Loading...
HomeMy WebLinkAboutAppendix K - Public Services ReportWest Ming Specific Plan - Draft EIR Michael Brandman Associates H:\Client (PN-JN)\0216\02160029\DEIR 9-1\02160029_Appendices.doc Appendix K: Public Services Report PUBLIC SERVICES REPORT FOR WEST MING SPECIFIC PLAN BAKERSFIELD, CALIFORNIA PREPARED FOR: Castle & Cooke - CA, Inc. 10000 Stockdale Highway – Suite 300 Bakersfield, California 93311 (661) 664-6500 Prepared by: 2001 Wheelan Court Bakersfield, CA 93309 (661) 834-4814 September 14, 2005 Revised August 24, 2006 Mc&A #6811.11(14) TABLE OF CONTENTS 1.0 INTRODUCTION__________________________________1 1.1 Scope_________________________________________________1 1.2 Summary of Project Description__________________________1 2.0 ENVIRONMENTAL SETTING_______________________5 2.1 Fire__________________________________________________5 2.2 Law Enforcement______________________________________ 6 2.3 Schools_______________________________________________6 2.4 Parks________________________________________________10 2.5 Water_______________________________________________11 2.6 Sewer________________________________________________15 2.7 Solid Waste___________________________________________16 2.8 Street Lighting________________________________________17 2.9 Canal Fencing_________________________________________18 3.0 CONCLUSIONS AND MITIGATION MEASURES_____18 3.1 Fire_________________________________________________18 3.2 Law Enforcement_____________________________________19 3.3 Schools______________________________________________20 3.4 Parks________________________________________________20 3.5 Water_______________________________________________21 3.6 Sewer________________________________________________24 3.7 Solid Waste___________________________________________25 3.8 Street Lighting________________________________________25 3.9 Canal Fencing_________________________________________25 RESOURCES_________________________________________27 APPENDIX_________________________________________________29 1 SECTION 1.0 - INTRODUCTION 1.1 Scope McIntosh & Associates has prepared this public services report to provide technical information for the development of the West Ming Specific Plan project in the City of Bakersfield, Kern County, California. The objective of this report is to identify existing public services, determine projected service needs, and determine if the proposed project will have an effect upon, or result in a need for new or expanded services. This report has included an analysis of existing public services and service systems, future projections, impacts, and recommendations of public service and service system needs to protect the levels of service. 1.2 Summary of Project Description The subject property is located in the middle of the southern end of the San Joaquin Valley, in the County of Kern, City of Bakersfield and in the State of California. The subject property is in all of Sections 11, 13 and 14, and in a portion of Sections 10 and 15 of Township 30 South, Range 26 East, Mount Diablo Baseline and Meridian (See attached Location Map - Page 2). The project is an amendment to the Land Use and Circulation elements of the Metropolitan Bakersfield General Plan and a concurrent Zone Change. The project site is currently designated as Resource Intensive Agriculture. The site is currently under agricultural production with some petroleum extraction facilities in the southerly portion of the site. The requested amendments and zone change will consist of approximately 4748 single family residential, 2702 multi-family residential, General Commercial (±74.41 acres), light industrial (±217.18 acres), schools (±68.55 acres), parks and lakes (±205.17), public facilities (canal ±20.38 acres), and the West Beltway and streets. (See Attached Site Map – Page 3). The approximate density is based upon 3.01 persons per single-family dwelling unit (2000 Federal Census) and 1.75 persons per multi-family dwelling unit. Based upon net acreages for the proposed project as shown on the table below, the increase in population would be approximately 19,020. PROJECTED POPULATION LAND USE DWELLING UNITS PERSONS PER HOUSEHOLD1 POPULATION ESTIMATE Single-family residential 4748 3.01 14,291 Multi-family 2702 1.75 4,729 TOTAL 7450 19,020 1 Source: 2000 Federal Census for like adjacent developments. Factor determined by City of Bakersfield Planning Department H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 2 The gross area of the project site is approximately 2181.46 acres. The project includes an annexation of approximately 1736.36 acres into the City of Bakersfield. The Circulation Element Amendment includes a realignment of White Lane, deletion of Renfro Road as an arterial, designation of White Lane (west of Buena Vista Road) as a collector, designation of Ming Avenue (west of Allen Road) as a collector, and realignment of numerous collectors within the project area. The project lies south of Ming Avenue, North of the Asphalto Branch Railroad and Pacheco Road, west of Buena Vista Road in Section 13, west of Allen Road is Section 11, and east of the West Beltway in Sections 10,15, and 14. H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 3 Location Map H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 4 1”~1880’ Site Map H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 5 SECTION 2 – ENVIRONMENTAL SETTING Appendix G, Section XIII (Environmental Checklist Form) of the California Environmental Quality Act (CEQA) Guidelines indicates that a project will normally have a significant adverse impact on public services if the project would result in substantial adverse physical impacts associated with the provision of the need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: fire protection, police protection, schools, parks, or other public facilities. In addition, CEQA Guidelines, Section XVI of the CEQA Guidelines state that a project will have a significant adverse impact on service utilities if the project: exceeds wastewater treatment requirements; require or result in construction of new, or expansion of existing water drainage and/or wastewater treatment facilities; require new or expanded water supply entitlements; exceed the permitted capacity of the landfill or fail to comply with Statutes and Regulations related to solid waste. 