Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FMC 2020
IMPACT VALVE LEAK DETECTOR MONITOR CERTIFICATION OVERFILL OPERABILITY SPILL BUCKET TEST 11000 N. MoPac Expressway, Suite 500 Austin, Texas 78759 Phone: (512) 451-6334 Fax: (512) 459-1459 Date Printed and Mailed: 7/16/2020 BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES INSPECTOR KRIS KARNS 1501 TRUXTUN AVE. BAKERSFIELD, CA 93301 Test Date: 7/13/2020 Order Number: 3451286 Dear Regulator, Enclosed are the results of recent testing performed at the following facility: 7-ELEVEN 38837 3698 MING AVE BAKERSFIELD, CA 93309 In an effort to keep all our record keeping and reporting requirements as current as possible, Tanknology kindly requests you notify Dawn Kohlmeyer in writing at dkohlmeyer@tanknology.com when your CUPA requires all records to be submitted electronically via the CERS database. Your assistance in this endeavor is greatly appreciated. Testing performed: Sincerely, Dawn Kohlmeyer Manager, Field Reporting LDT 5000 Field Test Apparatus Line Leak Detector Test Page 1 of 1 Work Order:3451286 Date:7/13/2020 Site Name / ID:7-ELEVEN 38837 / 38837 Address:3698 MING AVE City:BAKERSFIELD State:CA Zip:93309 Tank ID Product Product Line Tested From Existing/New Mechanical/Electronic Manufacturer/Model Serial No. Pump Operating Pressure (psi) Calibrated Leak (ml/min) Calibrated Leak (gph) Holding PSI *N/A for Electronic LD's Resiliency (ml) *N/A for Electronic LD's Metering PSI *N/A for Electronic LD's Opening Time (sec) *N/A for Electronic LD's Test Results T1 REGULAR 87 REG UNLEAD 1 3 Existing Mechanical Vaporless LD-2000 19121574 32.00 189.0 3.00 32.00 200.00 20 5 Pass T-2 87 REGULAR 1 3 Existing Mechanical Vaporless LD-2000 20031932 32.00 189.0 3.00 32.00 250.00 32 0 Fail T3 PREMIUM 91 PREMIUM 1 3 Existing Mechanical Vaporless LD-2000 20031933 32.00 189.0 3.00 32.00 350.00 32 0 Fail T4 DIESEL Diesel 1 7 Existing Mechanical Vaporless LD-2000 20031934 34.00 189.0 3.00 34.00 150.00 18 5 Pass T-2 87 REGULAR 1 3 Existing Mechanical Vaporless LD-2000 20031932 32.00 189.0 3.00 32.00 200.00 20 4 Pass T3 PREMIUM 91 PREMIUM 1 3 Existing Mechanical Vaporless LD-2000 20061231 32.00 189.0 3.00 32.00 215.00 18 3 Pass Technician Comments: Adjusted T2 87 south and replaced 91 LD, both retest and passed. Technician Name:Jeffrey Crisostomo Certification #:91137 Technician Signature:Expire Date:4/2/2022 Environmental Compliance for Petroleum Systems © 2020 Tanknology Inc., Austin, TX. All rights reserved. tanknology.com Impact Valve Inspection Impact Valve Operational Inspection Work Order:3451286 Date:7/13/2020 Site Name/ID:7-ELEVEN 38837 Address:3698 MING AVE City:BAKERSFIELD State:CA Zip:93309 How Inspected: Line Test NFPA 30A PEI RP1200 Other Dispenser Number Grade Secure Mount? Valve Lock?Pass/ Fail Comments 1/2 87 Pass Fail Not Tested 1/2 89 Pass Fail Not Tested 1/2 91 Pass Fail Not Tested 3/4 40 Pass Fail Not Tested 3/4 87 Pass Fail Not Tested 3/4 89 Pass Fail Not Tested 3/4 91 Pass Fail Not Tested 5/6 87 Pass Fail Not Tested 5/6 89 Pass Fail Not Tested 5/6 91 Pass Fail Not Tested 7/8 40 Pass Fail Not Tested 7/8 87 Pass Fail Not Tested 7/8 89 Pass Fail Not Tested 7/8 91 Pass Fail Not Tested Technician Comments: Technician Name:Jeffrey Crisostomo Signature: Environmental Compliance for Petroleum Systems ©2020 Tanknology Inc., Austin, TX. All rights reserved. tanknology.com UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 1 of 6) This form must be used to document testing and servicing of underground storage tank (UST) monitoring equipment. A copy of this form must be provided to the UST owner or operator. The owner or operator must submit a copy of this form to the local agency regulating the USTs within 30 days of the date of the monitoring system certification. I. FACILITY INFORMATION CERS ID unknown Date of Monitoring System Certification 7/13/2020 Business Name (Same as Facility Name