HomeMy WebLinkAboutPM 12166 Phases 3, 4, and 5 Drainage Study
AMENDMENT TO MASTER
DRAINAGE STUDY
FOR
SEVEN OAKS BUSINESS PARK
WEST MING SPECIFIC PLAN TO
INCLUDE PM 12166 PHASES 3, 4, & 5
BOLTHOUSE PROPERTIES
City of Bakersfield, California
JOB NUMBER 3151B
April 29, 2020
Prepared by:
PORTER & ASSOCIATES, INC.
Engineering and Surveying
1200 21st Street
Bakersfield, CA 93301
4/29/2020
AMENDMENT TO MASTER DRAINAGE STUDY
FOR SEVEN OAKS BUSINESS PARK
TO INCLUDE PM 12166 PHASES 3, 4, & 5
PURPOSE
The purpose of this study is to develop a detailed drainage plan that provides adequate
drainage facilities for Parcel Map (PM) 12166 Phases 3, 4, and 5 located within the
Seven Oaks Business Park (SOBP) east of Windermere Street. The proposed storm drain
system is an extension of an existing system studied per the Amendment to Master
Drainage Study for SOBP to Include VTPM 12135 dated November 12, 2014 (Study).
The proposed system will tie-in to the existing 36” stub studied as Reach 33 in the VTPM
12135 Drainage Study Amendment.
Hydrology and hydraulic analysis were completed for the areas and reaches associated
with PM 12166 Phases 3, 4, and 5. The overall tributary area draining to the ultimate
basin has not changed and the ultimate required volume remains adequate. The areas
from PM 12166 Phases 3, 4, and 5 are within the tributary area studied to discharge into
the 48” storm drain main in Bolthouse Drive, so the existing pipes per the approved
Study are still adequately sized. The hydraulic grade line (HGL) at the junction for the
36” stub to the north across from Benchmark Court in the VTPM 12135 Drainage Study
Amendment was used to begin the hydraulic calculations (see attached).
CALCULATIONS
The parameters outlined in the Master Study were used for the calculations in this study.
The 5-year flows in the gutters were calculated to check curb overtopping. In accordance
with the gutter flow chart attached with the hydrology calculations, the Q that can be
carried in a gutter with a 0.20% slope and a 6” water depth is 5.3 cfs. Inlet 3 has the
largest 5-year total flow of 1.17 cfs entering the inlet from two directions; therefore, the
proposed 6” curb and gutter are adequate to handle the 5-year flow.
The HGL at the junction for the 36” stub per the VTPM 12135 Amendment was used to
start the hydraulic calculations. The HGL includes freeboard of 0.5’ at catch basins and
manholes and a freeboard of 1.5’ at stubs to future parcels in accordance with City of
Bakersfield Standards. All pipes will be Class III reinforced concrete pipes (RCP). A
Manning’s “n” value of 0.013 was utilized per the City of Bakersfield Standards for
RCP.
The catch basins were sized by using the City Type “A” Catch Basin parameters to solve
the nomograph for capacity of curb opening inlets. Standard 3.5’ wide openings are
adequate for all catch basins.
The ultimate basin from the Master Study has been partially constructed to contain the
runoff from the existing portion of the Seven Oaks Business Park that has been
constructed. The basin will need to be expanded to at least 84% ultimate capacity
incorporate the runoff from PM 12166 Phases 3, 4, and 5. As construction of the Seven
Oaks Business Park continues, the ultimate basin will continue to be expanded until it is
at full design capacity.
CONCLUSION
The proposed storm drain system will carry runoff from the site to a previously studied
48” main that discharges into the existing drainage basin previously designed in the
Master Drainage Study. This study shows that adequate drainage facilities can be
provided for this portion of the SOBP in accordance with City of Bakersfield standards.
AMENDMENT TO MASTER DRAINAGE STUDY
FOR SEVEN OAKS BUSINESS PARK
TO INCLUDE PM 12166 PHASE 3
HYDROLOGY CALCULATIONS
Porter & Associates, Inc.Checked By: __________
Calculations By: LKR/TNB Date: __________
Date:04-29-2020 Job No. 3151B Sheet 1 of 1
i Qi i Qp
Point of Acres "C" CA SCA R/G G/T T/T 5 yr 5 yr 10 yr 10 yr Friction Vp d L T/P
Conc. min. min. min. in/hr cfs in/hr cfs Slope fps in ft min.
