Loading...
HomeMy WebLinkAbout02160029_Sec00-TOCWest Ming Specific Plan - Draft EIR Table of Contents Michael Brandman Associates iii H:\Client (PN-JN)\0216\02160029\DEIR 9-1\02160029_Sec00-TOC.doc TABLE OF CONTENTS Section 1: Introduction......................................................................................................1-1 1.1 - Purpose of the EIR...........................................................................................1-1 1.2 - Scope of the EIR..............................................................................................1-4 1.3 - Lead Agency and Contact Persons..................................................................1-8 1.4 - Review of the Draft EIR....................................................................................1-9 Section 2: Executive Summary.........................................................................................2-1 2.1 - Proposed Project..............................................................................................2-1 2.2 - Areas of Controversy/Issues To Be Resolved.................................................2-1 2.3 - Significant Unavoidable Adverse Environmental Effects.................................2-1 2.4 - Summary of Alternatives..................................................................................2-2 2.5 - Mitigation and Monitoring Program..................................................................2-2 2.6 - Summary of Significant Environmental Impacts and Mitigation Measures......2-2 Section 3: Project Description..........................................................................................3-1 3.1 - Project Location...............................................................................................3-1 3.2 - Project Site Background...................................................................................3-1 3.3 - Site Development Constraints..........................................................................3-1 3.4 - Project Characteristics.....................................................................................3-2 3.5 - Project Objectives..........................................................................................3-37 3.6 - Intended Uses of the Draft EIR......................................................................3-38 Section 4: General Description Of Environmental Setting.............................................4-1 Section 5: Project Impacts.............................................................................................5.1-1 5.1 - Agriculture Resources...................................................................................5.1-1 5.2 - Air Quality......................................................................................................5.2-1 5.3 - Biological Resources.....................................................................................5.3-1 5.4 - Cultural Resources........................................................................................5.4-1 5.5 - Geology and Soils.........................................................................................5.5-1 5.6 - Hazards and Hazardous Materials................................................................5.6-1 5.7 - Hydrology and Water Quality........................................................................5.7-1 5.8 - Noise.............................................................................................................5.8-1 5.9 - Public Services..............................................................................................5.9-1 5.10 - Recreation.................................................................................................5.10-1 5.11 - Transportation and Traffic.........................................................................5.11-1 5.12 - Utilities and Service Systems....................................................................5.12-1 5.13 - Population and Housing............................................................................5.13-1 Section 6: Cumulative Impacts.........................................................................................6-1 6.1 - CEQA Requirements........................................................................................6-1 6.2 - Cumulative Impact Setting...............................................................................6-1 6.3 - Cumulative Impact Analysis.............................................................................6-1 Section 7: Alternatives......................................................................................................7-1 7.1 - No Project/No Development Alternative...........................................................7-2 7.2 - Reduced Intensity Alternative..........................................................................7-6 7.3 - Alternative Site...............................................................................................7-12 7.4 - Environmentally Superior Alternative.............................................................7-13 Section 8: Other CEQA Considerations...........................................................................8-1 8.1 - Significant Unavoidable Impacts......................................................................8-1 8.2 - Growth Inducing Impacts.................................................................................8-2 8.3 - Irreversible and Irretrievable Commitment of Resource...................................8-3 Table of Contents West Ming Specific Plan - Draft EIR iv Michael Brandman Associates H:\Client (PN-JN)\0216\02160029\DEIR 9-1\02160029_Sec00-TOC.doc Section 9: Organizations and Persons Consulted..........................................................9-1 9.1 - Public Agencies...............................................................................................9-1 9.2 - Private Organizations.......................................................................................9-1 Section 10: Report Preparation Personnel....................................................................10-1 Section 11: References...................................................................................................11-1 APPENDICES Appendix A: Initial Study/Notice of Preparation and Responses Appendix B: Farmland Conversion Study Appendix C: Air Quality Assessment Appendix D: Biota Report Appendix E: Cultural Resources Survey Appendix F: Geotechnical Feasibility Study/ Geological Hazard Study Appendix G: Hazardous Materials Evaluation Appendix H: Natural Resources Impact Report Appendix I: Flood Study and Lake Report Appendix J: Noise Study Appendix K: Public Services Report Appendix L: Traffic Report Appendix M: Water Supply Assessment Appendix N: Compatibility and Safety Assessment Appendix O: Cumulative Projects List LIST OF TABLES Table 1-1: Potentially Significant Environmental Issues......................................................1-6 