2.1 Fire The City of Bakersfield Fire Department provides fire protection, fire prevention services, emergency medical (first responder) and rescue services, arson investigation, and hazardous material coordination with citizenry. Within the City there are 15 fire stations. The City of Bakersfield and County of Kern maintain a Joint Powers Agreement that determines agency functions within the Metropolitan Bakersfield area. This agreement provides for the closest station response concept. The newly completed City Fire Station No. 15 would have the responsibility for the “first response” emergency services for the proposed project site and would be supported by City Fire Station No. 9 in the event it were necessary. According to Fire Chief Ron Fraze, fire stations have been situated throughout the Metropolitan Bakersfield area to meet an emergency response time of six minutes or less (90% of the time), although this goal does not reflect actual experience in all situations. Response times for individual stations range from a low of 2.9 minutes to a high of 10 minutes. An overall average response time for engine and truck companies is 5.2 minutes for any property within a 2.6-mile area around a specific station. Station No. 15 is located on Buena Vista Road and Deer Peak Avenue, approximately 1.2 miles from the northeast corner of the site, while the furthest point is approximately 3 miles away. In addition, a future fire station is planned for construction within the McAllisiter Ranch project, immediately south of the West Ming Specific Plan. This station is anticipated to be operational sometime in 2008. The Insurance Service Office (ISO) Grading Schedule is a means of classifying cities with reference to their fire defenses and physical conditions. The insurance classification developed under this schedule is one of several elements used in the H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 6 development of insurance rates. The ISO rating for the Bakersfield area is a ‘3’ (Kern County is rated 4 through 9). In most instances the fire insurance costs are the same for residences in the 2 through 4 rating. However, commercial insurance costs are affected by each rating change. Development of the proposed project will increase the demand for fire protection and emergency services. The City of Bakersfield Fire Department has not established a ratio of staff to resident population, but the national industry standard is 1.0-fire personnel per 1,000 population. Currently, the City of Bakersfield operates at approximately 0.7 fire personnel per 1,000 population. Using the current City of Bakersfield ratio, 13 additional personnel would be required for fire protection and emergency purposes for the proposed project site at build-out. According to Chief Fraze, personnel at Station No. 15 will provide the required services to the project site and would conform to the six-minute response conformance. Station No. 15, which became operational in 2004, will provide the required services until the timing for new personnel and facilities is required. 2.2 Law Enforcement The City of Bakersfield Police Department provides law enforcement services within the City. Upon annexation, the property area will be served by the Bakersfield Police Department. However, the Kern County Sheriff’s Department also has a metropolitan area precinct that provides law enforcement within the general Bakersfield area. Because the site is currently under agricultural and petroleum production, the current demand for law enforcement is minimal. The City has a newly constructed substation adjacent to Fire Station No. 15, that will support project residents. Dispatch and 911 services for the Metropolitan area, are handled from the County Communications Center at Panorama Drive. The Kern County Sheriff’s Department also operates the Inmate Reception Center, the Lerdo Maximum Security facility, Lerdo Minimum/Medium Security facility, and the Lerdo Pre-Trial facility. The City of Bakersfield and the County of Kern have a formal mutual aid agreement for law enforcement and emergency services. Sheriff’s patrol units traveling through unincorporated cities within the County will respond to observed police problems and then call for City Police for follow-up. The City uses a staffing goal of 1.3 officers per 1,000 population. According to the Police Department, this goal is not being met currently due to budget constraints. Using the current City of Bakersfield ratio, 24 additional personnel would be required for law enforcement services. 2.3 Schools The proposed development is within the Panama-Buena Vista Union School District and Kern High School District (Stockdale High School) and will be served by these Districts. H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 7 Panama-Buena Vista Union School District The Panama-Buena Vista Union School District (PBVUSD) operates sixteen elementary schools (grades K-6) and four Junior High Schools (grades 7-8). These schools have a current capacity of 14,022 students. District enrollment is currently about 14,722 students. Elementary schools (based on site construction size) typically house from 600-800, and junior highs house 700-900. Mike Killeen, Facilities Director for the District, notes that all of the approximately 7450 dwelling units proposed as part of this project are within their district. Using student generation rates cited in the Residential Development School Justification Study, prepared for PBVUSD (February 3, 2006), shown in the table below, the proposed project is estimated to generate approximately 2,469 elementary students and 733 middle school students. ELEMENTARY/MIDDLE SCHOOL STUDENT GENERATION Residential Use Number of Units Generation Rate Total Students Single Family Detached1 4,748 Elementary-0.3659 Middle – 0.1153 1,738 548 Multi-Family2 2702 Elementary -0 .2705 Middle – 0.0683 731 185 TOTAL 7450 Elementary Middle 2,469 733 1Considers both low density & low-medium density residential to be single-family 2 Includes all residential units other than single-family The PBVUD notes that the Education Code requires school districts to provide for children of parents employed within the District. Based upon the 74.41 acres of commercial uses and 217.18 acres of industrial uses, the District will have to provide for additional students of employees at these establishments. PBVUSD has not established a generation rate factor for commercial and industrial development. Therefore, the number of additional students generated by this type of development is unknown at this time. The developer has conceptually sited four elementary and one junior high school within the project boundary. If required, the future school sites will be developed in consultation with the Panama Buena Vista Union School District and located per the District’s requirements. Kern High School District The Kern High School District (KHSD) currently operates 10 high schools within the Metropolitan Bakersfield area. It is the only high school district serving the Metropolitan Bakersfield area. Stockdale High School currently serves the project site and is located at the southeast corner of White Lane and Buena Vista Road (adjacent to the project site). Other nearby high schools serving the general vicinity are Liberty High School, located approximately 3 miles north of the H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 8 project site and West High School, located approximately 5.5 miles east of the project site. In addition, the Kern High School District is constructing Frontier High on Allen Road, approximately 5 miles north of the project site. Frontier High School is scheduled to be opened in the fall of 2006. The KHSD Board will revise school boundaries upon completion of the new Frontier High School. However it is anticipated that Stockdale High School will serve the project site after district boundaries are redrawn. According to Kern High School District, A Look Ahead – Growth Capacity, & Enrollment Patterns, prepared by Charles Rosengard, Manager Research and Planning; the district is growing at approximately one-half a high school a year with some acceleration in the past two years. One new school, located at Allen Road and Kratzmeyer Road (approximately 6-miles north of the project) is expected to open in 2006. In addition, the District anticipates constructing two additional schools by the fall of 2008 and a total of four schools within the next ten years. High schools constructed by KHSD typically have a capacity of approximately 2,150 