Loading...
HomeMy WebLinkAboutSB989 2021 Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 6 Month ܆ 36 Month CERS ID Test Date Facility Name Facility Address City ZIP Code Company Performing the Test Phone Mailing Address Service Technician Performing Test Contractor/Tank Tester License Number ICC Number ICC Expiration Date Manufacturer and Test Equipment Training Certifications Expiration Date Test Procedures Used Components Tested I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST 10155965 2-12-2021 Jaco #5562 Fastrip #6 1640 South Chester Avenue Bakersfield 93304 Confidence UST Services, Inc.(800) 339-9930 16250 Meacham Road, Bakersfield, CA 93314 Justin Williams 804904 8819073 8-27-22 ICC Tech 8819073 8-27-22 Incon level 4 1027843710 10-3-22 Incon 87 east stp Precision mechanical test gauge Tank annular’s and 87 east product secondary 2-12-2021 4 Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic Test Equipment Used: Tank ID Tank Manufacturer Tank Capacity Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic Test Equipment Used: Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail Additional copies of this page may be attached. 6. TANK SECONDARY CONTAINMENT TEST 7. PIPE SECONDARY CONTAINMENT TEST Precision mechanical test gauge 87 west Unknown 12k gallon 9:00 am 10 hg 10:00 am 10 hg 0.00” 0.00” Precision mechanical test gauge 87 east product Smith 9:00 am 5 psi 10:00 am 5 psi 0.00” 0.00” 87 east Unknown 12k gallon 9:00 am 10 hg 10:00 am 10 hg 0.00” 0.00” 91 Unknown 12k gallon 9:00 am 10 hg 10:00 am 10 hg 0.00” 0.00” Diesel Unknown 12k gallon 9:00 am 10 hg 10:00 am 10 hg 0.00” 0.00” Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ܆܆ Manufacturer ܆ Industry Standard ܆ Professional Engineer Test Type ܆ Pressure ܆ Vacuum ܆ Hydrostatic Test Equipment Used: Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST Incon 87 east STP Unknown 38” 24” 10:03 am 4.260” 10:18 am 4.258” 0.002” 0.002” Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 9. COMMENTS JW 2-12-21: Repair and retest 87 east product secondary and 87 east STP. Installed new split repair test boot on 87 east product secondary. Tested both the 87 east product secondary and STP. Both tests passed with no other repairs. Left site with all functions normal.