HomeMy WebLinkAboutFMC 2020CERS = California Environmental Reporting System, ID = Identification, ICC = International Code Council, Y = Yes, N = No, NA = Not applicable
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 1 of 6)
This form must be used to document testing and servicing of underground storage tank (UST) monitoring equipment. A copy of this form must be provided to the UST owner or operator. The owner or operator must submit a copy of this form to the local agency regulating the USTs within 30 days of the date of the monitoring system certification.
I. FACILITY INFORMATION CERS ID Date of Monitoring System Certification
Business Name (Same as Facility Name or DBA – Doing Business As.) Building #
Business Site Address City
ZIP Code
II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION
Name of Company Performing the Certification
Phone # ( ) - Ext.
Mailing Address
Name of UST Service Technician Performing the Certification (Print as shown on the ICC Certification.)
Contractor/Tank Tester License # ICC Certification #
ICC Certification Expiration Date
Monitoring System Training and Certifications (List all applicable certifications.) Expiration Date
III. RESULTS OF TESTING/SERVICING
Indicate and attach the following reports if the monitoring equipment is capable of generating either. Y N NA Monitoring System Set-up Alarm History Report
Was any monitoring equipment replaced?
(If “Yes,” identify the specific devices replaced and list the manufacturer and model for all replacement parts in section IV below.)
Was damage, debris, or liquid found inside any secondary containment systems? (If “Yes,” describe what was found in section IV below.)
Is all monitoring equipment operational per manufacturer’s specifications?
(If “No,” describe why in section IV below.)
IV. COMMENTS
If directed to use this section, describe how and when the issues were or will be corrected.
V. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING
I hereby certify that the equipment identified in this document was inspected/serviced in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2638 and all information contained herein is true and accurate. Attached to this certification is information (e.g., manufacturers' checklists, monitoring system set-up, alarm history report, etc.) necessary to verify that this information and the site plan showing the layout of UST system is complete and accurate. UST Service Technician Signature
ID = Identification, SW = Single-walled, VPH = Vacuum/Pressure/Hydrostatic, LLD = Line leak detector
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 2 of 6)
VI. INVENTORY OF EQUIPMENT CERTIFIED
A separate Monitoring System Certification Form must be prepared for each monitoring system control panel.
Make of Monitoring System Control Panel Model of Monitoring System Control Panel
Software Version Installed
Check the appropriate boxes to indicate specific equipment inspected/serviced.
Monitoring Device Used Device Model # Monitoring Device Used Device Model #
Tank ID:
(By tank number, stored product, etc.)
Tank ID:
(By tank number, stored product, etc.)
In-tank Gauging (SW Tank) In-tank Gauging (SW Tank)
Annular Space or Vault Sensor Annular Space or Vault Sensor
VPH Sensor VPH Sensor
Product Piping Product Piping
Mechanical LLD Mechanical LLD
Electronic LLD Electronic LLD
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Fill Piping Fill Piping
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Vent Piping Vent Piping
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Vapor Recovery Piping Vapor Recovery Piping
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Monitoring Device Used Device Model # Monitoring Device Used Device Model #
Tank ID:
(By tank number, stored product, etc.) Tank ID:
(By tank number, stored product, etc.)
In-tank Gauging (SW Tank) In-tank Gauging (SW Tank)
Annular Space or Vault Sensor Annular Space or Vault Sensor
VPH Sensor VPH Sensor
Product Piping Product Piping
Mechanical LLD Mechanical LLD
Electronic LLD Electronic LLD
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Fill Piping Fill Piping
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Vent Piping Vent Piping
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
Vapor Recovery Piping Vapor Recovery Piping
VPH Sensor (Piping) VPH Sensor (Piping)
Sump Sensor Sump Sensor
VPH Sensor (Sump) VPH Sensor (Sump)
ID = Identification, VPH = Vacuum/Pressure/Hydrostatic, UDC = Under-dispenser containment
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 3 of 6)
Monitoring Device Used Device Model # Monitoring Device Used Device Model #
Vent/Transition Sump ID: Vent/Transition Sump ID:
Sump Sensor Sump Sensor
VPH Sensor VPH Sensor
UDC ID: UDC ID:
Electronic Sensor Electronic Sensor
Mechanical Device Mechanical Device
VPH Sensor VPH Sensor
UDC ID: UDC ID:
Electronic Sensor Electronic Sensor
Mechanical Device Mechanical Device
VPH Sensor VPH Sensor
UDC ID: UDC ID:
Electronic Sensor Electronic Sensor
Mechanical Device Mechanical Device
VPH Sensor VPH Sensor
UDC ID: UDC ID:
Electronic Sensor Electronic Sensor
Mechanical Device Mechanical Device
VPH Sensor VPH Sensor
Other Monitored Component ID: Other Monitored Component ID:
Other (Specify in section VII.) Other (Specify in section VII.)
Other Monitored Component ID: Other Monitored Component ID:
Other (Specify in section VII.) Other (Specify in section VII.)
Other Monitored Component ID: Other Monitored Component ID:
Other (Specify in section VII.) Other (Specify in section VII.)
Include information for every underground storage tank component monitored by this monitoring system control panel. If the monitoring system control panel monitors more components than this form accommodates, additional copies of these pages may be attached.
VII. COMMENTS
Use this section to provide any additional comments about the inventory of the equipment certified.
Y = Yes, N = No, NA = Not Applicable
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6)
VIII. MONITORING SYSTEM AND PROGRAMMING
This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA
Are the visual and audible alarms operational?
Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, functionally tested, and confirmed operational?
Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper operation?
Was monitoring system set-up reviewed to ensure proper settings?
Was the monitoring panel’s backup battery visually inspected, functionally tested, and confirmed operational?
Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment?
Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically disconnected?
Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? Which sensors initiate positive shut down? (Check all that apply.) Sump Under-dispenser containment
If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational?
For any answer of “N” above, describe in section IX how and when these deficiencies were or will be corrected. IX. COMMENTS
X. IN-TANK GAUGING TESTING Check this box if tank gauging is used only for inventory control. (Do not complete this section.) Y N NA Check this box if NO tank gauging equipment is installed. (Do not complete this section.)
This section must be completed if in-tank gauging is used to perform leak detection monitoring.
Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for ground faults?
Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, and confirmed operational?
Was accuracy of system’s product level readings tested?
Was accuracy of system’s water level readings tested?
Were all probes reinstalled properly?
Were all items on the equipment manufacturer’s maintenance checklist completed?
For any answer of “N” above, describe in section XI how and when these deficiencies were or will be corrected. XI. COMMENTS
GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/Pressure/Hydrostatic, ID = Identification
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6)
XII. LINE LEAK DETECTOR TESTING Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) Y N NA This section must be completed if LLDs are installed. Was a leak simulated to verify LLD performance? (Check all that apply.) Simulated leak rate verified: 3 GPH 0.1 GPH 0.2 GPH
Was the testing apparatus properly calibrated?
For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected?
For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected?
For electronic LLDs, does the turbine automatically shut off when a leak is detected?
For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected?
For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test?
For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks?
Were all items on the equipment manufacturer’s maintenance checklist completed?
Were all LLDs confirmed operational within regulatory requirements?
For any answer of “N” above, describe in section XIII how and when these issues were or will be corrected. XIII. COMMENTS
XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING
Check this box if VPH monitoring is NOT used. (Do not complete this section.)
This section must be completed if VPH monitoring is used to perform leak detection monitoring.
System Type (Mark all that apply.) Vacuum Pressure Hydrostatic
Sensor ID Component(s) Monitored by this Sensor Sensor Functionality Test Interstitial Communication Test
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
Pass Fail Pass Fail
How was interstitial communication verified? Simulated leak at far ends of the interstitial space. Visual Inspection
Other (Describe the method in section XV below.) Gauge
Was the vacuum or pressure restored to operating levels in all interstitial spaces? Yes No (Describe the reason in section XV below.)
For any answer of “FAIL” above, describe in section XV how and when these issues were or will be corrected. XV. COMMENTS
Ilortitoring Systern Certifi cation
UST Monitoring Site Plan
site Address: 8803 Camino Media, Bakersfield, CA. 93311
...t
. ....\. ..
. . 1'l:115i,, : ? '.tr .
.2:h.rea _ ---:
zl. - )/u
....:..:....
....:.....
...ztxis. r,*.. .. . al€45\,r
gTontaw
:n*9.r.?,1&. .-
rJ is-,
'/..86-:, .. .
I tir.
.LLD . .
o:*t.:::::.,',
ilD -
,','nt"*,,,,
' ' . ..7.1\54o ".q:zo . ,)e^*r
Date map was drawn: _l_/_.
Instructions
If you akeady have a diagram that shows all required informatior" you may include it, rather than this page, with you! Monitoring
System Certification. On your site plan, show the general layout of tanks and piping. Cleady identify locations of the following
equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill
containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank liquid level probes (ifused
for leak detection)- In the space provided, note the date this Site Plan was prepared.
Page 4 of 4
wlyw.unidocs.orguN-036 - 4/4 Rev. 0l/17108
. .184tt..
02 12 20
CVE
Cal- Valley Equipment
3500 Gilmore Ave.
Bakersfield CA 93308
661 -327-9341 FAX# 661 -325-2529
VAPORLESS MANUFACTURING, INC.
LDT-890 Leak Detector Test Record
Technician Date
Pass / Fail
Product
Manufacturer
Leak rate
Operating pressure
Line pressure (pump off)
Facility Address
Bleed back (pump off)
Step through time to full flow
Stays in leak search position
CERS = California Environmental Reporting System, ID = Identification, UST = Underground storage tank, ICC = International Code Council
UNDERGROUND STORAGE TANK SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1)
Type of Action Installation Test Repair Test 12 Month Test
I. FACILITY INFORMATION
CERS ID
Date of Spill Container Test
Business Name (Same as Facility Name or DBA-Doing Business As.)
Business Site Address
City
ZIP Code
II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION
Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.)
Phone # ( ) - Ext.
Contractor/Tank Tester License #
ICC Certification #
ICC Certification Expiration Date
Spill Container Testing Training and Certifications (List applicable certifications.)
III. SPILL CONTAINER TESTING INFORMATION
Test Method Used:
Manufacturer Guidelines: (Specify)
Industry Code or Engineering Standard: (Specify)
Engineered Method: (Specify)
Attach the testing procedures and all documentation required to determine the results. # of Attached Pages
Tank ID: (By tank number, stored product, etc.)
Spill Container Manufacturer:
Method of Cathodic Protection
Non-Metallic Non-Metallic Non-Metallic Non-Metallic
Isolation Isolation Isolation Isolation
Other (Specify in section V.) Other (Specify in section V.) Other (Specify in section V.) Other (Specify in section V.)
Inside Diameter of Spill Container: (Inches)
Depth of Spill Container: (Inches)
Does the spill container have a 5 gallon capacity? Yes No Yes No Yes No Yes No
Method to Keep Spill Container Empty
Drain Valve Drain Valve Drain Valve Drain Valve
Onsite Pump Onsite Pump Onsite Pump Onsite Pump
Other
(Specify in section V.) Other
(Specify in section V.) Other
(Specify in section V.) Other
(Specify in section V.)
IV. SUMMARY OF TESTING RESULTS
Spill Container Test Results Pass Fail Pass Fail Pass Fail Pass Fail
V. COMMENTS
All items marked “Fail” above must be explained in this section. Any additional comments may also be provided here.
VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING
I hereby certify that the spill containers were tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637.1 and all the information contained herein is accurate.
UST Service Technician Signature
If the facility has more components than this form accommodates, additional copies of this page may be attached.
