Loading...
HomeMy WebLinkAboutSB-989 2021 (2)Transmittal Date:03/03/2021 To:Kris Karns 1500 Truxtun Ave 1st Floor Bakersfield, CA 93301 Send Via:Email Re:Costco Wholesale - BAKERSFIELD - 0688 3800 Rosedale Highway Bakersfield, CA 93308 The following test report(s) are included: - Secondary Containment Test Please do not hesitate to call me at (949) 460-5200 if you have any questions or concerns regarding this work. Project Coordinator Zac Kavanaugh 10025545 02/25/2021 Costco Wholesale - BAKERSFIELD - 0688 3800 Rosedale Highway Bakersfield 93308 Belshire Environmental (949) 460-5200 25971 Towne Centre Drive, Foothill Ranch, CA 92610 Jeff Badders 808313 5252456 05/29/2021 See Attached 02/25/2021 PEI - RP1200/Manufacturer PEI - RP1200/Manufacturer Tanks Piping PEI - RP1200 Containment Sumps Unleaded 87A - T1 Unleaded 87B - T2 Premium - T3 Diesel - T5 Vacuum Pump & Gauges Containment Solutions Containment Solutions Containment Solutions Containment Solutions 20000 20000 20000 15000 No Loss in Vacuum No Loss in Vacuum No Loss in Vacuum No Loss in Vacuum Unleaded 87A T1 - Product Unleaded 87B T2 - Product Premium A - Product Premium B - Product Environ Environ Environ Environ 08:00am 08:00am 08:15am 08:15am 5 5 5 5 09:00am 09:00am 09:15am 09:15am 0 0 1 5 -5 -5 -4 0 No Pressure Change No Pressure Change No Pressure Change No Pressure Change Gas Additive - Product 87 Manifold 87 Siphon Vapor Return - Vapor/Vent Ameron Environ AO Smith AO Smith 11:30am 09:15am 08:15am 11:30am 5 5 5 5 12:30pm 10:15am 09:15am 12:30pm 5 5 5 5 0 0 0 0 No Pressure Change No Pressure Change No Pressure Change No Pressure Change EXEMPT EXEMPT EXEMPT EXEMPT Fail Fail Fail Pass Pass Pass Pass Pass Pressurized Nitrogen & Gauges Vacuum Pump & Gauges Diesel - Product Diesel - Vent No Pressure Change No Pressure Change EXEMPT EXEMPT Pressurized Nitrogen & Gauges Unleaded 87A T1 - Turbine Unleaded 87B T2 - Turbine Premium T3 - Turbine Gas Additive - Transition Containment Solutions Containment Solutions Containment Solutions Containment Solutions 70 67 64 32 24 20 16 14 10:26am 10:26am 10:26am 01:10am 6.1955 1 1 4.4072 10:41am 10:41am 10:41am 01:25pm 6.1961 0 0 4.4071 0.0006 -1 -1 -0.0001 0.002 0.002 0.002 0.002 Diesel - Turbine Unleaded 87A T1 - Fill Unleaded 87B T2 - Fill Premium - Fill Containment Solutions Containment Solutions Containment Solutions 67 64 60 32 30 34 12:05pm 11:28am 11:28am 3.9912 5.6853 6.7304 12:20pm 11:43am 11:43am 3.9921 5.6864 6.7298 0.0009 0.0011 -0.0006 0.002 0.002 0.002 0.002 Incon Sump Test System Pass Fail Fail Pass EXEMPT Pass Pass Pass Diesel - Fill Dispenser 1-2 Dispenser 3-4 Dispenser 5-6 Containment Solutions Environ Environ Environ 36 36 32 11 11 11 01:54pm 01:54pm 01:54pm 1 1 1 02:09pm 02:09pm 02:09pm 0 0 0 -1 -1 -1 0.002 0.002 0.002 0.002 Dispenser 7-8 Dispenser 9-10 Dispenser 11-12 Dispenser 13-14 Environ Environ Environ 32 24 24 11 11 11 01:54pm 02:12pm 01:54pm 4.0714 2.9688 4.3551 02:09pm 02:27pm 02:09pm 4.0717 2.9686 4.3549 0.0003 -0.0002 -0.0002 0.002 0.002 0.002 0.002 Incon Sump Test System EXEMPT Fail Fail Fail Pass Pass Pass EXEMPT Dispenser 15-16 0.002 