Loading...
HomeMy WebLinkAboutSB989 2020Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ܆ Installation ܆ Repair ܆ 6 Month ܈ 36 Month CERS ID 10022425 Test Date 10-30-2020 Facility Name Sprint - Bakersfield Facility Address 715 E. Sumner St. City Bakersfield ZIP Code 93305 Company Performing the Test Jauregui & Culver Inc. Phone 760-743-0518 Mailing Address 959 W. Mission Ave. Escondido, CA. 92025 Service Technician Performing Test John Culver II Contractor/Tank Tester License Number 780231 ICC Number 8182417 ICC Expiration Date 4-16-21 Manufacturer and Test Equipment Training Certifications Expiration Date Incon - 1004353708 9-15-22 Test Procedures Used Components Tested I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 10-30-2020 Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ܆ Manufacturer ܈ Industry Standard ܆ Professional Engineer Test Type ܆ Pressure ܈ Vacuum ܆ Hydrostatic Test Equipment Used: Vacuum and gauges Tank ID Diesel Tank Manufacturer O/C Tank Capacity 550 Test Start Time 10:00am Initial Reading 10 inHg Test End Time 11:am Final Reading 10 inHg Change in Reading 0 Pass/Fail Criteria 0 Loss Tightness Test Results ܈ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail Test Method Developed by ܆ Manufacturer ܈ Industry Standard ܆ Professional Engineer Test Type ܈ Pressure ܆ Vacuum ܆ Hydrostatic Test Equipment Used: Nitrogen and gauges Pipe Run ID Supply Return Pipe Manufacturer Smith Smith Test Start Time 10:00am 10:00am Initial Reading 5 psi 5 psi Test End Time 11:00am 11:00am Final Reading 5 psi 5 psi Change in Reading 00 Pass/Fail Criteria 0 Loss 0 Loss Tightness Test Results ܈ Pass ܆ Fail ܈ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail Additional copies of this page may be attached. 6. TANK SECONDARY CONTAINMENT TEST 7. PIPE SECONDARY CONTAINMENT TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ܆ Manufacturer ܈ Industry Standard ܆ Professional Engineer Test Type ܆ Pressure ܆ Vacuum ܈ Hydrostatic Test Equipment Used: Incon Sump/UDC ID Diesel Sump Manufacturer O/C Sump Depth (inches) 36" Sump Bottom to Top of Highest Pipe Penetration (inches) 21" Test Start Time 10:56am Initial Reading 5.9457 Test End Time 11:11am Final Reading 5.9440 Change in Reading 0.0017 Pass/Fail Criteria +or-0.002 Tightness Test Results ܈ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 4 of 5 Test Method Developed by ܆ Manufacturer ܆ Industry Standard ܆ Professional Engineer Test Type ܆ Pressure ܆ Vacuum ܆ Hydrostatic Test Equipment Used: Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail ܆ Pass ܆ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST (continued) Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 9. COMMENTS