HomeMy WebLinkAboutSam's Bakersfield 4819 Hirt Satellite Vapor Pipe Installation-202087-REG-B
20K
87-REG-A
20K
91-PREM
20K
DIESEL
20K
N
E. KIOSLK W/ VEEDER ROOT
TLS350
E. BOLLARD, TYP. 6
E. DISPENSER, TYP. 6
E. CANOPY COLUMN, TYP. 6
E. BG FUEL PIPING
E. CONCRETE TANK SLAB
E. CONCRETE DRIVE SLAB W/ CANOPY OVERHEAD
NEW 2" DW SS BRUGG FLEXWELL
SATELLITE VAPOR PIPE FROM 87
STP SUMP TO HIRT PROCESSOR.
SLOPE MIN. 1% TO UST.
E. HIRT PROCESSOR
2" GALV. SCH. 40 VAPOR PIPE
RISER ASSEMBLY.UNISTRUT SUPPORT RACK
W/ (2) CONCRETE FOOTINGS
E. VENT TRANSITION BOX
W/ 2" VENT RISERS
E. 4" BOLLARDS, (TYP.)
ABANDONED CAS SLAB
CONNECT NEW VAPOR PIPE TO
EXISTING 4" ATG RISER IN
STP SUMP.
E. PLANTER
Ja
u
r
e
g
u
i
&
C
u
l
v
e
r
,
I
n
c
.
95
9
W
.
M
i
s
s
i
o
n
A
v
e
.
Es
c
o
n
d
i
d
o
,
C
A
9
2
0
2
5
Li
c
:
7
0
8
2
3
1
7
6
0
-
7
4
3
-
0
5
1
8
F
:
7
6
0
-
7
4
3
-
0
6
2
1
SCALE:
DRAWN BY:
DATE:
REV. DATE:
JCI JOB #:
APPROVED:
FILE:
REV. DATE:
Pr
o
j
e
c
t
:
SAM'S CLUB #4819
GAS STATION
2-20,000 GAL. REGULAR
1-12,000 GAL SUPER
1-8,000 GAL DIESEL
FUEL DISPENSERS
UNDER CANOPY
KIOSK W/ VEEDER
ROOT PANEL & ESO
SITE PLAN
SCALE 1/8" = 1'
REVISED SCOPE OF WORK:
THE HIRT VCS 100 VAPORTEK VAPOR PROCESSOR WITH INDICATOR PANEL HAS BEEN INSTALLED TO
REPLACE THE HEALY CAS PER PERMIT. IT HAS BEEN FOUND THAT THERE ARE STILL OVER-PRESSURIZATION
ALARMS OCCURRING. AFTER MEETINGS WITH THE HIRT ENGINEERING STAFF IT WAS DECIDED THAT BECAUSE
OF UNIQUE CONDITIONS AT THIS SITE, THE INSTALLATION OF A SATELLITE VAPOR PIPE WOULD BEST
ELIMINATE THE RECURRING ALARMS. THIS IS THE SCOPE OF WORK FOR THE INSTALLATION OF THE SATELLITE
VAPOR PIPE:
1.INSTALL A 4" X 2" TEE IN THE ATG RISER IN THE NEAREST GASOLINE UST (87-REG-B) STP SUMP.
2.INSTALL A 2" SATELLITE VAPOR PIPE FROM THE NEW TEE IN THE ATG RISER TO THE HIRT PROCESSOR,
TRENCHING AS NECESSARY. PIPE TO BE BRUGG FLEXWELL DW SS AND SLOPE A MIN. 1% FROM THE PROCESSOR
LOCATION TO THE UST.
3.INSTALL A BRAVO FIBERGLASS PENETRATION FITTING FOR THE DW TANK SUMP, APPROVED FOR BRUGG PIPE.
4.INSTALL THE VAPOR PIPE RISER ASSEMBLY IN THE PLANTER NEXT TO THE HIRT PROCESSOR PER DETAIL,
INCLUDING THE UNISTRUT SUPPORT ASSEMBLY.
5.BACKFILL PER BRUGG MANUFACTURER RECOMMENDATIONS (SAND OR PEA GRAVEL, MINIMUM 4" BELOW AND 6"
ABOVE THE PIPE.) PATCH CONCRETE AND ASPHALT TO MATCH EXISTING.
6.ALL REPAIR WORK IS TO BE PERFORMED BY OR DIRECTLY SUPERVISED BY A TECHNICIAN WITH A CURRENT
MANUFACTURER'S CERTIFICATION FOR THE EQUIPMENT BEING INSTALLED AND A CURRENT ICC CERTIFICATION
FOR UST INSTALLATION/RETROFITTING.
7.ALLOW A MINIMUM OF 48 HOURS ADVANCE NOTICE OF ANY PROPOSED INSPECTION SCHEDULING
APPOINTMENTS.
8.ALL WORK IS TO BE SUBJECT TO THE TESTING AND INSPECTION REQUIREMENTS SPECIFIED IN THE CUPA REPAIR
PERMIT AND E.O. VR-204-F. NO WORK IS TO BE COVERED UNTIL APPROVED OR AUTHORIZED BY THE CUPA
INSPECTOR. AQMD TESTING TO BE SCHEDULED AND PERFORMED PER THE AUTHORITY TO CONSTRUCT PERMIT.
