Loading...
HomeMy WebLinkAboutFMC 2020CERS = California Environmental Reporting System, ID = Identification, ICC = International Code Council, Y = Yes, N = No, NA = Not applicable UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 1 of 6) This form must be used to document testing and servicing of underground storage tank (UST) monitoring equipment. A copy of this form must be provided to the UST owner or operator. The owner or operator must submit a copy of this form to the local agency regulating the USTs within 30 days of the date of the monitoring system certification. I. FACILITY INFORMATION CERS ID Date of Monitoring System Certification Business Name (Same as Facility Name or DBA – Doing Business As.) Building # Business Site Address City ZIP Code II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION Name of Company Performing the Certification Phone # ( ) - Ext. Mailing Address Name of UST Service Technician Performing the Certification (Print as shown on the ICC Certification.) Contractor/Tank Tester License # ICC Certification # ICC Certification Expiration Date Monitoring System Training and Certifications (List all applicable certifications.) Expiration Date III. RESULTS OF TESTING/SERVICING Indicate and attach the following reports if the monitoring equipment is capable of generating either. Y N NA Monitoring System Set-up Alarm History Report Was any monitoring equipment replaced? (If “Yes,” identify the specific devices replaced and list the manufacturer and model for all replacement parts in section IV below.) Was damage, debris, or liquid found inside any secondary containment systems? (If “Yes,” describe what was found in section IV below.) Is all monitoring equipment operational per manufacturer’s specifications? (If “No,” describe why in section IV below.) IV. COMMENTS If directed to use this section, describe how and when the issues were or will be corrected. V. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING I hereby certify that the equipment identified in this document was inspected/serviced in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2638 and all information contained herein is true and accurate. Attached to this certification is information (e.g., manufacturers' checklists, monitoring system set-up, alarm history report, etc.) necessary to verify that this information and the site plan showing the layout of UST system is complete and accurate. UST Service Technician Signature ID = Identification, SW = Single-walled, VPH = Vacuum/Pressure/Hydrostatic, LLD = Line leak detector UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 2 of 6) VI. INVENTORY OF EQUIPMENT CERTIFIED A separate Monitoring System Certification Form must be prepared for each monitoring system control panel. Make of Monitoring System Control Panel Model of Monitoring System Control Panel Software Version Installed Check the appropriate boxes to indicate specific equipment inspected/serviced. Monitoring Device Used Device Model # Monitoring Device Used Device Model # Tank ID: (By tank number, stored product, etc.) Tank ID: (By tank number, stored product, etc.) In-tank Gauging (SW Tank) In-tank Gauging (SW Tank) Annular Space or