HomeMy WebLinkAboutFMC 2019CERS = California Environmental Reporting System, ID = Identification, ICC = International Code Council, Y = Yes, N = No, NA = Not applicable
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 1 of 6)
This form must be used to document testing and servicing of underground storage tank (UST) monitoring equipment. A copy of this form must be provided to the UST owner or operator. The owner or operator must submit a copy of this form to the local agency regulating the USTs within 30 days of the date of the monitoring system certification.
I. FACILITY INFORMATION CERS ID Date of Monitoring System Certification 07/18/19
Business Name (Same as Facility Name or DBA – Doing Business As.) Fed Ex Building #
Business Site Address 6100 District Blvd City Bakersfield
ZIP Code 93313
II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION
Name of Company Performing the Certification Cal Valley Equipment
Phone # (661) 327 - 9341 Ext.
Mailing Address 7608 Fruitvale Avenue, Bakersfield, CA. 93308
Name of UST Service Technician Performing the Certification (Print as shown on the ICC Certification.) Jerry Rangel
Contractor/Tank Tester License # 998733 ICC Certification # 8160834
ICC Certification Expiration Date 08/24/19
Monitoring System Training and Certifications (List all applicable certifications.) Expiration Date Veeder Root 12/19
III. RESULTS OF TESTING/SERVICING
Indicate and attach the following reports if the monitoring equipment is capable of generating either. Y N NA Monitoring System Set-up Alarm History Report
Was any monitoring equipment replaced?
(If “Yes,” identify the specific devices replaced and list the manufacturer and model for all replacement parts in section IV below.)
Was damage, debris, or liquid found inside any secondary containment systems? (If “Yes,” describe what was found in section IV below.)
Is all monitoring equipment operational per manufacturer’s specifications?
(If “No,” describe why in section IV below.)
IV. COMMENTS
If directed to use this section, describe how and when the issues were or will be corrected.
V. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING
I hereby certify that the equipment identified in this document was inspected/serviced in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2638 and all information contained herein is true and accurate. Attached to this certification is information (e.g., manufacturers' checklists, monitoring system set-up, alarm history report, etc.) necessary to verify that this information and the site plan showing the layout of UST system is complete and accurate. UST Service Technician Signature
ID = Identification, SW = Single-walled, VPH = Vacuum/Pressure/Hydrostatic, LLD = Line leak detector
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 2 of 6)
VI. INVENTORY OF EQUIPMENT CERTIFIED
A separate Monitoring System Certification Form must be prepared for each monitoring system control panel.
Make of Monitoring System Control Panel Veeder Root Model of Monitoring System Control Panel TLS-350
Software Version Installed 421.00
Check the appropriate boxes to indicate specific equipment inspected/serviced.
Monitoring Device Used Device Model # Monitoring Device Used Device Model #
Tank ID: Diesel
(By tank number, stored product, etc.)
Tank ID:
(By tank number, stored product, etc.)
In-tank Gauging (SW Tank) In-tank Gauging (SW Tank)
Annular Space or Vault Sensor 794380-420 Annular Space or Vault Sensor
VPH Sensor VPH Sensor
Product Piping Product Piping
Mechanical LLD Mechanical LLD
Electronic LLD Electronic LLD
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor 794380-208 Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Fill Piping Fill Piping
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor 794380-208 Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Vent Piping Vent Piping
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Vapor Recovery Piping Vapor Recovery Piping
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Monitoring Device Used Device Model # Monitoring Device Used Device Model #
Tank ID:
(By tank number, stored product, etc.) Tank ID:
(By tank number, stored product, etc.)
In-tank Gauging (SW Tank) In-tank Gauging (SW Tank)
Annular Space or Vault Sensor Annular Space or Vault Sensor
VPH Sensor VPH Sensor
Product Piping Product Piping
Mechanical LLD Mechanical LLD
Electronic LLD Electronic LLD
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Fill Piping Fill Piping
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Vent Piping Vent Piping
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Vapor Recovery Piping Vapor Recovery Piping
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
ID = Identification, VPH = Vacuum/Pressure/Hydrostatic, UDC = Under-dispenser containment
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 3 of 6)
Monitoring Device Used Device Model # Monitoring Device Used Device Model #
Vent/Transition Sump ID: Vent/Transition Sump ID:
Sump Sensor Sump Sensor
VPH Sensor VPH Sensor
UDC ID: 1 UDC ID:
Electronic Sensor 794380-208 Electronic Sensor
Mechanical Device Mechanical Device
VPH Sensor VPH Sensor
UDC ID: UDC ID:
Electronic Sensor Electronic Sensor
Mechanical Device Mechanical Device
VPH Sensor VPH Sensor
UDC ID: UDC ID:
Electronic Sensor Electronic Sensor
Mechanical Device Mechanical Device
VPH Sensor VPH Sensor
UDC ID: UDC ID:
Electronic Sensor Electronic Sensor
Mechanical Device Mechanical Device
VPH Sensor VPH Sensor
Other Monitored Component ID: Other Monitored Component ID:
Other (Specify in section VII.) Other (Specify in section VII.)
