HomeMy WebLinkAboutAST Inspection 2-16-21BAKERSFIELD FIRE DEPARTMENT
2101 H STREET, BAKERSFIELD, CA 93301
Date: 1/1 (rW-L I Inspector: Peter Armagost
Business Name: Triple E Trucking
Business Address: 1215 E. White Lane
Aboveground Petroleum Storage Tank Program -Tier 11 Qualified Facility Inspection Report (v 3.0)
Violation
Compliance
Number
Program Requirement
Citations
YorN
Class
Comments
Requirement to Prepare and Implement
4010001
SPCC has been prepared
HSC 6.6725270.4.5(a);
40 CFR 1112.3, 112.6
4010057
SPCC plan has been prepared that meets all
HSC 6.6725270.4.5(a);
applicable requirements
40 CFR 1112.3,112.6
4030038
SPCC has been implemented
HSC 6.6725270.4.5(a);
40 CFR 1112.3
4010008
SPCC onsite If facility staffed 4 hrs/day, or at
HSC 6.6725270.4.5(a);
the nearest field office if not so attended
40 CFR 1 112.3(e)(1)
4010047
Qualified Facility's SPCC plan has been self or
HSC 6.6725270.4.5(a);
PE certified.
40 CFR 1 112.6(a)(1),
112.6(b)
4010035
Facility prepared appropriate SPCC when no
HSC 6.6725270.4.5(a);
longer meeting Tier 1/11 requirement's
40 CFR 1 112.3(8)
L
SPCC Amendments
4010010
Facility has amended SPCC as necessary
HSC 6.6725270.4.5(a);
40 CFR 1 112.5(a),
112.5(b)
4030039
SPCC has been implemented within 6 months
HSC 6.6725270.4.5(a);
of amendment
40 CFR 1 112.5(a),
112.5(b)
I.J /A
4010052
Tech amendments certified when a change in
HSC 6.6725270.4.5(a);
facility design/operations occurs, & by PE
40 CFR 1 112.6(b)(2);
1when required
112.6(b)(2)(i)
Five Year Review
4010009
5 year review performed on SPCC and
HSC 6.6725270.4.5(a);
documented
40 CFR 1 112.5(b)
General SPCC Requirements
4010012
SPCC in writing, follows code seq/cross ref,—
HSC 6.6725270.4.5(a);
good eng practice, mgt approval, items not in
40 CFR 1112.7
place
'y
4010013
SPCC Plan discusses conformance with all SPCC
HSC 6.6725270.4.5(a);
rule requirements, & state
40 CFR 1112.7(a)(1),
rules/regs/guidelines.
112.7(j)
y
4010014
Environmental Equivalence, if claimed, is
HSC 6.6725270.4.5(a);
addressed in SPCC, other than for secondary
40 CFR I 112.7(a)(2)
containment.