Stub 1 1.75 0.90 1.58 10 4 14 1.52 2.39 0.05% 1.4 18 45.0 0 14 min. @ Junction J1
Stub 2 5.17 0.90 4.65 10 7 17 1.35 6.28 0.08% 2.0 24 10.0 0 17 min. @ i5
0.31 0.90 0.28 0 5 10 1.50 0.42 1.80 0.50
5.48 4.93 17 1.35 6.66 0.09% 2.1 24 17.7 0 17 min. @ Junction J1
J1 7.23 6.51 17 1.35 8.78 0.15% 2.8 24 120.3 1 18 min. @ Junction J2
J2 7.23 0.90 6.51 18 1.31 8.78 0.15% 2.8 24 90.0 1 19 min. @ Junction J3
i1 0.49 0.90 0.44 0 5 10 1.50 0.66 1.80 0.79 0.01% 0.4 18 27.7 0 10 min. @ Junction J3
i2 0.28 0.90 0.25 0 5 10 1.50 0.38 1.80 0.45 0.00% 0.3 18 17.7 0 10 min. @ Junction J3
J3 8.00 7.20 19 1.27 9.14 0.16% 2.9 24 87.1 0 19 min. @ Junction J4
Stub 3 5.92 0.90 5.33 10 7 17 1.35 7.19 0.10% 2.3 24 35.2 0 17 min. @ Junction J4
J4 13.92 12.53 19 1.27 15.91 0.15% 3.2 30 114.6 1 20 min. @ Junction J5
Stub 10 1.32 0.90 1.19 10 4 14 1.52 1.81 0.03% 1.0 18 35.0 0 14 min. @ Junction J9
Stub 11 1.00 0.90 0.90 10 3 13 1.58 1.42 0.02% 0.8 18 45.0 0 13 min. @ Junction J9
J9 2.32 2.09 14 1.52 3.17 0.09% 1.8 18 145.7 1 15 min. @ Junction J10
Stub 12 1.37 0.90 1.23 10 4 14 1.52 1.87 0.03% 1.1 18 35.0 0 14 min. @ Junction J10
J10 3.69 3.32 15 1.45 4.82 0.21% 2.7 18 88.7 1 16 min. @ Junction J5
Stub 4 0.32 0.25 0.08 10 3 13 1.58 0.13 0.00% 0.1 18 35.0 0 13 min. @ Junction J5
J5 17.93 15.93 20 1.22 19.43 0.22% 4.0 30 224.0 1 21 min. @ Junction J6
Stub 5 1.16 0.90 1.04 10 3 13 1.58 1.65 0.02% 0.9 18 57.4 0 13 min. @ Junction J6
Stub 6 1.70 0.90 1.53 10 3 13 1.58 2.42 0.05% 1.4 18 23.8 0 13 min. @ Junction J6
J6 20.79 18.50 21 1.18 21.83 0.11% 3.1 36 302.6 2 23 min. @ Junction J7
Stub 7 1.62 0.90 1.46 10 4 14 1.52 2.22 0.04% 1.3 18 45.0 0 14 min. @ Junction J7
Stub 8 1.76 0.90 1.58 10 4 14 1.52 2.41 0.05% 1.4 18 35.0 0 14 min. @ Junction J7
J7 24.17 0.90 21.55 23 1.10 23.70 0.13% 3.4 36 222.1 1 24 min. @ Junction J8
Stub 9 1.69 0.90 1.52 10 4 14 1.52 2.31 0.05% 1.3 18 16.8 0 14 min. @ i3
0.87 0.90 0.78 0 8 10 1.50 1.17 1.80 1.41
2.56 2.30 14 1.52 3.50 0.11% 2.0 18 27.7 0 14 min. @ Junction J8
i4 0.62 0.90 0.56 0 8 10 1.50 0.84 1.80 1.00 0.01% 0.6 18 17.7 0 10 min. @ Junction J8
J8 27.35 24.41 24 1.06 25.87 0.15% 3.7 36 66.8 0 24 min. @ Junction*
R/G = Roof to Gutter Time i = Rainfall Intensity Vp = Velocity in Pipe L = Length of Pipe Reach
G/T = Total Gutter Time Qi = Inlet Flow d = Pipe Diameter T/P = Pipe Travel Time
T/T = Total time Qp = Pipe Flow
*Junction previously studied as J15 in The Amendment to Master Drainage Study Seven Oaks Business Park to Include VTPM 12135 dated November 12, 2014.