Other Monitored Component ID: Other Monitored Component ID:
Other (Specify in section VII.) Other (Specify in section VII.)
Other Monitored Component ID: Other Monitored Component ID:
Other (Specify in section VII.) Other (Specify in section VII.)
Include information for every underground storage tank component monitored by this monitoring system control panel. If the monitoring system control panel monitors more components than this form accommodates, additional copies of these pages may be attached.
VII. COMMENTS
Use this section to provide any additional comments about the inventory of the equipment certified.
Y = Yes, N = No, NA = Not Applicable
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6)
VIII. MONITORING SYSTEM AND PROGRAMMING
This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA
Are the visual and audible alarms operational?
Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, functionally tested, and confirmed operational?
Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper operation?
Was monitoring system set-up reviewed to ensure proper settings?
Was the monitoring panel’s backup battery visually inspected, functionally tested, and confirmed operational?
Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment?
Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically disconnected?
Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? Which sensors initiate positive shut down? (Check all that apply.) Sump Under-dispenser containment
If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational?
For any answer of “N” above, describe in section IX how and when these deficiencies were or will be corrected. IX. COMMENTS
X. IN-TANK GAUGING TESTING Check this box if tank gauging is used only for inventory control. (Do not complete this section.) Y N NA Check this box if NO tank gauging equipment is installed. (Do not complete this section.)
This section must be completed if in-tank gauging is used to perform leak detection monitoring.
Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for ground faults?
Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, and confirmed operational?
Was accuracy of system’s product level readings tested?
Was accuracy of system’s water level readings tested?
Were all probes reinstalled properly?
Were all items on the equipment manufacturer’s maintenance checklist completed?
For any answer of “N” above, describe in section XI how and when these deficiencies were or will be corrected. XI. COMMENTS
GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/Pressure/Hydrostatic, ID = Identification
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6)
XII. LINE LEAK DETECTOR TESTING Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) Y N NA This section must be completed if LLDs are installed. Was a leak simulated to verify LLD performance? (Check all that apply.) Simulated leak rate verified: 3 GPH 0.1 GPH 0.2 GPH
Was the testing apparatus properly calibrated?
For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected?
For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected?
For electronic LLDs, does the turbine automatically shut off when a leak is detected?
For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected?
For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test?
For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks?
Were all items on the equipment manufacturer’s maintenance checklist completed?
Were all LLDs confirmed operational within regulatory requirements?
For any answer of “N” above, describe in section XIII how and when these issues were or will be corrected. XIII. COMMENTS
XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING
Check this box if VPH monitoring is NOT used. (Do not complete this section.)
This section must be completed if VPH monitoring is used to perform leak detection monitoring.
System Type (Mark all that apply.) Vacuum Pressure Hydrostatic
Sensor ID Component(s) Monitored by this Sensor Sensor Functionality Test Interstitial Communication Test
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
How was interstitial communication verified? Simulated leak at far ends of the interstitial space. Visual Inspection
Other (Describe the method in section XV below.) Gauge
Was the vacuum or pressure restored to operating levels in all interstitial spaces? Yes No (Describe the reason in section XV below.)
For any answer of “FAIL” above, describe in section XV how and when these issues were or will be corrected. XV. COMMENTS
Monitoring System Certification
UST Monitoring Site Plan
Site Address:
Date map was drawn: I l.
Instructions
If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring
System Certification. On your site plan, show the general layout of tanks and piping. Clearty identify locatioos of the fotlowing
equipment, if installed: monitoring system control panels; sensom monitoring tank annular spaces, sumPs, dispenser pans, spill
containers, or other secondary containment areas; mechanical or electronic line leak detectorsi and in-tank liquid level probes (ifused
lor leak detection). In the space provided, note the date this Site Plar was prepared.