to 2,180 students, but can accommodate approximately 100 students over this capacity. Stockdale High School has a current enrollment of 2,322 students, approximately 150-200 students over capacity. The Kern High School District is currently studying a new student generation rate, based upon the rapid growth of the Metropolitan area. According to the Kern Council of Governments (KERNCOG) Profile of General Demographic Characteristics, U.S. Census Bureau, Census 2000 Data, the overall student generation rate for the Bakersfield area is 0.22 students per residential unit. The addition of approximately 1,639 new students would indicate that ¾ of one high school would be required to accommodate this population. The addition of approximately 19,020 new residents will impact the school districts and necessitate construction of additional school facilities to serve the population. To address impacts resulting from this project, the project is subject to payment of statutory fees authorized under Education Code § 17620 and Government Code § 65995, 65995.5, 65995.6 and 65995.7, as amended November 4, 1998. Collection of the current fees is at time of issuance of building permits. Statutory fees are based upon the square footage of the residence. The current statutory minimum is $2.14 per square foot, but are scheduled to increase on July 1, 2004. In addition, the developer has conceptually sited several elementary and one junior high school within the project boundary. If required, the future school sites will be developed in consultation with the Panama Buena Vista School district and located per the District’s requirements. H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 9 School Location Map Stockdale High SchoolBoundary School Location LEGEND H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 10 2.4 Parks Park land is generally defined as any usable area of land or water designated on state, regional or local open space plans as open space or park land and is actively used for park and/or leisure recreational purposes with or without charge. Parks are generally characterized as either local or regional. Local parks generally range from 1-2.5 acres (mini-parks), to 5-10 acres (neighborhood parks), and approximately 30 acres (community parks). Local parks generally serve a population within a three-quarter mile radius. Regional parks, on the other hand, can range anywhere from 20 to 1,000 acres and serve a population living within one hour’s distance. Historically, the City of Bakersfield and, most recently private developers have supplied park facilities within the project area. The provision of regional parks has been primarily the responsibility of the County of Kern. The increase in population within the area would result in an impact upon the quality and quantity of existing residential opportunities by creating a need for new parks and recreational facilities to serve the residents. As indicated in the table below, the parkland requirement for the proposed project is calculated based on the General Plan and City Ordinance Park Standards (BMC §15.80.050) of 2.5 acres per 1,000 population. An estimated 56.06 acres would be needed to serve the project. PROPOSED PROJECT PARK LAND DWELLING UNITS PERSONS/ HOUSEHOLD1 POPULATION PARK FACTOR PARK ACREAGE NEEDED 7450 3.01 22,424.5 2.5 ac/ 1,000 56.06 1 Source: Bakersfield Municipal Code. Factor determined by City of Bakersfield Planning Department The proposed project includes both public and private parks, lakes and ponds. The project will provide approximately 91 acres of public and private parks and open space. Additional open space areas which include mini parks will be provided within the project boundary, but the number and acreage is not known at this time. In addition, every new residential unit must pay a park development fees (BMC § 15.82.010) at the time of issuance of a building permit. Compliance with the park land and park development fee ordinances ensures that parks are provided and built in accordance with the City standards as described in the Metropolitan Bakersfield General Plan. Public facility improvements from the proposed development and eventual build- up of this area will result in an increase in maintenance responsibility for the City of Bakersfield. The development is required to provide improvements, such as sewer and drainage facilities, in accordance with Bakersfield Municipal Code H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 11 §16.32.060 and Chapter 3.12, Development Improvement Standards and Specifications. This potential increase in maintaining services would be paid for by property tax revenues generated by this development. 2.5 Water The physical supply of water to residents and businesses throughout Metropolitan Bakersfield is provided by a series of water districts and private water supply companies. The majority of the City of Bakersfield is served by California Water Service Company (CWSC), a privately held public utility; its water supply is obtained principally from 187 wells and supplemented by Improvement District No. 4 (I.D. 4 – treated State Water Project surface supply water). Approximately 20% of the water used by CWSC is surface water purchased from ID 4. CWSC operates the city’s water system under contract for the city of Bakersfield. The balance of the City is principally served by the City of Bakersfield’s Ashe Water Company, with supplies obtained from 47 wells. Additional wells are continually in development. In addition, the city has acquired water rights for Kern River flows for approximately 140,000 acre-feet per year. Together with appropriate storage rights in Isabella reservoir; it currently sub-contracts to provide water for irrigation to five agricultural water districts a major portion of these rights, utilizing the balance for groundwater recharge. The City also operates the 2,800 acres of recharge ponds along the Kern River on the west side if the City. This spreading area provides groundwater recharge for Kern River flows utilizing both its own water rights and agreements with other water agencies for “banking” their waters in the underground aquifer. This banking system is an important reliability feature in the City’s water supply system. The future use of this water for municipal and industrial purposes is a key factor in the long-range adequacy of the urban water supply of the planning area. The proposed project will be served domestic water by the City of Bakersfield Water Services Department. The project proposes 4748 single-family residences and 2702 multi-family residences, 321.59 of commercial and industrial uses, and 197.93 acres of parks and lakes. There are several different methodologies for calculating domestic water demand for this project: Per Capita (using the City of Bakersfield Standards and Specifications); Per capita (using the City of Bakersfield 2000 City Water Balance Report); and a land-use base approach. According to the City of Bakersfield Standards and Specifications for Domestic Water Division, the density used single-family residential is 3.5 persons per unit; multi-family density is 1.75 persons per unit; commercial and industrial is considered equal to 5 single-family residences; and parks and schools are considered equal to 2 single-family residences. The City standards note that they use an average of 185 gallons per capita per day (67,525 gallons per year) to determine the average water