The following test report(s) are included:
- Secondary Containment Test
Please do not hesitate to call me at (949) 460-5200 if you have any questions or concerns regarding this work.
Project Coordinator
Zac Kavanaugh
10025545 02/25/2021
Costco Wholesale - BAKERSFIELD - 0688
3800 Rosedale Highway Bakersfield 93308
Belshire Environmental (949) 460-5200
25971 Towne Centre Drive, Foothill Ranch, CA 92610
Jeff Badders
808313
5252456 05/29/2021
See Attached
02/25/2021
PEI - RP1200/Manufacturer
PEI - RP1200/Manufacturer
Tanks
Piping
PEI - RP1200 Containment Sumps
Unleaded 87A - T1 Unleaded 87B - T2 Premium - T3 Diesel - T5
Vacuum Pump & Gauges
Containment Solutions Containment Solutions Containment Solutions Containment Solutions
20000 20000 20000 15000
No Loss in Vacuum No Loss in Vacuum No Loss in Vacuum No Loss in Vacuum
Unleaded 87A T1 - Product Unleaded 87B T2 - Product Premium A - Product Premium B - Product
Environ Environ Environ Environ
08:00am 08:00am 08:15am 08:15am
5 5 5 5
09:00am 09:00am 09:15am 09:15am
0 0 1 5
-5 -5 -4 0
No Pressure Change No Pressure Change No Pressure Change No Pressure Change
Gas Additive - Product 87 Manifold 87 Siphon Vapor Return - Vapor/Vent
Ameron Environ AO Smith AO Smith
11:30am 09:15am 08:15am 11:30am
5 5 5 5
12:30pm 10:15am 09:15am 12:30pm
5 5 5 5
0 0 0 0
No Pressure Change No Pressure Change No Pressure Change No Pressure Change
EXEMPT EXEMPT EXEMPT EXEMPT
Fail Fail Fail Pass
Pass Pass Pass Pass
Pressurized Nitrogen & Gauges
Vacuum Pump & Gauges
Diesel - Product Diesel - Vent
No Pressure Change No Pressure Change
EXEMPT EXEMPT
Pressurized Nitrogen & Gauges
Unleaded 87A T1 - Turbine Unleaded 87B T2 - Turbine Premium T3 - Turbine Gas Additive - Transition
Containment Solutions Containment Solutions Containment Solutions Containment Solutions
70 67 64 32
24 20 16 14
10:26am 10:26am 10:26am 01:10am
6.1955 1 1 4.4072
10:41am 10:41am 10:41am 01:25pm
6.1961 0 0 4.4071
0.0006 -1 -1 -0.0001
0.002 0.002 0.002 0.002
Diesel - Turbine Unleaded 87A T1 - Fill Unleaded 87B T2 - Fill Premium - Fill
Containment Solutions Containment Solutions Containment Solutions
67 64 60
32 30 34
12:05pm 11:28am 11:28am
3.9912 5.6853 6.7304
12:20pm 11:43am 11:43am
3.9921 5.6864 6.7298
0.0009 0.0011 -0.0006
0.002 0.002 0.002 0.002
Incon Sump Test System
Pass Fail Fail Pass
EXEMPT Pass Pass Pass
Diesel - Fill Dispenser 1-2 Dispenser 3-4 Dispenser 5-6
Containment Solutions Environ Environ Environ
36 36 32
11 11 11
01:54pm 01:54pm 01:54pm
1 1 1
02:09pm 02:09pm 02:09pm
0 0 0
-1 -1 -1
0.002 0.002 0.002 0.002
Dispenser 7-8 Dispenser 9-10 Dispenser 11-12 Dispenser 13-14
Environ Environ Environ
32 24 24
11 11 11
01:54pm 02:12pm 01:54pm
4.0714 2.9688 4.3551
02:09pm 02:27pm 02:09pm
4.0717 2.9686 4.3549
0.0003 -0.0002 -0.0002
0.002 0.002 0.002 0.002
Incon Sump Test System
EXEMPT Fail Fail Fail
Pass Pass Pass EXEMPT
Dispenser 15-16
0.002
Incon Sump Test System
EXEMPT
Component Comment
Unleaded 87A T1 - Product Failed at dispenser 3/4 due to bad test boots
Unleaded 87B T2 - Product Failed at dispenser 1/2 & 5/6 due to bad test boots.
