIVE (5) FEET OR DEEPER. 21, THE DESIGN ENGINEER SHALL EXERCISE SUFFICIENT SUPERVISOR CONTROL DURING GRAL'ING AND CONSTRUCTION TO INSURE COMPLIANCE WITH THE PLANS, SOILS REPORT, SPECIFICATIONS, AND CODE WITHIN HIS PURVIEW. 22. AN ENCROACHMENT PERMIT SHALL BE OBTAINED FROM THE GOVERNING PUBLIC WORKS DEPARTMENT PRIOR 10 WORKING WITHIN THE STREET RIGHT-OF-WAY. 23. IMPROVEMENTS IN THE STREET RIGHT --OF WAY MADE IN REFERENCE TO APPROVED STREET PLANS, 24. CONTRACTOR IS RESPONSIBLE FOR THE GRADING OF LOT PAD AREAS TO WITHIN .01` OF THE DESIGN ELEVATION. 25. ALL AREAS IN THE SITE ON WHICH STRUCTURES ARE TO BE PLACID MUST BE COMPACTED 'FO 90% RELATIVE DENSITY, FOR A MINIMUM DISTANCE OF (5) FEET' IN ALL DIRECTIONS FROM THE FOUNDARDN OF THE STRUCTURE. 26. COMPACTION IN PROPOSED PAVEMENT AREAS SHOULD BE THE SAME AS FOR THE BUILDING PADS, AND SHAD- EXTEND TO A MINIMUM DISTANCE OF (2) FEET BEYOND THE OUTSIDE EDGE OF PAVEMENTS. 27. DURING GRADNG, REASONABLE SEARCHING SHOULD BE PERFORMED FOR CANCELED SUBSURFACE OBSTRUCTIONS, ALL ABANDONED SUBSURFACE OBSTRUCTIONS SHOULD BE REMOVED. IF THE TERMINUS OF ANY ABANDONED PIPING IS OUTSIDE THE PROJECT LIMITS, THE PIPING SHOULD BE REMOVED WITHIN THE PROJECT AND PROPERLY CAPPED AT THE PROJECT BOUNDARY. 28, DUST CONTROL: SHAH- MEET THE REQUIREMENTS OF THC CALIFORNIA CONSTRUCTION GENERAL. PERMIT (CARCO ORDER NO, 2009-0009-DWQ AS AMENDED BY ORDER 2010-0014-DWO AND ORDER 2012-0006-DWQ.), AND IT SHALL BE THE CONTRACTORS RESPONSIBILITY TQ PREVENT A DUST NUISANCE ORIGINATING FROM THE SITE OF WORK AS A RESULT OF F#i9 OPERATIONS D'JE21NG THE EFFECTIVE PERIOD OF THIS CONTRACT. PREVENTATIVE MEASURES TO BE TAKEN BY THE CONTRACTOR SHALL INCLUDE BUT NOT BE UNITED TO THE FOLLOWING; A. WATER SHALL BE APPLIED TO ALL UNPAVED AREAS AS REQUIRED TO PREVENT THE SURFACE FROM BECOMING; DRY ENOUGH TO PERMIT DUST FORMATION. 9, CARLO SURFACES OVER OVER WHICH VEHICULAR TRAFFIC IS PERMITTEE: 70 'TRAVEL SHALL BE KEPT FREE OF DIRT. 29. CONTRACTOR TO COORDINATE ETH INSPECTOR AND DEVELOPER, THE LOCATION OF THE BORROW OR SPOILS PRIOR TO CONSTRUCTION. 30. THE LOCATION OF EXISTING UTILITIES AND UNDERGROUND PIPELINES SHOWN ON (HESE PLANS ARE APPROXIMATE ONLY, THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES AND ONCERGROUND PIPELINES BEFORE COMMENCING WORK, CONTRACTOR ASSUMES ALL LIABILITY FOR ANY AND ALL UNDERGROUND UTILITIES AND PIPELIES, 31. CONTRACTOR SHALL CALL UNDERGROUND SERVICE ALERT (USA) AND THE LOCAL PUBLIC WORKS DEPARTMENT AT LEAST TWO (2) WORKING DAYS PRIOR TO THE START OF CONSTRUCTION TO MARK THE LOCATIONS OF EXISTING UTILITY 11,41 S. PHONE: USA 811 32. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING, ACCEPTED STREET RIGHT-OF-WAY. UNLESS SECURED BY AN IMPROVEMENT AGREEMENT, APPROVED INSURANCE AND SECURITY BASED N AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE RIGHT-OF-WAY SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT. 33, ANY WORK CONNECTION TO EXISTING PUBLIC FACHUTIES FROM PRIVATE PROPERTY WILL REQUIRE AN ENGINEERS ESTIMATE FOR THE WORK IN EXISTING PUBLIC RIGHT-OF-WAY TO ESTABLISH THE NECESSARY DEPOSIT. 