or DBA-Doing Business As.) 7-ELEVEN 38837 Building # Business Site Address 3698 MING AVE City: BAKERSFIELD Zip: 93309 II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION Name of Company Performing the Certification TANKNOLOGY INC. Phone # (800) 800-4633 Ext. Mailing Address 11000 N. Mopac Expressway #500, Austin, TX 78759 Name of UST Service Technician Performing the Certification (Print as shown on the ICC Certification.) Jeffrey Crisostomo Contractor/Tank Tester License # Class A General Engineering 743160 ICC Certification # 8199847 ICC Certification Expiration Date 4/22/2021 Monitoring System Training and Certifications (List all applicable certifications.) Expiration Date Tanknology Certification Level III ATG Operability Training Certification Exam 91135 07/11/2022 ICC CA UST Service Technician 8199847 04/22/2021 III. RESULTS OF TESTING/SERVICING Indicate and attach the following reports if the monitoring equipment is capable of generating either. Monitoring System Set-up Alarm History Report Y N NA Was any monitoring equipment replaced? (If "Yes,"identify the specific devices replaced and list the manufacturer and model for all replacement parts in section IV below.) Was damage, debris, or liquid found inside any secondary containment systems? (If "Yes," describe what was found in section IV below.) Is all monitoring equipment operational per manufacturer's specifications? (If "No," describe why in section IV below.) IV. COMMENTS If directed to use this section, describe how and when the issues were or will be corrected. Adjusted T2 87 south LD and replaced 91 LD, both retest and passed. 3.67 VR battery. V. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING I hereby certify that the equipment identified in this document was inspected/serviced in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2638 and all information contained herein is true and accurate. Attached to this certification is information (e.g., manufacturers' checklists, monitoring system set-up, alarm history report, etc.) necessary to verify that this information and the site plan showing the layout of UST system is complete and accurate. UST Service Technician Signature CERS=California Environmental Reporting System, ID=Identification, UST=Underground storage tank, ICC=International Code Council UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 2 of 6) VI. INVENTORY OF EQUIPMENT CERTIFIED A separate Monitoring System Certification Form must be prepared for each monitoring system control panel. Make of Monitoring System Control Panel Veeder Root Model of Monitoring System Control Panel TLS-350 Software Version Installed 330.01 Check the appropriate boxes to indicate specific equipment inspected/serviced. Monitoring Device Used Device Model # Tank ID: T1 REGULAR 87 Gasoline - Regular (By tank number, stored product, etc.) In-tank Gauging (SW Tank) Annular Space or Vault Sensor 794380-303 VPH Sensor Product Piping Mechanical LLD LD-2000 Electronic LLD VPH Sensor (Piping) Sump Sensor 794380-208 VPH Sensor (Sump) Fill Piping VPH Sensor (Piping) Sump Sensor 794380-208 VPH Sensor (Sump) Vent Piping VPH Sensor (Piping) Sump Sensor VPH Sensor (Sump) Vapor Recovery Piping VPH Sensor (Piping) Sump Sensor VPH Sensor (Sump) Monitoring Device Used Device Model # Tank ID: T3 PREMIUM 91 Gasoline - Premium (By tank number, stored product, etc.) In-tank Gauging (SW Tank) Annular Space or Vault Sensor 794380-303 VPH Sensor Product Piping Mechanical LLD LD-2000 Electronic LLD VPH Sensor (Piping) Sump Sensor 794380-208 VPH Sensor (Sump) Fill Piping VPH Sensor (Piping) Sump Sensor 794380-208 VPH Sensor (Sump) Vent Piping VPH Sensor (Piping) Sump Sensor VPH Sensor (Sump) Vapor Recovery Piping VPH Sensor (Piping) Sump Sensor VPH Sensor (Sump) Monitoring Device Used Device Model # Tank ID: T-2 87 Gasoline - Regular (By tank number, stored product, etc.) In-tank Gauging (SW Tank) Annular