Vault Sensor Annular Space or Vault Sensor VPH Sensor VPH Sensor Product Piping Product Piping Mechanical LLD Mechanical LLD Electronic LLD Electronic LLD VPH Sensor (Piping) VPH Sensor (Piping) Sump Sensor Sump Sensor VPH Sensor (Sump) VPH Sensor (Sump) Fill Piping Fill Piping VPH Sensor (Piping) VPH Sensor (Piping) Sump Sensor Sump Sensor VPH Sensor (Sump) VPH Sensor (Sump) Vent Piping Vent Piping VPH Sensor (Piping) VPH Sensor (Piping) Sump Sensor Sump Sensor VPH Sensor (Sump) VPH Sensor (Sump) Vapor Recovery Piping Vapor Recovery Piping VPH Sensor (Piping) VPH Sensor (Piping) Sump Sensor Sump Sensor VPH Sensor (Sump) VPH Sensor (Sump) Monitoring Device Used Device Model # Monitoring Device Used Device Model # Tank ID: (By tank number, stored product, etc.) Tank ID: (By tank number, stored product, etc.) In-tank Gauging (SW Tank) In-tank Gauging (SW Tank) Annular Space or Vault Sensor Annular Space or Vault Sensor VPH Sensor VPH Sensor Product Piping Product Piping Mechanical LLD Mechanical LLD Electronic LLD Electronic LLD VPH Sensor (Piping) VPH Sensor (Piping) Sump Sensor Sump Sensor VPH Sensor (Sump) VPH Sensor (Sump) Fill Piping Fill Piping VPH Sensor (Piping) VPH Sensor (Piping) Sump Sensor Sump Sensor VPH Sensor (Sump) VPH Sensor (Sump) Vent Piping Vent Piping VPH Sensor (Piping) VPH Sensor (Piping) Sump Sensor Sump Sensor VPH Sensor (Sump) VPH Sensor (Sump) Vapor Recovery Piping Vapor Recovery Piping VPH Sensor (Piping) VPH Sensor (Piping) Sump Sensor Sump Sensor VPH Sensor (Sump) VPH Sensor (Sump) ID = Identification, VPH = Vacuum/Pressure/Hydrostatic, UDC = Under-dispenser containment UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 3 of 6) Monitoring Device Used Device Model # Monitoring Device Used Device Model # Vent/Transition Sump ID: Vent/Transition Sump ID: Sump Sensor Sump Sensor VPH Sensor VPH Sensor UDC ID: UDC ID: Electronic Sensor Electronic Sensor Mechanical Device Mechanical Device VPH Sensor VPH Sensor UDC ID: UDC ID: Electronic Sensor Electronic Sensor Mechanical Device Mechanical Device VPH Sensor VPH Sensor UDC ID: UDC ID: Electronic Sensor Electronic Sensor Mechanical Device Mechanical Device VPH Sensor VPH Sensor UDC ID: UDC ID: Electronic Sensor Electronic Sensor Mechanical Device Mechanical Device VPH Sensor VPH Sensor Other Monitored Component ID: Other Monitored Component ID: Other (Specify in section VII.) Other (Specify in section VII.) Other Monitored Component ID: Other Monitored Component ID: Other (Specify in section VII.) Other (Specify in section VII.) Other Monitored Component ID: Other Monitored Component ID: Other (Specify in section VII.) Other (Specify in section VII.) Include information for every underground storage tank component monitored by this monitoring system control panel. If the monitoring system control panel monitors more components than this form accommodates, additional copies of these pages may be attached. VII. COMMENTS Use this section to provide any additional comments about the inventory of the equipment certified. Y = Yes, N = No, NA = Not Applicable UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6) VIII. MONITORING SYSTEM AND PROGRAMMING This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA Are the visual and audible alarms operational? Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, functionally tested, and confirmed operational? Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper operation? Was monitoring system set-up reviewed to ensure proper settings? Was the monitoring panel’s backup battery visually inspected, functionally tested, and confirmed operational? Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically disconnected? Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? Which sensors initiate positive shut down? (Check all that apply.) Sump Under-dispenser containment If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? For any answer of “N” above, describe in section IX how and when these deficiencies were or will be corrected. IX. COMMENTS X. IN-TANK GAUGING TESTING Check this box if tank gauging is used only for inventory control. (Do not complete this section.) Y N NA Check this box if NO tank gauging equipment is installed. (Do not complete this section.) This section must be completed if in-tank gauging is used to perform leak detection monitoring. Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for ground faults? Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, and confirmed operational? Was accuracy of system’s product level readings tested? Was accuracy of system’s water level readings tested? Were all probes reinstalled properly? Were all items on the equipment manufacturer’s maintenance checklist completed? For any answer of “N” above, describe in section XI how and when these deficiencies were or will be corrected. XI. COMMENTS GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/Pressure/Hydrostatic, ID = Identification UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) XII. LINE LEAK DETECTOR TESTING Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) Y N NA This section must be completed if LLDs are installed. Was a leak simulated to verify LLD performance? (Check all that apply.) Simulated leak rate verified: 3 GPH 0.1 GPH 0.2 GPH Was the testing apparatus properly calibrated? For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? For electronic LLDs, does the turbine automatically shut off when a leak is detected? For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? Were all items on the equipment manufacturer’s maintenance checklist completed? Were all LLDs confirmed operational within regulatory requirements? For any answer of “N” above, describe in section XIII how and when these issues were or will be corrected. XIII. COMMENTS XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING Check this box if VPH monitoring is NOT used. (Do not complete this section.) This section must be completed if VPH monitoring is used to perform leak detection monitoring. System Type (Mark all that apply.) Vacuum Pressure Hydrostatic Sensor ID Component(s) Monitored by this Sensor Sensor Functionality Test Interstitial Communication Test Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail How was interstitial communication verified? Simulated leak at far ends of the interstitial space. Visual Inspection Other (Describe the method in section XV below.) Gauge Was the vacuum or pressure restored to operating levels in all interstitial spaces? Yes No (Describe the reason in section XV below.) For any answer of “FAIL” above, describe in section XV how and when these issues were or will be corrected. XV. COMMENTS Mdnitoring System Certi{ication UST Monitoring Site Plan site Ad&ess: 3701 East Belle Terrace, Bakersfield, CA. 93307 Date map was drawn: Instructions lf you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, show the general layout of tanks a:rd piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank liquid level probes (ifused for leak detection). In the space provided, note the date this Site Plan was prepaxed. Page 4 of 4 www.unidocs.org ' rar -i't te ,[,,, l*'-; ts?ll: D1s.s4 "r,-.1 . 9? TPt! , tlr"r . t'""i ,''..,, uN-036 - 4/4 Rev.0l/17l08 03/02/20 SYSTEH_SETUF r l'r-Ifllili EETUT. - T 1 : LTNLEAI)ET] r,R{,)DUCT C(]DE THEFI"IAL N(:iEFFTnlil: D I AI'|ETEk.IANX FRDF I LE FULL V'L8t.3 I lt(::H |,rL5E.5 INCH VI]L27.s t l,lCH ,,,i,,L FL(*T SI ZE: t IATEF tJAFI'll lli-; HI GH |NATEE L I 11I'I t"lH! OR LAEEL ,ll il {,VERFILL LII']II H 1C;H FROT]IJCT DEL I VERY L IIl I'I LOti PROTTUC:T I"]F1E !, ?o!Lt 8:,:13 HI,,] syiiTEH Utl t TE SYETEH LANGLTTi;E EI,]GL ISH S".b.TEI'1 I)HTE I I I1E FiHTIHTIlili [rtr Y??.,, HH:r,lt,t:lis .tt }{ERN HIGH EL]H tI;L IjsTJ7O1 E. EEI,I,E IEF]RAI EE|IiERSF I EL[l i- fi .6bl -B?7-3199 SH I FT TI I"IE ISHIFT TII'IE:SHIFT TJI-IE ]J SH I FT T I I.1E ] b : U0 Hl.j TT I EAELETT III SAELEIT Ir Ii:jnELE! C t"1t"1UNIr---ATIr frri :El,tl _ PORT SETT I IIIG:; ; I,IONE FOUNti I . rl0B7rJ0lll.ol-l4 PTS r ?0?3 9b7e 6ttt I 2357 4.0 lN. z.I4.ll r 2B:3 9 ori I LtE2t:l I Srii 11421lok1r0: THl,lli FER Ti-T r]EEI,EI, htFNTIISHELED THNII AIJII TST r,tELt,EIr FHFI SAELEII Ll I'lE RE-EtiHBt rt r.rETH+tlPHSE L I NE TEF,| I L I I..JE PER TsT IIEEI,EI, I,]RI,,I L I EHELEIT L I l,lE *tJlt T:-'f r.tEEtrEI, rJpt, T' I SAELED FRI T1T TC VOLLII1ES EI,]ABLETI 'IEf"lP t:ttP11,51,1.;;, 1 1 ,',,,VHLUE (DEG F /: Eit.nST tfI; HE I GHI rFF--iFT t' I FJAELED T,AYL I GHT EAii I I.1I-; ,f I I"IEEI,IAELED ETflFT D*TEI,]AR UEEH: sUI,]IJTAFT TI I,IE2; OD AH EI,IIJ DATEUCT tlEEli F- Sr.[!F],rD TItlE2;!ll AM RE-TTz ENL i.iF I1L]SSAi.;E rII SAELED LE*]{ ALARI,I LIIlIT: sUT]DE!I LOSS L IIII T; TIr I,IX T I LT : PEOEE OFFEET : l,lAl.l l FOLDED THll]:STd: I,]ONE b UIJ,1'1tr r_r. LJL-I LEHI{ I'11 I't PER I )Ir I,-' : :11'.t: lq[4 LEA}I: PlIN AIINUNL : COTi: 480r !'EF I0D I C TEFiT T\r'PE ETAI'IDHRIi Allllu*L TEET FirlL aLHPl"l f' I SAELEIT r,EE I ODI C TEFJT FH ] L AI.ARI"I D I ITiTELED GRT]SS TEST FAIL ALARI"] I] I SAELETT AI,IN TEST AUEF].r(,; I I..1G : OFF PER TEBT AVER.]IJ ] I,Ii] : DFF ,IAI"IH TEST I.II]T I F'"' : {JFF Tl',lX TST 5lr'HL)I.1 EREHII : DFF I,ELIVEFY DELHi : t l'lll.l PUI,IP THFESHILTT : 1 O. OtI'" T !: D IESEL I,RODUt]T [:ODE THEFI,IAL I]OEFF TAI,,IX D I A],]ETEF TANI{ PFOF I LE FL]LL Vi lLEg.3 INCH \,ri]LE5.E INCH UIJL 27. S I NCH \lJL FLOAT S IZE: tIATEF l,,lAEI'lI NG HIGH I^IATEF LII"]IT t'1/1)( oR LABEL lfil I]\,/EEFILL LIIl1'I HIGH PRODUCT DELI VEEY L II.1I LOI,I PRODU'jT 2 .0u0q5Lln r.00 1E02i 967E 6D1l 3. I I I,] . I D4.0 12Ll!lJ 90!t I OBEO 114?1 2 Olt !40+ tl .00045I] b3. 