34, 24 HOUR N0710E: PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CITY CONSTRUCTION INSPECTION SECTION SHALL BE GIVEN AT LEAST 24 HOURS NOTICE. THE SECTION MAY BE NOTIFIED AT (661)326-3049. 35. COMPACTION TEST SHALL BE THE RESPONSIBILITY OF THE DEVELOPER /SU8DIMDER/CONTRACTOR, THE NUMBER AND LOCATIONS OF REQUIRED TESTS SHALL BE DETERMINED 8Y THE CITY ENGINEER, 36. LANDSCAPE. AREAS ARE TO BE DESIGNED AND GRADED TO MINIMIZE EXCESS LANDSCAPE ORAINAGE ACROSS 114E SIDEWALK FOR THOSE AREAS OVER 2%. MAXIMUM SLOPE RATIO FROM BACK OF SIDEWALK TO FACE OF WALL OR STRUCTURE SHAT 1, BE 4:1, EXCEPT FOR THE TWO FEET BEHIND THE SIDEWALK WHERE THE MAXIMUM SLOPE SHALL BE 2%. ALTERNATIVELY, THE CITY ENGINEER MAP APPROVE CURBING BEHIND THE SIDEWALK OR OFFER METHOD TO PREVENT EROSION ONTO THE SIDEWALK, 37. FACES OF ALL CUT AND FILL SLOPES SHALL SHALL BE PLANTED WITH GROUND COVER INDIGENOUS TO THE AREA AND MAINTAINED AGAINST EROSION, 38, ANY PUBUC FACILITIES IN STREET" RIGHT-OF-WAY WITHIN THE PROPERTY FRONTAGE WHICH ARE SUBSTANDARD OR DAMAGED WILL REQUIRE RECONSTRUCTION M "! AVENUE BAKERSFIELD, j # SITE PLAN # / APfIJ WALL PLANS ! 19-3016 EXHIBIT "A" - PARCEL MERGER NO. 18-0340 BEING A MERGER AND RESUBDIVISION OF PARCELS I THROUGH 16 OF PARCEL MAP WAIVER N0. 4-81, .AS EVIDENCED BY THAT CERTAIN CERTIFICATE OF COMPLIANCE RECORDED MARCH 9, 1982 Y1 BOOK 5443, PAGE 1599 OF OFFICIAL RECORDS, AND RE-RECORDED MAY 28, 1982 IN BOOK 5462, PAGE 1619 OF OFFICIAL RECORDS, AND CORRECTED BY AN INSTRUMENT' RECORDED MARCH 16, 1953 IN BOOK 5534, PAGE 896 OF OFFICIAL RECORDS, ALL IN THE OFFICE OF KERN COUNTY RECORDER. ALSO BEING THOSE PORTIONS OF THE EAST HALF OF LOTS 1 AND 2 OF SALES MAP NO. 1 OF J.B. HAGGIN, IN THE NORTHEAST QUARTER OF SECTION 19, TOWNSHIP 30 SOUTH, RANGE EAST, 64. -.d 0 A Gc 28 E S D. CITY OF BAKERSFEL.D COUNTY 0.s KERN STATE OF CALIFORNIA, FILLED MAY 3, 1889 IN THE OFFICE OF KERN COUNTY RECORDER DESCRIBED AS FOLLOWS: PARCEL "B" COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 19, SAID POINT ALSO BEING THE CENTERLINE INTERSECTION OF PACHECO ROAD AND SOUTH UNION AVENUE; THENCE SOUTH 89'51'01" WEST, ALONG THE THE NORM LINE OF SAID SECTION 19 AND ;HE CENTERLINE OF PACHECO ROAD, A DISTANCE OF 299.97 -FFT TO THE NORTHERLY PROLONGATION OF THE WESTERLY LINE OF SAID LOT 1, SAID POINT ALSO BEING ON THE EASTERLY LINE OF TRACT NO. 4045, FILED FOR RECORD IN MAP BOOK 28, PAGES 23 AND 24, IN THE OFFICE OF THE KERN COUNTY RECORDER; THENCE SOUTH 00'01'15" EAST, ALONG SAID PROLONGATION AND THE WtS'ERLY LINE OF SAID LOTS 1 AND 2 AND SAID EASTERLY LINE, A DISTANCE OF 212.17 FEE - TO THE POINT OF BEGINNING; THENCE ALONG THE FOLLOWING SIX (6) COURSES 1. DEPARTING SAID WES"FERLY AND EASTERLY LINE AT RIGHT ANGLES, NORTH 89°58'45"EAST, A DISTANCE OF 63.50 FEET; THENCE 2. SOUTH 00°00'59" EAS?, PARALLEL WITH THE EAST LINE OF SAID SECTION, A DISTANCE OF 148.17 FEET; THENCE 3. NORTH 89'58`45" EAST, AT RIGHT ANGLES TO THE EASTERLY LINE OF SAID TRACT NO. 4045, A DISTANCE OF 166.45 FEET TO THE EAST LINE OF SAID