Space or Vault Sensor 794380-303 VPH Sensor Product Piping Mechanical LLD LD-2000 Electronic LLD VPH Sensor (Piping) Sump Sensor 794380-208 VPH Sensor (Sump) Fill Piping VPH Sensor (Piping) Sump Sensor 794380-208 VPH Sensor (Sump) Vent Piping VPH Sensor (Piping) Sump Sensor VPH Sensor (Sump) Vapor Recovery Piping VPH Sensor (Piping) Sump Sensor VPH Sensor (Sump) Monitoring Device Used Device Model # Tank ID: T4 DIESEL Diesel (By tank number, stored product, etc.) In-tank Gauging (SW Tank) Annular Space or Vault Sensor 794380-302 VPH Sensor Product Piping Mechanical LLD LD-2000 Electronic LLD VPH Sensor (Piping) Sump Sensor 794380-208 VPH Sensor (Sump) Fill Piping VPH Sensor (Piping) Sump Sensor 794380-208 VPH Sensor (Sump) Vent Piping VPH Sensor (Piping) Sump Sensor VPH Sensor (Sump) Vapor Recovery Piping VPH Sensor (Piping) Sump Sensor VPH Sensor (Sump) CERS=California Environmental Reporting System, ID=Identification, UST=Underground storage tank, ICC=International Code Council UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 3 of 6) Monitoring Device Used Device Model #Monitoring Device Used Device Model # Vent/Transition Sump ID: vent Vent/Transition Sump ID: Sump Sensor 794380-208 Sump Sensor VPH Sensor VPH Sensor UDC ID: 1/2 Electronic Sensor 794380-208 Mechanical Device VPH Sensor UDC ID: 5/6 Electronic Sensor 794380-208 Mechanical Device VPH Sensor UDC ID: 3/4 Electronic Sensor 794380-208 Mechanical Device VPH Sensor UDC ID: 7/8 Electronic Sensor 794380-208 Mechanical Device VPH Sensor UDC ID: Electronic Sensor Mechanical Device VPH Sensor UDC ID: Electronic Sensor Mechanical Device VPH Sensor UDC ID: Electronic Sensor Mechanical Device VPH Sensor UDC ID: Electronic Sensor Mechanical Device VPH Sensor Other Monitored Component ID: Other Monitored Component ID: Other(Specify in section VII) Other(Specify in section VII) Other Monitored Component ID: Other Monitored Component ID: Other(Specify in section VII) Other(Specify in section VII) Other Monitored Component ID: Other Monitored Component ID: Other(Specify in section VII) Other(Specify in section VII) Include information for every underground storage tank component monitored by this monitoring system control panel. If the monitoring system control panel monitors more components than this form accommodates, additoinal copies of these pages may be attached. VII. COMMENTS Use this section to provide any additional comments about the inventory of the equipment certified. CERS=California Environmental Reporting System, ID=Identification, UST=Underground storage tank, ICC=International Code Council UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6) VIII. MONITORING SYSTEM AND PROGRAMMING This section must be completed if a monitoring panel is used to perform leak detection monitoring.Y N NA Are the visual and audible alarms operational? Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, functionally tested, and confirmed operational? Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper operation? Was monitoring system set-up reviewed to ensure proper settings? Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operational? Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically disconnected? Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? Which sensors initiate positive shut down? (Check all that apply.) Sump Under-dispenser containment If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? For any answer of "N" above, describe in section IX how and when these deficiencies were or will be corrected. IX. COMMENTS Use this section to provide any additional comments about the inventory of the equipment certified. X. IN-TANK GAUGING TESTING Check this box if tank gauging is used only for inventory control. (Do not complete this section.) Check this box if NO tank gauging equipment is installed. (Do not complete this section.) This section must be completed if in-tank gauging is used to perform leak detection monitoring. Y N NA Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for ground faults? Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, and confirmed operational? Was accuracy of system's product level readings tested? Was accuracy of system's water level readings tested? Were all probes reinstalled properly? Were all items on the equipment manufacturer's maintenance checklist completed? For any answer of "N" above, describe in section XI how and when these deficiencies were or will be corrected. XI. COMMENTS Use this section to provide any additional comments about the inventory of the equipment certified. Y = Yes, N = No, NA = Not Applicable UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) XVI. LINE LEAK DETECTOR TESTING Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) This section must be completed if LLDs are installed.Y N NA Was a leak simulated to verify LLD performance? (Check all that apply.) Simulated leak rate verified: 3 GPH 1.1 GPH 0.2 GPH Was the testing apparatus properly calibrated? For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? For electronic LLDs, does the turbine automatically shut off when a leak is detected? For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? Were all items on the equipment manufacturer's maintenance checklist completed? Were all LLDs confirmed operational within regulatory requirements? For any answer of "N" above, describe in section XIII how and when these issues were or will be corrected. XIII. COMMENTS Adjusted T2 87 south LD and replaced 91 LD, both retest and passed. XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING Check this box if VPH monitoring is NOT used. (Do not complete this section.) This section must be completed if VPH monitoring is used to perform leak detection monitoring. System Type (Mark all that apply.) Vacuum Pressure Hydrostatic Sensor ID Component(s) Monitored by this Sensor Sensor Functionality Test Interstitial Communication Test Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail How was interstitial communication verified? Simulated leak at far ends of the interstitial space. Other (Describe the method in section XV below.) Visual Inspection Gauge Was the vacuum or pressure restored to operating levels in all interstitial spaces? Yes No (Describe the reason in section XV below.) For any answer of "N" above, describe in section XIII how and when these issues were or will be corrected. XV. COMMENTS GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/Pressure/Hydrostatic, ID = Identification UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) XVI. MONITORING SITE PLAN Date site map was prepared: If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) line leak detectors; and 11) devices monitoring any other secondary containment areas. UNDERGROUND STORAGE TANK SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1) Type of Action Installation Test Repair Test 12 Month Test I. FACILITY INFORMATION CERS ID unknown Date of Spill Container Test: 7/13/2020 Business Name (Same as Facility Name or DBA-Doing Business As.) 7-ELEVEN 38837 Business Site Address 3698 MING AVE City: BAKERSFIELD Zip: 93309 II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Jeffrey Crisostomo Phone # (800) 800-4633 Contractor/Tank Tester License # Class A General Engineering 743160 ICC Certification # 8199847 ICC Certification Expiration Date 4/22/2021 Spill Container Testing Training and Certifications (List applicable certifications.) ICC - CA UST Service Technician 8199847 04/22/2021 III. SPILL CONTAINER TESTING INFORMATION Test Method Used: Manufacturer Guidelines: (Specify) Industry Code or Engineering Standard: (Specify) PEI RP 1200 Engineered Method: (Specify) Attach the testing procedures and all documentation required to determine the results. # of Attached Pages 2 Tank ID: (By tank number, stored