Loading...
HomeMy WebLinkAbout631 Baker Street Final ELD 3-4-2019Exclusive Providers for MDleak® MSleak® DPleak® and PHDleak® Testing Technologies Page 1 of 3 Test Type: Facility Name: Job #: 3968 Prepared For: PO #: NA Site Address: City: Primary Test Leak Rate: 0.005 gph State and Zip: CA 93305 Secondary Test Leak Rate: 0.1 gph Start Date:End Date: SYSTEM TK-1 87 TK-2 91 Product Primary:PASS PASS Product Secondary:PASS PASS Vent Primary:PASS PASS Vent Secondary:PASS PASS VR Primary:PASS PASS VR Secondary:PASS PASS Tank:PASS PASS Turbine Sump:PASS PASS Turbine Sump Elect:PASS PASS Turbine Head:PASS PASS Fill/Vapor Sump:PASS PASS UDC's:PASS PASS Fill Bucket Primary:PASS PASS Vapor Bucket Primary:PASS PASS Fill Spill Bucket Hydo:PASS PASS Vapor Bucket Hydro:PASS PASS Vent Box:PASS PASS Certifying Field Technician: Ricardo Gonzalez State Lic. # : Certification Leak Rate: 0.005 gph Certifying Technician Signature: Date: Statement Confirmed by: Date: 3/6/2019 Office use only I declare under penalty of perjury that I am a licensed tank tester in the DPleak®,MDleak®and PHDleak®method,a method listed by the NWGLDE organization and that the information contained in this report is true and correct to the best of my knowledge. If you have any questions on the testing please do not hesitate to call. @ 855-255-5325. 04-1695 This is a statement to confirm that the components listed above,at the time of testing,have been tested to a leak sensitivity listed above by using one or more of the following DPleak®,MDleak®and PHDleak®EPA aproved Methods. The DPleak®,MDleak®and PHDleak®Methods are the most versatile and comprehensive testing procedures offered to the petroleum industry.All petroleum owners and contractors which utilize the DPleak®,MDleak®and PHDleak®Method can be assured that their facility has passed the Nation's highest standard in preventative leak detection. 3/5/2019 3/5/20193/4/2019 631 Baker Street Bakersfield Falcon Services Facility Certification CONFIDENTIAL California ELD New Construction Test MSleak Roy's Market Exclusive Providers for MDleak® MSleak® DPleak® and PHDleak® Testing Technologies Page 2 of 3 631 Baker Street Log of Repaired Leak/s CONFIDENTIAL TK-1 87 TK-2 91 Tank Volume: 10000 5000 Manufacture: Modern Modern Interstice: Dry Dry Depth To Tank: 60"66" Tank Dia: 10 ft 10 ft Depth to Fuel: Tank Sump Boots Turbine Bravo Smith FE Petro 4 Gilbarco OPW Smith Smith Smith Fire-Flex OPW EVR: Healy Reference #Date Time Status System Component Manufacture 128 3/4/19 13:23 Leak Final TK-2 91 Sump Turbine leak on riser to turbine. 129 3/4/19 13:45 Leak Final TK-1 87 Sump Turbine leak on riser to turbine. Reference #Date Time Status System Component Manufacture None Log of Repaired Leaks Log of Unrepaired Leaks Tank Information Containment Boots: Piping Information Manufacture Spill Buckets: Number of Dispensers: Manufacture: Shear Valve Manufacture: Flex: Product Lines: Vapor Return / Vent: UDC/Dispensers Information Depth to Ground Water: Manufacture: NA Exclusive Providers for MDleak® MSleak® DPleak® and PHDleak® Testing Technologies Page 3 of 3 631 Baker Street Reference Addendum CONFIDENTIAL Site Photo