w A
4010050
PE certified enviro equivalence,
HSC 6.6725270.4.5(a);
impracticability, and produced water
40 CFR 1 112.6(b)(3);
containers/piping, if needed
112.6(b)(4)(iii)
4010051
PE required attestations in the SPCC Plan for
HSC 6.6725270.4.5(a);
alternative measure claim at a Tier 11 facility
40 CFR 1 112.6(6)(4)(1)
4010016
Physical layout of the facility is adequately and
HSC 6.6725270.4.5(a);
accurately described in SPCC
40 CFR 1 112.7(a)(3)
4010041
SPCC Plan addresses the type of oil and
HSC 6.6725270.4.5(a);
storage capacity for all fixed and portable
40 CFR 1 112.7(a)(3)(i)
containers
I
Violation
Compliance
Number
Program Requirement
Citations
YorN
Class
Comments
4030003
Vehicular departure warning system in place at
HSC6.6725270.4.5(a);
facility with a loading/unloading rack
40 CFR 1 112.7(h)(2)
4030034
Oil filled operational equipment containment
HSC6,6725270.4.5(a);
istandards are met
40 CFR 1 112.7(k)
SPCC Requirements for Onshore Facilities
4010027
Facility drainage or drainage controls
HSC 6.6725270.4.5(a);
adequately discussed
40 CFR 1 112.7(a)(3)
(iii); 112.8(b)
4030035
Facility drainage adequately restrained unless
HSC 6.6725270.4.5(a);
conditions met
40 CFR I 112.8(b)(1)
4030005
Valves used for drainage are manual (not
HSC 6.6725270.4.5(a);
flapper -type) to prevent a discharge
40 CFR 1112.8(6)(2)
4030008
Drainage from undiked areas or diversion
HSC 6.6725270.4.5(a);
systems designed to retain final discharge in
40 CFR 1 112-8(b)(3),
facility
112.8(b)(4)
4030009
Lift pumps provided for treated drainage
HSC 6.6725270.4.5(a);
waters when more than one treatment unit
40 CFR 1112.8(b)(5)
4010029
Adequate discussion of all bulk storage
HSC6.6725270.4.5(a);
containers located at the facility
40 CFR 1 112.8(c)
4030012
Material and construction of all containers are
HSC 6.6725270.4.5(a);
compatible with the material stored
40 CFR 1 112.8(c)(1)
4030010
Adequately sized secondary containment
HSC 6.6725270.4.5(a);
provided and maintained for bulk storage
40 CFR 1 112.8(c)(2)
containers
4030013
Containment systems are sufficiently
HSC6.6725270.4.5(a);
impervious to contain oil
40 CFR 1112.8(c)(2)
4030006
Rainwater in diked areas is inspected before
HSC 6.6725270.4.5(a);
draining
40 CFR 1 112.8(c)(3)(i),
112.8(c)(3)(fi),
112.8(c)(3)(iii)
4010026
Records maintained of drainage from diked
HSC 6.6725270.4.5(a);
areas Cs
40 CFR 1 112.8(c)(3)(iv)
4030017
Buried section of partially buried or bunkered
HSC 6.6725270.4.5(a);
metallic tank has corrosion protection
40 CFR 1112.8(c)(5)
t J/Al
4010028
SPCC discusses procedures to test/inspect
HSC 6.6725270.4.5(a);
storage containers for integrity per industry
40 CFR 1112.8(c)(6)
standards
4030014
Tanks inspected and tested by qualified person
HSC 6.6725270.4.5(a);
in accordance with industry standards
40 CFR 1 112.8(c)(6)
4030015
Aboveground containers tested or inspected
HSC 6.6725270.4.5(a);
for integrity based on industry standards
40 CFR 1112.8(c)(6)
fi
4010021
Inspection/integrity testing records signed,
HSC 6.6725270.4.5(a);
kept for 3 years and written inspection
40 CFR 1 112.7(e),
procedures kept
112.8(c)(6)
4030018
Steam return/exhaust lines that discharge to
HSC 6.6725270.4.5(a);
watercourse are monitored or have treatment
40 CFR 1 112.8(c)(7)
system
N/k
4010056
SPCC adequately describes overfill prevention
40 CFR 1 112.8(c)(8);
methods, and devices/systems used for each
HSC 6.6725270.4.5(a)
container
Y
4030019
Each container installation has a liquid level
HSC6.6725270.4.5(a);
sensing device.