Page of4
?q\b3a'.299. .'qc aslc6.
Ooc
tiN-036 - 4/4 ll$'$.unidocs.org Re\'.01/17/08
.O1Cet-tr-tla.q.
. f, r\.
07 15 19
CERS = California Environmental Reporting System, ID = Identification, UST = Underground storage tank, ICC = International Code Council
UNDERGROUND STORAGE TANK SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1)
Type of Action Installation Test Repair Test 12 Month Test
I. FACILITY INFORMATION
CERS ID
Date of Spill Container Test 07/15/19
Business Name (Same as Facility Name or DBA-Doing Business As.) Fed Ex
Business Site Address 6100 District Blvd
City Bakersfield
ZIP Code 93313
II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION
Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Jerry Rangel
Phone # (661) 327 - 9341 Ext.
Contractor/Tank Tester License # 998733
ICC Certification # 8160834
ICC Certification Expiration Date 08/24/19
Spill Container Testing Training and Certifications (List applicable certifications.) OPW Phase I
III. SPILL CONTAINER TESTING INFORMATION
Test Method Used:
Manufacturer Guidelines: (Specify)
Industry Code or Engineering Standard: (Specify)
Engineered Method: (Specify)
Attach the testing procedures and all documentation required to determine the results. # of Attached Pages
Tank ID: (By tank number, stored product, etc.) Diesel
Spill Container Manufacturer: CNI
Method of Cathodic Protection
Non-Metallic Non-Metallic Non-Metallic Non-Metallic
Isolation Isolation Isolation Isolation
Other (Specify in section V.) Other (Specify in section V.) Other (Specify in section V.) Other (Specify in section V.)
Inside Diameter of Spill Container: (Inches) 11x12
Depth of Spill Container: (Inches) 11
Does the spill container have a 5 gallon capacity? Yes No Yes No Yes No Yes No
Method to Keep Spill Container Empty
Drain Valve Drain Valve Drain Valve Drain Valve
Onsite Pump Onsite Pump Onsite Pump Onsite Pump
Other
(Specify in section V.) Other
(Specify in section V.) Other
(Specify in section V.) Other
(Specify in section V.)
IV. SUMMARY OF TESTING RESULTS
Spill Container Test Results Pass Fail Pass Fail Pass Fail Pass Fail
V. COMMENTS
All items marked “Fail” above must be explained in this section. Any additional comments may also be provided here.
VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING
I hereby certify that the spill containers were tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637.1 and all the information contained herein is accurate.
UST Service Technician Signature