usage. According to these standards, the total annual project water demand is shown on the table below. H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 12 ANNUAL PROJECT WATER DEMAND AT PROJECT BUILD-OUT PER CAPITA/CITY STANDARDS AND SPECIFICATIONS LAND USE TOTAL UNITS DENSITY1 DEMAND/ CAPITA/ YEAR1 (GPD) TOTAL DEMAND/AC .FT. Single-Family Residential 4748 16,618 67,525 3444 Multi-Family Residential 2702 4,729 67,525 980.0 Commercial/ Industrial 321.59 acres 5,628 67,525 1166 Parks/Lakes 197.93 acres2 395.86 67,525 82 Schools 68.55 acres3 137.1 67,525 28 TOTAL WATER DEMAND (2182 acres) 5700 Source: City of Bakersfield Standards and Specifications for Domestic Water Division, October 15, 1998 Notes: GPD = gallons per day af/year = acre feet per year 1 af = 325,829 gallons 1 City Water Resources, 2004 2 Parks and lakes 3 Schools and street landscaping This per capita method relies on unit counts, consumption rate, and an assumed per-unit population density. Water demands for this methodology were based on a consumption rate of 325 gallons per capita per day. This usage value applies only to residential land uses because it is derived from total water production and population, so water demand associated with non-residential land uses is already included in this value. H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 13 ANNUAL PROJECT WATER DEMAND AT PROJECT BUILD-OUT PER CAPITA/CITY WATER BALANCE REPORT 2000 LAND USE Total Units Area (ac) UNIT DEMAND1 (afy/cap) POPULATION DENSITY (cap/du) AVERAGE DAY DEMAND (afy) Single Family Residential 4748 994 0.364 3.01 5,203 Multi-Family Residential 2702 377 0.364 1.75 1,722 Town Center and Mixed Use 63 General Commercial 50 Special Use 220 Schools 69 Public Parks 56 Private Parks/Open Space/Ponds 140 /Canals 213 Canal 20 TOTAL 2,182 6,925 Source: SB 610 Water Assessment Report for West Ming Specific Plan Notes: GPD = gallons per day af/year = acre feet per year 1 af = 325,829 gallons 1 Assumed population densities were only applied to residential land use types. The land-use-based demands from the City of Clovis Water Master Plan Update- Phase II Facilities Plan, dated July 1999 were used for the land-use-base methodology. Based on this method, water demand is calculated from the product unit demand and land use area. This methodology would underestimate annual water demand if not adjusted for different per capita demands. The unit values in the Clovis report were based upon a per capita use of 200 gpcd. Since the total annual average demand was adjusted by the ratio of Bakersfield to Clovis per capita usages. H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 14 ANNUAL AVERAGE WATER DEMAND AT PROJECT BUILD-OUT PER CAPITA/ LAND USE BASED UNIT DEMANDS LAND USE AREA (acres) UNIT DEMAND1 (afy/ac) AVERAGE DAY DEMAND (afy) Single Family Residential 994 2.5 2.485 Multi-Family Residential 377 4.2 104 Town Center and Mixed Use 63 2.2 139 General Commercial 50 1.8 90 Special Use 220 2.2 484 Schools 69 2.8 193 Ponds 60 6.2 370 Park/Open Space 80 2.8 224 /Canal 213 0 Subtotal (before per capita adjustment) 5,725 TOTAL 2,182 9,308 2 Source: SB 610 Water Assessment Report for West Ming Specific Plan Notes: GPD = gallons per day af/year = acre feet per year 1 af = 325,829 gallons 1 Unit demand values were based data from the 1999 City of Clovis Water Master Plan Update-Phase II Facilities Plan 2 Total average day demand was adjusted by the ratio of 325:200, which represents Bakersfield and Clovis annual per capita demands The City of Bakersfield has several water wells located within the project site and has indicated that they have the capability to serve this project (See water “will- serve” letter in Appendix). The City of Bakersfield prepared a Water Balance Report in the year 2000 in response to State Assembly Bill (AB) 330. An SB 610/SB 221 Report Water Assessment Report was prepared for the West Ming Specific Plan. The developer shall be required to construct water lines per the City of Bakersfield Subdivision Design Manual. In addition, the developer is required to pay to City Water Availability Fees of two thousand dollars ($2,000.00) per gross acre. Payment of these fees, on a pro-rate basis are due prior to final acceptance and recordation of each phase of the project. In addition, the Kern County Water Agency prepared a report, in 1993, projecting municipal and industrial water demands for an area closely corresponding to the Metropolitan Bakersfield General Plan area. That report predicted an increase from present usage of about 100,000 acre feet per year to a year 2010 usage of about 130,000 acre feet per year. The Metropolitan Bakersfield General Plan concluded that plan area water supplies and systems could meet future growth H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 15 potential in the planning area for the year 2010. Florn Core stated that the existing Water Balance Report has analyzed the future increase. 2.6 Sewer The Metropolitan Bakersfield area is served by five major wastewater treatment facilities: the City of Bakersfield’s Treatment Plant Nos. 2 and 3, the North of the River Sanitary District (NORSD) plant, Mount Vernon/Panorama District plant, and the Lamont Public Utility District Plant (located outside the Metropolitan boundary). There are several small, temporary treatment facilities in the Rosedale area north of the Kern River, and west of NORSD’s service area boundaries. The City of Bakersfield Treatment Plant No. 3 will serve the proposed project. The provision of adequate wastewater collection, treatment and disposal for the proposed project is essential to protect the health of residents, permit planned urban densities, and protect the groundwater resource. The City of Bakersfield Subdivision Design Manual has established a waste generation factor for determining the total amount of waste generated from various land uses. The table below shows the total amount of anticipated waste from the proposed project. DAILY PROJECTED SEWAGE GENERATION LAND USE TOTAL UNITS DENSITY FACTOR1 TOTAL POPULATION DENSITY GALLONS/ DAY GENERATED TOTAL MGD GENERATED Single- Family Residential 4748 2.6 12,344.8 100 GPD/person 1.23 Multi- Family Residential 2702 2.0 5,404.0 100 GPD/person 0.54 Commercial 74.41 acres N/A N/A 3,589 GPD /gross acre 0.27 Light Industrial 217.18 acres N/A N/A 4,848 GPD /gross acre 1.05 TOTAL SEWAGE GENERATED 2.83 1Source: City of Bakersfield Subdivision Design Manual, factor determined by City of Bakersfield Public Works Department Notes: GPD = gallons per day MGD = million gallons per day N/A = not applicable 1 Factor is person per unit The City of Bakersfield Wastewater Treatment Plant No. 3 has a capacity of 16.0 million gallons per day with an average flow of 11.3 million gallons per day. The proposed project will increase the existing average flow to a total of 14.4 million gallons per day. The city is currently writing a ‘Request for Proposal’ to expand Plant No. 3 to 24.0 million gallons per day to accommodate new urban growth within the Metropolitan Bakersfield General Plan Boundary (including this H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 16 project). Anticipated completion of construction of this expansion is in approximately 3 years. The City prepared a Bond Report that has analyzed expansion and maintenance costs for these improvements. The bond report states that reimbursement will be funded through sewer hook-up fees. Sewer connection