SPILL BUCKET TESTING INFORMATION
Test Method Used:
Test Equipment Used: Equipment Resolution:
Identify Spill Bucket (By Tank Number, Stored Product, etc.) 1 2 3 4
Bucket Installation Type:
Bucket Diameter:
Bucket Depth:
Wait time between applying vacuum/water and start of test:
Test Start Time (TI):
Initial Reading (RI):
Test End Time (TF):
Final Reading (RF):
Test Duration (TF – TI):
Change in Reading (RF - RI):
Pass/Fail Threshold or
Criteria:
Test Result:
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
<
I20100FEB 12, 2020 9:36 AM
BROOKSIDE MARKET
8803 CAMINO MEDIA BAKERSFIELD CA 93311
IN-TANK INVENTORY
TANK PRODUCT VOLUME TC VOLUME ULLAGE HEIGHT WATER TEMP 1 UNLEADED 13141 13149 6941 79.37 0.81 59.12
2 PREMIUM 5622 5611 6419 60.43 0.79 62.53 3 DIESEL 2863 2857 5164 49.27 0.00 64.20
>
<I90500
FEB 12, 2020 9:37 AMSOFTWARE REVISION LEVEL
VERSION 327.04SOFTWARE# 346327-100-E
CREATED - 07.02.06.10.28
S-MODULE# 330160-004-aSYSTEM FEATURES:
PERIODIC IN-TANK TESTS ANNUAL IN-TANK TESTS
ISD PMC
>
<I50201
FEB 12, 2020 9:37 AM
SHIFT TIME 1 : 11:00 PM
><
I50202FEB 12, 2020 9:37 AM
SHIFT TIME 2 : DISABLED
>
<I50203
FEB 12, 2020 9:37 AM
SHIFT TIME 3 : DISABLED
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
>
<I50204
FEB 12, 2020 9:37 AM
SHIFT TIME 4 : DISABLED
><
I54600FEB 12, 2020 9:37 AM
TANK PER TST NEEDED WRN: DISABLED
>
<I54900
FEB 12, 2020 9:37 AM
TANK ANN TST NEEDED WRN: DISABLED
><
I55300FEB 12, 2020 9:37 AM
LINE RE-ENABLE METHOD
PASS LINE TEST
><
I55600FEB 12, 2020 9:38 AM
LINE PER TST NEEDED WRN: DISABLED
>
<I55900
FEB 12, 2020 9:38 AM
LINE ANN TST NEEDED WRN: DISABLED
><
I51400FEB 12, 2020 9:38 AM
H-PROTOCOL DATA FORMAT
HEIGHT
><
I51A01
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
FEB 12, 2020 9:38 AM
DAYLIGHT SAVING TIME
ENABLED OFF
><
I51B00FEB 12, 2020 9:38 AM
DAYLIGHT SAVING TIME
START DATE APR WEEK 1 SUN 2:00 AM
END DATE OCT WEEK 6 SUN 2:00 AM
>
<I51600
FEB 12, 2020 9:38 AM
RE-DIRECT LOCAL PRINTOUTDISABLED
>
<I50400
FEB 12, 2020 9:38 AM
232 SECURITY CODE
PORT SECURITY CODE STATUS
1 000000 DISABLED 2 000000 DISABLED
3 000000 DISABLED 4 000000 DISABLED
5 000000 DISABLED 6 000000 DISABLED
>
<I21900
FEB 12, 2020 9:38 AM
TANK CHART SECURITYENABLED
>
<I5BD00
FEB 12, 2020 9:38 AM
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
CUSTOM ALARM LABELS
DISABLED
>
<I56000
FEB 12, 2020 9:38 AM
MASS/DENSITY
DISABLED
><
I88101FEB 12, 2020 9:38 AM
PORT SETTINGS:
COMM BOARD : 1 (EDIM )RS-232 SECURITY
CODE : ******
><
I88102FEB 12, 2020 9:38 AM
PORT SETTINGS:
COMM BOARD : 2 (S-SAT ) BAUD RATE : 9600
PARITY : NONE STOP BIT : 1 STOP
DATA LENGTH: 8 DATARS-232 SECURITY
CODE : ****** DTR NORMAL STATE: HIGH
>
<I88103
FEB 12, 2020 9:38 AMPORT SETTINGS:
COMM BOARD : 3 (RS-232)
BAUD RATE : 9600 PARITY : NONE
STOP BIT : 1 STOP DATA LENGTH: 8 DATA
RS-232 SECURITYCODE : ******
>
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
<
I60100FEB 12, 2020 9:38 AM
TANK CONFIGURATION
DEVICE LABEL CONFIGURED
1 UNLEADED ON 2 PREMIUM ON
3 DIESEL ON 4 HACKED OFF
>
<I60200
FEB 12, 2020 9:39 AM
TANK PRODUCT LABEL
TANK PRODUCT LABEL 1 UNLEADED
2 PREMIUM 3 DIESEL
4 HACKED >
<I60300
FEB 12, 2020 9:39 AM
TANK PRODUCT CODE
TANK PRODUCT LABEL 1 UNLEADED 1
2 PREMIUM 2 3 DIESEL 3
4 HACKED 4>
<I60900
FEB 12, 2020 9:39 AM
TANK THERMAL COEFFICIENT
TANK PRODUCT LABEL 1 UNLEADED 0.000700
2 PREMIUM 0.000700 3 DIESEL 0.000450
4 HACKED 0.000000>
<I60700
FEB 12, 2020 9:39 AM
TANK DIAMETER
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
TANK PRODUCT LABEL INCHES 1 UNLEADED 127.50
2 PREMIUM 127.50 3 DIESEL 127.50
4 HACKED 0.00>
<I60A00
FEB 12, 2020 9:39 AM
TANK FULL VOLUME
TANK PRODUCT LABEL TANK PROFILE GALLONS
1 UNLEADED 1 PT 20082
2 PREMIUM 1 PT 12041
3 DIESEL 1 PT 8027
