HomeMy WebLinkAboutFINAL ELD 2020 UST System Post Installation Test Report
ELD Test Date:
Customer:
Location:
Tested By: CGRS, Inc.
5444 Dry Creek Road
Sacramento, CA 95838
Project No:61-21162
Tanknology
7-Eleven #38654
11000 N. MoPac Expressway #500
Austin, TX 78759
3130 24th St.
Bakersfield, CA 93301
4/22/20 & 4/28/20
®
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
Test Certification
Post Installation Enhanced Leak Detection (ELD)
61-21162
7-Eleven #38654 4/22/20 & 4/28/20
3130 24th St. Sergio L. Nunez
Bakersfield, CA 93301
Post Installation ELD Test Results
87 Octane Primary Containment System PASS
91 Octane Primary Containment System PASS
Diesel Primary Containment System PASS
4/29/2020
Date
4/22/20 & 4/28/20
Date
This document certifies that the UST systems listed below at the above referenced location have been tested
and passed the iota®VaporTite V005 tightness test and iotaVision™L005.CGRS further certifies that the
iota®VaporTite V005 and iotaVision™L005 meets the post installation testing requirements for post
installation testing for newly installed underground storage tank systems as per the California Health and
Safety Code,Chapter 6.7,section 25290.1(j)(1).
Final Test Date:IOTA Technicians:
Site Information Installation Contractor Information
Facility:Customer Name/CA Contractor's License #:
Address:Address:
City, State, Zip:City, State, Zip:
County:Contact:
CUPA Contact:Phone/Email:
CUPA Email:
Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result
Tank 1 20,000 87 Octane DW Fiberglass Xerxes Yes PASS
Tank 2 12,000 91 Octane DW Fiberglass Xerxes Yes PASS
Tank 3 8,000 Diesel DW Fiberglass Xerxes Yes PASS
Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result
S1 42 58 347.86 87 TS PASS
S2 42 52 311.87 87 FS PASS
S3 42 52 311.87 91 TS PASS
S4 42 52 311.87 91 FS PASS
S5 42 52 311.87 DSL TS PASS
S6 42 52 311.87 DSL FS PASS
Junction Boxes with Tank Connection Description Test Result
S1 Tank Probe and Turbine J-Box Open During Test PASS
S3 Tank Probe and Turbine J-Box Open During Test PASS
S5 Tank Probe and Turbine J-Box Open During Test PASS
UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
UDC1 38 34 28 156.61 OPW PASS
UDC2 38 34 28 156.61 OPW PASS
UDC3 38 34 28 156.61 OPW PASS
UDC4 38 34 28 156.61 OPW PASS
UDC5 38 34 28 156.61 OPW PASS
UDC6 38 34 28 156.61 OPW PASS
Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
TS1 26 22 24 59.43 Bravo PASS
Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result
87 PL NOV DW Fiberglass 2 270 PASS
91 PL NOV DW Fiberglass 2 265 PASS
DSL PL NOV DW Fiberglass 2 150 PASS
Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result
87 Vent NOV DW Fiberglass 2 165 PASS
91 Vent NOV DW Fiberglass 2 60 PASS
DSL Vent NOV DW Fiberglass 2 105 PASS
Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result
VR NOV DW Fiberglass 3 285 PASS
Reviewed By Date IOTA Tech Signature Date
Final ELD Test Project Worksheet
4/22/20 & 4/28/20
7-Eleven #38654 RD Builders
Sergio L. Nunez
kkarns@bakersfieldfire.us; hwines@bakersfieldfire.us
PIPING
TANKS
3130 24th St. 4583 E. Eisenhower Circle
Anaheim, CA 92807
COMPONENTS IN CONTAINMENT
Kern Gary Redfern
Bakersfield FD; Howard Wines; Kris Karns 714-497-5812/gredfern@rdbuilders.com
Leak Logs / Repair
Bakersfield, CA 93301
4/22/20 & 4/28/20
CA License No.
4/29/2020 06-1727
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
PASS
91 Vent PASS
4/29/2020
Date
DSL PL PASS
4/22/20 & 4/28/20
Date
VR PASS
DSL Vent PASS
87 Vent
87 PL PASS
91 PL PASS
COMPONENTS RESULTS
Piping Secondary Communication Confirmation
3130 24th St. Sergio L. Nunez
Bakersfield, CA 93301
Secondary Flow Communication Test Certification
61-21162
7-Eleven #38654 4/22/20 & 4/28/20
CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed
throughout the secondary piping components listed below.