Loading...
HomeMy WebLinkAboutSam's Bakersfield 4819 Hirt Satellite Vapor Pipe Installation-202087-REG-B 20K 87-REG-A 20K 91-PREM 20K DIESEL 20K N E. KIOSLK W/ VEEDER ROOT TLS350 E. BOLLARD, TYP. 6 E. DISPENSER, TYP. 6 E. CANOPY COLUMN, TYP. 6 E. BG FUEL PIPING E. CONCRETE TANK SLAB E. CONCRETE DRIVE SLAB W/ CANOPY OVERHEAD NEW 2" DW SS BRUGG FLEXWELL SATELLITE VAPOR PIPE FROM 87 STP SUMP TO HIRT PROCESSOR. SLOPE MIN. 1% TO UST. E. HIRT PROCESSOR 2" GALV. SCH. 40 VAPOR PIPE RISER ASSEMBLY.UNISTRUT SUPPORT RACK W/ (2) CONCRETE FOOTINGS E. VENT TRANSITION BOX W/ 2" VENT RISERS E. 4" BOLLARDS, (TYP.) ABANDONED CAS SLAB CONNECT NEW VAPOR PIPE TO EXISTING 4" ATG RISER IN STP SUMP. E. PLANTER Ja u r e g u i & C u l v e r , I n c . 95 9 W . M i s s i o n A v e . Es c o n d i d o , C A 9 2 0 2 5 Li c : 7 0 8 2 3 1 7 6 0 - 7 4 3 - 0 5 1 8 F : 7 6 0 - 7 4 3 - 0 6 2 1 SCALE: DRAWN BY: DATE: REV. DATE: JCI JOB #: APPROVED: FILE: REV. DATE: Pr o j e c t : SAM'S CLUB #4819 GAS STATION 2-20,000 GAL. REGULAR 1-12,000 GAL SUPER 1-8,000 GAL DIESEL FUEL DISPENSERS UNDER CANOPY KIOSK W/ VEEDER ROOT PANEL & ESO SITE PLAN SCALE 1/8" = 1' REVISED SCOPE OF WORK: THE HIRT VCS 100 VAPORTEK VAPOR PROCESSOR WITH INDICATOR PANEL HAS BEEN INSTALLED TO REPLACE THE HEALY CAS PER PERMIT. IT HAS BEEN FOUND THAT THERE ARE STILL OVER-PRESSURIZATION ALARMS OCCURRING. AFTER MEETINGS WITH THE HIRT ENGINEERING STAFF IT WAS DECIDED THAT BECAUSE OF UNIQUE CONDITIONS AT THIS SITE, THE INSTALLATION OF A SATELLITE VAPOR PIPE WOULD BEST ELIMINATE THE RECURRING ALARMS. THIS IS THE SCOPE OF WORK FOR THE INSTALLATION OF THE SATELLITE VAPOR PIPE: 1.INSTALL A 4" X 2" TEE IN THE ATG RISER IN THE NEAREST GASOLINE UST (87-REG-B) STP SUMP. 2.INSTALL A 2" SATELLITE VAPOR PIPE FROM THE NEW TEE IN THE ATG RISER TO THE HIRT PROCESSOR, TRENCHING AS NECESSARY. PIPE TO BE BRUGG FLEXWELL DW SS AND SLOPE A MIN. 1% FROM THE PROCESSOR LOCATION TO THE UST. 3.INSTALL A BRAVO FIBERGLASS PENETRATION FITTING FOR THE DW TANK SUMP, APPROVED FOR BRUGG PIPE. 4.INSTALL THE VAPOR PIPE RISER ASSEMBLY IN THE PLANTER NEXT TO THE HIRT PROCESSOR PER DETAIL, INCLUDING THE UNISTRUT SUPPORT ASSEMBLY. 5.BACKFILL PER BRUGG MANUFACTURER RECOMMENDATIONS (SAND OR PEA GRAVEL, MINIMUM 4" BELOW AND 6" ABOVE THE PIPE.) PATCH CONCRETE AND ASPHALT TO MATCH EXISTING. 6.ALL REPAIR WORK IS TO BE PERFORMED BY OR DIRECTLY SUPERVISED BY A TECHNICIAN WITH A CURRENT MANUFACTURER'S CERTIFICATION FOR THE EQUIPMENT BEING INSTALLED AND A CURRENT ICC CERTIFICATION FOR UST INSTALLATION/RETROFITTING. 7.ALLOW A MINIMUM OF 48 HOURS ADVANCE NOTICE OF ANY PROPOSED INSPECTION SCHEDULING APPOINTMENTS. 8.ALL WORK IS TO BE SUBJECT TO THE TESTING AND INSPECTION REQUIREMENTS SPECIFIED IN THE CUPA REPAIR PERMIT AND E.O. VR-204-F. NO WORK IS TO BE COVERED UNTIL APPROVED OR AUTHORIZED BY THE CUPA INSPECTOR. AQMD TESTING TO BE SCHEDULED AND PERFORMED PER THE AUTHORITY TO CONSTRUCT PERMIT. 