HomeMy WebLinkAboutRES NO 081-2020RESOLUTION NO. 08 1- 2 0 2 0
A RESOLUTION DISPENSING WITH BIDDING X-Ref.h4r,90aO-O9(o
PROCEDURES DUE TO REPAIRS ON A
WINDROW TURNER, AND AUTHORIZING
RESOURCE MACHINERY & ENGINEERING TO
PERFORM NECESSARY REPAIRS, NOT TO
EXCEED $90,000.
WHEREAS, on March 2, 2020, a 2011 Scarab Windrow Turner (Compost Turner),
equipment number 4505, was reported by the using department as not functioning
properly; and
WHEREAS, the equipment was inspected by Fleet Services technicians and
was determined to have a worn out drum; and
WHEREAS, a repair quote was submitted by Resource Machinery &
Engineering, detailing the parts and materials needed to bring the equipment back
into proper working order, attached hereto and incorporated by reference herein
as Exhibif A; and
WHEREAS, the parts are only available through the equipment manufacturer,
Scarab, and Resource Machinery & Engineering is the factory authorized Scarab
dealer (sole source letter attached hereto and incorporated by reference herein as
Exhibit B); and
WHEREAS, the Public Works Director recommends the Council find that the
purchase of the parts and repairs to the Compost Turner can only be obtained from
Resource Machinery & Engineering, and recommend the Council dispense with
bidding requirements, in accordance with subsection D.2 of Section 3.20.060 of the
Bakersfield Municipal Code.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as
follows:
The above recitals are true and correct and incorporated herein by
reference.
2. Based on the facts included in the above recitals, the work, supplies,
equipment, and materials and the necessity to successfully repair the windrow
turner, as a whole, to function properly can only be provided by the factory
authorized Scarab dealer and repair facility, Resource Machinery & Engineering.
3. The Finance Director is authorized to dispense with bidding i�AKF
accordance with Section 3.20.060 of the Bakersfield Municipal Code. 0 9N
-- Page 1 of 2 Pages -- oa;c,rwA°
4. The expenditure of funds for said work and equipment shall not exceed
Ninety Thousand Dollars ($90,000(.
5. The City Clerk shall attest and certify to the passage and adoption of
this Resolution and it shall become effective immediately upon its approval.
HEREBY CERTIFY that the foregoing Resolution was passed and
adopted Ub the Council of the City of Bakersfield at a regular meeting thereof held
on Jn 2 6 1020 , by the following vote:
AYE COUNCILMEMBER RIVERRAA, cox LES,V F,SMI N FREEMAN, SULLIVAN, PARLIER
NOES: COUNCILMEMBER Norg
ABSTAIN: COUNCILMEMBER
ABSENT: COUNCILMEMBER Nc ra,
APPROVED:
JUN 16 2020
By
KAAEN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
CITY ATTORNEY
B2
J HUA . RUDNICK
Depu y City Attorney
Jul LIE DRIMAKIS, CMC
City Clerk and Ex Officio Clerk of the
Council of the City of Bakersfield
o``gAKF9�
r m
-- Page 2 of 2 Pages -- ORIS:NAL
Resource Machinery & Engineering
280 W. Stanley Ave, Unit A
Ventura, CA 93001
Phone: 1(805) 641-0991
Fax: 1 (805) 232-0991
Exhibit A
Quotation
Date
Quote#
3/9/2020
2533
Name / Address
tN.
Vendor ID
Please contact (909) 6156930 or mclarkellilresourcemachinery.cem with your questions or comments
r> r'm
V"
Page 1
City of Bakersfield
Finance Department,
1600 Truxtun Ave,
Bakersfield, CA 93301
Customer Contact
P.O. No.
Terms
Rep
FOB
Machine S/N
Albino R Gonzalez
Due on receipt
MC
White
Deer TX
20BD-540-RT 446
Part#
Description
Qty
Unit Price
Total
Drum 20' Combo
SCARAB 1/2 X 48" X 20' Combination (auger/flail) Drum
1
38,262.69
38,262.69T
with 3-15/16" replaceable shafts
5/8VP1800
SCARAB Drum Drive Belt -GATES 5/8VP1800 Predator
2
2,645.91
5,291.827
V -Belt - Top pulley set
4/8VP1900
SCARAB Drum Drive belts 4/BVP1900 Gates Predator
3
2,239.47
6,718.41T
V -Belt - Bottom pulley set
P4B522-ISAF-315
SCARAB Drum Bearing P4B522 315R/E
2
1,783.435
3,566.87T
315R Drum Bearing Drive Side.