9.AFTER WORK HAS BEEN INSPECTED AND ACCEPTED BY THE CUPA INSPECTOR IT MAY BE COVERED OR CLOSED. ALL
PROBES AND SENSORS ARE TO BE IN THEIR PROPER POSITIONS, FUNCTIONING PROPERLY AND BRINE LEVELS ARE
TO BE CORRECT AT THE COMPLETION OF THE REPAIR PROJECT.
APPLICABLE CODES:
THIS PROJECT SHALL COMPLY WITH THE APPLICABLE PROVISIONS OF THE 2019 CBC, CPC, CEC AND CFC.
ABBREVIATIONS:
ATG AUTOMATIC TANK GAUGE
BMP BEST MANAGEMENT PRACTICES
CAS HEALY CLEAN AIR SEPARATOR
CUPA CERTIFIED UNITIED PROGRAM AGENCY
DEH DEPARTMENT OF ENVIRONMENTAL HEALTH
DWFG DOUBLE WALL FIBERGLASS
E.EXISTING
PREM PREMIUM GASOLINE
REG REGULAR GASOLINE
SWFG SINGLE WALL FIBERGLASS
UDC UNDER DISPENSER CONTAINMENT
UST UNDERGROUND STORAGE TANK
HI
R
T
V
C
S
1
0
0
V
A
P
O
R
T
E
K
VA
P
O
R
P
R
O
C
E
S
S
O
R
I
N
S
T
A
L
L
A
T
I
O
N
SA
M
'
S
C
L
U
B
#
4
8
1
9
56
2
5
G
O
S
F
O
R
D
R
D
.
BA
K
E
R
S
F
I
E
L
D
,
C
A
9
3
3
1
3
AS NOTED
JC
12/16/19
P19-0691
FS-1
SITE PLAN
LIST OF DRAWINGS
FS-1 SITE PLAN
FS-2 DETAILS
AREA MAP
SITE MAP
HIRT VAPOR
PROCESSOR
REMOVED HEALY
CAS LOCATION
SAM'S CLUB #4819
05/19/2020
BOLLARD, TYP.
HIRT VCS 100 VAPORTEK
VAPOR PROCESSOR &
INDICATOR PANEL
3'
3'
3"
1'-3"
4"
4'
1'-6"
3'-2"
3' MIN.
12' MIN.
1'
1'-6"
NEW 2" GALV. SCH. 40
VAPOR PIPE
1/4" HIRT CHECK
VALVE WITH 1/4"
GALV. PIPE. TAP &
THREAD INTO PIPE
AND FITTING.
BRUGG 2" NPT END
FITTING
2" GALV. COUPLING
BRUGG 2" FLEXWELL
DW SS PIPE TO 87
STP SUMP.
UNISTRUT CHANNEL
SUPPORT RACK.
8' +/-
CONCRETE FOOTING, (TYP. 2)
BACKFILL MATERIAL PER BRUGG
MANUFACTURER'S RECOMMENDATIONS
Ja
u
r
e
g
u
i
&
C
u
l
v
e
r
,
I
n
c
.
95
9
W
.
M
i
s
s
i
o
n
A
v
e
.
Es
c
o
n
d
i
d
o
,
C
A
9
2
0
2
5
Li
c
:
7
0
8
2
3
1
7
6
0
-
7
4
3
-
0
5
1
8
F
:
7
6
0
-
7
4
3
-
0
6
2
1
SCALE:
DRAWN BY:
DATE:
REV. DATE:
JCI JOB #:
APPROVED:
FILE:
REV. DATE:
Pr
o
j
e
c
t
:
FS-2
UDC DETAILS
LIST OF DRAWINGS
FS-1 SITE PLAN
FS-2 UDC DETAILS
UST STP SUMP DETAIL
HIRT SATELLITE VAPOR PIPE INSTALLATION
SCALE 1" = 1'-0"
AS NOTED
JC
12/16/19
P19-0691
HI
R
T
V
C
S
1
0
0
V
A
P
O
R
T
E
K
VA
P
O
R
P
R
O
C
E
S
S
O
R
I
N
S
T
A
L
L
A
T
I
O
N
SA
M
'
S
C
L
U
B
#
4
8
1
9
56
2
5
G
O
S
F
O
R
D
R
D
.
BA
K
E
R
S
F
I
E
L
D
,
C
A
9
3
3
1
3
HIRT SATELLITE VAPOR PIPE
RISER ASSEMBLY DETAIL
SCALE 3/4" = 1'-0"
E. CHASE, TYP.
E. CONDUIT, TYP
E. DWFG PRODUCT LINE
NEW 2" BRUGG FLEXWELL DW SS PIPE
TO HIRT PROCESSOR. SLOPE MIN. 1%
FROM PROCESSOR TO UST.
INSTALL 4" X 2" GALV. TEE
IN ATG PROBE RISER.
E. TURBINE
E. 87 TURBINE SUMP
BRAVO FG PENETRATION FTG.
BRUGG 2" NPT END FITTING
E. SIPHON
E. 87 REG UST
E. ATG MAG PROBE
E. SIPHON PIPE
E. TURBINE
EQUIPMENT LIST
QTY ITEM #DESCRIPTION
TBD 82111781 BRUGG 2" FLEXWELL PIPE, FSR 60/83
2 82935900 BRUGG 2" END FITTING NPT
1 F-84-BRG-DF-CR5 BRAVO PENETRATION FITTING
2 BRAVO EPOXY-FITTING TO FRP SUMP WALL
2 BRAVO PE ADHESIVE-SEAL FITTING TO PIPE