fees in the amount of $2,400.00 (with a built-in inflationary adjustment yearly) per dwelling unit are collected at the building permit stage. Additional fees will be assessed for the Buena Vista trunk sewer (currently $447.48 per dwelling unit) and/or the Allen Road trunk sewer (currently $536.36 per dwelling unit). Industrial users must apply for a wastewater discharge permit from the applicable County and/or State agencies. Currently sewer trunk lines are located in Allen Road (south to White Lane) and Buena Vista Road. The proposed project will connect to the exiting sewer trunk lines. Cumulative impacts to the offsite sewer collection facilities will be mitigated by planned expansion of the existing lift station at White Lane and planned future extensions of the existing trunk lines as detailed above. These planned improvements to the system will be required even without development of this project as other development included in the Metropolitan Bakersfield General Plan occurs within the area. Sewer collection facilities within the proposed project will be constructed as development occurs in accordance with local improvement standards and specifications. 2.7 Solid Waste Operation of refuse collection services in the City of Bakersfield is managed by the City Sanitation Division through a system of collection and franchise agreements to control and manage waste collection. Within a district or franchise area, a waste hauler has exclusive rights to pick up residential and commercial wastes. Any customer desiring service must be provided service. In the permit areas, waste haulers also have exclusive territory rights. Refuse collected by the City or franchise hauler is transported to the County Landfill at Bena, located about 15 miles east of downtown Bakersfield. The Bena landfill is located approximately 20 miles from the project site. In 1992, the Kern County Waste Management Department opened the Metropolitan Bakersfield (Bena) Sanitary Landfill. Bena is the County’s first fully lined landfill and serves the Metropolitan Bakersfield area. Currently the County has permission to develop 48 acres of the 2,165-acre site for waste disposal. If the California Integrated Waste Management Board grants additional permits to develop the remainder of the site and waste diversion stabilizes at 50 percent, potential total capacity for the Bena Landfill site exceeds 60 years. The City could not provide waste generation estimates for the proposed mixed use and general commercial, light industrial, and park uses. The California Integrated Waste Management Board (CIWMB) does provide a list of waste generation information extracted from various sources including previously written environmental documents, such as those developed by city or county planning, or H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 17 environmental documents including the Los Angeles Draft CEQA Thresholds Guide. Although CIWMB does not officially endorse any of these rates and cannot validate their accuracy, the rates can be considered useful in providing a general level of information fro planning purposes. Waste generation from parks constructed as part of the proposed project was conservatively estimated at 25 pounds per day, based upon information provided for similar parks in Tustin, California (Jones & Stokes 2002). Based upon this information, the proposed project is anticipated to generate approximately 23,338 tons of solid waste per year as shown on the table below. ESTIMATED WASTE GENERATION RATES Land Use Units or Sq. Feet Generation Rate1 Solid Waste Generation Residential 7,450 units 1 ton/unit/year 7,450 tons/year General and Mixed Use Commercial 810,080 sq. feet 13lb/1,000 sq. ft/day 1,922 tons/year Schools 5,550 students 1 lb/student/day 1,013 tons/year Light Industrial 1,135,000 62.5lb/1,000 sq. ft./day 12,946 tons/year Open Space/Parks 106 acres 25 lb/acre/day 58 tons/year TOTAL 23,338 tons/year 1Waste Generation Rates provided by CIWMB According to the Kern County Waste Management Siting Element, 2003 Annual Report the anticipated disposal capacity of the Bena landfill in the year 2018 is 579,265 tons per year with the remaining permitted capacity, as of January 1, 2003, of 22,367,758 tons. The Bena landfill has sufficient capacity to accommodate the proposed project. The threshold of significance cites that a project be served by a landfill with sufficient permitted capacity. The addition of the proposed project is not a significant impact. 2.8 Street Lighting Street lighting is provided in nearly all developed areas of the city. Lighting which is not provided by the city is provided either by governmental agencies or private ownership. City development standards require street lights at intersections, and at midblock, where streets are greater than 600 feet in length, with the exception of some industrial areas in which street lights are required only at intersections. Most street lights in the City are provided under Pacific, Gas and Electric’s (PG& E) LS-1A or LS-1C rates. In the former, PG& E installs, owns and maintains the entire street light. In the latter the pole and support arm are installed and owned by the City with PG&E maintaining it. In new developments, the City itself does not install street lights. Rather the City requires developers to install lights and dedicate them to the city. Lights are often H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 18 required for newly annexed existing development areas. The proposed project will install street lighting per City standards and dedicate them to the City. 2.9 Canal Fencing The Kern River Canal traverses the project site from the northeast corner of Section 11, in a southwesterly direction. This canal is operated by the City of Bakersfield and is contracted to deliver water to the Buena Vista Water Storage District for 6 months of the year. The canal is empty the remaining six months. To maintain the integrity of the canal and ensure public safety, the canal shall be fenced in accordance with city development standards. SECTION 3 – STUDY CONCLUSIONS AND MITIGATION MEASURES 3.1 Fire Development of the proposed project will increase the demand for fire protection and emergency services. The City of Bakersfield Fire Department has not established a ratio of staff to resident population, but the national industry standard is 1.0-fire personnel per 1,000 population. Currently, the City of Bakersfield operates at approximately 0.7 fire personnel per 1,000 population. Personnel at Station No. 15 will provide the required services to the project site until the timing for new personnel and facilities. Based upon a population increase of 19,020, the proposed project will require additional personnel and equipment to provide fire protection services. As part of the proposed project, a development agreement would be entered into between the City and the project applicant to make a fair-share contribution for purchase of additional fire prevention equipment to be used by the Bakersfield Fire Department. The contribution would be used by the Bakersfield Fire Department to ensure that adequate fire station facilities and equipment are provided to serve the proposed project area and maintain current response times. Additional property tax revenues generated by this project may also be used for equipment, facilities, and personnel. In addition, a future fire station is planned for construction within the McAllisiter Ranch project, immediately south of the West Ming Specific Plan. This station is anticipated to be operational sometime in 2008. In conjunction with future development in the area, Station No. 15 and the proposed station within the McAllister Ranch project would be adequate to serve the area and maintain current response times. As part of the approval process, the project would be required to conform to the Uniform Fire Code and the City of Bakersfield Municipal Code Sections 15.64.010 to 15.64.480. These codes require projects to include specific design eatures such as ensuring appropriate emergency access, and requiring structures to H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 19 be built with approved building materials, etc. Conformance with these codes helps reduce the risks associated with fire hazards. Accordingly, all construction plans would be approved by the Fire Department to ensure that all fire code requirements are incorporated into the proposed project. These components of the proposed project would result in less-than-significant impacts. 