40 CFR 1 112.8(c)(8),
112.8(c)(8)(Nv)
Y
4030022
Liquid level sensing devices regularly tested to
HSC 6.6725270.4.5(a);
ensure proper operation 1
40 CFR 1 112.8(c)(8)(v)
'0
Y
Violation
Compliance
Number
Program Requirement
Citations
YorN
Class
Comments
4010015
SPCC contains an adequate facility diagram
HSC 6.6725270.4.5(a);
40 CFR 1 112.7(a)(3)
4010030
SPCC adequately addresses discharge
HSC 6.6725270.4.5(a);
prevention measures for routine handling,
40 CFR 1 112.7(a)(3)(Y)
loading/unloading
4010042
SPCC Plan addressed countermeasures for
HSC 6.6725270.4.5(a);
discharge discovery, response and cleanup
40 CFR 1 112.7(a)(3)(iv)
4010043
SPCC Plan addresses disposal methods for
HSC 6.6725270.4.5(a);
recovered materials
40 CFR 1 112.7(a)(3)(v)
4010017
SPCC contains procedures for reporting a
HSC 6.6725270.4.5(a);
discharge
40 CFR 1112.7(a)(3)
(vi); 112.7(a)(4)
4010018
SPCC organized so discharge procedures are
HSC 6.6725270.4.5(a);
readily usable if the facility has no response
40 CFR 1 112.7(a)(5)
plan
4010019
SPCC predicts direction, rate of flow, total
HSC 6.6725270.4.5(a);
quantity of oil that could be released from a
40 CFR 1 112.7(6)
discharge
4010020
SPCC addresses the appropriate general
HSC 6.6725270.4.5(a);
containment/diversionary
40 CFR 1 112.7(c)
structures/equipment
4030037
Appropriate (general)
HSC 6.6725270.4.5(a);
containment/diversionary
40 CFR 1 112.7(c)
structures/equipment have been provided
V/
4010004
Impracticability of containment/diversionary
HSC 6.6725270.4.5(a);
items, if claimed, is PE demonstrated and
40 CFR 1112.7(d)
certified
I
4030033
Periodic integrity/leak testing performed with
HSC 6.6725270.4.5(a);
impracticability claim
40 CFR 1112.7(d)
ArA
4010005
If claiming impracticability of
HSC 6.6725270.4.5(a);
containment/diversionary items a contingency
40 CFR 1 112.7(d)(1)
plan has been included
A
4010006
If claiming impracticability written
HSC 6.6725270.4.5(a);
commitment of manpower., equipment., and
40 CFR 1 112.7(d)(2)
materials provided
A
4010023
Employee training and spill prevention
HSC 6.6725270.4.5(a);
briefings discussed in SPCC plan
40 CFR 1 112.7(f)(1)j
112.7(f)(3)
4020001
Training provided for op/maint of equip,
HSC 6.6725270.4.5(a);
discharge procedures, laws/regs, general fac
40 CFR 1 112.7(f)(1)
ops, and SPCC
4010022
Person has been designated as accountable for
HSC 6.6725270.4.5(a);
discharge prevention and reports to
40 CFR 1 112.7(f)(2)
management
4030040
Spill prevention briefings are conducted
HSC 6.6725270.4.5(a);
annually
40 CFR 1 112.7(f)(3)
4010024
SPCC addresses security measures -lighting,
HSC 6.6725270.4.5(a);
access to hand ling/storage,
40 CFR 1 112.7(8)
valves/pumps/transfer equip
4030001
Handling areas, valves, pumps/starter controls,
HSC 6.6725270.4.5(a);
load/unload connections secured, lighting
40 CFR 1 112.7(8)
adequate
A
A
4010025
SPCC adequately discusses facility tank car and
HSC 6.6725270.4.5(a);
tank truck loading/un loading rack
40 CFR 1 112.7(h)
4A
fQ/.N
4030002
Loading rack containment has capacity to
HSC 6.6725270.4.5(a);
contain single largest compartment of tank
40 CFR 1 112.7(h)(1)
Icar/truck
I
Violation
Compliance
Number
Program Requirement
Citations
YorN
Class
Comments
4030023
Discharge from effluent treatment facilities
HSC 6.6725270.4.5(a);
which discharge to navigable waterways
40 CFR 1 112.8(c)(9)
observed
4030021
Visible discharges promptly corrected and any
HSC 6.6725270.4.5(a);
accumulation of oil in diked areas promptly
40 CFR 1 112.8(c)(10)
removed.