SECTION 19 AND CENTERLINE OF SOUTH UNION AVENUE; THENCE 4. SOUTH 00°00'59" EAS?, ALONG SAID EAST LINE AND SAID CENTERLINE, A DISTANCE OF 214.33 FEET TO THE EASTERLY PROLONGATION OF THE SOUTHERLY LINE OF SAID LOT 16; THENCE 5. SOUTH 89"58'45' WEST, ALONG SAID PROLONGATION AND THE SOUTHERLY LINE OF SAID LOT 16 TO THE SOUTHWEST CORNER OF SAID LOT 16, SAID POINT ALSO BEING ON THE EASTERLY LINE OF SAID TRACT NO. 4045: THENCE 6. NORTH 00°01'59" WEST, ALONG SAID EASTERLY LINE AND THE WESTERLY LINE OF LOTS 2-16 TO THE POINT OF BEGINNING. CO)CONTROL N )TAINING 1.35 (GROSS) ACRES, MORE OR LESS ST 1. PORTABLE WATER WILL BE APPLIED TO DISTURBED SOIL AREAS OF THE PROJECT SITE TO CONTROL DUST AND MAINTAIN OPTIMUM MOiSTiIRE. LEVELS FOR COMPACTION. THE WATER WILL BE APPLIED USING WATER TRUCKS. AS SHOWN ON THE PROJECT SCHEDULE, PROJECT SOILS WILL BE DISTURBED AND EXPOSED FROM APPROXIMATELY MAY 1 THROUGH SEPTEMBER 15. WATER APPLICATIONS WI!_L BE CONCENTRATED DURING THE LATE SUMMER AND EARLY FALL MONTHS. THE TOTAL. WATER TO BE APPLIED IS EXPECTED TO BE BETWEEN 110,000 AND 180,000 FT. 2. BMP Al WIND EROSION CONTROL, AND BMP NS -1, WATER CONSERVATION PRACTICES, NLL BE IMPLEMENTED TO PROVIDE DUST CONTROL AND PREVENT DISCHARGES FROM DUST CONTROL ACTIVITIES AND WATER SUPPLY EQUIPMENT. WATER APPLICATION RATES ELL BE MINIMIZED AS NECESSARY TO PREVENT RUNOFF AND PONDING AND WATER EQUIPMENT LEAKS WILL BE REPAIRED IMMEDIATELY. * MOST DUST CONTROL MEASURES SECURE FREQUENT, OFTEN DAILY, OR MULTIPLE TIMES PER DAY ATTENTION. 3. DURING WINDY CONDITIONS (FORECAST OR ACTUAL WIND CONDITIONS APPROXIMATELY 25 MPH OR GREATER), DUST CONTROL WILL BE APPLIED TO DISTURBED AREAS, INCLUDING HAUL ROADS, TO ADEQUATELY CONTROL END EROSION. 4. BMP WM--3, STOCKPILE MANAGEMENT, USING SILT' FECES AND PLASTIC COVERS WILL BE IMPLEMENTED TO PREVENT WIND DISPERSAL OF SEDIMENT FROM STOCKPILES. IF THE PROJECT IS SUBJECT TO THE PROVISIONS OF THE NATIONAL POLUTON DISCHARGE ELIMINATION SYSTEM (NPDES), A "NOTICE OF INTENT" (HOT) TO COMPLY WITH THE TERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY (SWRCB ORDER NO. 2009-009 DW'O AS AMENDED BY ORDER 20110-0014--DWQ AND ORDER 2012 -006 -DMO) MUST BE FILED WITH STATE WATER RESOURCES CONTROL BOARD IN SACRAMENTO BEFORE THE BEGINNING OF ANY CONSTRUCTION ACTIVITY. COMPLIANCE WITH 'HE GENERAL PERMIT REQUIRES THAT A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) BE PREPARED, CONTINUOUSLY CARRIED OUT, AND ALWAYS BE AVAILABLE FOR PUBLIC INSPECTION DURING NORMAL CONSTRUCTION HOURS. CALIFORNIA WATER CODE - NPDES PERMIT ACTIVITY CALIFORNIA BUILDING STANDARDS CODE WITH RESPECT TO THE STORMWATER AND III REQUIREMENTS PER THE ABOVE REFERENCED CODES, REGULATIONS AND STANDARDS: 1. CONSTRUCTION ACTIVITY WILL NOT RESULT IN THE DISTURBANCE OF ONE ACRE OR MORE OF TOTAL LAUD AREA 2CONSTRUCTION ACTIVITY 'OIL & GAS' WILL NOT RESULT IN THE DISCHARGE TO A WATER OF THE STATE OF STORMWATER CONTAINING CONTAMINANTS AND/OR SEDIMENTS THAT WILL CONTRIBUTE TO A VIOLATION OF WATER QUALITY STANDARDS. 