Loading...
HomeMy WebLinkAbout5625 Gosford Road Final ELD 10-24-20 UST System Post Installation Test Report ELD Test Date: Customer: Location: Tested By: CGRS, Inc. 5444 Dry Creek Road Sacramento, CA 95838 Project No:61-21860 Jauregui & Culver Inc. Sam's Club #4819 959 W. Mission Ave. Escondido, CA 92025 5625 Gosford Rd. Bakersfield, CA 93313 October 24, 2020 ® Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services Test Certification Post Installation Enhanced Leak Detection (ELD) October 24, 2020 61-21860 Sam's Club #4819 5625 Gosford Rd. Bakersfield, CA 93313 Sergio L. Nunez Date VR Date Primary Containment System PASS 87 PL North/South Primary Containment System PASS 91 PL North/South Primary Containment System PASS Post Installation ELD Test Results 10/24/2020 10/26/2020 This document certifies that the product lines listed below at the above referenced location have been tested and passed the iota®VaporTite V005 tightness test.CGRS further certifies that the iota®VaporTite V005 meets the post installation testing requirements for post installation testing for newly installed underground storage tank systems as per the California Health and Safety Code,Chapter 6.7,section 25290.1(j)(1). Final Test Date:IOTA Technicians: Site Information CGRS Project No :61-21860 Installation Contractor Information Facility:Customer Name: Address:Address: City, State, Zip:City, State, Zip: County:Contact: CUPA Contact:Phone/Email: CUPA Email: Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result Tank 1 20,000 87 Octane DW Fiberglass Xexes Yes N/A Tank 2 20,000 87 Octane DW Fiberglass Xexes Yes N/A Tank 3 12,000 91 Octane DW Fiberglass Xexes Yes N/A Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result S1 42 50 299.88 87 TS1 PASS S2 42 50 299.88 87 FS1 PASS S3 42 50 299.88 87 TS2 PASS S4 42 50 299.88 87 FS2 PASS S5 42 50 299.88 91 TS PASS S6 42 50 299.88 91 FS PASS Junction Boxes with Tank Connection Description Test Result S1 Tank Probe and Turbine J-Box Open During Test PASS S3 Tank Probe and Turbine J-Box Open During Test PASS S5 Tank Probe and Turbine J-Box Open During Test PASS UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result UDC1 42 22 32 128.00 Bravo PASS UDC2 42 22 32 128.00 Bravo PASS Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result N/A N/A N/A N/A N/A N/A N/A Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result 87 PL North NOV DW Fiberglass 2 75 PASS 87 PL South NOV DW Fiberglass 2 75 PASS 91 PL North NOV DW Fiberglass 2 75 PASS 91 PL South NOV DW Fiberglass 2 75 PASS Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result N/A N/A N/A N/A N/A PASS Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result VR NOV DW Fiberglass 3 100 PASS Reviewed By Date IOTA Tech Signature Date Final ELD Test Project Worksheet 10/24/2020 Sam's Club #4819 Jauregui & Culver Inc. Sergio L. Nunez kkarns@bakersfieldfire.us; hwines@bakersfieldfire.us PIPING TANKS 5625 Gosford Rd.959 W. Mission Ave. Escondido, CA 92025 COMPONENTS IN CONTAINMENT Kern Matt Jauregui Bakersfield FD; Howard Wines; Kris Karns 760-743-0518/matt@jcincorp.net Leak Logs / Repair Bakersfield, CA 93313 10/24/2020 CA License No. 10/26/2020 06-1727 Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services VR PASS 10/26/2020 Date 10/24/2020 Date 87 PL PASS 91 PL PASS COMPONENTS RESULTS Piping Secondary Communication Confirmation 5625 Gosford Rd.Sergio L. Nunez Bakersfield, CA 93313 Secondary Flow Communication Test Certification 61-21860 Sam's Club #4819 October 24, 2020 CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed throughout the secondary piping components listed below.