Test Type:
Facility Name: Job #: 4129
Prepared For: PO #: NA
Site Address:
City: Primary Test Leak Rate: 0.005 gph
State and Zip: CA 93308 Secondary Test Leak Rate: 0.1 gph
Start Date:End Date:
SYSTEM TK-1 87 TK-2 91 TK-3 DSL
Product Primary:PASS PASS PASS
Product Secondary:PASS PASS PASS
Vent Primary:PASS PASS PASS
Vent Secondary:PASS PASS PASS
VR Primary:PASS PASS NA
VR Secondary:PASS PASS NA
MCleak ELD Tank:PASS PASS PASS
Turbine Sump:PASS PASS PASS
Turbine Sump Elect:PASS PASS PASS
Turbine Head:PASS PASS PASS
Fill/Vapor Sump:PASS PASS PASS
UDC's:PASS PASS PASS
Fill Bucket Primary:PASS PASS PASS
Vapor Bucket Primary:PASS PASS PASS
Fill Spill Bucket Hydo:PASS PASS PASS
Vapor Bucket Hydro:PASS PASS PASS
Vent Box:PASS PASS PASS
Certifying Field Technician: Ricardo Gonzalez State Lic. # :
Certification Leak Rate: 0.005 gph
Certifying Technician Signature: Date:
Statement Confirmed by: Date: 12/16/2019
Office use only
I declare under penalty of perjury that I am a licensed tester in one of the above methods listed by the National Workgroup
on Leak Detection Evaluations (NWGLDE)organization and that the information contained in this report is true and correct
to the best of my knowledge.
If you have any questions on the testing please do not hesitate to call. @ 855-255-5325.
04-1695
This is a statement to confirm that the components listed above,at the time of testing,have been tested to a leak sensitivity
listed above by using one or more of the following DPleak®,MDleak®and PHDleak®EPA aproved Methods.The DP leak ®,
MDleak®and PHDleak®Methods are the most versatile and comprehensive testing procedures offered to the petroleum
industry.All petroleum owners and contractors which utilize the DPleak®,MDleak®and PHDleak®Method can be assured
that their facility has passed the Nation's highest standard in preventative leak detection.
12/14/2019
12/14/201912/13/2019
11212 Olive Drive
Bakersfield
BSSR Inc.
Facility Certification CONFIDENTIAL
California ELD New Construction Test (No Fuel in System)MSleak
Olive Grove Foodmart
Exclusive Providers for MDleak® MSleak® DPleak® and
PHDleak® Testing Technologies
Page 2 of 3
11212 Olive Drive Log of Repaired Leak/s
CONFIDENTIAL
TK-1 87 TK-2 91 TK-3 DSL
Tank Volume: 15000 10000 10000
Manufacture: Modern Modern Modern
Interstice: Dry Dry Dry
Depth To Tank: 80"77"75"
Tank Dia: 10 ft 10 ft 10 ft
Depth to Fuel: No Fuel No Fuel No Fuel
Tank Sump Boots Turbine
Bravo Smith Red Jacket
6
Gilbarco
OPW
Smith
Smith
Smith
Fire-Flex
PhilTite
EVR: Veeder-Root
Reference #Date Time Status System Component Manufacture
108 12/13/19 11:46 Leak Final TK-3 DSL Vent Box Smith pipe to flex connector leaking.
118 12/13/19 12:02 Leak Final TK-2 91 STP Sump
120 12/13/19 12:04 Leak Final TK-3 DSL STP Sump
Reference #Date Time Status System Component Manufacture
None
Log of Repaired Leaks
Log of Unrepaired Leaks
Tank Information
Containment Boots:
Piping Information
Manufacture
Spill Buckets:
Number of Dispensers:
Manufacture:
Shear Valve Manufacture:
Flex:
Product Lines:
Vapor Return / Vent:
UDC/Dispensers Information
Depth to Ground Water:
Manufacture:
Exclusive Providers for MDleak® MSleak® DPleak® and
PHDleak® Testing Technologies
Page 3 of 3
11212 Olive Drive Reference Addendum CONFIDENTIAL
Site Photo