For CB Sizing & Curb Topping
i5 For CB Sizing & Curb Topping
Remarks
PM 12166 Phases 3, 4, & 5 Hydrology Calculations
Drainage Area Time of Concentration Pipeline
i3
Porter & Associates, Inc.Checked By: __________
Calculations By: LKR/TNB Date: __________
Date:04-29-2020 Job No. 3151B Sheet 1 of 1
Point of Avg Street Vg Dist. G/T
Conc. Slope fps ft min.
i1 0.25% 1.2 360 5
i2 0.25% 1.2 376 5
i3 0.40% 1.5 725 8
i4 0.39% 1.5 743 8
i5 0.30% 1.3 360 5
G/T = Total Gutter Time
Vg = Gutter Velocity
PM 12166 Phases 3, 4, & 5 Hydrology Calculations
Gutter Time for Catch Basins
Porter & Associates, Inc.Checked By: __________
Calculations By: LKR/TNB Date: __________
Date:04-29-2020 Job No. 3151B Sheet 1 of 1
Point of V Dist. G/T
Conc. fps ft min.
Stub 1 1.8 420 4
Stub 2 1.8 800 7
Stub 3 1.8 800 7
Stub 4 1.8 310 3
Stub 5 1.8 350 3
Stub 6 1.8 320 3
Stub 7 1.8 400 4
Stub 8 1.8 450 4
Stub 9 1.8 380 4
Stub 10 1.8 400 4
Stub 11 1.8 300 3
Stub 12 1.8 400 4
PM 12166 Phases 3, 4, & 5 Hydrology Calculations
Gutter Time for Stubs
AMENDMENT TO MASTER DRAINAGE STUDY
FOR SEVEN OAKS BUSINESS PARK
TO INCLUDE PM 12166 PHASES 3, 4 & 5
HYDRAULIC GRADE LINE CALCULATIONS
Porter & Associates, Inc.Checked By: __________
Calculations By: LKR/TNB Date: __________
Date:04-29-2020 Job No. 3151B Sheet 1 of 1
station length diameter area Q velocity friction exit friction entrance flowline freeboard
ft in sf cfs ft/sec slope loss loss loss HGL elevation
Existing Junction*343.87 348.80 4.93
Reach 1 66.8 36.0 7.069 25.87 3.66 0.0015 0.21 0.10 0.04
J8 344.22 348.43 4.21
Reach 2 222.1 36.0 7.069 23.70 3.35 0.0013 0.03 0.28 0.03
J7 344.57 349.83 5.26
Reach 3 302.6 36.0 7.069 21.83 3.09 0.0011 0.03 0.32 0.03
J6 344.95 350.58 5.63
Reach 4 224.0 30.0 4.909 19.43 3.96 0.0022 0.05 0.50 0.12
J5 345.63 351.10 5.47
Reach 5 114.6 30.0 4.909 15.91 3.24 0.0015 0.16 0.17 0.03
J4 346.00 350.92 4.92
Reach 6 87.1 24.0 3.142 9.14 2.91 0.0016 0.03 0.14 0.03
J3 346.19 350.52 4.33
Reach 7 90.0 24.0 3.142 8.78 2.80 0.0015 0.02 0.14 0.02
J2 346.37 350.71 4.34
Reach 8 120.3 24.0 3.142 8.78 2.80 0.0015 0.02 0.18 0.06
J1 346.64 351.03 4.39
Reach 9 45.0 18.0 1.767 2.39 1.35 0.0005 0.03 0.02 0.01
Stub 1 346.71 351.03 4.32
J1 346.64 351.03 4.39
Reach 10 17.7 24.0 3.142 6.66 2.12 0.0009 0.07 0.02 0.03