Incon Sump Test System EXEMPT Component Comment Unleaded 87A T1 - Product Failed at dispenser 3/4 due to bad test boots Unleaded 87B T2 - Product Failed at dispenser 1/2 & 5/6 due to bad test boots. Premium A - Product Unleaded 87B T2 - Turbine Not tested due to bad pen Premium T3 - Turbine Not tested due to bad pen Dispenser 1-2 Not tested due to bad test boot on the 87 B line Dispenser 3-4 Not tested due to bad test boot on the 87 A line Dispenser 5-6 Not tested due to bad test boot on the 87 B line.              Spill Bucket Integrity Testing Hydrostatic Test Method Facility:Costco Wholesale - BAKERSFIELD - 0688 Date:02/25/2021 Address:3800 Rosedale Highway Bakersfield, CA 93308City, State, Zip: Belshire Environmental This procedure is to test the leak integrity of single- and double-walled spill buckets using PEI/RP1200 Section 6.2 for hydrostatic testing. Comments: Testing Company: Jeff BaddersTester Name: Spill Bucket ID:Unleaded 87A-T1 Unleaded 87B-T2 Premium-T3 Diesel-T5 Unleaded 87A-T1 Spill Bucket Capacity Manufacturer Franklin Fueling Franklin Fueling Franklin Fueling OPW Franklin Fueling Construction Single-walled Double-walled Single-walled Double-walled Single-walled Double-walled Single-walled Double-walled Single-walled Double-walled Spill Bucket Type Fill Fill Fill Fill Vapor Liquid and debris removed from spill bucket?*Yes No Yes No Yes No Yes No Yes No Visual Inspection:Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Tank riser cap included in test?Yes No NA Drain valve included in test? Starting Level 4.0337 2.0127 Test Start Time 03:01pm 08:06am Ending Level 4.0329 2.0126 Test Period Level Change Pass/fail criteria: Must pass visual inspection and hydrostatic water level drop of less than 1/8inch. Test End Time 03:16pm 08:21am Test Results:Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA *All liquids and debris must be disposed of properly# No cracks, loose parts or separation of the bucket from the fill pipe. Inside Diameter of Bucket 12 12 12 12 12 Depth of Spill Container 15 15 15 18 16 Method of Cathotic Protection Non-Metallic Other Non-Metallic Other Non-Metallic Other Non-Metallic Other Non-Metallic Other Isolation Isolation Isolation Isolation Isolation Method to Keep Spill Container Empty: Drain Valve Drain Valve Drain Valve Drain Valve Drain Valve Onsite Pump Onsite Pump Onsite Pump Onsite Pump Onsite Pump # Technician Signature:Date:02/25/2021 Component Comment Unleaded 87A - T1 - Fill Unleaded 87B - T2 - Fill Premium - T3 - Fill Spill Bucket Integrity Testing Hydrostatic Test Method Facility:Costco Wholesale - BAKERSFIELD - 0688 Date:02/25/2021 Address:3800 Rosedale Highway Bakersfield, CA 93308City, State, Zip: Belshire Environmental This procedure is to test the leak integrity of single- and double-walled spill buckets using PEI/RP1200 Section 6.2 for hydrostatic testing. Comments: Testing Company: Jeff BaddersTester Name: Spill Bucket ID:Unleaded 87B-T2 Premium-T3 Spill Bucket Capacity Manufacturer Franklin Fueling Franklin Fueling Construction Single-walled Double-walled Single-walled Double-walled Single-walled Double-walled Single-walled Double-walled Single-walled Double-walled Spill Bucket Type Vapor Vapor Liquid and debris removed from spill bucket?