If the facility has more components than this form accommodates, additional copies of this page may be attached.
coPlr.luNICATrOr,,ls ?Elrjl _ _
PIET SETT I I.{GS :
guTa-l !liil- TIl.1E SETUF:
n E : lEEl EFr HO{IT i FI,1r-:1
Irl gL L,IEEHL!/
L,IENIrt*L TIl"rE : E::r1 Ftl
FECE]I/ER REPIETs i
Sr:l IEl'l llETL..lP
.l!L 18. lll1r 10:3! All
SYFi'IEl'l L tli TF
S"iETEI'i LAI'lrrUHtiE
EI,]I:;L I SH
trt STEI.] !HTE.'T I I"]E FiJEIIAT
I.10ll IrD lY'fi HH:l,ll{:lili ill
3EE[:I FET]E}I FPE I GHT
61 tL] LiFJTEI ]T EL\]TT
EAHEFSF I ELIT L::&
COl1ll E{rtrEtrEitUI RITTE
STOI, BIT
IrATH LEli,;TH
I { Fl[t]D ]:4ntl
OtlI)
i:iHIFT Tll'1E 1
5H1FT TII.1E :J
FHlFT' TIIlE J
SHiFT Tlf'lE ri
1:: 15 Atl
Il I IJ|IELELt I EAELEII
I I SHELEIT
I,]EET]ETT Lr,EN
t,{EEITEIT l.tEt'l
l,lEEtrEIr l,.lFl1
tlEELEtr i"lFll
L].XI{Il EOAETT
F F1E I T.1
|JTT}P E I T
trATA LEI'Jl-rT H
! 1EE-!tI)
1?0rl
(:IDD
1 STL1F
TAN]I: T,EF I.ET
tT 1E$ELEI]T* lr sN T5f
L l SAELE:I]
L I tlE PEF: T=T
I] I:iFELET]
L.l l'lE .1Hf'l 1"111
D 1 EAELEI]
83.!T! IJETUR I TY
:]OT]E : I]I FAELEL
tsU]" r 'IFlril'lEl.1l T -qETT I flGS :
AUT I-EA]{ Alr.llll'1 L I I"ll T
trl S*ELEIT
AI.ITO HIGH ],]ATEFI LII,lIT
1] ]:JAELEIIAUTi O,EEFILL LII.]IT
Ir I SHELEI
ul,iT{r LOLJ FR,}tr -lL-rT
T] ] SAELED
AUTtl THEFT L I I'1] T
tT I FJAELEI,
f,UTI TTEL I VER I, TjTART
IT I SflELEI
ALITO IIEL I VER\, EI\]D
IT I F]TIELEN
AUTO EIITER AL l Hpr_rT ilri
D I EAELETT
AUTO E/ IEFI'l L I llPLlT llFF
D I SAELEI
AUTO SEI']EfiE FL]EL ELAFII
I] I BAELETT
AUTaI FiEl,lElFl tnATER trLARl"l! I E*ELED
AUT4] BEI,,]ETF ]UT ALflHI1
F5_.:TT SEi]UE I Tf
COT]E : D i SHELETTTIIIrL T, FE : T{IlE
AI,IBI]EE - l,l : 1 RINij
f,lrllEI"l EETUP EITE I t,lrl :
TJ ] AL T[I,]E I i,ITEEI,/HL : 32 ITi:].?3! EI.]I DF I]EFJEHGE! I S*ELE[]
tulo_ol*! HLTiRI l_sErLiF_ _
! J I VEEI1EF E,i]Li,T { FI,],.-:i )
flLL : LEAI: ril-AFll'lALL:HIGH L"]ATEF *I,AEI,]
AI-L :I\,IEFFILL ALIIRI,]
HLT, : L{:I],] FR ]TTULT ALF,EI']
ALL :ETUTTT]EI.I L ]gS ALARI']
ALL : HI r--;H Fll{jt],i--T ALARI I*LL ; Il't!HLiD FUEL LE\/EL*LL : PEI]EE iI.]T
i,lLL : H I;H IqTER I,IHRNI I']tJ
ilLL :TTELI\.IERY NEEITELL
ALL : I ]I.tH PFO TI,,]I:TT ALARI 1
*LL :T,TEiES TEST FIT I L
TLL :FER I OtT I T TEFJT FAI L
ALL : AI]I,,]U*L TEET FA I L
ALL:NO iSLL ITTLE TII,IE
ALL :,lF-rl-.Ir I l'llrFl EfiTE L,lHRtleLL:Alr: I j:HAFT l*L L,JAF:ll
*LL :EEC,IN I'IITEI'I I I]:;
*LL:RETOII ALAEI.IgLI, : LftI,] TEIlP LNARI,I] II:
ALI- : ::EiSE Fii 1T, L ] NE TNH
L I {rl-.ll Ir FjEI,IE,JF ,irl-l lE
ALL : FUEL ALARil
ALL :SEllstlll {lUT ALAHI'IgLL ::HORT r,iLARI'1
,!LL : IIHTEF] ALAF]f.]