3.2 Law Enforcement Development of the proposed project will increase the demand for law enforcement services. According to Police Chief, Bill Rector, the substation located adjacent to Fire Station 15, will be adequate to serve the project residents at this time. If new law enforcement personnel and associated equipment is not provided, the proposed project could not be adequately served by police protection. This inadequate protection would result in an impact to the safety of future and existing residents. Property tax revenues will reduce this impact to a level of insignificance. The Police Department has indicated current staffing levels are below their staffing goal of 1.3 officers per 1,000 population. Law enforcement may lag behind actual demand due to lack of funds immediately available to hire officers. Short term cumulative demand may lag several years behind actual staffing needs. However, because the project would be phased, the staffing and equipment needs will be adequate to serve eventual project demand. The proposed project’s incremental contribution to this impact will be mitigated through property tax revenues to a level of insignificance. In addition, as part of the proposed project, a development agreement would be entered into between the City and the project applicant to make a fair-share contribution for purchase of additional equipment and facilities. The contribution would be used by the Bakersfield Police Department to ensure that adequate facilities and equipment are provided to serve the proposed project area and maintain current response times. Additional property tax revenues generated by this project may also be used for equipment, facilities, and personnel. Incorporation of these project elements would ensure that impacts to police services are minimized to a less than significant level. H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 20 3.3 Schools The addition of approximately 2,469 elementary, 733 middle school, and 1,639 high school students will impact the school districts and necessitate construction of additional school facilities to serve the population. To address impacts resulting from this project, the project is subject to payment of statutory fees authorized under Education Code § 17620 and Government Code § 65995, 65995.5, 65995.6 and 65995.7, as amended November 4, 1998. Collection of the fees is at time of issuance of building permits. In addition, the developer has conceptually sited several elementary and one junior high school within the project boundary. If required, the future school sites will be developed in consultation with the Panama-Buena Vista School District and located per the District’s requirements. The location and designation of the schools are not established because the City of Bakersfield does not designate school sites at the General Plan or zoning level of planning. In accordance with the city’s General Plan and zoning designations, the schools could be located within any of the residential areas. Compliance with the statutory requirements is deemed to be full and complete mitigation of impacts of a development project on school facilities. In addition, the proposed project includes several school sites (the precise mechanism for dedication or purchase has not been determined at this time). If additional schools are required to accommodate project area students, the proposed project is subject to the statutory fees as outlined. The proposed project would not result in substantial adverse impacts associated with the provision of new schools. The West Ming Specific Plan will work cooperatively with school officials to identify and acquire appropriate sites for new school facilities to minimize the burden upon the school districts as subsequent development proposals are introduced within the site. Additionally as tract maps are designed and reviewed, applicants will be required to pay the appropriate impact-based school fees at the latest rates established. Impacts would be less than significant. 3.4 Parks Compliance with the park land and park development fee ordinances ensures that parks are provided and built in accordance with the City standards as described in the Metropolitan Bakersfield General Plan. The developer will provide parkland well in excess of the required minimum (i.e. ±91 acres v.56.06 acres). No impact has been identified. Public facility improvements from the proposed development and eventual build- up of this area will result in an increase in maintenance responsibility for the City of Bakersfield. The development is required to provide improvements, such as sewer and drainage facilities, in accordance with Bakersfield Municipal Code H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 21 §16.32.060 and Chapter 3.12, Development Improvement Standards and Specifications. This potential increase in maintaining services would be paid for by property tax revenues generated by this development. No significant impact is anticipated. 3.5 Water The additional need of between 5700-9,308 acre-feet of water per year is a significant impact on the water demand for the City of Bakersfield. However, the City of Bakersfield has several water wells located within the project site and has indicated that they have adequate capacity to serve this project. The City of Bakersfield prepared a Water Balance Report in the year 2000 in response to State Assembly Bill (AB) 330. In addition, an SB 610/SB 221 Water Assessment Report was prepared for the West Ming Specific Plan. Although water supply for the proposed project is expected to be adequate, additional infrastructure would be necessary to reach and distribute water to the proposed project. The infrastructure required for a complete water system includes transmission lines, distribution system, meters, and a meter reading systems. These utilities would be engineered according to project demand, and sized and located appropriately to serve future residents. All water distribution infrastructure would be installed as part of the proposed project as development progresses. The developer shall be required to construct water lines per the City of Bakersfield Subdivision Design Manual. The proposed development would not result in a need for significant additional systems or substantially alter the existing water utilities in the area. Expansion