Loading...
HomeMy WebLinkAboutOPI 2020Appendix IX Underground Storage Tank Overfill Prevention Equipment Inspection Report Form CERS = California Environmental Reporting System, ID = Identification, ICC = International Code Council, OPE = Overfill Prevention Equipment Page 1 of 2 TYPE OF ACTION ☐☐☐☐Installation ☐☐☐☐Repair XXXX36 Month 1. FACILITY INFORMATION CERS ID 10022869 Inspection Date 12/16/2020 Facility Name Circle K Facility Address 5634 Stine Rd. City Bakersfield ZIP Code 93313 2. SERVICE TECHNICIAN INFORMATION Company Performing the Inspection B&T Service Station Contractors Phone 805-929-8944 Mailing Address 630 S. Frontage Rd. Nipomo, CA 93444 Service Technician Performing Inspection Michael A. Molacek Contractor/Tank Tester License Number 902034 ICC Number 9175943 Expiration Date 11/15/2021 3.TRAINING AND CERTIFICATIONS Manufacturer and Test Equipment Training Certifications Expiration Date OPW EVR UST Certification #0178497 06/24/2021 FFS EVR Phase 1 Systems 11/11/2021 4.INSPECTIONPROCEDURES INFORMATION InspectionProcedures Used Components Inspected Industry Standard 87 91 drop tubes 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING INSPECTION I hereby certify that the OPE was inspected in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637.2; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 12/16/2020 Total # of Pages 6.OVERFILL PREVENTION EQUIPMENT DETAILS Underground Storage Tank Overfill Prevention Equipment Inspection Report Additional copies of this page may be attached. Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) Page 2 of 2 Tank ID (one OPE per column) 87 91 Are both vent and tank riser piping secondarily contained? XXXX Yes ☐☐☐☐ No XXXX Yes ☐☐☐☐ No ☐☐☐☐ Yes ☐☐☐☐ No ☐☐☐☐ Yes ☐☐☐☐ No OPE Model 71-SO 71-SO What is the OPE response when activated? (Check all that apply.) XXXX Shut off Flow ☐☐☐☐Restricts Flow ☐☐☐☐ Audible Alarm ☐☐☐☐ Visual Alarm XXXX Shut off Flow ☐☐☐☐Restricts Flow ☐☐☐☐ Audible Alarm ☐☐☐☐ Visual Alarm ☐☐☐☐ Shut off Flow ☐☐☐☐Restricts Flow ☐☐☐☐ Audible Alarm ☐☐☐☐ Visual Alarm ☐☐☐☐ Shut off Flow ☐☐☐☐Restricts Flow ☐☐☐☐ Audible Alarm ☐☐☐☐ Visual Alarm Are flow restrictors installed on vent piping that may interfere with the OPE operation? ☐☐☐☐ Yes* XXXX No ☐☐☐☐ Yes* XXXX No ☐☐☐☐ Yes* ☐☐☐☐ No ☐☐☐☐ Yes* ☐☐☐☐ No At what level in the tank is the OPE set to activate? (Inches from bottom of tank) 90 92 What is the percent capacity of the tank at which the OPE activates? 90 90 Is the OPE in proper operating condition to respond when the stored substance reaches the designated regulatory level? XXXX Yes ☐☐☐☐ No XXXX Yes ☐☐☐☐ No ☐☐☐☐ Yes ☐☐☐☐ No ☐☐☐☐ Yes ☐☐☐☐ No 7. SUMMARY OF TESTING RESULTS OPE Inspection Results XXXXPass ☐☐☐☐Fail XXXXPass ☐☐☐☐Fail ☐☐☐☐Pass ☐☐☐☐Fail ☐☐☐☐Pass ☐☐☐☐Fail 1 8. COMMENTS Describe all results marked “Fail” and each proposed remedy. * Mark here if: ☐☐☐☐ Flow restrictors interfere with overfill prevention and equipment repairs required.