4 HACKED 1 PT 111111
>
<I60400
FEB 12, 2020 9:39 AM
TANK FULL VOLUME
TANK PRODUCT LABEL GALLONS 1 UNLEADED 20082
2 PREMIUM 12041 3 DIESEL 8027
4 HACKED 111111>
<I60500
FEB 12, 2020 9:39 AM
TANK 4 POINT VOLUMES
TANK PRODUCT LABEL GALLONS 1 UNLEADED 20082 0 0 0
2 PREMIUM 12041 0 0 0 3 DIESEL 8027 0 0 0
4 HACKED 111111 0 0 0
><
I60600FEB 12, 2020 9:39 AM
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
TANK 20 POINT VOLUMES
TANK PRODUCT LABEL GALLONS
1 UNLEADED 20082 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 2 PREMIUM 12041 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
3 DIESEL 8027 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 4 HACKED 111111 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
>
<I61500
FEB 12, 2020 9:39 AM
TANK PRODUCT LABEL METER DATA 1 UNLEADED NO
2 PREMIUM NO 3 DIESEL NO
4 HACKED NO
><
I62F00FEB 12, 2020 9:39 AM
MAG PROBE FLOAT SIZE
TANK PRODUCT LABEL FLOAT SIZE:
1 UNLEADED 4.0 INCHES 2 PREMIUM 4.0 INCHES
3 DIESEL 4.0 INCHES
><
I62700FEB 12, 2020 9:39 AM
TANK HIGH WATER WARNING LIMIT
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
TANK PRODUCT LABEL INCHES
1 UNLEADED 2.0 2 PREMIUM 2.0
3 DIESEL 2.0>
<9999FF1B><
I62400FEB 12, 2020 9:39 AM
TANK HIGH WATER LEVEL LIMIT
TANK PRODUCT LABEL INCHES
1 UNLEADED 3.0 2 PREMIUM 3.0
3 DIESEL 3.0>
<I62800
FEB 12, 2020 9:39 AM
TANK MAXIMUM VOLUME LIMIT
TANK PRODUCT LABEL GALLONS 1 UNLEADED 20082
2 PREMIUM 12041 3 DIESEL 8027
4 HACKED 111111>
<I62300
FEB 12, 2020 9:40 AM
TANK OVERFILL LEVEL LIMIT
TANK PRODUCT LABEL GALLONS 1 UNLEADED 18073
2 PREMIUM 10837 3 DIESEL 7224
4 HACKED 0>
<I62200
FEB 12, 2020 9:40 AM
TANK HIGH PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS 1 UNLEADED 19078
2 PREMIUM 11439 3 DIESEL 7625
4 HACKED 0>
<
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
I62900
FEB 12, 2020 9:40 AM
TANK DELIVERY REQUIRED LIMIT
TANK PRODUCT LABEL GALLONS 1 UNLEADED 2008
2 PREMIUM 1204 3 DIESEL 802
4 HACKED 0>
<I62100
FEB 12, 2020 9:40 AM
TANK LOW PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS 1 UNLEADED 500
2 PREMIUM 500 3 DIESEL 500
4 HACKED 0>
<I62600
FEB 12, 2020 9:40 AM
TANK LEAK ALARM LIMIT
TANK PRODUCT LABEL GALLONS 1 UNLEADED 99
2 PREMIUM 99 3 DIESEL 99
4 HACKED 99>
<I62500
FEB 12, 2020 9:40 AM
TANK SUDDEN LOSS LIMIT
TANK PRODUCT LABEL GALLONS 1 UNLEADED 50
2 PREMIUM 50 3 DIESEL 50
4 HACKED 99>
<I60800
FEB 12, 2020 9:40 AM
TANK TILT
TANK PRODUCT LABEL INCHES
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
1 UNLEADED 0.00
2 PREMIUM 0.00 3 DIESEL 0.00
4 HACKED 0.00>
<I60B00
FEB 12, 2020 9:40 AM
STICK HEIGHT OFFSET ENABLE STATUSDISABLED
>
<I60C00
FEB 12, 2020 9:40 AM
TANK STICK HEIGHT OFFSETTANK PRODUCT LABEL INCHES
1 UNLEADED 0.00 2 PREMIUM 0.00
3 DIESEL 0.00 4 HACKED 0.00
><
I61200FEB 12, 2020 9:40 AM
TANK MANIFOLDED PARTNERS
TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINE MANIFOLDED TANKS
1 UNLEADED NONE NONE 2 PREMIUM NONE NONE
3 DIESEL NONE NONE 4 HACKED NONE NONE
><
I63600FEB 12, 2020 9:40 AM
PERIODIC LEAK TEST MIN VOLUME
TANK PRODUCT LABEL GALLONS
1 UNLEADED 2008 2 PREMIUM 1204
3 DIESEL 802 4 HACKED 0
><
I62A00FEB 12, 2020 9:40 AM
ANNUAL LEAK TEST MIN VOLUME
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
TANK PRODUCT LABEL GALLONS
1 UNLEADED 2008 2 PREMIUM 1204
3 DIESEL 802 4 HACKED 0
><
I62C00FEB 12, 2020 9:40 AM
TANK PERIODIC TEST TYPE
TANK PRODUCT LABEL PERIODIC TEST TYPE
1 UNLEADED STANDARD 2 PREMIUM STANDARD
3 DIESEL STANDARD 4 HACKED STANDARD
>
<I62D00
FEB 12, 2020 9:40 AM
TANK LEAK TEST FAIL ALARMS
TANK PRODUCT LABEL 1 UNLEADED GROSS TEST FAIL ALARM DISABLED
PERIODIC TEST FAIL ALARM DISABLED ANNUAL TEST FAIL ALARM DISABLED
2 PREMIUM GROSS TEST FAIL ALARM DISABLED
