Loading...
HomeMy WebLinkAboutFINAL ELD 2020 UST System Post Installation Test Report ELD Test Date: Customer: Location: Tested By: CGRS, Inc. 5444 Dry Creek Road Sacramento, CA 95838 Project No:61-21162 Tanknology 7-Eleven #38654 11000 N. MoPac Expressway #500 Austin, TX 78759 3130 24th St. Bakersfield, CA 93301 4/22/20 & 4/28/20 ® Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services Test Certification Post Installation Enhanced Leak Detection (ELD) 61-21162 7-Eleven #38654 4/22/20 & 4/28/20 3130 24th St. Sergio L. Nunez Bakersfield, CA 93301 Post Installation ELD Test Results 87 Octane Primary Containment System PASS 91 Octane Primary Containment System PASS Diesel Primary Containment System PASS 4/29/2020 Date 4/22/20 & 4/28/20 Date This document certifies that the UST systems listed below at the above referenced location have been tested and passed the iota®VaporTite V005 tightness test and iotaVision™L005.CGRS further certifies that the iota®VaporTite V005 and iotaVision™L005 meets the post installation testing requirements for post installation testing for newly installed underground storage tank systems as per the California Health and Safety Code,Chapter 6.7,section 25290.1(j)(1). Final Test Date:IOTA Technicians: Site Information Installation Contractor Information Facility:Customer Name/CA Contractor's License #: Address:Address: City, State, Zip:City, State, Zip: County:Contact: CUPA Contact:Phone/Email: CUPA Email: Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result Tank 1 20,000 87 Octane DW Fiberglass Xerxes Yes PASS Tank 2 12,000 91 Octane DW Fiberglass Xerxes Yes PASS Tank 3 8,000 Diesel DW Fiberglass Xerxes Yes PASS Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result S1 42 58 347.86 87 TS PASS S2 42 52 311.87 87 FS PASS S3 42 52 311.87 91 TS PASS S4 42 52 311.87 91 FS PASS S5 42 52 311.87 DSL TS PASS S6 42 52 311.87 DSL FS PASS Junction Boxes with Tank Connection Description Test Result S1 Tank Probe and Turbine J-Box Open During Test PASS S3 Tank Probe and Turbine J-Box Open During Test PASS S5 Tank Probe and Turbine J-Box Open During Test PASS UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result UDC1 38 34 28 156.61 OPW PASS UDC2 38 34 28 156.61 OPW PASS UDC3 38 34 28 156.61 OPW PASS UDC4 38 34 28 156.61 OPW PASS UDC5 38 34 28 156.61 OPW PASS UDC6 38 34 28 156.61 OPW PASS Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result TS1 26 22 24 59.43 Bravo PASS Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result 87 PL NOV DW Fiberglass 2 270 PASS 91 PL NOV DW Fiberglass 2 265 PASS DSL PL NOV DW Fiberglass 2 150 PASS Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result 87 Vent NOV DW Fiberglass 2 165 PASS 91 Vent NOV DW Fiberglass 2 60 PASS DSL Vent NOV DW Fiberglass 2 105 PASS Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result VR NOV DW Fiberglass 3 285 PASS Reviewed By Date IOTA Tech Signature Date Final ELD Test Project Worksheet 4/22/20 & 4/28/20 7-Eleven #38654 RD Builders Sergio L. Nunez kkarns@bakersfieldfire.us; hwines@bakersfieldfire.us PIPING TANKS 3130 24th St. 4583 E. Eisenhower Circle Anaheim, CA 92807 COMPONENTS IN CONTAINMENT Kern Gary Redfern Bakersfield FD; Howard Wines; Kris Karns 714-497-5812/gredfern@rdbuilders.com Leak Logs / Repair Bakersfield, CA 93301 4/22/20 & 4/28/20 CA License No. 4/29/2020 06-1727 Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services PASS 91 Vent PASS 4/29/2020 Date DSL PL PASS 4/22/20 & 4/28/20 Date VR PASS DSL Vent PASS 87 Vent 87 PL PASS 91 PL PASS COMPONENTS RESULTS Piping Secondary Communication Confirmation 3130 24th St. Sergio L. Nunez Bakersfield, CA 93301 Secondary Flow Communication Test Certification 61-21162 7-Eleven #38654 4/22/20 & 4/28/20 CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed throughout the secondary piping components listed below.