product, etc.) Spill Container Manufacturer: Method of Cathodic Protection Inside Diameter of Spill Container: (Inches) Depth of Spill Container: (Inches) Does the spill container have a 5 gallon capacity? Method to Keep Spill Container Empty IV. Spill Container Test Results Fill T1 REGULAR 87 REG UNLEAD OPW Non-Metallic Isolation Other (Specify in section V) 12 16 Yes No Drain Valve Onsite Pump Other (Specify in section V) Fill T-2 87 REGULAR OPW Non-Metallic Isolation Other (Specify in section V) 12 16 Yes No Drain Valve Onsite Pump Other (Specify in section V) Fill T3 PREMIUM 91 PREMIUM OPW Non-Metallic Isolation Other (Specify in section V) 12 16 Yes No Drain Valve Onsite Pump Other (Specify in section V) Fill T4 DIESEL Diesel OPW Non-Metallic Isolation Other (Specify in section V) 12 16 Yes No Drain Valve Onsite Pump Other (Specify in section V) SUMMARY OF TESTING RESULTS Pass Fail Pass Fail Pass Fail Pass Fail V. COMMENTS All items marked failed above must be explained in this section. Any additional comments may also be provided here. VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS I hereby certify that the spill containers were tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637.1 and all the information contained herein is accurate. UST Service Technician Signature If the facility has more components than this form accommodates, additional copies of this page may be attached. CERS=California Environmental Reporting System, ID=Identification, UST=Underground storage tank, ICC=International Code Council SWRCB, January 2006 Spill Bucket Testing Report Form This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: 7-ELEVEN 38837 Date of Testing: 7/13/2020 Facility Address: 3698 MING AVE , BAKERSFIELD, CA 93309 Facility Contact:Phone: - Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (if present during testing): Fire inspector 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY INC. Technician Conducting Test: Jeffrey Crisostomo Credentials1: CSLB Contractor ICC Service Tech. SWRCB Tank Tester Other (Specify) License Number(s): 743160-8199847 3. SPILL BUCKET TESTING INFORMATION Test Method Used By: Hydrostatic Vacuum Other Test Equipment Used: LAKE TEST Equipment Resolution: 0.0625 in. Identify Spill Bucket (By Tank Number, Stored Product, etc.) Bucket Installation Type: Bucket Diameter: Bucket Depth: Wait time between applying vacuum/water and start of test Test Start Time (TI): Initial Reading (RI): Test End Time(TF): Final Reading (RF): Test Duration(TF–TI): Change in Reading (RF–RI) : Pass/Fail Threshold or Criteria: Test Result: Spill Box # Tank T1 REGULAR 87 REG UNLEAD - Fill 1 - Direct - Grade level in containment sump Direct Bury Contained in Sump 12.00 16.00 15 min 09:00:00 14.50 in. H20 10:00:00 14.50 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # Tank T-2 87 REGULAR - Fill 1 - Direct - Grade level in containment sump Direct Bury Contained in Sump 12.00 16.00 15 min 09:00:00 14.50 in. H20 10:00:00 14.50 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # Tank T3 PREMIUM 91 PREMIUM - Fill 1 - Direct - Grade level in containment sump Direct Bury Contained in Sump 12.00 16.00 15 min 09:00:00 14.50 in. H20 10:00:00 14.50 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # Tank T4 DIESEL Diesel - Fill 1 - Direct - Grade level in containment sump Direct Bury Contained in Sump 12.00 16.00 15 min 09:00:00 14.50 in. H20 10:00:00 14.50 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. Technician's Signature:Date:7/13/2020 1State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent. WO: 3451286 UNDERGROUND STORAGE TANK OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1) Type of Action Installation Test Repair Test 36 Month Test I. FACILITY INFORMATION CERS ID unknown Date of Overfill Prevention Equipment Inspection: 7/13/2020 Business Name (Same as Facility Name or DBA-Doing Business As.) 7-ELEVEN 38837 