Loading...
HomeMy WebLinkAboutOlive Grove Foodmart Final ELDExclusive Providers for MDleak® MSleak® DPleak® and PHDleak® Testing Technologies Page 1 of 3 Test Type: Facility Name: Job #: 4129 Prepared For: PO #: NA Site Address: City: Primary Test Leak Rate: 0.005 gph State and Zip: CA 93308 Secondary Test Leak Rate: 0.1 gph Start Date:End Date: SYSTEM TK-1 87 TK-2 91 TK-3 DSL Product Primary:PASS PASS PASS Product Secondary:PASS PASS PASS Vent Primary:PASS PASS PASS Vent Secondary:PASS PASS PASS VR Primary:PASS PASS NA VR Secondary:PASS PASS NA MCleak ELD Tank:PASS PASS PASS Turbine Sump:PASS PASS PASS Turbine Sump Elect:PASS PASS PASS Turbine Head:PASS PASS PASS Fill/Vapor Sump:PASS PASS PASS UDC's:PASS PASS PASS Fill Bucket Primary:PASS PASS PASS Vapor Bucket Primary:PASS PASS PASS Fill Spill Bucket Hydo:PASS PASS PASS Vapor Bucket Hydro:PASS PASS PASS Vent Box:PASS PASS PASS Certifying Field Technician: Ricardo Gonzalez State Lic. # : Certification Leak Rate: 0.005 gph Certifying Technician Signature: Date: Statement Confirmed by: Date: 12/16/2019 Office use only I declare under penalty of perjury that I am a licensed tester in one of the above methods listed by the National Workgroup on Leak Detection Evaluations (NWGLDE)organization and that the information contained in this report is true and correct to the best of my knowledge. If you have any questions on the testing please do not hesitate to call. @ 855-255-5325. 04-1695 This is a statement to confirm that the components listed above,at the time of testing,have been tested to a leak sensitivity listed above by using one or more of the following DPleak®,MDleak®and PHDleak®EPA aproved Methods.The DP leak ®, MDleak®and PHDleak®Methods are the most versatile and comprehensive testing procedures offered to the petroleum industry.All petroleum owners and contractors which utilize the DPleak®,MDleak®and PHDleak®Method can be assured that their facility has passed the Nation's highest standard in preventative leak detection. 12/14/2019 12/14/201912/13/2019 11212 Olive Drive Bakersfield BSSR Inc. Facility Certification CONFIDENTIAL California ELD New Construction Test (No Fuel in System)MSleak Olive Grove Foodmart Exclusive Providers for MDleak® MSleak® DPleak® and PHDleak® Testing Technologies Page 2 of 3 11212 Olive Drive Log of Repaired Leak/s CONFIDENTIAL TK-1 87 TK-2 91 TK-3 DSL Tank Volume: 15000 10000 10000 Manufacture: Modern Modern Modern Interstice: Dry Dry Dry Depth To Tank: 80"77"75" Tank Dia: 10 ft 10 ft 10 ft Depth to Fuel: No Fuel No Fuel No Fuel Tank Sump Boots Turbine Bravo Smith Red Jacket 6 Gilbarco OPW Smith Smith Smith Fire-Flex PhilTite EVR: Veeder-Root Reference #Date Time Status System Component Manufacture 108 12/13/19 11:46 Leak Final TK-3 DSL Vent Box Smith pipe to flex connector leaking. 118 12/13/19 12:02 Leak Final TK-2 91 STP Sump 120 12/13/19 12:04 Leak Final TK-3 DSL STP Sump Reference #Date Time Status System Component Manufacture None Log of Repaired Leaks Log of Unrepaired Leaks Tank Information Containment Boots: Piping Information Manufacture Spill Buckets: Number of Dispensers: Manufacture: Shear Valve Manufacture: Flex: Product Lines: Vapor Return / Vent: UDC/Dispensers Information Depth to Ground Water: Manufacture: Exclusive Providers for MDleak® MSleak® DPleak® and PHDleak® Testing Technologies Page 3 of 3 11212 Olive Drive Reference Addendum CONFIDENTIAL Site Photo