00 l Urlrl 800 400 250 3.tt IN. 5.I 5.0 l rlDn r0q 900 9Dt; 900 01'" 0 U 99 0.01-10.oti 201 28r T 3: USED OIL I,RODI-.ICT i:rt)IrE THEEMAL I]OEFF TANX D I AI.IETEE TAI..IX PROF I LE FULL VilL46.5 Itl|:H UiL 31 , TI I N'.:H V'L15.5 INCH Vl]L FLOAT BIZE: KJfrTEE L^]AR I,,I I I.1( J HIGH UATEE LII.'IIT H I L]H F,RODUUT DELI1JEE! LII{IT LNU PRODUCT LEAX ALAFI,I L I I"II T EUDDEN LOSF t,I I.1I TANH TILT PEOBE OFFEET i l'lAI'll FOLDEIT THIiHIiTS: NONE I"]AX OE LAEEL ,,JUL : OVEEFILL LtH] r,EE I ON I LT TEST T\'PE STA I,,JDARtT AI,,If.]UAL TEST F.i I L ALHRI.I TT I SAELE! PEEIODIC TEEII' FAIL ALAEI'] T] I EAELED GE{ISS TEST FAIL ALAHI.I T}I EAELED AllN TEST AVERiIG I llD : +FFFEF TE,ST AVERHG I tlG : OFF TANI{ TEST f.JOl.I F,/' : oFF TllX TST SIPHIN BREfTI::OFF ITEL T VEEY DELA| : 3 I"iI NFUI'IP THEESHNLD : II,].0!}" LEFH_rESrl.r!n!,__ TEET Ol,1 IIHTE : FLL TflNNJ*N 1, zDtrl ETHRT TII.1E : 3:E3 AI"] TEET EATE : I.I . :L'1 IAL,JHR DURATION i ! HOURS TST EAFLY STIIT': TII S*ELED LEflH TEST EEF ]RT FORI']AT E N HA f,,lCETI LIlTUID SEI,,IE{]E BETUI' L 1:RUL AI,INUL*F TEI_STATE {5] I,]T:;LE FLIIATI iATEiiORY : AI'll,iL|LAE SPADE TRI -STTTTE (EIIIGLE FLOATI iATE',,iORY : I-TP SUI.1F L 3:RUL 1-2 TRI-STATE (S] I.I{]LE FLOAT} I::ATEGOEY : tT I,:lI'EI'ISEE FFN t. 4:EuL 3-4 TE I -STATE I IJ I I,]iJLE FLOI]T } CATEGOR'I : II I 1JFENSER PAI'] L 5:t]]EEEL ANITULAR TFI -STATE (EI I.II:;LE FLOHT} .ATEG+EY : AI']I"]ULSF SPA{IE L b:DIE]5EL i]TP TE I -ST*TE ($I I,,]'..:LE FLCf,T ) CATEGOFT/ : STP F]U[']F LEf,H ALfiRI"] L] ,IIT: SUDDEN LOEE LIf']IT: TH I,I}1 T I LT : PEOEE DFFSET : I']AN I FOLDEII TAI,lTi:ST6: NONE bu0 99 9S iJ.00 LEAI{ f, N pEEI..tlrli_r: 20I: !404 LEAH l'1lN AI,]I'.]LIHL : 40+; PEEIODIC TEST T',FE uuli:li ii i,,] N LIAL TEST FH I L ALAllf"l L I IiABLEII PERIODIN TEST FAIL ALHEII Ir I SAELEIT I]EOSS TEST FA IL ALAHI'I t,l SHELED frNl'l TEET A!,rEFHr;1 ftaj : t)FF PEH TEST A\,/EFiIIT I I',]G : OFF TAI.IH TEST NDT I FI : OFF TI,IH TET S I PHIJI,I EEEH}: : OFF LE*ii I']I N I,EF ],, ]! I i ] : LEfrl,l l,ll N HNNUiiL : DELIVERI IrELri 1 I,UI,]P THEESHOLI] s I'lt I,1 I 0 . LLDI." IUTPUT FELfiT ,jETLIP L 7:DSL 5Tlil -STATE (S1t,tr_;[.E FLOATT LIfiTET-:OEY : IT I;JF,EI,]EER !,AI.I L B:DgL E TR I -STATE (E I I''I(-,;LE FLT]HT i {.:HTEGOR'Y : ! I=I'EI,,]SEE I'ftll L B: L^IASTE 0lL HllllULHR TRI .FJTATE ( 5I I..iI]LE FLNHT ) |,:HTEGORY : flIlI,iI,]I.AF SPAI:E Ll0:I,JASTE OIL F]TF I.IOEI"]ALLY ULT)EED C|ITEGOEY : PI P I I''JG SLII"IP Ll 1 :LUE-OIL r-it.r t, I TRI _STATE (SI f.ti]LE FLOHTl CATEGORV : [,1I,I NE SUI'IT' LI !:LUE-OI L ! E.lSLANT) TRI -STATE isl'l{11-E FL *Tr L.]ATEGORY : PIPII'.JI,- SUI1T, Ll t:LUB-Ol L 3 ll.ISLirNIl TFI.STATE (EI I,,I':;LE FLOAT' TTATEGOEV : PIF'IN'; sUI'IP F 1 : HUL-ETT, T?F,E: STfiI!LAR! l,10Et'lgLLY t:rL0stiD LIUU]D SENINF] HLI'1F-rL ?:FUEL ALHIiI.IL 3:FUEL AL*Ei"IL 4:F!EL AL*RI"IL 3 : EENSNE lUT *LHRI'1L 4 : SEI,ISOR ,JdT iILAFI'IL z:SHORT AL.IHI{L B:BHOET HLHEt.jL 4 ;SHOET FLNR|J R ! : I) I ESEL*E'I'r, T'/PE : STAI,iDARDlliEtlALLy cL{Ll:tEI) LIDUID SE I,.]S(]E, AI-I.,IIiL SiFIJEL AL*FJ1L E:FUEL ALtsRI.IL 7:FUEL ALA}iI'IL A: F[,]EL ALA]II'IL E : EEI']EOF IUT HLIRI{L b :SENSOE OIJT TLiiRI'IL 7 : SElisoR or.lT HL*Rt'tL B :SENFJ E OIJT ALFEI,]L 5:SHOFT HLHFI'1L 