4030020
Adequate secondary containment provided for
HSC 6.6725270.4.5(a);
mobile/portable storage containers
40 CFR 1112.8(c)(11)
4030025
Buried piping is inspected for deterioration if
HSC 6.6725270.4.5(a);
exposed and repaired if corrosion damage is
40 CFR 1 112.8(4)(1)
found
4030027
Buried piping is corrosion protected with
HSC 6.6725270.4.5(a);
protective wrapping, coating, or cathodic
40 CFR 1112.8(d)(1)
protection
I NVA
4030028
Terminal connection capped/blank flanged at
HSC 6.6725270.4.5(a);
transfer point & origin marked if not in
40 CFR 1 112.8(4)(2)
service/standby
1A
4030029
Pipe supports designed to minimize abrasion
HSC 6.6725270.4.5(a);
and corrosion, and allow for expansion and
40 CFR 1 112.8(d)(3)
contraction
4030026
Aboveground valves, piping, and
HSC 6.6725270.4.5(a);
appurtenances are regularly inspected
40 CFR 1 112.8(d)(4)
4030030
Integrity/leak tested buried piping when
HSC 6.6725270.4.5(a);
installed, modified, constructed, relocated, or
40 CFR 1 112.8(d)(4)
replaced
�JA
4030031
Vehicle traffic warned of aboveground piping
HSC 6.6725270.4.5(a);
40 CFR 1112.8(d)(5)
if
I or other oil transfer operations
Oil Filled Electrical Equipment
4010037
Oil filled electrical equipment exclusions have
HSC6.6725270.2(a)(4)
been met, and where not met is included in
SPCC plan
General Facility Requirements
4010034
Valid permit maintained
HSC 6.1125404.1
4010032
Tank Facility Statement or Business Plan has
HSC 6.6725270.6(a)(1),
been submitted
25270.6(a)(2)
4040001
Spills/releases of 42 gallons or more of
HSC 6.67 25270.8
petroleum reported upon discovery to Cal OES
& UPA or 911
4010033
APSA program fee paid
HSC 6.6725270.6(b)
4030036
All/any permanently closed tanks are properly
HSC 6.6725270.4.5(a);
closed under the definition in 40 CFR 112.2
40 CFR 1 112.1(b)(3),
112.2
4010044
Substantial Harm Criteria certification
HSC 6.6725270.4.5(a);
—maintained
at the facility as required
40 CFR 1 112.20(e)1Q1A
4010
Administration/Documentation - General
40 CFR 1112; HSC 6.67
Multiple
4015
Administration/Documentation - General Local
Ordinance
filtA.
4020
Training - General
HSC 6.67; 40 CFR 1112
Multiple
4025
Training - General Local Ordinance
IJJA
4030
Operations/Maintenance - General
HSC 6.67; 40 CFR 1112
Multiple
4035
Operations/Maintenance - General Local
Ordinance
& f A
4040
Release/Leaks/Spills - General
HSC 6.67 Multiple; 40
I
I
CFR 1112 IN
A.JA
_
Violation
Compliance
Number
Program Requirement
Citations
Y or N
Class
Comments
4045
Release/Leaks/Spills - General Local Ordinance
�Jlk
4050
Abandonment/Illegal Disposal/Unauthorized
HSC 6.67 Multiple; 40
Treatment - General
CFR 1 112
4055
Abandonment/Illegal Disposal/Unauthorized
_
Treatment General Local Ordinance
JA
Comments:
CY/There were no violations noted for this inspection
El This report shall serve as a "NOTICE TO COMPLY" for Minor Violations, and a "NOTICE OF VIOLATION" for Major violations. You
are, hereby, ordered to correct the above noted violations within 30 days, or according to correction summaries provided. Formai
enforcement and/or penalty assessment may be initiated for any violations noted, and for those not corrected in a timely manner.
(NOTE: If this is a preliminary report, a final report will follow.)
Operator's Name: ✓ Operator's Signature: 4 Date:oZ`'��"'��
�// 6,
Inspector's Signature: Date: