Loading...
HomeMy WebLinkAbout3000 harris rd haddad apsa 5.21.20BAKERSFIELD FIRE DEPARTMENT 2101 H STREET, BAKERSFIELD, CA 93301 Date: S -2 f '2C) Inspector: Shane Gardner Business Name: HADDAD Business Address: 3000 Harris Rd Aboveground Petroleum Storage Tank Program -Tier II Qualified Facility Inspection Report (v 3.0) Violation VIOL Number Program Requirement Citations Y or N Class Comments Requirement to Prepare and Implement 4010001 SPCC has been prepared HSC 66725270.4.5(x); 40 CFR 11123, 111.6 4010057 SPCC plan has been prepared that meets all HSC6.6725270.4.5(.); applicable requirements 40 CFR 1112.3,112.6 4030038 SPCC has been implemented HSC 6.6725270.4.5(.); `r 40 CFR 1112.3 1 4010008 SPCC onsite If facility staffed 4 hrs /day, or at HSC6.5725270.4.5(0); the nearest field office if not so attended 40 CFR 1112.3(e)(1) 4010047 Qualified Facility's SPCC plan has been self or HSC5.6725270.4.5(.); PE certified. 40 CFR 1 112.6(b) 4010035 Facility prepared appropriate SPCC when no HSC6.6725270.4.5 (.J; longer meeting Tier I /11 requirements 40 CFR 1112.3(9) Y SPCC Amendments 4010010 Facility has amended SPCC as necessary HSC6.6725270.A5(.), 40 CFR 11125(x), \! 12.5(b) i 4030039 SPCC has been implemented within 6.months H5C6.6725270.4.5(x); 40 CFR 1112.5(.); `1 Of amendment 12.5(6) 1 4010052 Tech amendments certified when a change in HSC 66725270.4,5(.); facility design /operations occurs, & by PE 40 CFR 1112.6(b)(2); 112.6(b)(2)(0 Y when required Five Year Review 4010009 5 year review performed on SPCC and HSC 6.6725270.4.5(.); `I documented 40 CFR 1112.5(6) 7 General SPCC Requirements 4010012 SPCC in writing, follows code sec /cross ref,_ HSC 6.6725270.4.5(x); good eng practice, mgt approval, items not in 40 CFR 1112.7 �! 7 place 4010013 SPCC Plan discusses conformance with all SPCC HSC 6.5725270.4.5(. ); rule requirements, &state 40 ,7R111z.7(o)(1), 112.70, 1 rules /regs /guidelines. 4010014 Environmental Equivalence, if claimed, is HSC 6.6725270.4.5(a); addressed in SPCC, other than for secondary 40 CFR 1112.7(.)(2) `1 containment. 4010050 PE certified enviro equivalence, HS CFR impracticability, and produced water 11227(bl(3); 4o 1112.6(6)(3/; `I 1 112.6(b)(4)(iii) .6( containers /piping, if needed 4010051 PE required attestations in the SPCC Plan for HSC6.6725270.4.50); alternative measure claim at a Tier 11 facility 40 CFR 1112.6(b)(4)(i) Violation VIOL Number Program Requirement Citations Y or N Class Comments 4010016 Physical layout of the facility is adequately and HSC 6.6725270.4.5(.); accurately described in SPCC 40 CFR 1112.7(0)(3) 4010041 SPCC Plan addresses the type of oil and HSC6.5725270.4.5(o), storage capacity for all fixed and portable 40 CFR 1112.7(0)(3)(1) .( r containers 4010015 SPCC contains an adequate facility diagram HSC 6.6725270.4.5(0); 40 CFR 11127(.)(3) 4010030 SPCC adequately addresses discharge HSC 6.6725270.4.5(.); prevention measures for routine handling, 40 CFR 11127(.)(3)(li) loading /unloading 4010042 SPCC Plan addressed countermeasures for HSC6.6725270.4.5(.), response and cleanup discharge discovery, p p 40 CFR 1112.7(0)(3)(io 4010043 SPCC Plan addresses disposal methods for HSC6.5725270A.5(0); recovered materials 90 CFR 11127(0)(3)(27) 4010017 SPCC contains procedures for reporting a. HSC6.6725270.4.5(0), discharge 40 CFR 1112.7(.)(3) �p I (vi),- 112.7(.)(4) 4010018 SPCC organized so discharge procedures are HSC6.6725270.4.5(.c readily usable if the facility has no response 40 CFR 1112.7(0)(5) plan W 4010019 SPCC predicts direction, rate of flow, total HSC 6.6725270.4.5(.); quantity of oil that could be released from a 40 CFR 1112.7(b) , 'Y discharge 4010020 SPCC addresses the appropriate general HSC 6.6725270.4.5(0); containment /diversionary 40 CFR 1112.7(c) structures /equipment 4030037 Appropriate(general) HSC 66725270.4.5(.); containment /diversionary 40 CFR 1112.7(c) Yi structures /equipment have been provided 4010004 Impracticability of containment /diversionary HSC 66725270.4.5(.); items, if claimed, is PE demonstrated and 40 CFR 1112.7(d) �J certified 4030033 Periodic integrity /leak testing performed with HSC6.6725270.4.5(.); fA, impracticability claim 40 CFR 1112.7(d) N 4010005 If claiming impracticability of HSC6.6725270.4.5(.); containment /diversionary items a contingency 40 CFR 1112.7(d)(1) P P plan has been included 4010006 If claiming impracticability written H5C6.6725270.4.5(0); commitment of manpower, equipment, and 40 CFR 1112.7(d)(2) materials provided 4010023 Employee training and spill prevention HSC6.6725270.4.5(.); briefings discussed in SPCC plan 40CFR1112.7(f)(1), 1127(f)(3) 4020001 Training provided for op /maint of equip, HSC 6.6725n0.4.5(.); discharge procedures, laws /regs, general fac 40 CFR 1112.7(8(1) ops, and SPCC 4010022 Person has been designated as accountable for HSC6.6725270A.5(1), G discharge prevention and reports to 40 CFR 1112.7(f)(2) `ry management Violation VIOL Number Program Requirement Citations Y or N Class Comments 4030040 Spill prevention briefings are conducted HSC 6.5725170.4.5(.); annually 40 CFR 1112.7(f)(3) 4010024 SPCC addresses security measures- lighting, HSC 6.6725270.4.5(a), access to hand ling /storage, 40 CFR 1112.7(9) Y valves /pumps /transfer equip 4030001 Handling areas, valves, pumps /starter HSC6.67252704.5(a)) controls, load /unload connections secured, 40 CFR 1112:7(9) lighting adequate 4010025 SPCC adequately discusses facilitytank car and HSC 6.6725270.4.5(.); tank truck loading /unloading rack 40 CFR I,12.7(h) 4030002 Loading rack containment has capacity to HSC 6.5725270.43(.); contain single largest compartment of tank 40 CFR 1112.7(h)(1) car /truck 4030003 Vehicular departure warning system in place HSC6.5725270.4.5(a); at facility with a loading /un loading rack 40 CFR 1112.7(h)(2) 4030034 Oil filled operational equipment containment HSC 6.57 25270.4.5(a); standards are met 140 CFR 1112,7(k) �N SPCC Requirements for Onshore Facilities 4010027 Facility drainage or drainage controls H5C6.6725270.4.5(0); adequately discussed 40 CFR 1112.7(0)(3) ^(� (iii); 112.8(6) `• 4030035 Facility drainage adequately restrained unless HSC6.6725270.4.5(a); conditions met 40 CFR 1112.8(b)(1) 4030005 Valves used for drainage are manual (not HSC6.6725270.4.5(a); flapper -type) to prevent a discharge 40 CFR 1111.8(6)(2) 4030008 Drainage from undiked areas or diversion HSC6.6725270A.5(.); systems designed to retain final discharge in 40 CFR 1112.8(b)(3), ^'Ik facility 4030009 Lift pum ps provided for treated d rainage HSC6.67252704.5(a); waters when more than one treatment unit 40 CFR 1112, 8(6)(5) 4010029 Adequate discussion of all bulk storage HSC 6.6725270.4,5(.); containers located at the facility 40 CFR 1112.8(,) 4030012 Material and construction of all containers are HSC6.6725270.4.5(a); compatible with the material stored 40 CFR 1112.8(1)(1) 4030010 Adequately sized secondary containment HSC 6.6725270.4.5(x); provided and maintained for bulk storage 40 CFR 1112.8(,)(2) containers 4030013 Containment systems are sufficiently HSC 6.6725270.4.5(.)1 1. 1 impervious to contain oil 45 CFR 1112.8(,)(2) Y 4030006 Rainwater in diked areas is inspected before HSC 5.6725270.4.5fa); draining 40 CFR 1112.8(c)(3)(i), r� u2s(c)(3)(ip, N 112.8(c)(3)(iil) 4010026 Records maintained of drainage from diked HSC 6.6725270.4.5(a)1 40 CFR 1112.8(cf(3)(iv) areas 4030017 Buried section of partially buried or bunkered HSC6.6725270.4.5(.); metallic tank has corrosion protection 40 CFR 1112.8(c)(5) 1 4010028 SPCC discusses procedures to Test /inspect HSC6.6725270.4.5(a); storage containers for integrity per industry 40 CFR1112.8(c)(6) standards Violation VIOL Number Program Requirement Citations Y or N Class Comments 4030014 Tanks inspected and tested by qualified person HSC 6.6725270 .4.5(.); in accordance with industry standards 40 CFR 1112.8(c)(6) 4030015 Aboveground containers tested or inspected HSC6.6725270A.5(a), for integrity based on industry standards 40 CFR 1112.8(c)(6) \4' 4010021 Inspection /integrity testing records signed, HSC6.672527GA.5(.); kept for 3 years and written inspection 40 CFR 1112.7(e), procedures kept 4030018 Steam return /exhaust lines that discharge to HSC6.6725270.4.5(0); watercourse are monitored or have treatment 40 CFR 11128(c)(7) system 4010056 SPCC adequately describes overfill prevention 40 CFR I112.8(c)(8); methods, and devices /systems used for each HSC6.6725270A.50) 7 container 4030019 Each container: installation has a liquid level HSC6.6725270A.5(o); sensing device. 40 CFR 1112B(c)(8), T 112.8(c)(8)(I w) 4030022 Liquid level sensing devices regularly tested to HSC6.5725270.4.5(a); ly ensure . proper operation 40 CFR 1112.8(c)(8 &) 4030023 Discharge from effluent treatment facilities HSC6.6725270A.5(0); which discharge to navigable waterways 40 CFR 1112.8(c)(9) +r observed 1 4030021 Visible discharges promptly corrected and any HSC6.67252704.5(a), accumulation of oil in diked areas promptly 40 CFR 1112.8(c)(10) U removed. 4030020 Adequate secondary containment provided for HSC 6.67 25270 4.5 a), mobile /portable storage containers 40 CFR 1112.8(cJ(11) 4030025 Buried piping is inspected for deterioration if HSCE6725270.4.5(.); exposed and repaired if corrosion damage is 40 CFR 1112.8(d)(1) tf found 4030027 Buried piping is corrosion protected with HSC 6.6725270 .4.5(.); protective wrapping, coating, or cathodic 40 CFR 1112.8(d)(1) protection 4030028 Terminal connection capped /blank flanged at HSC6.6725270.4.5(at transfer point & origin marked if not in 40 CFR 111z.8(d)(2) service /standby 4030029 Pipe supports designed to minimize abrasion H5C6.6725270A.5(a); and corrosion, and allow for expansion and 40 CFR 1112.8(d)(3) Iu contraction 4030026 Aboveground valves, piping, and HSC 6.6725270.4.5/.); appurtenances are regularly inspected 40 CFR 1112.8(d)(4) 4030030 Integrity /leak tested buried piping when HSC 6.6725270.4.5(0); installed, modified, constructed, relocated, or 40 CFRI 112.8(d)(4) replaced 4030031 Vehicle traffic warned of aboveground piping HSC 6.6725270.4.5(.); or other oil transfer operations 40 CFR I112.8(d)(s) Oil Filled Electrical Equipment 4010037 oil filled electrical equipment exclusions have HSC6.6725270.2(c)(4) been met, and where not met is included in SPCC plan `" Violation VIOL Number Program Requirement Citations Y or N Class Comments General Facility Requirements 4010034 Valid permit maintained HSC 6.1125404.1 y 4010032 Tank Facility Statement or Business Plan has HSC 6.6725270.6(a)(1), been submitted 25270.6(0)(2) 7 4040001 Spills /releases of 42 gallons or more of H5C6.6725170.8 petroleum reported upon discovery to Cal DES y & UPA or 911 4010033 APSA program fee paid HSC6.6725270.6(b) y 4030036 All /any permanently closed tanks are properly HSC6.6725270.4.5(a); closed under the definition in 40 CFR 112.2 40 CFR1112.1(b)(8), 112.2 4010044 Substantial Harm Criteria certification HSC6.6725270.4.5(a); maintained at the facility as required 40 CFR 1112.20(e) 4010 Administration /Documentation - General 40 CFR 1112, HSC 667 Multiple 4015 Administration /Documentation - General Local Ordinance 4020 Training - General HSC6.67,40CFR1112 Multiple 4025 Training - General Local Ordinance 4030 Operations /Maintenance - General HSC 6.67, 40 CFR 1112 Multiple 4035 Operations /Maintenance - General Local Ordinance 4040 Release /Leaks /Spills - General HSC 6.67 Multiple; 40 CFR 1112 4045 Release/ Leaks /Spills - General Local Ordinance 4050 Abandonment/illegal Disposal /Unauthorized HSC 6.67 Multiple; 40 Treatment - General CFR 1112 4055 Abandonment /Illegal Disposal /Unauthorized Treatment - General Local Ordinance ❑ There were no violations noted for this inspection ❑ This report shall serve as a "NOTICE TO COMPLY" for Minor Violations, and a "NOTICE OF VIOLATION" for Major violations. You are, hereby, ordered to correct the above noted violations within 30 days, or according to correction summaries provided. Formal enforcement and /or penalty assessment may be initiated for any violations noted, and for those not corrected in a timely manner. (NOTE: If this is a preliminary report, a final report will follow.) Operator's Name: 15 AV C w.el -rte Operator's Signature: Z�� Date: -5 -Z(-2a Inspector's Signature: S