5:SHOFT ALITFI1L 7 :EHOFT ALHFt"lL B:SHORT HI,itFI"] R 3:UUER.FILL ALiRI"] STfiNDAETJ I'IIFI"]ALLY [:LL]:iETr I N-TAI..]X ALAEI,I:JALL:OVERFILI_ ALHFH LICjUID SEI,]FjOR HLI.IsALL:FUEL ALARI'IALL:SENSOF I]UT FL*FJ IHLL : EHORT rrlilFt'1 E(-)FT ARE EE\r'l ij I |ll LELTEL I./ERSION 122.Lr0 SOFTI1IfiEES :48I :lr- I oD-H ':TFEHTED - 81 . I Lr. I E.U:r.i-l!; l!0 S FTLII*EE l,ll)IrUl.E FJYSTEI4 FEATLIFTEH: FERIODI(_r I t't -',t*t,tx TEET!r Hl!l,lUAL I I,l-Tdl,{H TESTE PECOf,IC I L I AT 1i.iI.1 j.jETUp TtUTUMfiT I {t Ir* I t_\ LrLt-rFi i Nr;TIl"lE: ?:0U Hr.l PERIT)DIC REI|.I,Ii.T I L I IT I oIlJlriil E i Plt-illTHL r TEMF COi"lPEl'ljiH I I irl,l ETAIiBAFD EUS SLOT FUEL ,t1ETER_TriNH T*llN l,lHF El'lp'i,, ---- I t,t-TAHti irLiiFI'l ,---'- ---- I l"l-THl,lli iiLAPl'l - --- i l.illrll ittr L r, i lrl TiLHRI'] Hl STrrRti' ktl!.ijRT IILAEI"] H t FJTIFY FEI'OIIT ---- I ll-TAl',lH HL*EI'I -'.--- T 3:L]EED OIL SETllP DrrTH lnnrll'll llG HOU 16, r0l0 I l:EE, fiHAUG .1, 20aJE I : .lLl Hl"l ALrLl 19, !Ull: riLrg AI"l HIGH l"lalTER Al-;tEl"l EEF 17. ?019 r,:0E Al'1 sEP 14. 2u1B 7:uX nl'l,+PF 4, E0l E l rl : lE Hl"l O\/EEFILL ALAETIsEr, 17. 2t:j1,-r 5:E1 nt't sEP 16. 2019 l:5E Ftl sEF lb, eBt9 1:J,1 Pt"l HIGH PEOI)T[T .ILARI'I ljEC 14, llll9 7:u! *l,l EEP 17, ?019 r:51 Al"l EEP 1 ri, :01 lr I : 56 Pl'l I I'JVAL I TT FUEL I-EVEL l,1AY 2l . !01 I E, : rl? pll HPR 16. :01! 3:14 Pl"lI']AE 7, t019 lt:lri PI"l I,ROEE bUT sEP 27, 2019 1!i1r Pf.1sEP I 6, ?ut r 2: l': PI.1 EEP lb. !0lB t:0! PPI H I {:iH l^lflTER I,JAEI,JI I'lG EEp 17, rl]19 b:t]E Al'1 SEP 24, 2DlB ?:urj Al{APE 4, ?0l s t r-r ; !5 At'l t,1Ht{ tRoDLlr-T *l-*Rf.,ll"tAE 7, ztr15 l?:?6 Pt"lHHE ?. ?019 1l:39 Al'',] oNT PU. 2tl0t I : 44 Pt'l PEE TST NEEITEU HLI']f'lov 6. 2809 I ! : 00 Al'l LOI"J TEI'IF UAF l'1 I Nar AUS I E, 2rl0E rl : 0! Pl'l trEC 13, zll[i] 5:09 Fl1 T I : UI.IL,EADEII SETUF I)ATA l*lHlil'11 I'lLj ft-Jr) 1 6, :[u2 .1 : 59 Fl'1 LEFTH ALARI'1 l',10V 21 . 200E ! :57 nl"l O!/ERFILL ALARI.I trEC 10. 2lll9 7:2! Hl'1 t"lHY 29, 2[lE ]l:04 Af"] l'1*Y ?, 2Lr1E :r:5t Al',l SUTTDEN LOSS F,I-iiRf'I I,tov zi. 200E, t:2E, AIi H ] I]H PRODUIJT NLHRI'I AUG :b, 2014 lJ:2t I,l'1 OCT f0. 20lt-l E:dE Pfl fJou 24, :009 5 : !4 t'l'] I IiVAL I D FUEL I-EVELJUL 13, TOIt, I:85 PI'l FR BE OUT JUI'1 ?8, 2Bl7 l !: 1 Fl'l ,rUL l g. 201b I ;07 F,t'1JUL 13, 20tE 1:tr3 PI"l ITEL I VERY f,iEEI'ET' r::T S0. ZBl9 E:19 pfl It0v 9, l01T lD:E9 Hi"lJUN 12, 201? l[:-J: tl'l PER TBT NEELEIT HLf'lllDV 5. 2009 I ! : 0u Al'1 LOI,J TEPIr' [.]AFll'ltl'lL; J|JN 26. ?01 ? r : O4 F',l'l trEC 22, 1003 r I i ?7 Hl'l T 2:ITIEEEL OIERFILL ALHEI l FEE lE, :tl:[ i l:39 HI"l JAI^I E7, ?olD 1 ! : r-11 PI"l AE 10, lnlB B:4? AI'l LOI,I I'RODU{.-T ALAFI1 FEE 13. ?rl2u 9:t: *t'1 IrEC ?tl, :[l! 2:115 PI'1or-:T ?, lB19 l:88 pl'1 SUDDEII LilsE ALHEI"I l,lOV ?1, 2O0F- E:53 Al"l H I GH !,EODUNT "iLAEI"]oi:T 30, 20r:t:j 4 : 2!' Pl"l I NVAL I D FUEI- L-EI./ELptarF 6, g0l T I I :58 Ht"lsEP 6. 201 I L Lr : 3E AllsEI, 4.2011 E,:38 *l'1 I,RUEE OUT AFE 1?. 1017 ',j:11 Nl"l JUL 13. ?ll1E E:4i:l fil'1 HfiR 31. 3[15 ::t5 FI"] TTEL I VEEY I.IEEL,IJLT FirE ?E. ?D20 I : D7 At'l FEE :2, zB:u :1:te PH FEE 1 ?. 