PERIODIC TEST FAIL ALARM DISABLED ANNUAL TEST FAIL ALARM DISABLED
3 DIESEL GROSS TEST FAIL ALARM DISABLED
PERIODIC TEST FAIL ALARM DISABLED ANNUAL TEST FAIL ALARM DISABLED
4 HACKED GROSS TEST FAIL ALARM DISABLED
PERIODIC TEST FAIL ALARM DISABLED ANNUAL TEST FAIL ALARM DISABLED
><
I63100FEB 12, 2020 9:40 AM
TANK LEAK TEST AVERAGING
TANK PRODUCT LABEL ANNUAL PERIODIC
1 UNLEADED OFF OFF 2 PREMIUM OFF OFF
3 DIESEL OFF OFF
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
4 HACKED OFF OFF
>
<I63000
FEB 12, 2020 9:40 AM
IN-TANK LEAK TEST NOTIFY
TANK PRODUCT LABEL TANK TEST NOTIFY: 1 UNLEADED OFF
2 PREMIUM OFF 3 DIESEL OFF
4 HACKED OFF
><
I63200FEB 12, 2020 9:41 AM
TANK TEST SIPHON BREAK
TANK PRODUCT LABEL SIPHON BREAK
1 UNLEADED OFF 2 PREMIUM OFF
3 DIESEL OFF 4 HACKED OFF
>
<I61000
FEB 12, 2020 9:41 AM
TANK DELIVERY DELAY
TANK PRODUCT LABEL 1 UNLEADED 15
2 PREMIUM 15 3 DIESEL 15
4 HACKED 1>
<I63A00
FEB 12, 2020 9:41 AM
LOW LEVEL PUMP THRESHOLD FOR SEQUENTIAL LINE MANIFOLD
TANK PRODUCT LABEL PUMP THRESHOLD 1 UNLEADED 10.00%
2 PREMIUM 10.00% 3 DIESEL 10.00%
4 HACKED 10.00%
>
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
<
I61100FEB 12, 2020 9:41 AM
LEAK TEST METHOD
- - - - - - - - - - - -TEST ANNUALLY: ALL TANK
DEC WEEK 2 WEDSTART TIME : 2:30 AM
TEST RATE :0.20 GAL/HRDURATION : 2 HOURS
TST EARLY STOP:DISABLED
>
<I61300
FEB 12, 2020 9:41 AMCSLD PROBABLITY OF DETECTION
><
I61400FEB 12, 2020 9:41 AM
CSLD CLIMATE FACTOR
>
<I61600
FEB 12, 2020 9:41 AM
TANK PRODUCT LABEL CAL UPDATE 1 UNLEADED IMMEDIATE
2 PREMIUM IMMEDIATE 3 DIESEL IMMEDIATE
4 HACKED IMMEDIATE
><
I61A00FEB 12, 2020 9:41 AM
IN-TANK LEAK TEST EARLY STOP
TANK PRODUCT LABEL TST EARLY STOP:
1 UNLEADED DISABLED 2 PREMIUM DISABLED
3 DIESEL DISABLED 4 HACKED DISABLED
><
I61B00
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
FEB 12, 2020 9:41 AM
IN-TANK LEAK GROSS TEST AUTO-CONFIRM
><
I61C00FEB 12, 2020 9:41 AM
CSLD REPORT ONLY
><
I63400FEB 12, 2020 9:41 AM
RECONCILIATION WARNING LIMIT
TANK PRODUCT LABEL GALLONS
1 UNLEADED 0 2 PREMIUM 0
3 DIESEL 0 4 HACKED 0
><
I63500FEB 12, 2020 9:41 AM
RECONCILIATION ALARM LIMIT
TANK PRODUCT LABEL GALLONS
1 UNLEADED 1 2 PREMIUM 1
3 DIESEL 1 4 HACKED 1
><
I78700FEB 12, 2020 9:41 AM
>
<I70200
FEB 12, 2020 9:41 AM
LIQUID LABEL
DEVICE LABEL 1 87 ANNULAR
2 87 STP 3 87 FILL
4 91-DIESEL ANNULAR
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
5 91 STP
6 91 FILL 7 DIESEL STP
8 DIESEL FILL 9 DISP 1-2
10 DISP 3-4 11 DISP 5-6
12 DISP 7-8 13
14 15
16
><
I70300FEB 12, 2020 9:41 AM
LIQUID TYPE
SENSOR LOCATION TYPE
1 87 ANNULAR TRI-STATE (SINGLE FLOAT) 2 87 STP TRI-STATE (SINGLE FLOAT)
3 87 FILL TRI-STATE (SINGLE FLOAT) 4 91-DIESEL ANNULAR TRI-STATE (SINGLE FLOAT)
5 91 STP TRI-STATE (SINGLE FLOAT) 6 91 FILL TRI-STATE (SINGLE FLOAT)
7 DIESEL STP TRI-STATE (SINGLE FLOAT) 8 DIESEL FILL TRI-STATE (SINGLE FLOAT)
9 DISP 1-2 TRI-STATE (SINGLE FLOAT) 10 DISP 3-4 TRI-STATE (SINGLE FLOAT)
11 DISP 5-6 TRI-STATE (SINGLE FLOAT) 12 DISP 7-8 TRI-STATE (SINGLE FLOAT)
13 TRI-STATE (SINGLE FLOAT) 14 TRI-STATE (SINGLE FLOAT)
15 TRI-STATE (SINGLE FLOAT) 16 TRI-STATE (SINGLE FLOAT)
>
<I70400
FEB 12, 2020 9:41 AM
LIQUID CATEGORY
SENSOR LOCATION CATEGORY 1 87 ANNULAR ANNULAR SPACE
2 87 STP STP SUMP 3 87 FILL OTHER SENSORS
4 91-DIESEL ANNULAR ANNULAR SPACE 5 91 STP STP SUMP
6 91 FILL OTHER SENSORS 7 DIESEL STP STP SUMP
8 DIESEL FILL OTHER SENSORS
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
9 DISP 1-2 DISPENSER PAN
10 DISP 3-4 DISPENSER PAN 11 DISP 5-6 DISPENSER PAN
12 DISP 7-8 DISPENSER PAN 13 OTHER SENSORS
14 OTHER SENSORS 15 OTHER SENSORS
16 OTHER SENSORS
><
I80700FEB 12, 2020 9:41 AM
RELAY LABEL
DEVICE LABEL
1 87 STP 2 91 STP
3 DIESEL STP 4
>
<I80900
FEB 12, 2020 9:42 AM
RELAY ORIENTATION
