HomeMy WebLinkAboutOVERFILL 2020Testing and Inspection Certificate
Tanknology Inc.
11000 North MoPac Expressway, Suite 500, Austin, TX 78759
800-800-4633 www.tanknology.com Page 1 of 1
Test Date 9/14/2020 Tanknology WO#SC1-3452154
Test Purpose COMPLIANCE Customer PO#
Customer Location
7-ELEVEN, INC.
P.O. BOX 711
DALLAS, TX 75221
7-ELEVEN #32241, MKT 2368
4101 CALLOWAY DRIVE
BAKERSFIELD, CA 93312
Attn: ENVIRONMENTAL DEPARTMENT Attn: Iman 5/18/16
(972) 828-7575
(661) 379-5911
Test / Inspection Description Item Tested Date
Tested Result
Drop Tube/Drain Valve TankT4 RUL - Drain Valve 9/14/2020 Pass
Drop Tube/Drain Valve TankT4 RUL - Drop Tube 9/14/2020 Pass
Drop Tube/Drain Valve TankT5 PUL - Drain Valve 9/14/2020 Pass
Drop Tube/Drain Valve TankT5 PUL - Drop Tube 9/14/2020 Pass
Stage I Pressure Decay See test report for details 9/14/2020 Pass
CA Overfill Prevention Equipment Inspection Report T4 RUL 4 RUL 9/14/2020 Pass
CA Overfill Prevention Equipment Inspection Report T5 PUL 5 PUL 9/14/2020 Pass
Overfill Insp OPW Flapper Valve T4 RUL RUL 9/14/2020 Pass
Overfill Insp OPW Flapper Valve T5 PUL PUL 9/14/2020 Pass
Tanknology Representative: Mark Lindsey Technician: Edwin Pineda
Telephone: (800) 666-2176 Technician Certification: (See forms)
TP‐201.1C/D
Leak Rate of Drop Tube/Drain Valve Assembly and Leak Rate of Drop Tube Overfill Protection
Devices and Spill Container
Drain Valves Report Form
Permit Number: S‐3256‐1‐3 Test Company: TANKNOLOGY INC.
Site Name: 7‐ELEVEN #32241, MKT 2368 Technician: Edwin Pineda
Site Address: 4101 CALLOWAY DRIVE Certification Number Expiration Date
City: BAKERSFIELD Zip: 93312 District: SJV‐0227 4/4/2021
Date/Time of Test: 9/14/2020
DROP TUBE DRAIN VALVE AND OVERFILL PROTECTION DEVICE PRESSURE INTERGITY TEST
Straight Drop Tube1 Drop Tube with an Overfill Protection Device2
Drop Tube Drain Valve Pressure Test:
Flow rate 80 ml/min
Drop Tube Overfill Device Pressure Test:
Flow rate 200 ml/min “Corrected” Overfill Device Leak Rate
Time to reach 2 in.
w.c. at 80 ml/min
Drain valve
leak rate3
Final
pressure
Time to reach 2
in. w.c. at 200
ml/min
Overfill leak
rate3
Final
pressure
Overfill Device
Leak Rate
Minus Equals
Drain Valve
Leak Rate
Corrected Leak
Rate
Tank Grade mins.ml/min in. w.c.mins.ml/min in. w.c.ml/min ml/min ml/min
T4
RUL RUL 12 0.00 2.05 149 0.00 2.00 0.00 0.00 0.00
T5
PUL PUL 9 0.00 2.05 185 0.00 2.02 0.00 0.00 0.00
NOTES:1 A straight drop tube must be tested with a bladder in place and using a flow rate of 80 ml/min.
2 The bladder section of TP‐201.1D may be skipped if the entire drop tube passes with a leak rate below 80 ml/min
3 Leak rate = nitrogen flow rate needed to maintain a constant pressure (at least 2 in. w.c.) for 30 seconds.
I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry, the statements and
information provided in the document are true, accurate, and complete.
Signature of Technician:Date:9/14/2020
WO: 3452154 Ver. 1.0 – 12.26.07
2 inch Pressure Decay Test
TP201.3
Store Information Testing Company
Site Name :7-ELEVEN #32241, MKT 2368 Name :TANKNOLOGY INC.
Address :4101 CALLOWAY DRIVE
BAKERSFIELD, CA 93312
Address :11000 N. MoPac Expressway Suite 500
Austin, TX 78759
Phone :661-379-5911 Phone :(800) 800-4633
Stage I System?Dual
Stage II System?Assit
Total # of Nozzles :8
Products per Nozzle :3
Tanks Manifolded ?Yes
Drop-Out tank present?No
Total # of Tanks Tested :2
Tank Information :
Product Grade :
Tank Capacity, gallons :
Gasoline, gallons :
Ullage, gallons :
Testing Information :
Start Time :
Initial Pressure, wcg :
Pressure @ 1 minute(s) :
Pressure @ 2 minutes :
Pressure @ 3 minutes :
Pressure @ 4 minutes :
Pressure @ 5 minutes :
Allowable Final Pressure :
Pass/Fail (Enter "GF" Gross Failure)
T4 RUL
RUL
14544
12387
2157
13:20
2.00
2.00
2.00
2.00
2.00
2.00
1.83
Pass
T5 PUL
PUL
9695
5889
3806
Total
24239
18276
5963
All
13:20
2.00
2.00
2.00
2.00
2.00
2.00
1.83
Pass
Comments:
Tester :Edwin Pineda Test Date :9/14/2020
Signature :Work Order :3452154
WO: 3452154
UNDERGROUND STORAGE TANK
OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1)
Type of Action Installation Test Repair Test 36 Month Test
I. FACILITY INFORMATION
CERS ID
10024393
Date of Overfill Prevention Equipment Inspection:
9/14/2020
Business Name (Same as Facility Name or DBA-Doing Business As.)