ALL : L"]ATEF UUT ALARI,I
ALL: H IGH LIITUITT *LARI'I
ALL :L'.\L.J LlI]LII! HLAEI'1
ALL:LIELlltr []frRN I tlrj
E:{TEFI,IAI. l NPI]TS
ALL : EiITEEII I FL]T ALARIl
FEt-rE I ;EE *t-ARllE
EEEII I IJE REFiET ]*RN
AL*RI.] ILEAR I,,JIIEI']I NG
PF I NT Tr---r \i*LUIlEs
E I,lilELEIr
TEf IP il,:rl.lPEnE*T I rlll
/ALUE { trEr:; F 1: E0.ll
5T I {-:H IIE I I;HT FFEET
L-j t EAELEIT
H_!,EITi-iL]+L DATS F.}RI'1AT
HE I IJHT
I,,q\rL I GHT S,qtllll Til']E
ENTIELEI
=TAET DHTEl"lrlFr []EEH I ELlIl
STTFT T I I,lE'::00 nl.1
E[,ltr lri-tTEn\/ L,rEEli l suN
E Ir T I l,lE
? : [: nl,1
RE_I] I EEU'I LI-I-:FI. PFIIlTOUT
T l 5AELED
EURi I.RTITiiIJiJL PFEF I,'1
E
EYETEI1 EE:IUF l TY
N{iDE : InE Ir]Ll
FEI rE I !,rEE t:jETLlF :
I1 B :r TEEI1EF Fi --/tlT t FI'15 )
1E0r_riJTr,4'155
FLI\,rFi TYPE: f,{:llPI-ITEEF ET Nn: 1
EETFY I'lO : 5
RETR,I IIEL*Y: 5rl0IlF I EI"]i"1T I L)ll EEI irRT : llFF
I N_TANH EETUP-
T 1 : tr I EEEL
PROTTUL:T.ODE
THEFI"]AL iJi)EFF
TAl,lX I! I AI'IETEF
T*NX FROFI LE
FULL VI]L
FLTIHT li I ZE :
, nlt-lr Li*F:I l :jHIGH UATER LiI"IIT:
I.1rr il llR LHI,EL. !,t0L
I]. EFF ] LL I.If,IIT
HI Gt.l pRLrtrULtT
DELI\/EEV LII,]]T
1
.0lJ045D
1Lrg.5rllFT
I lLr0D
4. rl I fl.
E ITEIiI,.IAL- i NPUT EETUP
t"l0I,tE
U ]rPr]r RELA! F:El,l _ _ _
R 1:EEIIOTE ilLHRt.l
ST H l,l tlFrRtlII EI 1HLL !' DI,Et\l
I l'l-THlll.:,qLHFr,lE
ALL : rl\ ERF I LL HLAFt,t
ALL : LUL,J PRT.INU|T ALARI"IALL: HIGH PE()IiT](:.T ALARI'IilLL : PRtrEE OLIT
ALL : H i GI.1 L,dATER I,]*RI,II IIGHLL : IIEL I VEEY I'IEEIEDHLL : l"lA,:; I,ETIDUL'T HLART'I
LIQUI lr F-EI'IE R ALl,lS
rtLL : FUEL flLFEI']
ALL : SEI.ISL)R OUT ALfiRI.l
HLL : FIHoET nLHRt"l
ALL :l"]ATER ALAEI.]ALL:H1I]H LlGUII AL*FI'IAl.L : L{, ti L I GU I Ir ALHRHALL:LI8UI I, I,JAENI lii]
R I:P SITII,iE FjHuTi:)FF
STAI'II/AIITT
l,lOEI'lHLLi OF,Etl
- filo rlLAF. Fir-it:rt Gtll"lEftTl; -
}:]{-LI]TL,JI1F]E RE\.I I 5 I .1I1] LEVELrrEESILrll 4!1 . LttE FTITTHRES :tE4:l -1 0Lt-AIjRE*TEL - olt. i 1. 15. 1t.4[
l{ir :ri- FTL,THEE lltitrLlLE
LiltJ I,E4-rtrLlr: T
LEHI': HLAFIl
I:J.LILEII LNEIE
TAN]: TILT
t_|t11'
5.05.0
12000
g tl%
l OBDD
95%
1 I 4r-]0
bDrl
500
99
s9
0. D0
LIi'IIT:
I.1AI,I I FOLTJED TAI,IHSTl: ll{: l',]E
DELIVEEY TTELfiY :5 HI N
LI iLrl Ir_FjEl,{9}Fl_E!r!r _ _ ,
L I : AI.II,IULHRTFll-STATE lSl l,lriLE FLOAT)
LTATEG{]F.I' : AI,]I]L]LAH EPfll:E
L T:l:juI]TH ET - I"]I'
TR I -STHTE 5l l,lril.E FI-OAT )
CIITEL:/.]E! : iiTF SUI"II'
L 4 : f,lOFT H Er Llt lF,TFI -ETHTE I5I NI.;LE FLO*T)CATEI]iEY : STF }.jUI1P
L 5 :NIsI,EI..IEER PAI,]
TEI -STATE (!I I,']I,;LE FLIIAT)r-]*TEGORT : Ir I SFEI.IFJEE PAN
BLAFJ"i H ] iJ I4,)EY EEFT}RT
-- -.- riYsTEH Hl.f.lEI'1 --- --
!HFEFi II-TEEF:4, !JIB 3:q} FI"]
FFi i I,]TEFI ER]IDF
E*TTEEi 1E UFF.lAI,1 1, l,--196 B l.]! Al,1
fiLH,L;]ii H I STIRY IiEPOF,T
. |JEF]SIFI ALARf,lL I :Al'tl,l]i-f,F
Al,ll'll...lLAF EPAiiE
FUEL ALHEI']
.-lUIl !r;. trllB 10:1'J *ll
FLIEL ALHRI'I
.l -.lf,l !8. :-r17 l:18 PI'l
FL.IEL HLARI']JUl,l 1T. 3[1E E:2t gi1
x$ **iENIJrar:(x
i'i];tiitEIIIr+iti:t}
FLHEIi H I El'i EY REFUFTT
--- -- EEI'lEtlE 8L*El,l --*--L 3 :3{ ]TH SUI'1!