RELAY DESIGNATION ORIENTATION 1 87 STP NORMALLY CLOSED
2 91 STP NORMALLY CLOSED 3 DIESEL STP NORMALLY CLOSED
4 NORMALLY OPEN
><
I80B00FEB 12, 2020 9:42 AM
RELAY TANK ASSIGNMENT
RELAY DESIGNATION TANK
1 87 STP 1 2 91 STP 2
3 DIESEL STP 3 4 NONE
>
<I80A00
FEB 12, 2020 9:42 AM
RELAY TYPE
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
RELAY DESIGNATION TYPE
1 87 STP STANDARD 2 91 STP STANDARD
3 DIESEL STP STANDARD 4 STANDARD
>
<I80800
FEB 12, 2020 9:42 AM
RELAY SETUP REPORT
R 1:87 STP TYPE:
STANDARDNORMALLY CLOSED
TANK #: 1
LIQUID SENSOR ALMS L 1:FUEL ALARM
L 2:FUEL ALARM L 9:FUEL ALARM
L10:FUEL ALARM L11:FUEL ALARM
L12:FUEL ALARM L 1:SENSOR OUT ALARM
L 2:SENSOR OUT ALARM L 9:SENSOR OUT ALARM
L10:SENSOR OUT ALARM L11:SENSOR OUT ALARM
L12:SENSOR OUT ALARM
ISD SITE ALARMS ISD GROSS PRES FAIL
ISD DEGRD PRES FAIL ISD VAPOR LEAK FAIL
ISD HOSE ALARMS
ALL:FLOW COLLECT FAIL
R 2:91 STP
TYPE: STANDARD
NORMALLY CLOSED
TANK #: 2
LIQUID SENSOR ALMS
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
L 4:FUEL ALARM
L 5:FUEL ALARM L 9:FUEL ALARM
L10:FUEL ALARM L11:FUEL ALARM
L12:FUEL ALARM L 4:SENSOR OUT ALARM
L 5:SENSOR OUT ALARM L 9:SENSOR OUT ALARM
L10:SENSOR OUT ALARM L11:SENSOR OUT ALARM
L12:SENSOR OUT ALARM
ISD SITE ALARMS ISD GROSS PRES FAIL
ISD DEGRD PRES FAIL ISD VAPOR LEAK FAIL
ISD HOSE ALARMS
ALL:FLOW COLLECT FAIL
R 3:DIESEL STP
TYPE: STANDARD
NORMALLY CLOSED
TANK #: 3
LIQUID SENSOR ALMS
L 4:FUEL ALARM L 7:FUEL ALARM
L12:FUEL ALARM L 4:SENSOR OUT ALARM
L 7:SENSOR OUT ALARM L12:SENSOR OUT ALARM
R 4: TYPE:
STANDARDNORMALLY OPEN
TANK #: NONE
- NO ALARM ASSIGNMENTS -
><
I79000FEB 12, 2020 9:42 AM
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
EDIM:1 VR:349643-001-B TD:97.10.27.11.25
>
<I72300
FEB 12, 2020 9:42 AM
BROOKSIDE MARKET 8803 CAMINO MEDIA
BAKERSFIELD CA 93311
SMARTSENSOR ASSIGNMENT
DEVICE LABEL CATEGORY01 DISP 1-2 FM AIR FLOW METER
02 DISP 3-4 FM AIR FLOW METER03 DISP 5-6 FM AIR FLOW METER
04 DISP 7-8 FM AIR FLOW METER05 PRESS SENSOR VAPOR PRESSURE
06 UNKNOWN07 UNKNOWN
08 UNKNOWN09 UNKNOWN
10 UNKNOWN11 UNKNOWN
12 UNKNOWN13 UNKNOWN
14 UNKNOWN15 UNKNOWN
16 UNKNOWN17 UNKNOWN
18 UNKNOWN19 UNKNOWN
20 UNKNOWN21 UNKNOWN
22 UNKNOWN23 UNKNOWN
24 UNKNOWN25 UNKNOWN
26 UNKNOWN27 UNKNOWN
28 UNKNOWN29 UNKNOWN
30 UNKNOWN31 UNKNOWN
32 UNKNOWN33 UNKNOWN
34 UNKNOWN35 UNKNOWN
36 UNKNOWN37 UNKNOWN
38 UNKNOWN
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
39 UNKNOWN
40 UNKNOWN
><
IV4F00FEB 12, 2020 9:42 AM
BROOKSIDE MARKET
8803 CAMINO MEDIA BAKERSFIELD CA 93311
NOZZLE A/L RANGEA/L RATIO: 0.95 - 1.15
>
<IV4000
FEB 12, 2020 9:42 AM
BROOKSIDE MARKET 8803 CAMINO MEDIA
BAKERSFIELD CA 93311
VAPOR PROCESSOR TYPE
NO VAPOR PROCESSOR
><
IV4700FEB 12, 2020 9:43 AM
BROOKSIDE MARKET
8803 CAMINO MEDIA BAKERSFIELD CA 93311
ASSESSMENT TIMESTART TIME: 10:00 AM
TIME DELAY MINUTES: 1
><
IV5200FEB 12, 2020 9:43 AM
BROOKSIDE MARKET
8803 CAMINO MEDIA BAKERSFIELD CA 93311
ACCEPT HIGH ORVR: NO
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
>
<IV4A00
FEB 12, 2020 9:43 AM
BROOKSIDE MARKET 8803 CAMINO MEDIA
BAKERSFIELD CA 93311
ISD HOSE TABLE
HOSE FP FP AFM HOSE
ID ID LABEL ID LABEL 01 01 01 01 BLEND3
02 02 02 01 BLEND3 03 03 03 02 BLEND3
04 04 04 02 BLEND3 05 05 05 03 BLEND3
06 06 06 03 BLEND3 07 07 07 04 BLEND3
08 08 08 04 BLEND3
><
IV4B00FEB 12, 2020 9:43 AM
BROOKSIDE MARKET
8803 CAMINO MEDIA BAKERSFIELD CA 93311
PRODUCT/HOSE MAP TABLE
FP AFID M1/H1 M2/H2 M3/H3 M4/H401 01 02/01 09/01 01/01 xx/xx
02 01 02/02 09/02 01/02 xx/xx03 02 02/03 09/03 01/03 xx/xx
04 02 02/04 09/04 01/04 xx/xx05 03 02/05 09/05 01/05 xx/xx
06 03 02/06 09/06 01/06 xx/xx07 04 02/07 09/07 01/07 xx/xx
08 04 02/08 09/08 01/08 xx/xx
><
IV4900FEB 12, 2020 9:43 AM
BROOKSIDE MARKET
8803 CAMINO MEDIA BAKERSFIELD CA 93311