3. CONSTRUCTION ACTIVITY WILL COMPLY WITH CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN) REQUIREMENTS. SEE APPROVED BUILDING PLANS SHEET A-1.2, BMP -1, AND BMP -2 FOR ADDITIONAL STORM 'WATER AND EROSION CONTROL REOUIRMENTS THESE PLANS WERE PREPARED BY ME OR UNDER MY DIRECTION DATE: I BY: I REVISION 03- -- ml� 28 191 305 1 PLAN CHECK RESPONSE 05-20-18 ENGINEER MAKES NO WARRANTY OF THE ANTICIPATED IS BOS I PLAN CHECK RESPONSE 07 05 191 805 ISLAM CHECK RESPONSE s -le ,SP,.. nMFVc onIIA tu,W,FCV w trx_t;y VRDAt.'?rC ILL1EirFcr I,r n fiFf �kn , rnnryin!°fJ ,2,N'Ar E�VRG_e,6 q r n- ,.0 ar cr: rvcTY 9r"L, cr.:�h7 rs Titr. s.F,Vs.. 4 -I ssotr I.t, cI.0la s, % p Q NONE PROPOSED GD -1 COVER SHEET GD -2 AREA DRAINAGE PLAN GD -3 GRADING PLAN GD -4 CROSS SECTIONS AND DETAILS TOTAL DISTURBANCE SURFACE AREA 1 40,427 SF (0.93 ACRES) GROSS CUT 1,400 YARDS GROSS FILL 100 YARDS PACIFIC GAS & ELECTRIC COMPANYS AC LES TINGLE LEGEND QUANTITIES ARE FOR GRADING PERMIT ONLY. THE SMIJ :i c0 7 F II ENGINEER MAKES NO WARRANTY OF THE ANTICIPATED IS - TOP OF PAVEMENT SHRINKAGE FACTOR. THE CONTRACTOR SHALL NOT FF - FINISHED FLOOR ELEVATION UP £ THESE QUANTITIES TO BASE HIS BID ON. FP - FINISHED PAD ELEVVJON I v T: -- LANDSCAPE AREA 'i GO BC -BEGIN CURVE LOCATION VERIFIED BY SOILS ENGINEER. EC "X, DESTINATION OF EXPORT MATERIALS TO BE DETERIMED I - BEGIN CURVE RETURN 'i ECR - END CURVE RETURN FL - FLOW LINE DESTINATION OF EXPORT' MATERIAL WILL BE TRUCKED TO - TOP OF CURB OFFSITE. OFFSITE DESTINATION TO BE DETERMINED BY C - CONCRETE CONTRACTOR A, TIME OF WORK. GB - GRADE BREAK IF - TOP OF_F FOOTING 13ENCH MARK TW - TOP OF 'WALL - FILL DL - DAYLIGHT I BHC - BEGIN VERTICAL CURVE j I i FLOW LINE AT THE WEST RETURN OF THE NORTH POVC - POINT OF VERTICAL CURVE WEST CORNER OF SOUTH UNION AND LOIS LANE PER CB - CATCH BASIN TORO SURVEY DATED 6-30-18 ! j I T.T. - TRAFFIC INDEX ASSUMED ELEVATION 368.94 INV, - PIPE INVERT GD -1 COVER SHEET GD -2 AREA DRAINAGE PLAN GD -3 GRADING PLAN GD -4 CROSS SECTIONS AND DETAILS TOTAL DISTURBANCE SURFACE AREA 1 40,427 SF (0.93 ACRES) GROSS CUT 1,400 YARDS GROSS FILL 100 YARDS PACIFIC GAS & ELECTRIC COMPANYS AC LES TINGLE LEGEND QUANTITIES ARE FOR GRADING PERMIT ONLY. THE BAKERSFIELD, CA 93313 ENGINEER MAKES NO WARRANTY OF THE ANTICIPATED IS - TOP OF PAVEMENT SHRINKAGE FACTOR. THE CONTRACTOR SHALL NOT FF - FINISHED FLOOR ELEVATION UP £ THESE QUANTITIES TO BASE HIS BID ON. FP - FINISHED PAD ELEVVJON BAKERSFIELD, CA 93313 v T: -- LANDSCAPE AREA IMPORT MATERIAL. MUST BE FROM APPROVED GO BC -BEGIN CURVE LOCATION VERIFIED BY SOILS ENGINEER. EC - END CURVE DESTINATION OF EXPORT MATERIALS TO BE DETERIMED OCR - BEGIN CURVE RETURN BY CONTRACTOR. ECR - END CURVE RETURN FL - FLOW LINE DESTINATION OF EXPORT' MATERIAL WILL BE TRUCKED TO - TOP OF CURB OFFSITE. OFFSITE DESTINATION TO BE DETERMINED BY C - CONCRETE CONTRACTOR A, TIME OF WORK. GB - GRADE BREAK IF - TOP OF_F FOOTING 13ENCH MARK TW - TOP OF 'WALL - FILL DL - DAYLIGHT TBM BHC - BEGIN VERTICAL CURVE VPI - VERTICAL POINT OF INTERSECTION FLOW LINE AT THE WEST RETURN OF THE NORTH POVC - POINT OF VERTICAL CURVE