7-ELEVEN #32241, MKT 2368
Business Site Address
4101 CALLOWAY DRIVE
City:
BAKERSFIELD
Zip:
93312
II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION
Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.)
Edwin Pineda
Phone #
(800) 800-4633
Contractor/Tank Tester License #
Class A General Engineering 743160
ICC Certification #
8373052
ICC Certification Expiration Date
6/17/2021
Spill Container Testing Training and Certifications (List applicable certifications.)
ICC - CA UST Service Technician 8373052 06/17/2021 OPW - EVR Phase 1 100776 01/05/2021
III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION
Test Method Used:
Manufacturer Guidelines (Specify)
Industry Code or Engineering Standard (Specify) PEI RP 1200
Engineered Method (Specify)
Attach the testing procedures and all documentation required to determine the results. # of Attached Pages:
1
Tank ID: (By tank number, stored product, etc.)
What is the tank inside diameter? (Inches)
Is the fill piping secondarily contained?
Is the vent piping secondarily contained?
Overfill Prevention Equipment Manufacturer(s)
What is the overfill prevention equipment response
when activated? (Check all that apply.)
Are flow restrictors installed on vent piping?
At what level in the tank is the overfill prevention set to
activate? (Inches from bottom of tank.)
What is the percent capacity of the tank at which the
overfill prevention equipment activates?
Is the overfill prevention in proper operating condition
to respond when the substance reaches the
appropriate level?
IV.
Overfill Prevention Inspection Results
T4 RUL
91.63 in.
Yes No
Yes No
Unknown
OPW
Shuts Off Flow
Restrict Flow
A/V Alarm
Yes No
80.75"
93.55%
Yes
No
(Specify in section V)
T5 PUL
91.63 in.
Yes No
Yes No
Unknown
OPW
Shuts Off Flow
Restrict Flow
A/V Alarm
Yes No
80.75"
93.13%
Yes
No
(Specify in section V)
Yes No
Yes No
Shuts Off Flow
Restrict Flow
A/V Alarm
Yes No
Yes
No
(Specify in section V)
Yes No
Yes No
Shuts Off Flow
Restrict Flow
A/V Alarm
Yes No
Yes
No
(Specify in section V)
SUMMARY OF TESTING RESULTS
Pass Fail Pass Fail Pass Fail Pass Fail
V. COMMENTS
All items marked failed above must be explained in this section. Any additional comments may also be provided here.
VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS
I hereby certify that the spill containers were tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section
2637.1 and all the information contained herein is accurate.
UST Service Technician Signature
If the facility has more components than this form accommodates, additional copies of this page may be attached.
CERS=California Environmental Reporting System, ID=Identification, UST=Underground storage tank, ICC=International Code Council
Overfill Prevention Equipment Inspection
OPW 61 and 71 Series Overfill Prevention Device Inspection
Date:9/14/2020
Customer Name:7-ELEVEN, INC.
Location #:7-ELEVEN #32241, MKT 2368
Location Address:4101 CALLOWAY DRIVE ,BAKERSFIELD ,CA , 93312
OPW Model Number:61SO
PART 1) Proper height setting calculation
Maximum Tank Volume per: Tank Chart A gallons
Max shut off requirement for Flapper is 95% B 95%
Multiply Maximum tank volume by 95% C gallons
Use tank chart to determine height of calculated volume D inches
Measure top of fill riser threads, or face seal adapter when used, to tank top E inches
Tank diameter From Chart F inches
Upper Tube in tank (G) F - D = G G inches
Subtract 2 inches from upper tube in tank G - 2"= H H inches
Calculated minimum upper tube length (I) H + E = I I inches
Actual measured upper tube length (Without fill
adapter) (J) J inches
PART 2) Device certification criteria evaluation
Criteria 1 Does the overfill prevention device meet the 95% requirement?
Criteria 1a If the final shutoff volume is installed greater than 95%, is there at
least 250 gallons of ullage above the overfill device activation point
to ensure that none of the tank top fittings are exposed to product,
meeting the criteria established in EPA 280.20iic and per OPW
installation guidelines.
Criteria 2 Is the Actual measured upper tube length 6.5 inches
or more than the fill riser? (J must be 6.5" or more
than E)
Criteria 3 Does the overfill prevention device function as
required? (Inspect the device for damage,
contamination, freedom of movement,
weakening due to wear and corrosion)
PART 3) Device Certification PASS / FAIL
Technician certifies that the device is operationally
compliant.
T4 RUL
14544.000
0.95
13816.800
82.500
60.875
91.625
9.125
7.125
68.000
69.250
Yes
NA
Yes
Yes
Pass
T5 PUL
9695.000
0.95
9210.250
82.375
58.125
91.625
9.250
7.250
65.375
67.125
Yes
NA
Yes
Yes
Pass
0.95
0.95
Comments:
Signature of Technician: Date: 9/14/2020
Edwin Pineda
WO: SC1- 3452154
Site Diagram
(This site diagram is for reference only and is not drawn to scale)
Work Order:3452154
Site ID / Name:32241 / 7-ELEVEN #32241, MKT 2368
Address:4101 CALLOWAY DRIVE
City:BAKERSFIELD State:CA Zip:93312
W.O.# SC1-3452154
OVF
W.O.# SC1-3452154
TAPES
W.O.# SC1-3452154