of all water utilities would be required to serve this development, but the impact is not considered significant. The project will be served by the City of Bakersfield Water Resources Department, which indicates that the district has adequate capacity to serve the subject site. The water utility company may require the project applicant to provide some water system improvements to service the site but this impact is not regarded as significant. Eight water wells have been conceptually sited within the West Ming Specific Plan. However, the Water Resources Department will determine the number and location of wells to serve this project site at the time of tentative map approval. In addition, the developer is required to pay to City Water Availability Fees (currently $2,000.00 per gross acre). Payment of these fees, on a pro-rate basis are due prior to final acceptance and recordation of each phase of the project. In addition, the Kern County Water Agency prepared a report in 1983, projecting municipal and industrial water demands for an area closely corresponding to the Metropolitan Bakersfield General Plan area. That report predicted an increase from present usage of about 100,000 acre feet per year to a year 2010 usage of about 130,000 acre feet per year. The Metropolitan Bakersfield General Plan concluded that plan area water supplies and systems could meet future growth H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 22 potential in the planning area for the year 2010. Page II-4 of the Metropolitan Bakersfield General Plan states: “… development of urban Bakersfield will be focused in ten new mixed use activity centers, in the southwest, northwest, and northeast…the southwest center [location of the project site] is warranted due to its growth potential and its related impacts, impact on prime agricultural lands, and potential to impact the Kern River corridor.” A statement of overriding considerations for this impact was adopted by the City when the General Plan was certified. Since the project site area was designated as a future mixed-use activity center in the General Plan, the existing adopted statement of overriding considerations would still be valid. This impact has been reduced to a level of insignificance. Public facility improvements from the proposed development and eventual build- up of this area will result in an increase in maintenance responsibility for the City of Bakersfield. The development is required to provide improvements, such as sewer, water and drainage facilities, in accordance with Bakersfield Municipal Code §16.32.060 and Chapter 3.12, Development Improvement Standards and Specifications. This potential increase in maintaining services would be paid for by property tax revenues generated by this development. No significant impact is anticipated. City fees for inspection of installation of water facilities are currently at four (4%) percent of the estimated construction costs of the in-tract facilities. In addition, a $10.00 meter installation fee for each service will be assessed for 2” and less in size. The inspection fees will be due and payable to the City by the Land owner/developer within 30 days of invoice. Since landowner records for water diversions were not available for this area, existing crop water demand was calculated from available historical data. Existing crop area totals were published in the 1990 and 1998 Department of Water Resources (DWR) Crop Survey. Crop evapotranspiration requirements were obtained from reports published by the University of California Experimental Station. Crop data was used from both the 1990 and 1998 DWR Crop Survey reports in order to develop a range of existing irrigation demands. The 1990 DWR Crop Survey report states that existing agricultural uses included field crops, grain, hay, native vegetation, semi-agricultural, urban industrial and pasture. Total area for these uses was approximately 2,106 acres. Crop area totals presented in this report can vary significantly between years because of changing agricultural market conditions and crop selection. The estimated annual consumptive use for lands, as determined in the SB610 Water Assessment Report for West Ming Specific Plan, for 1990 and 1998 was 6,393 and 4,326 –af respectively. Estimated annual consumptive use for these two years was 5,360-af. The table below lists specifics of water consumption for this development for conditions previously discussed. The water demand impact associated with this development has the potential for a wide range of variability; however the most probable condition is one that is based upon averaging high and low water H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 23 demand estimates, proposed and existing crop demands; and keeping wastewater generation constant. The lowest water demand estimate (based upon City Standards and Specifications) was not used for this averaging,. to give the most conservative, yet realistic estimate. Based on anticipated-demand evaluation, this development would increase consumptive use for this area by 1,138-af/year. CONSUMPTIVE WATER USE EVALUATION BEST CASE EVALUATION ANTICIPATED DEMAND EVALUATION WORST-CASE EVALUATION Proposed Demand 6,925 8,116 9,308 Wastewater Generation 1,4721 1,4721 1,4721 Existing Crop Demand 6,393 5,360 4,326 TOTAL CONSUMPTIVE USE CHANGE -9402 1,2842 4,9822 1 The City of Bakersfield Kern River surface water entitlement, even during the driest year on record, would yield 19,000-af/yr. the City of Bakersfield service area current water demand is 35,668-af/yr, and the proposed project would increase this water demand by 8,116-af/yr which represents a total water demand of 48,200-af/yr. However, the consumptive use for this region, based on the anticipated demand evaluation, will increase existing use by 1,284-af/yr. Base upon available information, the City of Bakersfield is able to supply water to the proposed project area and would still have ample supplies, including 190,000-ac of water stored in the groundwater bank. According to the SB 610 Water Assessment for the West Ming Specific Plan, the City has ample supplies to not only meet the demands of this development but the ongoing developments envisioned by the City in recent planning documents. According to the Kern Council of Governments (KernCOG) regional growth forecast adopted April 2002, the population of the Metropolitan Bakersfield area was anticipated to grow 2% on an average annual basis over the next twenty years. This overall growth projection is consistent with the City of Bakersfield’s growth projections and is slightly lower than the State of California Department of Finance growth projections; however, it incorporates all existing, planned, and reasonably foreseeable future projects within the Metropolitan Bakersfield area. Incorporation of these project elements would ensure that impacts to water service and facilities are minimized to a less than significant level. H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 24 3.6 Sewer The City of Bakersfield will provide sewer service to the proposed project site. Currently sewer trunk lines are located in Allen Road (south to White Lane) and Buena Vista Road. The proposed project will connect to the exiting sewer trunk lines. Additional major trunk sewers may be required to serve the urban growth projected with this project. The City of Bakersfield Wastewater Treatment Plant No. 3 has a capacity of 