WEST CORNER OF SOUTH UNION AND LOIS LANE PER CB - CATCH BASIN TORO SURVEY DATED 6-30-18 Sc - SAWCUT T.T. - TRAFFIC INDEX ASSUMED ELEVATION 368.94 INV, - PIPE INVERT SSMH - SANITARY SEWER MANHOLE SDMH - STORY DRAIN MANHOLE BASIS I-_-_ SDDI - DRAIN INLET D.S. - DOWN SPOUT CENTER LINE OF PACHECO ROAD ON TRACT NO 4046, S - SWALE MAP BOOK 28, PAGES 23 & 24. p - PAVEMENT TAKEN AS N 89' 51' 01" E G - GROUND S - SEWER UMLrff COMPANIES W SD - WATER -STORM DRAIN PW - RIGHT BE 'NAY I_ELECTRICITY: PACIFIC GAS & ELECTRIC COMPANYS AC LES TINGLE AS 4101 OBL`c RD. C / F BAKERSFIELD, CA 93313 (� 1-661-398-5975 2. GAS: PACIRC GAS & ELECTRIC COMPANYS 2018-18 LES INGLE -{�- 4101 BIBLE RD. 1 OF 4 BAKERSFIELD, CA 93313 v T: 1-661-398-5975 3. CABLE: SPECTRUM 4. TELEPHONE SPECTRUM 5. WATER: CALIFORNIA WATER COMPANY BRIAN BENNETTE 3725 SOUTH H STREET BAKERSFIELD, CA 93304 ,'661)837-7241 6. SEWER: CITY OF BAKERSFIELD ELUDED WORKS DEPRTMENT i501TRF)XTON AVENUE BAKERSFIELD, CA 93301 (661)326-3576 C.O.B. - CITY OF BAKERSFIELD AC - ASPHALT CONCRETE AS - AGGREGATE BASE C / F - CUT / FILL DAYLIGHT (� - CONSTRUCTION NOTE ._._. - DIRECTION OF DRAINAGE 2018-18 (MIN. 2% IN LANDSCAPE AREA) -{�- - EXISTING MANHOLE 1 OF 4 - PROPOS-ED MANHOLE v T: EX!SRNG FIRE HYDRANT - PROPOSED FIRE HYDRANT u - EXISTING POWER PCUE Com., PROPOSED POWER POLE C - EXISTING WATER VALVE p{ PROPOSED WATER VALVE .-7x - EXISTING STREET EIGHT - PROPOSED STREET LIGHT - HANDICAP PARKING - FINISH BUILDING PAD - NEW SITE BOUNDARY ----- - EXISTING SITE BOUNDARY -- GENERAL. PROPOSED DRIVE DIRECTION .. - PAVEMENT - BENCH MARK THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AMC TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. ANY ERRORS, OMISSIONS OR DEVIATIONS FROM THOSE ORDINANCES OR STANDARDS ENCOUNTERED DURING CONSTRUCTION SHALL BE CORRECTED AND SUCH CORRECTIONS RFFLECTEIL-,GN--THE PLANS AND SUBMITTED TO THE CITY ENGINEER. ORTIZ SALGADO, R.C.E 71320 A A 1 s; w- r Records No, DATE: 08-20-18 DRAWN BY; AFINAR SCALE: AS NOTED JCJ 2018-18 1 OF 4 Il.J v T: 214 BERNARD STREET 3AKERSFIELD, CA 93305 '(661)7* -7448 Fc8"716-744 www.afinar.net Exp. DRAIN INLET ----� I� y" OUTLET STRUCTU4E -� DRAIN INLET 18" STORM DRAIN LINE PAMELA STREET a 18" S7 RM DRAIN LINE I THESE PLANS WERE PREPARED BY ME OR UNDER MY DIRECTION 0. SALGADO, PE DATE N Wh%V 214M' DATE: BY: REVISION 03-28-19 BOS PLAN CHECK RESPONSE 05-20-19 BOS PLAN CHECK RESPONSE 07-05-19 BOS IPLAN CHECK RESPONSE UI 4�Ae SOUTH UNION AVENUE a y -- 14 SCALE: I"=40' EXISTING DRAINAGE PATTERNS SOLAR PANELS AT FASTRIP STORE 5003 SOUTH UNION AVENUE GRADING AND DRAINAGE PLANS C>FiA1NAGE AREA PLAN Records No. DATE: 08-20-18 DRAWN BY: AFINAR SCALE: AS NOTED JOB#r 2018-18 GD -2 20F4 EXISTING SHARED DRIVE WAY -PROTECT GD�4;= y i STA: 0+10.25 o I STA: 3+88.20 > OFF: 0.25'R L_ �y p__OND OFF: 0.25'R� 'CJI -Y -G/-(3.58) _. J �.