Premium A - Product
Unleaded 87B T2 - Turbine Not tested due to bad pen
Premium T3 - Turbine Not tested due to bad pen
Dispenser 1-2 Not tested due to bad test boot on the 87 B line
Dispenser 3-4 Not tested due to bad test boot on the 87 A line
Dispenser 5-6 Not tested due to bad test boot on the 87 B line.
Spill Bucket Integrity Testing
Hydrostatic Test Method
Facility:Costco Wholesale - BAKERSFIELD - 0688 Date:02/25/2021
Address:3800 Rosedale Highway
Bakersfield, CA 93308City, State, Zip:
Belshire Environmental
This procedure is to test the leak integrity of single- and double-walled spill buckets using PEI/RP1200 Section 6.2 for
hydrostatic testing.
Comments:
Testing Company:
Jeff BaddersTester Name:
Spill Bucket ID:Unleaded 87A-T1 Unleaded 87B-T2 Premium-T3 Diesel-T5 Unleaded 87A-T1
Spill Bucket Capacity
Manufacturer Franklin Fueling Franklin Fueling Franklin Fueling OPW Franklin Fueling
Construction Single-walled
Double-walled
Single-walled
Double-walled
Single-walled
Double-walled
Single-walled
Double-walled
Single-walled
Double-walled
Spill Bucket Type Fill Fill Fill Fill Vapor
Liquid and debris removed
from spill bucket?*Yes No Yes No Yes No Yes No Yes No
Visual Inspection:Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail
Tank riser cap included
in test?Yes No NA
Drain valve included in
test?
Starting Level 4.0337 2.0127
Test Start Time 03:01pm 08:06am
Ending Level 4.0329 2.0126
Test Period
Level Change
Pass/fail criteria: Must pass visual inspection and hydrostatic water level drop of less than 1/8inch.
Test End Time 03:16pm 08:21am
Test Results:Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail
Yes No NA Yes No NA Yes No NA Yes No NA
Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA
*All liquids and debris must be disposed of properly# No cracks, loose parts or separation of the bucket from the fill pipe.
Inside Diameter of Bucket 12 12 12 12 12
Depth of Spill Container 15 15 15 18 16
Method of Cathotic
Protection
Non-Metallic
Other
Non-Metallic
Other
Non-Metallic
Other
Non-Metallic
Other
Non-Metallic
Other
Isolation Isolation Isolation Isolation Isolation
Method to Keep Spill
Container Empty:
Drain Valve Drain Valve Drain Valve Drain Valve Drain Valve
Onsite Pump Onsite Pump Onsite Pump Onsite Pump Onsite Pump
#
Technician Signature:Date:02/25/2021
Component Comment
Unleaded 87A - T1 - Fill
Unleaded 87B - T2 - Fill
Premium - T3 - Fill
Spill Bucket Integrity Testing
Hydrostatic Test Method
Facility:Costco Wholesale - BAKERSFIELD - 0688 Date:02/25/2021
Address:3800 Rosedale Highway
Bakersfield, CA 93308City, State, Zip:
Belshire Environmental
This procedure is to test the leak integrity of single- and double-walled spill buckets using PEI/RP1200 Section 6.2 for
hydrostatic testing.
Comments:
Testing Company:
Jeff BaddersTester Name:
Spill Bucket ID:Unleaded 87B-T2 Premium-T3
Spill Bucket Capacity
Manufacturer Franklin Fueling Franklin Fueling
Construction Single-walled
Double-walled
Single-walled
Double-walled
Single-walled
Double-walled
Single-walled
Double-walled
Single-walled
Double-walled
Spill Bucket Type Vapor Vapor
Liquid and debris removed
from spill bucket?*Yes No Yes No Yes No Yes No Yes No
Visual Inspection:Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail
Tank riser cap included
in test?Yes No NA
Drain valve included in
test?
