Loading...
HomeMy WebLinkAboutFINAL ELD 6-15-20 UST System Post Installation Test Report ELD Test Date: Customer: Location: Tested By: CGRS, Inc. 5444 Dry Creek Road Sacramento, CA 95838 Project No:61-21735 Tanknology 7-Eleven #38837 11000 N. MoPac Expressway #500 Austin, TX 78759 3698 Ming Ave. Bakersfield, CA 93309 June 15, 2020 ® Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services 6/16/2020 Date Diesel Primary Containment System PASS 6/15/2020 Date 87 Octane TK2 Primary Containment System PASS 91 Octane Primary Containment System PASS Post Installation ELD Test Results 87 Octane TK1 Primary Containment System PASS 3698 Ming Ave.Sergio L. Nunez Bakersfield, CA 93309 Test Certification Post Installation Enhanced Leak Detection (ELD) 61-21735 7-Eleven #38837 June 15, 2020 This document certifies that the UST systems listed below at the above referenced location have been tested and passed the iota®VaporTite V005 tightness test and iotaVision™L005.CGRS further certifies that the iota®VaporTite V005 and iotaVision™L005 meets the post installation testing requirements for post installation testing for newly installed underground storage tank systems as per the California Health and Safety Code,Chapter 6.7,section 25290.1(j)(1). Final Test Date:IOTA Technicians: Site Information Installation Contractor Information Facility:Customer Name/CA Contractor's License #: Address:Address: City, State, Zip:City, State, Zip: County:Contact: CUPA Contact:Phone/Email: CUPA Email: Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result Tank 1 12,000 87 Octane TK1 DW Fiberglass Xerxes Yes PASS Tank 2 12,000 87 Octane TK2 DW Fiberglass Xerxes Yes PASS Tank 3 12,000 91 Octane DW Fiberglass Xerxes Yes PASS Tank 4 10,000 Diesel DW Fiberglass Xerxes Yes PASS Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result S1 48 60 470.01 87 TS1 PASS S2 42 60 359.86 87 FS2 PASS S3 48 60 470.01 87 TS2 PASS S4 42 60 359.86 87 FS2 PASS S5 48 60 470.01 91 TS PASS S6 42 60 359.86 91 FS PASS S7 48 60 470.01 DSL TS PASS S8 42 60 359.86 DSL FS PASS Junction Boxes with Tank Connection Description Test Result S1 Tank Probe and Turbine J-Box Open During Test PASS S3 Tank Probe and Turbine J-Box Open During Test PASS S5 Tank Probe and Turbine J-Box Open During Test PASS S7 Tank Probe and Turbine J-Box Open During Test PASS UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result UDC1 36 18 28 78.55 OPW PASS UDC2 36 18 28 78.55 OPW PASS UDC3 36 18 28 78.55 OPW PASS UDC4 36 18 28 78.55 OPW PASS Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result TS1 24 22 32 73.14 Bravo PASS Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result 87 PL1 NOV DW Fiberglass 2 250 PASS 87 PL2 NOV DW Fiberglass 2 10 PASS 91 PL NOV DW Fiberglass 2 195 PASS DSL PL NOV DW Fiberglass 2 145 PASS Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result 87 TK1 Vent NOV DW Fiberglass 2 45 PASS 87 TK2 Vent NOV DW Fiberglass 2 60 PASS 91 Vent NOV DW Fiberglass 2 90 PASS DSL Vent NOV DW Fiberglass 2 90 PASS Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result VR NOV DW Fiberglass 3 275 PASS Reviewed By Date IOTA Tech Signature Date 6/15/2020 CA License No. 6/16/2020 06-1727 3698 Ming Ave.4583 E. Eisenhower Circle Anaheim, CA 92807 COMPONENTS IN CONTAINMENT Kern Gary Redfern Bakersfield FD; Howard Wines; Kris Karns 714-497-5812/gredfern@rdbuilders.com Leak Logs / Repair Bakersfield, CA 93309 kkarns@bakersfieldfire.us; hwines@bakersfieldfire.us PIPING TANKS Final ELD Test Project Worksheet 6/15/2020 7-Eleven #38837 RD Builders Sergio L. Nunez Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services Secondary Flow Communication Test Certification 61-21735 7-Eleven #38837 June 15, 2020 3698 Ming Ave.Sergio L. Nunez Bakersfield, CA 93309 COMPONENTS RESULTS Piping Secondary Communication Confirmation 87 PL PASS 91 PL PASS 6/16/2020 Date DSL PL PASS 6/15/2020 Date VR PASS DSL Vent PASS 87 Vent PASS 91 Vent PASS CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed throughout the secondary piping components listed below.