HomeMy WebLinkAbout2201 S Union Final ELD 2019 UST System Post Installation Test Report
ELD Test Date:
Customer:
Location:
Tested By: CGRS, Inc.
5444 Dry Creek Road
Sacramento, CA 95838
Project No:6-14222-18169-9954
DNJ Construction Inc.
Union Village
PO Box 81233
Bakersfield, CA 93380
201 S. Union Ave.
Bakersfield, CA 93307
August 14, 2019
®
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
8/15/2019
Date
8/14/2019
Date
91 Octane Primary Containment System PASS
Diesel Primary Containment System PASS
Post Installation ELD Test Results
87 Octane Primary Containment System PASS
201 S. Union Ave.Sergio L. Nunez
Bakersfield, CA 93307
Test Certification
Post Installation Enhanced Leak Detection (ELD)
6-14222-18169-9954
Union Village August 14, 2019
This document certifies that the UST systems listed below at the above referenced location have been tested
and passed the iota®VaporTite V005 tightness test and iotaVision™L005.CGRS further certifies that the
iota®VaporTite V005 and iotaVision™L005 meets the post installation testing requirements for post
installation testing for newly installed underground storage tank systems as per the California Health and
Safety Code,Chapter 6.7,section 25290.1(j)(1).
Final Test Date:IOTA Technicians:
Site Information Installation Contractor Information
Facility:Customer Name/CA Contractor's License #:
Address:Address:
City, State, Zip:City, State, Zip:
County:Contact:
CUPA Contact:Phone/Email:
CUPA Email:
Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result
Tank 1 15,000 87 Octane DW Fiberglass Xerxes Yes PASS
Tank 2 7,000 91 Octane DW Fiberglass Xerxes Yes PASS
Tank 3 2,000 Diesel DW Fiberglass Xerxes Yes PASS
Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result
S1 48 60 470.01 87 TS PASS
S2 42 60 359.86 87 FS PASS
S3 48 60 470.01 91 TS PASS
S4 42 60 359.86 91 FS PASS
S5 48 60 470.01 DSL TS PASS
S6 42 60 359.86 DSL FS PASS
Junction Boxes with Tank Connection Description Test Result
S1 Tank Probe and Turbine J-Box Open During Test PASS
S3 Tank Probe and Turbine J-Box Open During Test PASS
S5 Tank Probe and Turbine J-Box Open During Test PASS
UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
UDC1 42 22 36 144.00 Bravo PASS
UDC2 42 22 36 144.00 Bravo PASS
UDC3 42 22 36 144.00 Bravo PASS
UDC4 42 22 36 144.00 Bravo PASS
UDC5 42 22 36 144.00 Bravo PASS
UDC6 42 22 36 144.00 Bravo PASS
UDC7 42 22 36 144.00 Bravo PASS
UDC8 42 22 36 144.00 Bravo PASS
UDC9 42 22 36 144.00 Bravo PASS
UDC10 42 22 36 144.00 Bravo PASS
Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
TS1 24 22 36 82.29 Bravo PASS
Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result
87 PL NOV DW Fiberglass 2 275 PASS
91 PL NOV DW Fiberglass 2 255 PASS
DSL PL NOV DW Fiberglass 2 165 PASS
Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result
87 Vent NOV DW Fiberglass 2 60 PASS
91 Vent NOV DW Fiberglass 2 75 PASS
DSL Vent NOV DW Fiberglass 2 80 PASS
Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result
VR NOV DW Fiberglass 3 300 PASS
Reviewed By Date IOTA Tech Signature Date
8/14/2019
CA License No.
8/15/2019 06-1727
201 S. Union Ave.PO Box 81233
Bakersfield, CA 93380
COMPONENTS IN CONTAINMENT
Kern Jerry Hale
Bakersfield Fire 661-201-3707/dnj3430@sbcglobal.net
Leak Logs / Repair
Bakersfield, CA 93307
kkarns@bakersfieldfire.us; hwines@bakersfieldfire.us;
sgardner@bakersfieldfire.us
PIPING
TANKS
Final ELD Test Project Worksheet
8/14/2019
Union Village DNJ Construction Inc.
Sergio L. Nunez
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
Secondary Flow Communication Test Certification
6-14222-18169-9954
Union Village August 14, 2019
201 S. Union Ave.Sergio L. Nunez
Bakersfield, CA 93307
COMPONENTS RESULTS
Piping Secondary Communication Confirmation
87 PL PASS
91 PL PASS
8/15/2019
Date
DSL PL PASS
8/14/2019
Date
VR PASS
DSL Vent PASS
87 Vent PASS
91 Vent PASS
CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed
throughout the secondary piping components listed below.