Table 2-1: Executive Summary............................................................................................2-3 Table 3-1: Statistical Summary............................................................................................3-7 Table 3-2: West Ming Specific Plan General Plan Land Use Designation Acreages.........3-11 Table 3-3: West Ming Specific Plan Zoning District Acreages...........................................3-12 Table 3-4: Dwelling Unit Range.........................................................................................3-15 Table 3-5: West Ming Specific Plan Maximum Building Height.........................................3-15 Table 5.2-1: State and Federal Ambient Air Quality Standards¹.....................................5.2-13 Table 5.2-2: San Joaquin Valley Air Basin - District Portion Attainment Status..............5.2-14 Table 5.2-3: Background Ambient Air Quality for Ozone................................................5.2-15 Table 5.2-4: Background Ambient Air Quality Data for PM10..........................................5.2-15 Table 5.2-5: Background Ambient Air Quality Data for PM2.5.........................................5.2-16 West Ming Specific Plan - Draft EIR Table of Contents Michael Brandman Associates v H:\Client (PN-JN)\0216\02160029\DEIR 9-1\02160029_Sec00-TOC.doc Table 5.2-6: Background Ambient Air Quality Data for CO.............................................5.2-16 Table 5.2-7: Background Ambient Air Quality Data for NOx............................................5.2-16 Table 5.2-8: Background Ambient Air Quality Data for SOx............................................5.2-17 Table 5.2-9: Background Ambient Air Quality Data for Lead..........................................5.2-17 Table 5.2-10: Emissions from Existing Project Site Agricultural Operations...................5.2-18 Table 5.2-11: Standards Utilized for General Thresholds of Significance.......................5.2-21 Table 5.2-12: Models used in Impact Analysis................................................................5.2-23 Table 5.2-13: Total Project Emissions............................................................................5.2-31 Table 5.2-14: Project Criteria Pollutant Impact Model Results for Intermediate Construction Year and Buildout Year.......................................................5.2-33 Table 5.2-15: Toxic Emissions from Gasoline Dispensing Facilities - Gasoline.............5.2-38 Table 5.2-16: CALINE-4 Predicted Carbon Monoxide (CO) Concentrations..................5.2-46 Table 5.2-17: CALINE-4 Predicted Carbon Monoxide (CO)...........................................5.2-46 Table 5.2-18: Operational Year Odor Impacts................................................................5.2-50 Table 5.3-1: Special-Status Plant and Wildlife Species Potentially Occurring on the Project Site................................................................................................5.3-3 Table 5.3-2: Consistency of the West Ming Specific Plan with the Metropolitan Bakersfield General Plan.........................................................................5.3-13 Table 5.5-1: Active Faults Within the Project Area............................................................5.5-2 Table 5.8-1: Metropolitan Bakersfield 2010 General Plan Hourly Noise Level Standards..................................................................................................5.8-2 Table 5.8-2: Existing Off Site Traffic Noise Levels............................................................5.8-4 Table 5.8-3: 2015 and 2030 Traffic Noise Levels on the Project Site.............................5.8-11 Table 5.8-4: 2015 and 2030 Offsite Traffic Noise Levels................................................5.8-16 Table 5.8-5: Construction Equipment Noise...................................................................5.8-25 Table 5.9-1: Student Generation Rates............................................................................5.9-6 Table 5.11-1: LOS Criteria for Signalized and Unsignalized Intersections.....................5.11-8 Table 5.11-2: LOS Criteria for Roadway Segments........................................................5.11-9 Table 5.11-3: Project Trip Generation...........................................................................5.11-11 Table 5.12-1: Estimated Solid Waste Generation.........................................................5.12-10 Table 5.13-1: Kern County and City of Bakersfield Population Projections....................5.13-2 Table 5.13-2: Kern County and City of Bakersfield Housing Projections........................5.13-2 Table 6-1: Year 2015 Cumulative Off Site Noise Analysis.................................................6-10 Table 6-2: Year 2030 Cumulative Off Site Noise Analysis.................................................6-16 Table of Contents West Ming Specific Plan - Draft EIR vi Michael Brandman Associates H:\Client (PN-JN)\0216\02160029\DEIR 9-1\02160029_Sec00-TOC.doc LIST OF EXIBITS Exhibit 3-1: Regional Location Map.....................................................................................3-3 Exhibit 3-2: Vicinity Location Map........................................................................................3-5 Exhibit 3-3: West Ming Specific Plan General Plan Land Use Designations.......................3-9 Exhibit 3-4: Zoning Districts...............................................................................................3-13 Exhibit 3-5: Annexation Area.............................................................................................3-17 Exhibit 3-6: Circulation Plan...............................................................................................3-19 Exhibit 3-7: Trails Plan.......................................................................................................3-21 Exhibit 3-8: Utility Concept Plan - Water............................................................................3-23 Exhibit 3-9: Utility Concept Plan - Sewer...........................................................................3-25 Exhibit 3-10: Storm Drain Plan...........................................................................................3-29 Exhibit 3-11: Public Open Space Plan...............................................................................3-31 Exhibit 3-12: Private Open Space Plan..............................................................................3-33 Exhibit 3-13: Project Phasing.............................................................................................3-35 Exhibit 5.7-1: Existing Flood Map.....................................................................................5.7-3 Exhibit 5.7-2: Future Flood Map......................................................................................5.7-13 Exhibit 5.11-1: Traffic Study Area...................................................................................5.11-3