` STA: 0+10.00 0o _. (36q2,) Q / D— (364) \ J I OFF: 0.00' a , -- - (-364)f Qo G368.70 — - -� - _ 0 Y+00 GRADE BREAK G36&.30 2+00 NO°01'15"W 529.67 3+00 — — c366.7D - G368.70 -(370) _ - \G368.70 - � (�6 NOQ'0-t 15 W 362.50 � —I— --- ---- —�---"— --- a-�-----�- ' Co �_ �� m� — m (3 ��� - -__ _. (37 l6 RADE _G.368.30 - _ bz V _ _(371) _ _ 3 .3 EX APARTMENT �_ z%�,6% — — — — — — — - — -{372) FINISH FLOOR 370.61' cn - _"�' "' --� dGRADE RE G379.74 370) —� _ �__--- -_ -- ----- 472 / m i GD -4 GRFj01` BREAK G372.62 �'�• 4G*D-4 GRADE BREAK HOLD 1.5 FEET J.,B) J H ml m lQ `372)... CC3)? ( FROM EXISTING IMPROVEMENTS uoi iG 6.68 3 B) �q, GD 4 �I o (rel " - — — _ _ — — SO '00'59"E c o 8 — — y EXISTING PAVED 2% PARKING TC36 .>�8 owl w N LOT -PROTECT C=G3 53, - 1 N0 01 15 W X15 00 o 4 of GD— - 1sr- L 68.30- m LD1 1 to jj� \ 369) � EDGE OF EXISTING w�} FL368.23 \ �, z - - _-_ - -- O W C7 PAVEMENT z I . `D LIP368.36- w� /. '� 3�A)-G369.33 - - G369.83- F'5Tfi�- - O ��© �. ( ` TOP368.30 -- - c .— J 1)-3:1 WT SLOPE — — — — — —._—-"' "� O a CD l - GRADE BREAK HOLD 1.5 FEET EXISTING AC CU B AND CHAIN FROM EXISTING IMPROVEMENTS o LINK FENCE PR TECT GRADE BREAK H( FROM EXISTING IN f3>F� RIGHT OF WAY D 1.5 FEET aROVEMENTS EXISTING PAVED DIRVEWAY-PROTECT ------ a I RIGHT OF WAY START NEW BLOCK WALL So ❑° El O D A I O (cO -P GD 4 .;.. -4 ,... / GD -4n ,�.. EXISTING DRIVE WAY -PROTECT ---- EXISTING DRIVE WAY -PROTECT ---- ®RAINAGE AREA PLAN SOUTH UNION AVENUE i EXISTING BLOCK WALL AT PROPERTY LINE -- EXISTING GUTTER DRAINING TO NORTH EXISTING EDGE OF PAVEMENT -PROTECT 0 20 40 10 30 SCALE: 1"=20' CffxJM DEMO 0N9 rE DEMO ONUM &FROVEWM NOTES D7 NONE PROPOSED D SAW CUT AND REMOVE EXISTING PAVEMENT EAST OF PROPERTY LINE �u INSTALL NEW 4' WADE V -GUTTER PER DETAIL GD� (fT2� REMOVE EXISTING CHAIN LINK FENCE AS REWIRED FOR INSTALLATION OF _ NEW BLOCK WALL NEW 4' THICK CONCRETE DRIVE ON COMPACTED SUBGRADE TO 90% RELATIVE DENSITY. MATCH PAVEMENT AT EXISTING PARKING LOT AND MATCH GRADE AT NEW GUTTER. MAX 10% CROSS SLOPE OFFSTTE *,AMVEMENT NOTES NEW 6' TALL CURB PER DETAIL NONE PROPOSED �D4 NEW 12'x6' SEDIMENT BASIN. 21 SIDE SLOPES MAX 18" DEEP n 86 LF OF NEW 6' TALL BLOCK WALL WITH SEE DETAIL- HOLD GRADE AT ADJACENT PROPERTY. 0 377 LF OF NEW 6' TALL BLOCK WALL WITH SEE DETAIL- HOLD GRADE AT ADJACENT PROPERTY. 07 GRADE EXISTING DIRT YARD FOR NEW SOLAR PANELS C) SEDIMENT TRAP (DEPRESSION) - TO BE CUT INTO GRADE 12' DEEP WITH 3:1 MAX SIDE SLOPES City Records No. THESE PLANS WERE PREPARED DATE: BY: REVISION DATE: 08-20-18 --�p� 214 BERNARD STREET BY ME OR UNDER MY DIRECTION DRAWN BY: AFINAR essi 03-28-19 BOS PLAN CHECK RESPONSE BAKERSFELD, CA sRTIZSF� SOLAR PANELS AT FASTRIP STORE SCALE: AS NOTED Qat c 05-20-19 BOS PLAN CHECK RESPONSE fincILIL P(66„77,6-7443 P(W976.-7443 m a 5003 SOUTH UNION AVENUE wo. 7iazo * 07-05-19 BOS PLAN CHECK RESPONSE JOB#: 2018-18 Exp. ,z 3, ,e GRADING AND DRAINAGE PLANS G®_3 oro i4T ST L,T,1, (1F 1( rt�< I1 I1( www.afinar.net srgFa f �- t Z Can kbm v" ft (d: 9 BEXNARD 0. SALGADO, PE DATE C�RAINACE ARBA PLAN 3 OF 4 PACHECO ROAD - - - - - - - - - - - - - - - - - - - - - - - - - - - � - - - - - - - - - - - - - - - - - - - - - -`i00m WELL 1 n N ft=20.00' 388-49 p Gross 371.15 I EG 3]0.26 a)O.JD O Ec Tc L=31.46 0,08, 380.7] 360.08 368.38 368.89 389.93 389.53 3)0.03 3]1.12 370.67 �- FL Tc R R Tc R rc R Tc Tc90'06'00' J88'1WC 168.99 xen ax .., .... 