i5 346.76 351.03 4.27
Reach 11 10.0 24.0 3.142 6.28 2.00 0.0008 0.06 0.01 0.03
Stub 2 346.86 351.03 4.17
J3 346.19 350.52 4.33
Reach 12 27.7 18.0 1.767 0.79 0.45 0.0001 0.00 0.00 0.00
i1 346.20 350.52 4.32
J3 346.19 350.52 4.33
Reach 13 17.7 18.0 1.767 0.45 0.26 0.0000 0.00 0.00 0.00
i2 346.19 350.56 4.37
J4 346.00 350.92 4.92
Reach 14 35.2 24.0 3.142 7.19 2.29 0.0010 0.08 0.04 0.04
Stub 3 346.15 350.92 4.77
J5 345.63 351.10 5.47
Reach 15 88.7 18.0 1.767 8.78 4.97 0.0070 0.38 0.62 0.08
J10 346.71 350.90 4.19
Reach 16 145.7 18.0 1.767 6.66 3.77 0.0040 0.04 0.59 0.11
J9 347.45 349.58 2.13
Reach 17 35.0 18.0 1.767 0.79 0.45 0.0001 0.00 0.00 0.00
Stub 10 347.45 349.58 2.13
J9 347.45 349.58 2.13
Reach 18 45.0 18.0 1.767 0.00 0.00 0.0000 0.00 0.00 0.00
Stub 11 347.45 349.58 2.13
J10 346.71 350.90 4.19
Reach 19 35.0 18.0 1.767 0.00 0.00 0.0000 0.00 0.00 0.00
Stub 12 346.71 350.90 4.19
J5 345.63 351.10 5.47
Reach 20 35.0 18.0 1.767 0.13 0.07 0.0000 0.00 0.00 0.00
Stub 4 345.63 351.10 5.47
J6 344.95 350.58 5.63
Reach 21 57.4 18.0 1.767 1.65 0.93 0.0002 0.01 0.01 0.01
Stub 5 344.99 350.58 5.59
J6 344.95 350.58 5.63
Reach 22 23.8 18.0 1.767 2.42 1.37 0.0005 0.03 0.01 0.01
Stub 6 345.01 350.58 5.57
J7 344.57 349.83 5.26
Reach 23 45.0 18.0 1.767 2.22 1.25 0.0004 0.02 0.02 0.01
Stub 7 344.63 349.83 5.20
J7 344.57 349.83 5.26
Reach 24 35.0 18.0 1.767 2.41 1.36 0.0005 0.03 0.02 0.01
Stub 8 344.63 349.83 5.20
J8 344.22 348.43 4.21
Reach 25 27.7 18.0 1.767 3.50 1.98 0.0011 0.06 0.03 0.03
i3 344.34 348.43 4.09
Reach 26 16.8 18.0 1.767 2.31 1.31 0.0005 0.03 0.01 0.01
Stub 9 344.39 348.43 4.04
J8 344.22 348.43 4.21
Reach 27 17.7 18.0 1.767 1.00 0.57 0.0001 0.01 0.00 0.00
i4 344.23 348.43 4.20
J = Junction Number
i = Inlet Number
PM 12166 Phases 3, 4, & 5 Hydraulic Grade Line Calculations
*Junction previously studied as J15 in The Amendment to Master Drainage Study Seven Oaks Business Park to Include VTPM 12135 dated
November 12, 2014.
AMENDMENT TO MASTER DRAINAGE STUDY
FOR SEVEN OAKS BUSINESS PARK
TO INCLUDE PM 12166 PHASES 3, 4 & 5
CATCH BASIN SIZING CALCULATIONS
Porter & Associates, Inc.Checked By: __________
Calculations By: LKR/TNB Date: __________
Date:04-29-2020 Job No. 3151B Sheet 1 of 1
Catch Basin Q - cfs Opening Required Opening Provided
No. 10 - year ft. ft.