2010 4 : 0E Fl'l PER TST NEEITEI) HLI']tJov 6, ?lltllr I!:ilu *ll LOL.] TEI,IP L..JAFI,] I I,lLifiFE 12, ?ul7 li;51 PI"1.lul- 13, l01E ',?:!t PPI FEE 12. ?Ul5 ::36 FI"l *,xx xElltr IiI*I iI***ElltriIi*x :r}*x:Eiltri+i*r. AL*RI'] HISTOE'I' KEFUF]T ----- BENS6R HLAEf.l -----L 1:RUL AI.]NULIIEl{lll,lul-*F EPAI:E FUEL ALAEI,IAUG 8,2[lS 9:13 *t,] SEI']EOF I]IJT *LTFI"I I'1AE 7, lul9 1t:51 AI'l FUEL ALANI.]I'IAF 7, 2019 lLi:51 *f.1 ALAFI'I HiETORY F]L:I.,OFT - --- SEI,ISOF ilrlFl"l ----L 3;FUL I-3 t,l F,TPENSER PAl,l EEI'IEOF OUT Ftt.r:tRl"lf'lAR 7, llll1'1 l1:il1 lil'l FUEL ALBEI,Il1AF 7. !019 lrJ:47 AI,1 gENS{lR OUT nLHRl"lJAll 11.2018 9:4I1 til'l fiLFEI'i H IE-TOFi' REPiET ---- SEtllSnP iLHEI"l -----L E:DIESEL AI.JI'I].]LAR AI,]f,IUL*F S!,*LIE SEIIEOE OUT AL;rEI']l"lAF 7,2019 lt::l Al't FUEL ALARI.If,lAF 7, !D M 0 : 5! iit"l SEI,ISOR oUT HL,rFr{ ,1iiN 11,2t.t1E t:4:1 AI'l l;rxr(;(EHnr;(:txt ALfiFII HIETOE'J' RL]F,DET --- * EEftEOFt .rLHRt"t ----*L 2 :RLIL STF FUEL ALAFI,]f,lAE ?, 3|]lB l::tE F,r'l SENSOE LIL|T IllrtRl"lI'IAE 7. 2819 12:34 pt1 SEIISOR OUT HL;iFll"lllnF 7, ?tllr II:31 AI"l iitI*xEllJ, *Alxt HLARf'] H: STOR\' REI'OFT ---- FiENS(,F nLARtl ----- D ] SFETISEE PAI'I BEI,iSOR OLJT Hl.HEriI1HE 7, 2BI9 I1:II AI'] FUEL *LARI.1 t'1AF 7, ?[19 lD:4T AI"1 EEIISOR OUT AL-E|'1 JAl"l 11, 2018 9:4::i Hl'l xr(*x*El,llrI} *x} ALTTRf'1 HI STOR',1 ]TEII{JET ----- EE I,{SOE , tLHFl"lL E, : IT I EEEL FJT iTsrp sut'1P SENEoE OUT HLHRI'Il'lAR 7, ?Llq 11::t FI"l FUEL ALARI1I'IAF 7, E0t9 ll]: d9 At"l EENEDF OUT FLirF.l'lJAN 11" ?0tE 9:.1:r Ff'l ,(x*XXElllr ir*}i+XltXxrElt!.ri,I{ ,i lt } X I ENIL + n :* li * i.iLHRl'l H I5TOF,' RE!iET ----- 3ENljOR HLHEtl - --- L 7:DSL 5 D I SI,EI,,]$EF PAI"I EENSOE OUT HLiiEt"l f,lHR 7. 2LJl9 ll:31 irl'l FUEL ALAEI'] t"tAR 7, ?01'J t u: {E All =ElislrR OUT FL, rRH .tnu 11. zDiE !:4:r Hl"l , *'Ll }\ ENLr * 4t*' ALARH H I FjT*Fii. tiE!.|RT ----- SENE{IE ,lLHRI'l -- -- L B:DSL 6 ! I ET,ENEER T,HI.I SENEOR OUT HL rRli MIrR ?, 201:r Il :31 HH FUEL HLAEI']l'lAR ?, 201! l0:'lE nl"l FUEL ALARI'I FeS :2, :ot:r 5:): I I'l ALI1EII HIETOIIi FEI,I]RT --'-*- gEHS,lFl ,rl-i.rRl'l -----L I : |..JAFiTE 0l t, Hl.lllULAR AI,,]NUL*R SI,AfE SENSOE OUT lrL.,rRl"lllHR ?, 20le ll:3: AI"i FUEL I{LARI,1l"lAR 7. 2Bl9 i Lr:5: Ar"1 EENEUE oUT gl.,rFl'1 .JAI'I 1 I . 201 Ll ll : 4f Hl"l |ILARI,I H ISTi.IRt }.]EF,,'E'I - --- - FiENSOR ,rLAFl'] ---- - Ll Lr:L,iri--TE i-ilL i:rTP F I I, I NIJ SUI'I}, FUEL ALAFI.IMAE 7, 2t:119 L I ::: Ht"] FUEL ALAEI.I I"IHR 7. 2D I I I rl : 5li Al'l F UEL AI,ARI,I.lAN ll, !01U B:qi l"1 ALHRf'] H IsT{'Ei. FTEI'iFT ----- SEl,lgi)E ,1L*Rl'1 --Ll l :LUE-OlL SrltlF I PIPI I1IG SUI.1P SENSOE OI]T ALNRT] I.1*R 7, 201 '-r 1 l : 33 *l.l FJEf,,]SOF OUT AI-,iFJ.I JAN ll, 30tE v:4:.i Al'l FUEL I1LC]RI"IJHl,l 11, ?0lE 9:41 Al"l HLilRll H I 91r:rEl' kfi!'t)llT ----- SENS(IR , rl-Alil-l L12:LUE_OI L : E. IELIiI.IITf,tpt N''j SUtlF SEflSilR oUT AL,rFl'lt"lAR 7, :,I:il9 11:3: Al+ FUEL ALARf.lI']HE 7. 2Ltl'l l Lr:49 *l"l EEI'1EOR OLIT HLrrRl.l JAN ll, 20lE 9:43 Al'l iiiirfEl1t'tar^t iit,xiEll!, i^^ * X xrl * EI'lIr . t t I I ;tririrEl,lI,r**,* )i^r}lEllfri*{}r HLAEII HISTOH"' EET'ORT '--- SEl,JL]H ,ilHLll - ' L13:LUE-OIL r:r 1,..1. I El.itl,tlr F,I PI IlG EUI"]P FUEL ALARI.! HUG 17, :l]lt ttt:0] Pt'l bEt'trfoR oLtT ;iL,lRm. l.1HE 7. 