Business Site Address 3698 MING AVE City: BAKERSFIELD Zip: 93309 II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Jeffrey Crisostomo Phone # (800) 800-4633 Contractor/Tank Tester License # Class A General Engineering 743160 ICC Certification # 8199847 ICC Certification Expiration Date 4/22/2021 Spill Container Testing Training and Certifications (List applicable certifications.) ICC - CA UST Service Technician 8199847 04/22/2021 III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION Test Method Used: Manufacturer Guidelines (Specify) vr Industry Code or Engineering Standard (Specify) PEI RP 1200 Engineered Method (Specify) Attach the testing procedures and all documentation required to determine the results. # of Attached Pages: 2 Tank ID: (By tank number, stored product, etc.) What is the tank inside diameter? (Inches) Is the fill piping secondarily contained? Is the vent piping secondarily contained? Overfill Prevention Equipment Manufacturer(s) What is the overfill prevention equipment response when activated? (Check all that apply.) Are flow restrictors installed on vent piping? At what level in the tank is the overfill prevention set to activate? (Inches from bottom of tank.) What is the percent capacity of the tank at which the overfill prevention equipment activates? Is the overfill prevention in proper operating condition to respond when the substance reaches the appropriate level? IV. Overfill Prevention Inspection Results T1 REGULAR 87 89.75 in. Yes No Yes No Franklin Fueling other Shuts Off Flow Restrict Flow A/V Alarm Yes No 89.92% 75" Yes No (Specify in section V) T-2 87 89.75 in. Yes No Yes No Franklin Fueling other Shuts Off Flow Restrict Flow A/V Alarm Yes No 89.92% 75' Yes No (Specify in section V) T3 PREMIUM 91 89.75 in. Yes No Yes No Franklin Fueling other Shuts Off Flow Restrict Flow A/V Alarm Yes No 89.92% 75" Yes No (Specify in section V) T4 DIESEL 89.75 in. Yes No Yes No OPW other Shuts Off Flow Restrict Flow A/V Alarm Yes No 90% 75" Yes No (Specify in section V) SUMMARY OF TESTING RESULTS Pass Fail Pass Fail Pass Fail Pass Fail V. COMMENTS All items marked failed above must be explained in this section. Any additional comments may also be provided here. Ball float not confirmed. VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS I hereby certify that the spill containers were tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637.1 and all the information contained herein is accurate. UST Service Technician Signature If the facility has more components than this form accommodates, additional copies of this page may be attached. CERS=California Environmental Reporting System, ID=Identification, UST=Underground storage tank, ICC=International Code Council Site Diagram (This site diagram is for reference only and is not drawn to scale) Work Order:3451286 Site ID / Name:38837 / 7-ELEVEN 38837 Address:3698 MING AVE City:BAKERSFIELD State:CA Zip:93309 Test Duration Test Pressure P/F Threshold Tank Annular - Vacuum 1 hr, 20k or less tank 10" hg 0 loss, int dry before and after test Tank Annular - Vacuum 2 hr, >20k tank 10" hg 0 loss, int dry before and after test Line Annular - Pressure 1 hr 5 psi 0 loss STP Sump - Hydro 1 hr 4" above highest penetration or sidewall seam less than 1/8" over hour, settle time of 15 minutes minimum prior to starting the test UDC Sump - Hydro 1 hr 4" above highest penetration or sidewall seam less than 1/8" over hour, settle time of 15 minutes minimum prior to starting the test Spill Bucket - SW Vac 1 min 30" wc no greater than 4" wc vaccum decay - bucket must be dry Spill Bucket - SW Hydro 1 hr within 1.5" of top of the bucket less than 1/8" over hour, settle time of 5 minutest minimum prior to starting the test Spill Bucket - DW Vac 1 min 15" wc no greater than 3" wc vaccum decay - int must be dry W.O.# SC1-3451286 Cust Ref#: 2312105 Tank chart W.O.# SC1-3451286 Cust Ref#: 2312105