Starting Level 3.2053 2.3227
Test Start Time 08:06am 08:06am
Ending Level 3.2048 2.3218
Test Period
Level Change
Pass/fail criteria: Must pass visual inspection and hydrostatic water level drop of less than 1/8inch.
Test End Time 08:21am 08:21am
Test Results:Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail
Yes No NA Yes No NA Yes No NA Yes No NA
Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA
*All liquids and debris must be disposed of properly# No cracks, loose parts or separation of the bucket from the fill pipe.
Inside Diameter of Bucket 12 12
Depth of Spill Container 17 16
Method of Cathotic
Protection
Non-Metallic
Other
Non-Metallic
Other
Non-Metallic
Other
Non-Metallic
Other
Non-Metallic
Other
Isolation Isolation Isolation Isolation Isolation
Method to Keep Spill
Container Empty:
Drain Valve Drain Valve Drain Valve Drain Valve Drain Valve
Onsite Pump Onsite Pump Onsite Pump Onsite Pump Onsite Pump
#
Technician Signature:Date:02/25/2021
Component Comment
l
Last First Training Date Expiration
Badders Jeff Emco Wheaton Phase I and Phase II EVR 05/19/2020 05/19/2022
Badders Jeff Franklin DC400 Dispensing Cutoff (formerly Beaudre 09/30/2019 09/30/2021
Badders Jeff Franklin Flexible Connectors (Formerly Flex-ing)07/15/2019 07/15/2021
Badders Jeff Franklin Fueling Defender Spill Buckets 07/19/2019 07/19/2021
Badders Jeff Franklin Fueling Overfill Prevention 09/03/2019 09/03/2021
Badders Jeff Franklin Fueling Phase I - VR-101 (Formerly Phil
Tite)
07/19/2019 07/19/2021
Badders Jeff Franklin Submersible Pumps/Forecourt Specialist 07/19/2019 07/19/2021
Badders Jeff Healy Systems, Inc. Stage II Vapor Recovery 07/29/2019 07/29/2021
Badders Jeff Hose Master Installer Training 09/09/2019 09/09/2021
Badders Jeff INCON Level 1 - FMS Installation (EVO)01/06/2020 01/06/2022
Badders Jeff INCON Level 2 - FMS Programming 01/06/2020 01/06/2022
Badders Jeff INCON Level 4 - Franklin Sump Test System 10/28/2020 10/28/2022
Badders Jeff Modern Welding Tank Installation 12/06/2018 12/06/2021
Badders Jeff Morrison Brothers VR-402 (Phase I EVR for ASTs)01/04/2018 01/04/2022
Badders Jeff NOV FiberGlass Systems Piping (Formerly AO
Smith)
10/15/2020 10/15/2023
Badders Jeff OPW EVR Phase I - AST 05/02/2019 05/02/2021
Badders Jeff OPW EVR Phase I - UST 05/02/2019 05/02/2021
Badders Jeff OPW Fueling Containment Systems - FlexWorks 08/02/2019 08/02/2021
Badders Jeff PEI RP1200 Testing/Verification of UST Equipment 09/14/2018
Badders Jeff Ronan Authorized Service Contractor 06/26/2020 06/26/2022
Badders Jeff Vaporless LDT-890 Leak Detector Tester 10/29/2020 10/29/2022
Badders Jeff Vaporless Mechanical LLD Installer 10/29/2020 10/29/2022
Badders Jeff Veeder Root Level 2/3/4 11/13/2020 11/13/2022
Badders Jeff VST - Hanging Hardware Installation 11/06/2020 11/06/2022
Badders Jeff Xerxes UST Installation Training Seminar 09/14/2018 09/14/2021
Training Certificates