371.2s� 3]1.9 I -25F 9 LIGHT STO COW wNc I 3691 82 I Xao. I I i I X1.38 3 370.831 37 VN WTE/RLI1 BLCG FN-' CONI ac I CONC tout W y� LONG L 8&557 NO 36962 J71AI CONC JcoxcJ ni Al L CONI O O 371.0 O O O O 3JL66 O 3]t93 - 0 0 0 0 (E) BUILDING _ X21.71 __._ 57.75' X9L49 AL SCALE: _T` 3.50 TC -3]2.14 ,-w xTc - SJ1.59 L371 3] 09 EG 56 L/O Is C/ A371'13 R 37204 __X3>tID AC WATER nPPP 3]1.88 v SM.41 _3R.0 OB TC 371 38 CON(. _ _ _ _ _ FL FNC 3)225 WDO iNG EP _ -_--- 372.01 37t86 371.7a 33.90 CON( CON( iC 060.19 I XPC 3]1.90 3]162 3F) L3_372.09 PUMP R 3 .fit ]1.44 PUMP EG 6p $. I 302)3 372.04 372. Z O 3)3.19- 68 - 371,`9 _• I TG R W1q ----- 3)2.15 371.82 NQ ______ _ ___ _ PU_MP____ PUMP__ 369.30 w W J ]0 3)201 ]2 NG O I XN X .50 CON( J69.ID ONC EGSCONC No W 37194 ,3Mo t / 3]l65 1 CONCDHC m �. W�_I-__-_ 3]5.36 _ __.e___ -o-_ __-__ O N WALL rC })1.23 372.63 _ 373.24 /^1 FL TC, I TC X3'2,56 v 0 3]2.13 ID O x AG x,3AJC1.)6 Ay. 00 b O 3 L65 Nm _ ________ _LONG 2.13 Z 20.0' _.. _. CON( X337194 JJL34 EG1 371.24 372.34 33.09 34 EG AC AC 171.E 371.) 371.11 37286FL 386xc� TC 3M Tc 3]1.45 37175 37295 372.37 371JiibC 37296 TC AC 371.2] TC X37335 3]2.57 y, , 33.31 FL x_3]0.10 NG FNC 3)221) \ TC 311,4) p 3 NG i NG EG -`- 372.6/ TC 368.NG7] I 2_ X3]2&5 \\ 372.15 Mpf 3)2TO TC NO 371 FNCZ65 Q 33.06 AC -__ z 3]1.1) 372.86 FL TC 371.52 37201 372.03 \ 3)245 IAC 3 X3]150 3]3.N89G `NC iL' .f� 3;1.59 366.25 NG 3]2.03 TG NO AC 3]1:� 3720_ TG N88't5 3Rt0` 367.65 387.92 ]68.10 ]WAS FFNC15/WyGRND 3 FMC MR/MND %FNC LN F✓W/GRND NO NO 360.15 s Y ( # X 3J7LV S12A11 --- --- --_-t3a7512 ]6].18 JW.26 - - - - ^AC 4 - }Mj 1 TOP M TOP raP TOP AP r x v 367. 1 y TOW.O6 W 6 1 N�NG Nc N x 1 _________---------358s1 I 3]1.61 �. WI'S0 371.26 1'TDE s/w i J- ° 3>1.1Lro3 TYo.Js 11 1 X3 L86 373.23 J>0.90 1 y I 1 367.79 X a R E6 'i0P E W II TOE11 NO 371.31 3w 371.47 NO X1 359.67 336.94 9 i -X / I NC 1 387.52 363.32 /' YI 36661 TOE E/W 1 372k TOP 5/E'M'�� HD .N 366.78 X. .as X371.BD W� TOP NOaJt <CO 311�I 358.50 �JI`358.09 370.93 r INV 13 IN coNc PIPE 355.46 . TOE (E) SUMP 1 55 I� 8T' 1 65�MX 372.13 371.12 1 AC 3133 I I 3]1.63 �.�65H0IMWALL9 __ T. `3/1.51G >"=35)-08NG E 1 TOE S 1 ID 358.91 \� 1 1 AC AC IND WALL MB 36 LONG 5 36250 i0P-4 380.01 I J\\ I I FNC I y xNG9.i] XNC .10 37114 � - V.3$654 I J6B.6B 7--- NO ----------- IDE 1 NG - 1 9 356.14-/ 355.90 T -NO _ _ _ _ _ _ _ _ _ _ _ _ _ _ i'YC I TOE �iOE I I 3p71.12 A A F TB70.77 x 371 26 1 361.10 368]7 36],00 388.12 I I X36&20 TC_37061 TIE TOP AP ryp CrTOP TOP M 1 7.82 XNO 58923 NG X36&W 3M.ii �1'S9 310.98 FL ________________________________y.____-___36840 NO aA�C�� EG NW 6FXBF PAO xNG j ]]0.87 x369.04 --�1T fs 3)1.25-R SJ2[ r x- 3(3.08 `387,35 L36>.10 36681 $$9'S$'45'6ii $6.14' 368.96'1 M"' 36912 NG M 3]085 fNC COR/GRND NG NO m CO2/Gnm EC 3711 368.39 CLOG NG Ac 38968 3 5/67 57.75' BLDG NO 370.61 369.35 x 389.15 FF iNG 5/E If FNG N/W 371 23 �8, x.82 TC 8. 