Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
OPI Billing APp 10.21.19
BILLING 81 PERMIT STATEMENT PERMIT # BAKERSFIELD FIRE DEPARTMENT Prevention Services 2101 H Street Bakersfield, CA 93301 Phnne AIR 1_i9A- ?479 • Fav ARI -RO -7171 ..z tae Ofts) SITE INFORMATION LOCATION OF Q1ECT PROPERTV OWNER SCGPE GF KORK �� O NAME PRmECr NAME ACORE55 RHONE •���� \��_ WVJJ I.ECr A00 5, O 1 t! .1 - [ZAK— ERSFIELU STATE C fA 21P CODEC'� 661DU CONTRACTOR INFORMATION CIXJFRACT,C,,Ra NAME L07 l)1 ` d \•OC mi TYPE O'LCENSE '77M P �� COMRACTyyCCQL1Y�&Y 7E FAX �r&a -7 d-tl AWRE55 ✓C) a ZIP CODE o Please make checks payable to C Y OF BAKERSFIEr FEE CALCULATION OTAL ruc ❑ Alarm - New & Modification (minimum charge) FA $ 288 ONLY TREAS ACCT ❑ Over 10,000 sq ft $ 0 .0288 x sq ft • Alarm - Minor Modification (Add 1 device /Relocation of 2 devices) $ 98 1hr (2 him minimum) = $196 84 • Sprinkler- New & Modification (minimum charge) FIRE $ 288 ❑ Over 10,000 sq ft $ 0 .028 x sq ft • Sprinkler - Minor Modification ( <30 heads) $ 98 /hr (2 hm minimum) = $196 84 • Commercial Hood (New & UL 300 Upgrade Modification) FHD Additional Hood $ 241 $ 59 /hood ❑ Commercial Hood - Minor Modification (add /move nozzle) $ 98 /hr (2 hm minimum) = $196 84 • Spray Booth (New & Modification) W $ 241 • Aboveground Storage Tank (1 inspection per installation) AST $ 185 /tank • Each Additional Tank $ 981-rank • Aboveground Storage Tank (Removal, Mod, or Inspection) ATR $ 112 /tank • Underground Storage Tank (Installation /Inspection) NI $ 900 /tank • Underground Storage Tank (Modification) MOD $ 900 /site • Underground Storage Tank (Minor Modification) MTN $ 171 /sRe Underground Storage Tank (Removal) TR $ 587 /tank Mandated UST Testing: Fuel Mont Cert,/SB989 /Cath. Prot. NOTE: TT $ 98 /hr (2 him minimum) _ $196 ❑ Oil well (Installation, Inspection, or re- inspection) X $ 98 /hr 84 ❑ Tent TENT $ 98 /hr • After -hours inspection fee 124 hr 2 hrs minimum )= 248 • Pyrotechnic (1 permit per event, plus an inspection fee of $98 /hr during business hours) PTRO NOTE: Re- inspection /Follow -up Inspection $ 98 /hr + (5 hrs min standby fee /insp) _ $588 $ 98 1hr • 84 • Portable LPG (Propane): # of Cages? _ $ 98 /hr 84 ❑ Explosive Storage $ 241 64 ❑ Copying & File Research (File Research fee $51 /hr) $ 0.02 /page 84 ❑ Miscellaneous Site Plan Review (Carnival & Fairs/Vehicle $ 98 /hr 84 ..z tae Ofts)