16.0 million gallons per day with an average flow of 11.3 million gallons per day. The proposed project will increase the existing average flow to a total of 14.4 million gallons per day. The city is currently in design for expansion of Plant No. 3 to 32.0 million gallons per day to accommodate new urban growth within the Metropolitan Bakersfield General Plan boundary. Completion of construction of this expansion is estimated to be completed in 2008. Additionally, because the project would be phased, the plant would have adequate capacity to serve eventual project demand. According to Jacques LaRochelle, Assistant Public Works Director, the West Ming Specific Plan area is included in the service area for Plant No. 3 and will be served by the City of Bakersfield. If project generation exceeds capacity, then additional trunk sewers or lift stations shall be provided as necessary per the City of Bakersfield Subdivision Design Manual. The following condition is suggested to reduce the impact to existing sewer services: “Prior to recordation of Final Maps, a Sewer Study shall be completed and approved by the City Public Works Department.” The Metropolitan Bakersfield General Plan concluded that plan area sewer systems could meet future growth potential in the planning area for the year 2010 with the addition of the construction of major trunk sewers. Page II-4 of the Metropolitan Bakersfield General Plan states: “… development of urban Bakersfield will be focused in ten new mixed use activity centers, in the southwest, northwest, and northeast…the southwest center [location of the project site] is warranted due to its growth potential and its related impacts, impact on prime agricultural lands, and potential to impact the Kern River corridor.” A statement of overriding considerations was adopted by the City when the General Plan was certified. Since the project site area was designated as a future mixed- use activity center in the General Plan, the existing adopted statement of overriding considerations would still be valid. This impact has been reduced to a level of insignificance. Public facility improvements from the proposed development and eventual build- up of this area will result in an increase in maintenance responsibility for the City of Bakersfield. The development is required to provide improvements, such as sewer and drainage facilities, in accordance with Bakersfield Municipal Code §16.32.060 and Chapter 3.12, Development Improvement Standards and Specifications. This potential increase in maintaining services would be paid for by property tax revenues generated by this development. No significant impact is anticipated. H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 25 The proposed project will connect to the exiting sewer trunk lines. Cumulative impacts to the offsite sewer collection facilities will be mitigated by planned expansion of the existing lift station at White Lane and planned future extensions of the existing trunk lines as detailed above. These planned improvements to the system will be required even without development of this project as other development included in the Metropolitan Bakersfield General Plan occurs within the area. Sewer collection facilities within the proposed project will be constructed as development occurs in accordance with local improvement standards and specifications. 3.7 Solid Waste According to the Kern County Waste Management Department, the proposed project is anticipated to generate approximately 23,338 tons of solid waste per year. According to the Kern County Waste Management Siting Element 2003 Annual Report, the anticipated disposal capacity of the Bena landfill in the year 2018 is 579,265 tons per year with the remaining capacity, as of January 1, 2003, of 22,367,758 tons. The addition of the proposed project is not a significant impact. Additionally, as part of the proposed project, future residents would be enrolled in the City’s curbside recycling program for greenwaste. All remaining trash would be sorted in compliance with the City’s Source Reduction and Recycling Element (SRRE) at the Mount Vernon Recycling Center, which will reduce waste disposed at area landfills. Recycling efforts would be expected to reduce waste to landfills by an additional 50%. These efforts would reduce the proposed project’s contribution to the Bena landfill to approximately 11,669 tons per year that would require disposal. Therefore, impacts associated with solid waste disposal would be less than significant. 3.8 Street Lighting In new developments, the City itself does not install streets lights. Rather the City requires developers to install lights and dedicate them to the city. Lights are often required for newly annexed areas. The proposed project will install street lighting per City standards and dedicate them to the City. No impact is anticipated. 3.9 Canal Fencing The Kern River Canal traverses the project site from the northeast corner of Section 11, in a southwesterly direction. This canal is operated by the City of Bakersfield and is contracted to deliver water to the Buena Vista Water Storage District for 6 months of the year. The canal is empty the remaining six months. To maintain the integrity of the canal and ensure public safety, the canal shall be fenced in accordance with city standards. No impact is anticipated. H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 26 RESOURCES Barnes, Kevin. Solid Waste Director, City of Bakersfield, Personal communication: August 2005 2003 California Environmental Quality Act, CEQA Guidelines, 2002 Califronia Integrated Solid Waste Management Division a. Estimated Solid Waste Generation Rates 2004b City of Bakersfield Development Improvement Standards City of Bakersfield Municipal Code, December 2003 City of Bakersfield Standards and Specifications for Domestic Water Division, October 15, 1998 City of Bakersfield Subdivision Design Manual, July 1989 City of Bakersfield Water Resources Department Water Balance Report, 2000 Core,Florn. WaterResources Department Director, City of Bakesfield. Personal communication: July 2004 Fraze, Ron, Fire Chief, City of Bakersfield Fire Department. Personal communication: February 2004 Kern High School District, A Look Ahead – Growth Capacity and Enrollment Patterns, Charles Rosengard, 2002 Kileen,, Mike. Facilities Director, Panama-Buena Vista Union School District. Personal communication: July 2005 LaRochelle, Jacques. Public Works Assistant Director, City of Bakersfield. Personal Communication: June 2006 Metropolitan Bakersfield General Plan, February 26, 2003 Metropolitan Bakersfield General Plan FEIR, June 26, 2002 Rector, Bill. Chief of Police, City of Bakersfield Police Department. Personal Communication: March 2004. Residential Development School Feed Justification Study, Prepared for Panama-Buena Vista Union School District, David Taussig & Associates, February 3, 2006 H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 27 Sewer Study for the West Ming Specific Plan, May 2004 SB 221/610 Water Assessment Report, West Ming Specific Plan, August 2006 State of California Senate Bill 221, October 9, 2001 U.S. Census Bureau, 2000 Federal Census, Kern Council of Governments, 2000 Waste Characterization Report, California Integrated Waste Management Board, State of California, 1991 H:\Client (PN-JN)\0216\02160029\DEIR 9-1\Appendices\Appendix K - Public Services\PUBLIC SERVICE STUDY2006-08- 24.doc 28 APPENDIX