9.AFTER WORK HAS BEEN INSPECTED AND ACCEPTED BY THE CUPA INSPECTOR IT MAY BE COVERED OR CLOSED. ALL PROBES AND SENSORS ARE TO BE IN THEIR PROPER POSITIONS, FUNCTIONING PROPERLY AND BRINE LEVELS ARE TO BE CORRECT AT THE COMPLETION OF THE REPAIR PROJECT. APPLICABLE CODES: THIS PROJECT SHALL COMPLY WITH THE APPLICABLE PROVISIONS OF THE 2019 CBC, CPC, CEC AND CFC. ABBREVIATIONS: ATG AUTOMATIC TANK GAUGE BMP BEST MANAGEMENT PRACTICES CAS HEALY CLEAN AIR SEPARATOR CUPA CERTIFIED UNITIED PROGRAM AGENCY DEH DEPARTMENT OF ENVIRONMENTAL HEALTH DWFG DOUBLE WALL FIBERGLASS E.EXISTING PREM PREMIUM GASOLINE REG REGULAR GASOLINE SWFG SINGLE WALL FIBERGLASS UDC UNDER DISPENSER CONTAINMENT UST UNDERGROUND STORAGE TANK HI R T V C S 1 0 0 V A P O R T E K VA P O R P R O C E S S O R I N S T A L L A T I O N SA M ' S C L U B # 4 8 1 9 56 2 5 G O S F O R D R D . BA K E R S F I E L D , C A 9 3 3 1 3 AS NOTED JC 12/16/19 P19-0691 FS-1 SITE PLAN LIST OF DRAWINGS FS-1 SITE PLAN FS-2 DETAILS AREA MAP SITE MAP HIRT VAPOR PROCESSOR REMOVED HEALY CAS LOCATION SAM'S CLUB #4819 05/19/2020 BOLLARD, TYP. HIRT VCS 100 VAPORTEK VAPOR PROCESSOR & INDICATOR PANEL 3' 3' 3" 1'-3" 4" 4' 1'-6" 3'-2" 3' MIN. 12' MIN. 1' 1'-6" NEW 2" GALV. SCH. 40 VAPOR PIPE 1/4" HIRT CHECK VALVE WITH 1/4" GALV. PIPE. TAP & THREAD INTO PIPE AND FITTING. BRUGG 2" NPT END FITTING 2" GALV. COUPLING BRUGG 2" FLEXWELL DW SS PIPE TO 87 STP SUMP. UNISTRUT CHANNEL SUPPORT RACK. 8' +/- CONCRETE FOOTING, (TYP. 2) BACKFILL MATERIAL PER BRUGG MANUFACTURER'S RECOMMENDATIONS Ja u r e g u i & C u l v e r , I n c . 95 9 W . M i s s i o n A v e . Es c o n d i d o , C A 9 2 0 2 5 Li c : 7 0 8 2 3 1 7 6 0 - 7 4 3 - 0 5 1 8 F : 7 6 0 - 7 4 3 - 0 6 2 1 SCALE: DRAWN BY: DATE: REV. DATE: JCI JOB #: APPROVED: FILE: REV. DATE: Pr o j e c t : FS-2 UDC DETAILS LIST OF DRAWINGS FS-1 SITE PLAN FS-2 UDC DETAILS UST STP SUMP DETAIL HIRT SATELLITE VAPOR PIPE INSTALLATION SCALE 1" = 1'-0" AS NOTED JC 12/16/19 P19-0691 HI R T V C S 1 0 0 V A P O R T E K VA P O R P R O C E S S O R I N S T A L L A T I O N SA M ' S C L U B # 4 8 1 9 56 2 5 G O S F O R D R D . BA K E R S F I E L D , C A 9 3 3 1 3 HIRT SATELLITE VAPOR PIPE RISER ASSEMBLY DETAIL SCALE 3/4" = 1'-0" E. CHASE, TYP. E. CONDUIT, TYP E. DWFG PRODUCT LINE NEW 2" BRUGG FLEXWELL DW SS PIPE TO HIRT PROCESSOR. SLOPE MIN. 1% FROM PROCESSOR TO UST. INSTALL 4" X 2" GALV. TEE IN ATG PROBE RISER. E. TURBINE E. 87 TURBINE SUMP BRAVO FG PENETRATION FTG. BRUGG 2" NPT END FITTING E. SIPHON E. 87 REG UST E. ATG MAG PROBE E. SIPHON PIPE E. TURBINE EQUIPMENT LIST QTY ITEM #DESCRIPTION TBD 82111781 BRUGG 2" FLEXWELL PIPE, FSR 60/83 2 82935900 BRUGG 2" END FITTING NPT 1 F-84-BRG-DF-CR5 BRAVO PENETRATION FITTING 2 BRAVO EPOXY-FITTING TO FRP SUMP WALL 2 BRAVO PE ADHESIVE-SEAL FITTING TO PIPE