Loading...
HomeMy WebLinkAboutSB989 2020 Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ☐ Installation ☐ Repair ☐ 6 Month X 36 Month CERS ID 10129798 Test Date 12/8/2020 Facility Name Panam Buena Vista School District Facility Address 4200 Ashe Rd City Bakersfield Ca ZIP Code 93313 Company Performing the Test Advanced Compliance Phone 6617064321 Mailing Address 4007 Brae Burn Dr Bakersfield Ca 93306 Service Technician Performing Test Bradley Hinsley Contractor/Tank Tester License Number 971259 ICC Number 8373948 ICC Expiration Date 8/10/2021 Manufacturer and Test Equipment Training Certifications Expiration Date ICC Service Techican 8/10/2021 INCON STS 10/9/2021 Test Procedures Used Components Tested PEI/RP1200-19 Sect. 4. Tank Annular PEI/RP1200-19 Sect. 5. Line Secondary PEI/RP1200-19 Sect. 6. Containment Sump I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 12/8/2020 Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST 6. TANK SECONDARY CONTAINMENT TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ☐ Manufacturer X Industry Standard ☐ Professional Engineer Test Type ☐ Pressure X Vacuum ☐ Hydrostatic Test Equipment Used: Tank Annular Testing Set-Up Tank ID 87 Diesel Waste Oil Tank Manufacturer Unknown Unknown Unknown Tank Capacity 12,153 12,153 550 Test Start Time 08:50 10:00 11:30 Initial Reading -10 -10 -10 Test End Time 09:50 11:00 12:30 Final Reading -10 -10 -10 Change in Reading 0 0 0 Pass/Fail Criteria 2 2 2 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail Test Method Developed by ☐ Manufacturer X Industry Standard ☐ Professional Engineer Test Type X Pressure ☐ Vacuum ☐ Hydrostatic Test Equipment Used: Secondary line test set-up Pipe Run ID 87 Diesel Pipe Manufacturer Unknown Unknown Test Start Time 08:30 08:50 Initial Reading 5 5 Test End Time 09:30 09:50 Final Reading 5 5 Change in Reading 0 0 Pass/Fail Criteria 0 0 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 7. PIPE SECONDARY CONTAINMENT TEST 8. SUMP/UDC TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ☐ Manufacturer X Industry Standard ☐ Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: Incon STS Sump/UDC ID 87 STP 87 UDC Diesel STP Diesel UDC Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 42 40 42 40 Sump Bottom to Top of Highest Pipe Penetration (inches) 20 25 20 25 Test Start Time 08:35 09:39 08:16 09:39 Initial Reading 7.4497 3.1679 6.0161 7.1957 Test End Time 08:50 09:54 08:31 09:54 Final Reading 7.4517 2.8976 6.0165 7.1969 Change in Reading 0.0020 0.2703 0.0004 0.0012 Pass/Fail Criteria 0.0020 0.0020 0.0020 0.0020 Tightness Test Results X Pass ☐ Fail ☐ Pass X Fail X Pass ☐ Fail X Pass ☐ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 4 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard ☐ Professional Engineer Test Type ☐ Pressure ☐ Vacuum ☐ Hydrostatic Test Equipment Used: Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☒ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST (continued) Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 87 UDC Failed Hydrostatic testing. Must be repaired and retested. 9. COMMENTS