*Yes No Yes No Yes No Yes No Yes No Visual Inspection:Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Tank riser cap included in test?Yes No NA Drain valve included in test? Starting Level 3.2053 2.3227 Test Start Time 08:06am 08:06am Ending Level 3.2048 2.3218 Test Period Level Change Pass/fail criteria: Must pass visual inspection and hydrostatic water level drop of less than 1/8inch. Test End Time 08:21am 08:21am Test Results:Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA *All liquids and debris must be disposed of properly# No cracks, loose parts or separation of the bucket from the fill pipe. Inside Diameter of Bucket 12 12 Depth of Spill Container 17 16 Method of Cathotic Protection Non-Metallic Other Non-Metallic Other Non-Metallic Other Non-Metallic Other Non-Metallic Other Isolation Isolation Isolation Isolation Isolation Method to Keep Spill Container Empty: Drain Valve Drain Valve Drain Valve Drain Valve Drain Valve Onsite Pump Onsite Pump Onsite Pump Onsite Pump Onsite Pump # Technician Signature:Date:02/25/2021 Component Comment l Last First Training Date Expiration Badders Jeff Emco Wheaton Phase I and Phase II EVR 05/19/2020 05/19/2022 Badders Jeff Franklin DC400 Dispensing Cutoff (formerly Beaudre 09/30/2019 09/30/2021 Badders Jeff Franklin Flexible Connectors (Formerly Flex-ing)07/15/2019 07/15/2021 Badders Jeff Franklin Fueling Defender Spill Buckets 07/19/2019 07/19/2021 Badders Jeff Franklin Fueling Overfill Prevention 09/03/2019 09/03/2021 Badders Jeff Franklin Fueling Phase I - VR-101 (Formerly Phil Tite) 07/19/2019 07/19/2021 Badders Jeff Franklin Submersible Pumps/Forecourt Specialist 07/19/2019 07/19/2021 Badders Jeff Healy Systems, Inc. Stage II Vapor Recovery 07/29/2019 07/29/2021 Badders Jeff Hose Master Installer Training 09/09/2019 09/09/2021 Badders Jeff INCON Level 1 - FMS Installation (EVO)01/06/2020 01/06/2022 Badders Jeff INCON Level 2 - FMS Programming 01/06/2020 01/06/2022 Badders Jeff INCON Level 4 - Franklin Sump Test System 10/28/2020 10/28/2022 Badders Jeff Modern Welding Tank Installation 12/06/2018 12/06/2021 Badders Jeff Morrison Brothers VR-402 (Phase I EVR for ASTs)01/04/2018 01/04/2022 Badders Jeff NOV FiberGlass Systems Piping (Formerly AO Smith) 10/15/2020 10/15/2023 Badders Jeff OPW EVR Phase I - AST 05/02/2019 05/02/2021 Badders Jeff OPW EVR Phase I - UST 05/02/2019 05/02/2021 Badders Jeff OPW Fueling Containment Systems - FlexWorks 08/02/2019 08/02/2021 Badders Jeff PEI RP1200 Testing/Verification of UST Equipment 09/14/2018 Badders Jeff Ronan Authorized Service Contractor 06/26/2020 06/26/2022 Badders Jeff Vaporless LDT-890 Leak Detector Tester 10/29/2020 10/29/2022 Badders Jeff Vaporless Mechanical LLD Installer 10/29/2020 10/29/2022 Badders Jeff Veeder Root Level 2/3/4 11/13/2020 11/13/2022 Badders Jeff VST - Hanging Hardware Installation 11/06/2020 11/06/2022 Badders Jeff Xerxes UST Installation Training Seminar 09/14/2018 09/14/2021 Training Certificates