36880 36 98 3, AC 3J1.NC 310 F6 3Ns4 p 389,30( 371.Ua T,iy0.43 C = 10 NO 170.39 O R J 3)0.5 370.81 G m 2 W VALVE In P FC v O yX368'� XAACC8.19 O 388.34 3]1.30 })1,pB 31080 3]0.4] AC z AG 136934 AC EC FC EC XNC _ 3]0.30 1 1 380.49 JTFNC JJt s5 3)1.01 R 3 ]36].95 AC 371.42 iT 3370.70 TO 389.21 389.32 38-9.10 T` 370.]3 1 1 189.]4 FNC N/E FNG 5/tV 3 XNC9.28 311A. To T37 M 388.50 BLDG NO R 3)0.40 BIOG NG x \ 3WEO EG 367.21 35/31 589'5845"W 66.02' BW BW/OK OW 36964 R=20.00' 1 W 387.03 BK DW 6 AC vALv L=31.41' Sss. 0=89'59'44" O FL 366.66 387.15 JB&9A O J68.J4 R R R ' m 370.43 1 - ------ --387.11 LSWS6 160.55 �s69.52 �3J0.45 AC AC AC AC AC 1 LOIS LANE I ------------------------------------------------------------ 4901 S. UNION AVENUE •'•�ii 111115 a ' CA 93307 III D z LL_I 4 z 0 ORAVRt GC CHECKED GG DATE 6/30/18 706 NO. 18-0942 DWM NOLO TOPO ►ITIlWirFAIWI7 __l AC = ASPHALT CONCRETE AP = ANGLE POINT CNC = CONCRETE CLK = CHAIN-LINK COR = CORNER DW = DRIVEWAY (E) = EXISTING EP = EDGE OF PAVEMENT FD = FOUND FC = FACE OF BUILDING OR WALL FF = FINISH FLOOR FL = FLOWLINE FN = FENCE GR = GRASS IP = IRON PIPE LP = LOW POINT NG = NATURAL GROUND MH = MANHOLE PP = POWERPOLE RET = RETENTION WALL SIGH = SIGN SPG = WATER SPIGOT SMH = SEWER MANHOLE SSD = STANDARD SURVEY DEPARTMENT STP = STEP TC = TOP OF CURB OR CONCRETE TOE = TOE OF SLOPE TOP = TOP OF SLOPE WD = WOOD WI = WROUGHT IRON WILL = WALL TOP OF BRASS CAP IN CONCRETE MONUMENT WELL LOCATED AT THE CENTERLINE INTERSECTION OF PACHECO ROAD AND PAMELA STREET. ELEVATION: 367.95 FEET THE BEARING OF N89'51'01"E, SHOWN FOR THE CENTERLINE OF PACHECO ROAD ON TRACT NO. 4045, MAP BOOK 28, PAGES 23 & 24, WAS USED AS THE BASIS OF BEARINGS HEREON. NOTES: ALL DISTANCES AND DIMENSIONS SHOWN HEREON ARE IN FEET AND DECIMALS THEREOF. LEGEND., -0- (E) POWER POLE ® (E) SEWER MANHOLE x (E) FENCE ----OH- (E) OVERHEAD POWER SURVEYOR'S STATEMENT - THIS MAP WAS PREPARED BY ME OR UNDER MY DIRECTION AND 15 BASED UPON A FIELD SURVEY IN ACCORDANCE WITH THE CALIFORNIA LAND SURVEYOR'S ACT AND LOCAL ORDINANCE AT THE REQUEST OF JACO OIL COMPANY IN JUNE OF 2018. r rA 7/5/18BE RY,LS 776 DATE PREPARED BY: CALIFORNIA ENGINEERING & SURVEYING INC 5210 MOLISE COURT, BAKERSFIELD, CA 93308 (661) 809-7372 glen@calengr,com SCALE: 1" = 30' TOP OF BRASS CAP IN CONCRETE MONUMENT WELL LOCATED AT THE CENTERLINE INTERSECTION OF PACHECO ROAD AND PAMELA STREET. ELEVATION: 367.95 FEET THE BEARING OF N89'51'01"E, SHOWN FOR THE CENTERLINE OF PACHECO ROAD ON TRACT NO. 4045, MAP BOOK 28, PAGES 23 & 24, WAS USED AS THE BASIS OF BEARINGS HEREON. NOTES: ALL DISTANCES AND DIMENSIONS SHOWN HEREON ARE IN FEET AND DECIMALS THEREOF. LEGEND., -0- (E) POWER POLE ® (E) SEWER MANHOLE x (E) FENCE ----OH- (E) OVERHEAD POWER SURVEYOR'S STATEMENT - THIS MAP WAS PREPARED BY ME OR UNDER MY DIRECTION AND 15 BASED UPON A FIELD SURVEY IN ACCORDANCE WITH THE CALIFORNIA LAND SURVEYOR'S ACT AND LOCAL ORDINANCE AT THE REQUEST OF JACO OIL COMPANY IN JUNE OF 2018. r rA 7/5/18BE RY,LS 776 DATE PREPARED BY: CALIFORNIA ENGINEERING & SURVEYING INC 5210 MOLISE COURT, BAKERSFIELD, CA 93308 (661) 809-7372 glen@calengr,com