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
LABEL TABLE
ID LABEL01 UNASSIGNED
02 BLEND3 03 REGULAR
04 MID GRADE 05 PREMIUM
06 GOLD 07 BRONZE
08 SILVER 09 BLEND2
10 BLEND4
><
IV1000FEB 12, 2020 9:43 AM
ISD VERSION: 01.01
>
<I90200
FEB 12, 2020 9:43 AMSOFTWARE REVISION LEVEL
VERSION 327.04SOFTWARE# 346327-100-E
CREATED - 07.02.06.10.28
S-MODULE# 330160-004-aSYSTEM FEATURES:
PERIODIC IN-TANK TESTS ANNUAL IN-TANK TESTS
ISD PMC
>
<I11100
FEB 12, 2020 9:43 AM
BROOKSIDE MARKET 8803 CAMINO MEDIA
BAKERSFIELD CA 93311
PRIORITY ALARM HISTORY
ID CATEGORY DESCRIPTION ALARM TYPE STATE DATE TIMEE 1 OTHER COMMUNICATION ALARM CLEAR 2-12-20 4:41AM
E 1 OTHER COMMUNICATION ALARM ALARM 2-12-20 4:39AME 1 OTHER COMMUNICATION ALARM CLEAR 2-10-20 2:09AM
E 1 OTHER COMMUNICATION ALARM ALARM 2-10-20 2:07AME 1 OTHER COMMUNICATION ALARM CLEAR 2-03-20 2:10AM
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
E 1 OTHER COMMUNICATION ALARM ALARM 2-03-20 2:07AM
E 1 OTHER COMMUNICATION ALARM CLEAR 1-27-20 2:09AME 1 OTHER COMMUNICATION ALARM ALARM 1-27-20 2:07AM
E 1 OTHER COMMUNICATION ALARM CLEAR 1-20-20 2:08AME 1 OTHER COMMUNICATION ALARM ALARM 1-20-20 2:06AM
E 1 OTHER COMMUNICATION ALARM CLEAR 1-13-20 2:11AME 1 OTHER COMMUNICATION ALARM ALARM 1-13-20 2:08AM
E 1 OTHER COMMUNICATION ALARM CLEAR 1-06-20 2:10AME 1 OTHER COMMUNICATION ALARM ALARM 1-06-20 2:08AM
T 1 TANK UNLEADED OVERFILL ALARM CLEAR 12-31-19 11:01AMT 1 TANK UNLEADED OVERFILL ALARM ALARM 12-31-19 10:44AM
E 1 OTHER COMMUNICATION ALARM CLEAR 12-30-19 2:09AME 1 OTHER COMMUNICATION ALARM ALARM 12-30-19 2:07AM
L 8 OTHER DIESEL FILL FUEL ALARM CLEAR 12-26-19 12:25PML 8 OTHER DIESEL FILL FUEL ALARM ALARM 12-26-19 9:37AM
E 1 OTHER COMMUNICATION ALARM CLEAR 12-23-19 2:10AME 1 OTHER COMMUNICATION ALARM ALARM 12-23-19 2:08AM
E 1 OTHER COMMUNICATION ALARM CLEAR 12-16-19 2:09AME 1 OTHER COMMUNICATION ALARM ALARM 12-16-19 2:07AM
T 1 TANK UNLEADED OVERFILL ALARM CLEAR 12-09-19 7:45AMT 1 TANK UNLEADED OVERFILL ALARM ALARM 12-09-19 7:21AM
E 1 OTHER COMMUNICATION ALARM CLEAR 12-09-19 2:10AME 1 OTHER COMMUNICATION ALARM ALARM 12-09-19 2:07AM
T 1 TANK UNLEADED OVERFILL ALARM CLEAR 12-06-19 10:01AMT 1 TANK UNLEADED OVERFILL ALARM ALARM 12-06-19 9:41AM
E 1 OTHER COMMUNICATION ALARM CLEAR 12-02-19 2:09AME 1 OTHER COMMUNICATION ALARM ALARM 12-02-19 2:07AM
E 1 OTHER COMMUNICATION ALARM CLEAR 11-25-19 2:10AME 1 OTHER COMMUNICATION ALARM ALARM 11-25-19 2:07AM
E 1 OTHER COMMUNICATION ALARM CLEAR 11-18-19 2:09AME 1 OTHER COMMUNICATION ALARM ALARM 11-18-19 2:07AM
E 1 OTHER COMMUNICATION ALARM CLEAR 11-14-19 8:23AME 1 OTHER COMMUNICATION ALARM ALARM 11-14-19 8:20AM
E 1 OTHER COMMUNICATION ALARM CLEAR 11-11-19 2:08AME 1 OTHER COMMUNICATION ALARM ALARM 11-11-19 2:06AM
E 1 OTHER COMMUNICATION ALARM CLEAR 11-04-19 9:12AME 1 OTHER COMMUNICATION ALARM ALARM 11-04-19 9:09AM
T 1 TANK UNLEADED OVERFILL ALARM CLEAR 10-31-19 3:34AMT 1 TANK UNLEADED OVERFILL ALARM ALARM 10-31-19 3:07AM
E 1 OTHER COMMUNICATION ALARM CLEAR 10-29-19 11:35AME 1 OTHER COMMUNICATION ALARM ALARM 10-29-19 11:23AM
E 1 OTHER COMMUNICATION ALARM CLEAR 10-29-19 11:20AME 1 OTHER COMMUNICATION ALARM ALARM 10-29-19 11:18AM
E 1 OTHER COMMUNICATION ALARM CLEAR 10-28-19 1:09AME 1 OTHER COMMUNICATION ALARM ALARM 10-28-19 1:07AM
>
<I11200
FEB 12, 2020 9:43 AM
BROOKSIDE MARKET 8803 CAMINO MEDIA
BAKERSFIELD CA 93311
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
NON-PRIORITY ALARM HISTORY
ID CATEGORY DESCRIPTION ALARM TYPE STATE DATE TIME SYSTEM PRINTER ERROR CLEAR 12-27-19 8:59AM
SYSTEM PAPER OUT CLEAR 12-27-19 8:59AM SYSTEM PAPER OUT ALARM 12-27-19 8:58AM
SYSTEM PRINTER ERROR ALARM 12-27-19 8:58AM SYSTEM PRINTER ERROR CLEAR 12-19-19 8:56AM