315RE Drum Bearing Idle Side.
128V16000D
MAR 12 8V 1600QD HI -CAP TB V -Belt Pulley 5050
1
3,937.15
3,937.15T
5050
5050 X 3-15/16 Bushing
1
353.11
353.11T
12/8V4450
Martin 12 8V 4450 P HI CAP QD V -Belt Pulley
1
9,156.34
9,156.347
PX3
DO bushing P3-15/16"
1
1,404.00
1,404.00T
Please sign, add PO # and return this quotation by fax to (905) 232-0991. This Quotation is a
Subtotal
confirmed order and Pro
Forma invoice when authonzed below and returned within the quotation
Period with established financing
or payment arrangements. Shipping is additional
Sales Tax (8.25%)
NOTE: if Stated shipping quotes are estimates only, actual shipping costs may be greater
NAME:
DATE.
TITLE-.
PHONE:
Total
P.O. No.
AUTHORIZED SIGNITURE
Valid for 30 days from date of Quotation shown above
tN.
We appreciate your inquiry and look forward to your purchase order
Please contact (909) 6156930 or mclarkellilresourcemachinery.cem with your questions or comments
r> r'm
V"
Page 1
q��
" 1 MNAL
Resource Machinery & Engineering
280 W. Stanley Ave, Unit
Ventura, CA 93001
Phone: 1 (805) 641-0991
Fax: 1 (805) 232-0991
Name / Address Vendor ID
City of Bakersfield
Finance Department,
1600 Truxtun Ave,
Bakersfield, CA 93301
Quotation
Customer Contact
Quote
�Dae
3/9/2'0+202533
Rep
Customer Contact
P.O. No.
Terms
Rep
FOB
Machine S/N
Albino R Gonzalez
Due on receipt
MC
White Deer TX
20BD-540-RT 446
Part #
Description
City
Unit Price
Total
Labor to take off old drum and fit new drum.
1
10,600.00
10,600.00
Fit new drum drive belts and new drum bearings and
pulleys
SCARAB 20BD-450-RT s/n 446
15% deposit on SCARAB drum due with receipt of order
further 75% of SCARAB drum due on notice to ship
Balance due on completion of project
Shipping estimated, cost may be higher on final invoice.
Recommend that drum bearings be replaced
Recommend that drive belts be replaced.
Recommend that V -Belt pulleys by inspected and replaced
as necessary
Shipping Drum from White Deer, TX
1
3,200.00
3,200.00
Please sign, add PO # and return this quotation by fax to (805) 232-0991. This Quotation is a
Subtotal $82,490.39
confirmed order and Pro Forms invoice when authorized below and retumad within the quotation
period with established financing or payment arrangements. Shipping is additional
Sales Tax'B.TS%) $5,666.96
NOTE: if stated shipping quotes are estimates only, actual shipping costs may be greater
NAME:
DATE:
TITLE:
PHONE'.
Total $88,157.35
Pa. No:
AUTHORIZED SIGNITURE
Valid far 31J flays from ase or uumahon shown euory J,
We appreciate your inquiry and look forward to your purchase order ?'
Please contact (909) 6156930 or mclarke@msour machinery.com with your questions or comments
Page 2 J V
ORIG;FAL
Iit�mSCARAB Exhibit B
IN T E R N AT 10 N AL
SCARAB International, LLLP
1475 County Road W
White Deer, TX 79097
806.8837621
March 22, 2020
Dear City of Bakersfield:
Resource Machinery & Engineering (Michael Clarke) is the Sole Source Provider for the Parts and Service
required for your SCARAB Compost Turner, please see the terms I-sted beiow.
• All parts and services are provided on an as needed basis with cost quoted at the market rate at the
time of order.
• warranty policy will be upheld as per each individual item and the manufacturer of that Item
• return policy will be upheld as per each individual item and the manufacturer of that Rem
• all prices are E.X.W. origin
If I can provide any additional information, please let me know.
The You,
C�/Kovette 1ey�
Office Administrator
SCARAB International, LLLP
1475 County Road W
White Deer, TX 79097
(806)883-7621
F. (806) 883-6804
Kovette.bredley@scarebmfg.cnm
Or`BAKe9s
r
J
Ori:G;tvAL