2uM 1 : ilr Htl ] FUEL ALAEI"Il.lflF 7, 201 ,,r r D : 5u Al"l i * * i ,( Elllr i a r r , CVE Cal- Valley Equipment 3500 Gilmore Ave. Bakersfield CA 93308 661 -327-9341 FAX# 661 -325-2529 VAPORLESS MANUFACTURING, INC. LDT-890 Leak Detector Test Record Technician Date Pass / Fail Product Manufacturer Leak rate Operating pressure Line pressure (pump off) Facility Address Bleed back (pump off) Step through time to full flow Stays in leak search position CERS = California Environmental Reporting System, ID = Identification, UST = Underground storage tank, ICC = International Code Council UNDERGROUND STORAGE TANK SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1) Type of Action Installation Test Repair Test 12 Month Test I. FACILITY INFORMATION CERS ID Date of Spill Container Test Business Name (Same as Facility Name or DBA-Doing Business As.) Business Site Address City ZIP Code II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Phone # ( ) - Ext. Contractor/Tank Tester License # ICC Certification # ICC Certification Expiration Date Spill Container Testing Training and Certifications (List applicable certifications.) III. SPILL CONTAINER TESTING INFORMATION Test Method Used: Manufacturer Guidelines: (Specify) Industry Code or Engineering Standard: (Specify) Engineered Method: (Specify) Attach the testing procedures and all documentation required to determine the results. # of Attached Pages Tank ID: (By tank number, stored product, etc.) Spill Container Manufacturer: Method of Cathodic Protection Non-Metallic Non-Metallic Non-Metallic Non-Metallic Isolation Isolation Isolation Isolation Other (Specify in section V.) Other (Specify in section V.) Other (Specify in section V.) Other (Specify in section V.) Inside Diameter of Spill Container: (Inches) Depth of Spill Container: (Inches) Does the spill container have a 5 gallon capacity? Yes No Yes No Yes No Yes No Method to Keep Spill Container Empty Drain Valve Drain Valve Drain Valve Drain Valve Onsite Pump Onsite Pump Onsite Pump Onsite Pump Other (Specify in section V.) Other (Specify in section V.) Other (Specify in section V.) Other (Specify in section V.) IV. SUMMARY OF TESTING RESULTS Spill Container Test Results Pass Fail Pass Fail Pass Fail Pass Fail V. COMMENTS All items marked “Fail” above must be explained in this section. Any additional comments may also be provided here. VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING I hereby certify that the spill containers were tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637.1 and all the information contained herein is accurate. UST Service Technician Signature If the facility has more components than this form accommodates, additional copies of this page may be attached. SPILL BUCKET TESTING INFORMATION Test Method Used: Test Equipment Used: Equipment Resolution: Identify Spill Bucket (By Tank Number, Stored Product, etc.) 1 2 3 4 Bucket Installation Type: Bucket Diameter: Bucket Depth: Wait time between applying vacuum/water and start of test: Test Start Time (TI): Initial Reading (RI): Test End Time (TF): Final Reading (RF): Test Duration (TF – TI): Change in Reading (RF - RI): Pass/Fail Threshold or Criteria: Test Result: