Loading...
HomeMy WebLinkAboutMC S PM 3509 and 3001 Panama Lane Commercial apprPUBLIC WORKS DEPARTMENT NICK FIDLER • DIREC`CC]R, CITY ENGINEER August 30, 2017 McIntosh & Associates 2001 Wheelan Court Bakersfield, CA 93309 RE: Sewer Study for Proposed 13 AC Commercial Development on Parcel Map 3509 Dear Mr. Neptune: We have completed review of the sewer study for Commercial Development on Parcel Map No. 3509 dated July, 2017. As a result of our review, we approve the sewer study with the following comment. 1. Please correct "the future commercial is expected to generate 0.234 cfs (105.026 gpm) of peak sewer flow" to match the numbers given in the sewer flow spreadsheet. 2. Please correct "decrease the flow to 3.28 cfs" to "increase the flow to 3.23 cfs" on page 3, second paragraph. 3. Please run a quick spell check for any other typos. 4. Note that the calculations for flow rate in the 27 inch sewer main in Panama included in this study are based on an assumed minimum slope of 0.08%, giving a flow velocity of approximately 2.3 cfs, unlike the 1.23 cfs measured per the flow meter as described in the body of the report. Estimating the 80% depth flow rate based on the measured parameters yields a capacity of 4.44 cfs, considerably less than the 10.10 cfs calculated in the report. This results in an excess capacity in Panama Lane of 1.16 cfs rather than 6.82 as described in the report; however the excess capacity is still sufficient for the proposed project. 5. Please provide a copy of the calculations on a CD. As a back up to the hard copy submitted, the City is asking all the engineering firms to submit a digital PDF copy. 1644 Truxtun Avenue www.bakersfieldcity.us `;t9 Bakersfield • Califomia • 93341 (661)326-3724 �+ n Fax (661) 852-2124 i B A K E R S F I E L D PUBLIC WORKS DEPARTMENT NICK FIDLER • DIREC`CC]R, CITY ENGINEER August 30, 2017 McIntosh & Associates 2001 Wheelan Court Bakersfield, CA 93309 RE: Sewer Study for Proposed 13 AC Commercial Development on Parcel Map 3509 Dear Mr. Neptune: We have completed review of the sewer study for Commercial Development on Parcel Map No. 3509 dated July, 2017. As a result of our review, we approve the sewer study with the following comment. 1. Please correct "the future commercial is expected to generate 0.234 cfs (105.026 gpm) of peak sewer flow" to match the numbers given in the sewer flow spreadsheet. 2. Please correct "decrease the flow to 3.28 cfs" to "increase the flow to 3.23 cfs" on page 3, second paragraph. 3. Please run a quick spell check for any other typos. 4. Note that the calculations for flow rate in the 27 inch sewer main in Panama included in this study are based on an assumed minimum slope of 0.08%, giving a flow velocity of approximately 2.3 cfs, unlike the 1.23 cfs measured per the flow meter as described in the body of the report. Estimating the 80% depth flow rate based on the measured parameters yields a capacity of 4.44 cfs, considerably less than the 10.10 cfs calculated in the report. This results in an excess capacity in Panama Lane of 1.16 cfs rather than 6.82 as described in the report; however the excess capacity is still sufficient for the proposed project. 5. Please provide a copy of the calculations on a CD. As a back up to the hard copy submitted, the City is asking all the engineering firms to submit a digital PDF copy. 1644 Truxtun Avenue www.bakersfieldcity.us `;t9 Bakersfield • Califomia • 93341 (661)326-3724 �+ n Fax (661) 852-2124 2 Should you have any questions, ,please contact Alerik Hoeh at (661 ) 326-3576. Very truly yours. NICK FIDLER Public Warks Director By: Jim Schroeter Civil Engineer III -Subdivision cc: Project files: 12330 30127 Sewer File Reading Fila \ah S:lLET7ERS\SEWER\2.017\MC S PIN 3509 Commercial apprcbc