SYSTEM PAPER OUT CLEAR 12-19-19 8:56AM SYSTEM PRINTER ERROR ALARM 12-19-19 8:56AM
SYSTEM PAPER OUT ALARM 12-19-19 8:56AMT 1 TANK UNLEADED HIGH PRODUCT ALARM CLEAR 12-09-19 11:07AM
T 1 TANK UNLEADED HIGH PRODUCT ALARM ALARM 12-09-19 7:24AM SYSTEM PRINTER ERROR CLEAR 11-11-19 9:36AM
SYSTEM PRINTER ERROR ALARM 11-11-19 9:36AMT 1 TANK UNLEADED HIGH PRODUCT ALARM CLEAR 10-25-19 7:37AM
T 1 TANK UNLEADED HIGH PRODUCT ALARM ALARM 10-25-19 3:47AM SYSTEM PRINTER ERROR CLEAR 10-12-19 10:04AM
SYSTEM PRINTER ERROR ALARM 10-12-19 10:04AM OTHER ISD VAPOR LEAK WARN CLEAR 10-07-19 9:16AM
OTHER ISD VAPOR LEAK WARN ALARM 10-06-19 10:01AMh 5 OTHER FP5: BLEND3 FLOW COLLECT WARN CLEAR 10-02-19 1:04PM
h 5 OTHER FP5: BLEND3 FLOW COLLECT WARN ALARM 10-02-19 10:01AMh 3 OTHER FP3: BLEND3 FLOW COLLECT WARN CLEAR 10-01-19 10:38PM
h 3 OTHER FP3: BLEND3 FLOW COLLECT WARN ALARM 10-01-19 10:01AM OTHER ISD VAPOR LEAK WARN CLEAR 9-30-19 6:36AM
h 4 OTHER FP4: BLEND3 FLOW COLLECT WARN CLEAR 9-30-19 6:36AMh 4 OTHER FP4: BLEND3 FLOW COLLECT WARN ALARM 9-30-19 10:01AM
h 6 OTHER FP6: BLEND3 FLOW COLLECT WARN CLEAR 9-30-19 9:03AM OTHER ISD VAPOR LEAK WARN ALARM 9-29-19 10:01AM
h 6 OTHER FP6: BLEND3 FLOW COLLECT WARN ALARM 9-29-19 10:01AMh 4 OTHER FP4: BLEND3 FLOW COLLECT WARN CLEAR 9-26-19 9:15PM
h 4 OTHER FP4: BLEND3 FLOW COLLECT WARN ALARM 9-26-19 10:01AMh 4 OTHER FP4: BLEND3 FLOW COLLECT WARN CLEAR 9-24-19 7:28PM
h 4 OTHER FP4: BLEND3 FLOW COLLECT WARN ALARM 9-24-19 10:01AM OTHER ISD VAPOR LEAK WARN CLEAR 9-23-19 7:53AM
OTHER ISD VAPOR LEAK WARN ALARM 9-17-19 10:01AM SYSTEM PRINTER ERROR CLEAR 9-11-19 8:53PM
SYSTEM PAPER OUT CLEAR 9-11-19 8:53PM SYSTEM PAPER OUT ALARM 9-11-19 8:53PM
SYSTEM PRINTER ERROR ALARM 9-11-19 8:53PM
><
I20600FEB 12, 2020 9:43 AM
BROOKSIDE MARKET
8803 CAMINO MEDIA BAKERSFIELD CA 93311
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
TANK ALARM HISTORY
TANK 1 UNLEADED
OVERFILL ALARM DEC 31, 2019 10:44 AM
DEC 9, 2019 7:21 AM DEC 6, 2019 9:41 AM
HIGH PRODUCT ALARM DEC 9, 2019 7:24 AM
OCT 25, 2019 3:47 AM
TANK 2 PREMIUM
TANK 3 DIESEL
>
<I38200
FEB 12, 2020 9:44 AM
><
I30200FEB 12, 2020 9:44 AM
BROOKSIDE MARKET
8803 CAMINO MEDIA BAKERSFIELD CA 93311
LIQUID ALARM HISTORY REPORT
SENSOR LOCATION 1 87 ANNULAR
2 87 STP 3 87 FILL
4 91-DIESEL ANNULAR 5 91 STP
6 91 FILL 7 DIESEL STP
8 DIESEL FILL DEC 26, 2019 9:37 AM FUEL ALARM
9 DISP 1-2 10 DISP 3-4
11 DISP 5-6 12 DISP 7-8
>
<I31600
FEB 12, 2020 9:44 AM
BROOKSIDE MARKET
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
8803 CAMINO MEDIA
BAKERSFIELD CA 93311
SMART SENSOR ALARM HISTORY REPORT
SENSOR LOCATION
1 DISP 1-2 FM 2 DISP 3-4 FM
3 DISP 5-6 FM 4 DISP 7-8 FM
5 PRESS SENSOR
><
I10200FEB 12, 2020 9:44 AM
BROOKSIDE MARKET
8803 CAMINO MEDIA BAKERSFIELD CA 93311
SYSTEM CONFIGURATION
SLOT BOARD TYPE POWER ON RESET CURRENT 1 UNUSED 9962839 9962839
2 UNUSED 9940357 9940357 3 UNUSED 9943437 9943437
4 UNUSED 9937717 9937717 5 4 PROBE / G.T. 163824 163824
6 INTERSTITIAL BD 202188 202188 7 INTERSTITIAL BD 203453 203453
8 8SMARTSENSOR BD 39564 39564 9 UNUSED 9944648 9944648
10 RELAY BOARD 14965 14965 11 UNUSED 9947895 9947895
12 UNUSED 9939053 9939053 13 UNUSED 9943558 9943558
14 UNUSED 9941568 9941568 15 UNUSED 9943810 9943810
16 UNUSED 9937649 9937649 COMM 1 ELEC DISP INT. 101498 101498
COMM 2 SERIAL SAT BD 485684 485684 COMM 3 RS232 SERIAL BD 15049 15049
COMM 4 UNUSED 9949928 9949928 COMM 5 UNUSED 9937587 9937587
COMM 6 UNUSED 9944899 9944899
><
I90200FEB 12, 2020 9:44 AM
SOFTWARE REVISION LEVEL
file:///C/Users/jerryr/Desktop/Oaks%20-%20Monitor/Oaks%20setup.txt[2/18/2020 2:42:03 PM]
VERSION 327.04
SOFTWARE# 346327-100-E CREATED - 07.02.06.10.28
S-MODULE# 330160-004-a
SYSTEM FEATURES: PERIODIC IN-TANK TESTS
ANNUAL IN-TANK TESTS ISD
PMC
>