1 0.79 0.50 3.50
2 0.45 0.28 3.50
3 1.41 0.88 3.50
4 1.00 0.63 3.50
Notes: 1. Catch Basins are sized in accordance with the attached Inlet Capacity Chart
for Type "A" Standard Catch Basin in a sag condition.
PM 12166 Phases 3, 4, & 5 Catch Basin Sizing Table
AMENDMENT TO MASTER DRAINAGE STUDY
FOR SEVEN OAKS BUSINESS PARK
TO INCLUDE PM 12166 PHASES 3, 4 & 5
INTERIM SUMP SIZING CALCULATION
Porter & Associates, Inc.Checked By: __________
Calculations By: LKR/TNB Date: __________
Date:04-29-2020 Job No. 3151B Sheet 1 of 1
Drainage Areas*Area (Acres)C AxC
Area A 25.49 0.90 22.94
Area B 15.75 0.90 14.18
Area C 14.83 0.90 13.35
Area D 9.59 0.90 8.63
Area E 12.14 0.90 10.93
Area F 6.90 0.90 6.21
Area G 1.17 0.80 0.94
Area H 0.92 0.78 0.72
Area I 2.96 0.79 2.34
Area J 3.06 0.40 1.22
Area K 4.73 0.69 3.26
Area L 1.03 0.70 0.72
Area M 0.32 0.15 0.05
Ʃ(CxA)=85.48
Design Volume (Existing + Phases 3, 4, & 5) = 0.15*Ʃ(CxA)=12.82 AC-FT
Total Design Volume** Required = 15.35 AC-FT
% sump to be constructed= 84%
*Refer to attached Interim Basin Area Exhibit for drainage area locations.
**Total Design Volume from Master Drainage Study for Seven Oaks Business Park
West Ming Specific Plan
PM 12166 Phases 3, 4, & 5 Interim Basin Sizing Table
Po
r
t
e
r
&
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
Ch
e
c
k
e
d
B
y
:
_
_
_
_
_
_
_
_
_
_
Ca
l
c
u
l
a
t
i
o
n
s
B
y
:
L
K
R
/
T
N
B
Date: __________
Da
t
e
:
0
4
-
2
2
-
2
0
2
0
J
o
b
N
o
.
3
1
5
1
B
Sheet 1 of 1
Av
e
r
a
g
e
A
c
c
u
m
u
l
a
t
e
d
A
c
c
u
m
u
l
a
t
e
d
El
e
v
a
t
i
o
n
A
r
e
a
A
r
e
a
V
o
l
u
m
e
V
o
l
u
m
e
V
o
l
u
m
e
ft
s
q
.
f
t
.
s
q
.
f
t
.
c
u
.
F
t
.
c
u
.
f
t
.
a
c
-
f
t
33
7
.
7
6
0
1
8
1
61
3
6
9
6
1
3
6
9
6
1
3
6
9
1
.
4
1
33
8
.
7
6
2
5
5
7
63
7
5
9
6
3
7
5
9
1
2
5
1
2
8
2
.
8
7
33
9
.
7
6
4
9
6
1
66
1
7
7
6
6
1
7
7
1
9
1
3
0
6
4
.
3
9
34
0
.
7
6
7
3
9
4
68
6
2
4
6
8
6
2
4
2
5
9
9
2
9
5
.
9
7
34
1
.
7
6
9
8
5
4
71
0
9
8
7
1
0
9
8
3
3
1
0
2
7
7
.
6
0
34
2
.
7
7
2
3
4
1
73
5
9
9
7
3
5
9
9
4
0
4
6
2
6
9
.
2
9
34
3
.
7
7
4
8
5
7
76
1
2
9
7
6
1
2
9
4
8
0
7
5
5
1
1
.
0
4
34
4
.
7
7
7
4
0
1
78
6
8
7
7
8
6
8
7
5
5
9
4
4
2
1
2
.
8
4
34
5
.
7
7
9
9
7
3
PM
1
2
1
6
6
P
h
a
s
e
s
3
,
4
,
&
5
I
n
t
e
r
i
m
B
a
s
i
n
V
o
l
u
m
e
P
r
o
v
i
d
e
d