Loading...
HomeMy WebLinkAboutSewer Study Tract 7352 ApprovedPORTER & ASSOCIATES INC. ENGINEERING & SURVEYING Job No. 2992C March 9, 2029 Manny Behl Public Works department 1600 Truxtun Avenue Bakersfield, CA 93301 RE: Sewer Letter for Tract 7352 Dear Manny: Tract 7352 is currently an R-1 zone and would have been studied as an R-1 zone for the downstream trunk mains. There is an existing 12" sewer main in Poppyseed Street which currently serves Fire Station 413 and is also more than adequate to serve the 26 proposed lots in Tract 7352. 8" sewer main extensions will be utilized to serve the tract. An 8" pvc sewer pipe is capable of serving 575 single family homes. Therefore, the 8" sewer lateral will be capable of serving the 26 lots of Tract 7352. The tract is bounded by Farmer's Canal, Arvin Edison Intake Canal, an R-3 Zoned Property, and Fire Station #13; and none of the sewer mains can be extended. Further study is not necessary. Please call me with any questions or comments. Sincerely, �K) cj�& Fred W_ Porter II RCE 74059 —. __ EPo =n � Rc� 74059 4" 1�- "" OF C ALS 1200 21st Street, Bakersfield, California 93301 • 661.327.4362 • FAX 661,327.1065