Loading...
HomeMy WebLinkAbout2201 S Union Final ELD 2019 UST System Post Installation Test Report ELD Test Date: Customer: Location: Tested By: CGRS, Inc. 5444 Dry Creek Road Sacramento, CA 95838 Project No:6-14222-18169-9954 DNJ Construction Inc. Union Village PO Box 81233 Bakersfield, CA 93380 201 S. Union Ave. Bakersfield, CA 93307 August 14, 2019 ® Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services 8/15/2019 Date 8/14/2019 Date 91 Octane Primary Containment System PASS Diesel Primary Containment System PASS Post Installation ELD Test Results 87 Octane Primary Containment System PASS 201 S. Union Ave.Sergio L. Nunez Bakersfield, CA 93307 Test Certification Post Installation Enhanced Leak Detection (ELD) 6-14222-18169-9954 Union Village August 14, 2019 This document certifies that the UST systems listed below at the above referenced location have been tested and passed the iota®VaporTite V005 tightness test and iotaVision™L005.CGRS further certifies that the iota®VaporTite V005 and iotaVision™L005 meets the post installation testing requirements for post installation testing for newly installed underground storage tank systems as per the California Health and Safety Code,Chapter 6.7,section 25290.1(j)(1). Final Test Date:IOTA Technicians: Site Information Installation Contractor Information Facility:Customer Name/CA Contractor's License #: Address:Address: City, State, Zip:City, State, Zip: County:Contact: CUPA Contact:Phone/Email: CUPA Email: Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result Tank 1 15,000 87 Octane DW Fiberglass Xerxes Yes PASS Tank 2 7,000 91 Octane DW Fiberglass Xerxes Yes PASS Tank 3 2,000 Diesel DW Fiberglass Xerxes Yes PASS Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result S1 48 60 470.01 87 TS PASS S2 42 60 359.86 87 FS PASS S3 48 60 470.01 91 TS PASS S4 42 60 359.86 91 FS PASS S5 48 60 470.01 DSL TS PASS S6 42 60 359.86 DSL FS PASS Junction Boxes with Tank Connection Description Test Result S1 Tank Probe and Turbine J-Box Open During Test PASS S3 Tank Probe and Turbine J-Box Open During Test PASS S5 Tank Probe and Turbine J-Box Open During Test PASS UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result UDC1 42 22 36 144.00 Bravo PASS UDC2 42 22 36 144.00 Bravo PASS UDC3 42 22 36 144.00 Bravo PASS UDC4 42 22 36 144.00 Bravo PASS UDC5 42 22 36 144.00 Bravo PASS UDC6 42 22 36 144.00 Bravo PASS UDC7 42 22 36 144.00 Bravo PASS UDC8 42 22 36 144.00 Bravo PASS UDC9 42 22 36 144.00 Bravo PASS UDC10 42 22 36 144.00 Bravo PASS Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result TS1 24 22 36 82.29 Bravo PASS Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result 87 PL NOV DW Fiberglass 2 275 PASS 91 PL NOV DW Fiberglass 2 255 PASS DSL PL NOV DW Fiberglass 2 165 PASS Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result 87 Vent NOV DW Fiberglass 2 60 PASS 91 Vent NOV DW Fiberglass 2 75 PASS DSL Vent NOV DW Fiberglass 2 80 PASS Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result VR NOV DW Fiberglass 3 300 PASS Reviewed By Date IOTA Tech Signature Date 8/14/2019 CA License No. 8/15/2019 06-1727 201 S. Union Ave.PO Box 81233 Bakersfield, CA 93380 COMPONENTS IN CONTAINMENT Kern Jerry Hale Bakersfield Fire 661-201-3707/dnj3430@sbcglobal.net Leak Logs / Repair Bakersfield, CA 93307 kkarns@bakersfieldfire.us; hwines@bakersfieldfire.us; sgardner@bakersfieldfire.us PIPING TANKS Final ELD Test Project Worksheet 8/14/2019 Union Village DNJ Construction Inc. Sergio L. Nunez Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services Secondary Flow Communication Test Certification 6-14222-18169-9954 Union Village August 14, 2019 201 S. Union Ave.Sergio L. Nunez Bakersfield, CA 93307 COMPONENTS RESULTS Piping Secondary Communication Confirmation 87 PL PASS 91 PL PASS 8/15/2019 Date DSL PL PASS 8/14/2019 Date VR PASS DSL Vent PASS 87 Vent PASS 91 Vent PASS CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed throughout the secondary piping components listed below.