EElrEuE { lT Hl,.rtrtlJUr'l 16. rltlB ltt:1T *t,l
FL]EL ALAHI,]JU !E, :rl1B 1D:14 Atl
FL]EL HI-ARli
.l UI,l :8" :n1T :r;19 FI'l
+ + + t * FllT - - + + -
l. 2L]19 E:!E Fl,17. 1014 1n:4.1 AI'1':, !"r1i 9:lB gll
ALH]II"i H]ET,JFY FIEI'+ET
I I,l-THflH *L*Ell
T 1:I]IE|JEL
fl,,JEEF ] LI- iiLAEI ]
Hnn 20, :017 1!:18 Pl,lFEE E, :t..llE E:rl FI"l
J U"t 1Ll, rtl15 :r;49 Al'1
LrlL,J I FliltruL T ALrlEll
I"1i]E E. r0]B 1l: l5 *1.1
I,1 I GH FE t J TT *L F]I'IJUII i T. 3n14 i]:38 lrl'1JUll 1:. 101'l B:El Hl"]iiPE E. :D1l 4:Lt:] Fll
I Ni/gL I D FUEI- LE,ELJ,N 1I, !:1? E:I4 AI"1*PFr B. ?n1l 4:t-r3 ! l'.1
l,lAR 15, !r_r1 l l : J5 F,t1
PF{IEE II-IT
ft,qF 13. ltll! B:1E PttJ.lN IT. :U14 1!l:4: AI'1
Jr..lll 17, :014 3: 16 Al"l
IrEL I l/EF! ilEEtrEIl
t,1AR E. ltrtE 12:1.! f11,1
ll*.! PEotrutrT *LHEt'l
JUN 1T. :1.J14 9: I1g AI'1
JUH 12, 'llttl E:51 FI.1APR E. trtl1 41:r3 Fl']
LITLI TEI']P ]..]A]IIII Ni]
HLEFI'I H I =T :\R,1 HEI':IET
F'EI,l=(: E ALARI'I -----L ! :IT I EFENEEF
II I FJI EI..]EEE PA I,1
EEf.]FJ{- E I-I,UT ALARIillAR 1i-J. :rtlS ?:l...rE pl']
EEt,liinR nUT ALAET'IJUL:t. !015 11:Zrt *tl
FUEL FLHRI1.lul. :!, !015 1l:18 At']
t i i i i Ellt i i x i X
HL*EI] HI5TOHY FEP ET-
----- sE[suE] AL*n[l -L 4 i r{r,iFTH El,lNF
iJTP 5LLI.]F
SEIIETF (:IUT AL*RI,]
,IUI,I :E, :Dl E 1r:J:17 Htl
FLEL ilLAEl.l
J r_11,1 !E, :LrlE 1L[14 *t't
F .]EL LARI ]JAI] ?S, .]U1E I I : D1 AI'I
I lili
.-1t t1. ltl
Xrli,iiEl.lllirSXX iis** EI'IL*riiX
ttl-lrFlf'l HISTORT EEPORT
-- -- - EEt,t:t{iE ALARI'] -----L 5 : TT I ST'E I']:JER T,AI']
L I SFEIIXEF PAI'I
SEI,ISOR OUT ALARI']
JUl,l I'i. ?018 10:1? Ar'l
FUEL i'il.*Rl"l
JUN lE,. 3tl1E t0:15 *t,l
SENEi]R OUT iTLARI']JUtl JB. ZtllT 3:!0 !,1,1
,r i ii iElltr i! ,xt