HomeMy WebLinkAboutRES NO 052-2021RESOLUTION NO.
052
—2 02 1
RESOLUTION OF THE CITY OF BAKERSFIELD
ADOPTING THE EASTSIDE CANAL CROSSINGS
PLANNED MAJOR THOROUGHFARE AREA AND
MAKING FINDINGS RELATIVE THERETO. (WARD 1)
X-Refo
WHEREAS, by Resolution of Intention No. 2077, adopted February 17,
2021, a public hearing was called for March 17, 2021, at the hour of 5:15 pm in the
Council chambers in the City Hall, 1501 Truxtun Avenue, Bakersfield, California,
regarding the establishment of the Eastside Canal Crossings Planned Major
Thoroughfare Area; and.
WHEREAS, notice of such hearing has been given to all affected property
owners as such are shown on the latest equalized assessment roll; and,
WHEREAS, such hearing has been duly and regularly held, and all
persons interested have been given an opportunity to appear and be heard.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of
Bakersfield as follows:
1. The foregoing recitals are true and correct and incorporated herein
by reference.
2. The facilities in the Eastside Canal Crossings Planned Major
Thoroughfare Area are located on roads identified in the circulation element of the 2010
General Plan.
3. The Eastside Canal Crossings Planned Major Thoroughfare Area is
in addition to existing major thoroughfares serving the area.
4. No majority protest as to the formation of the Eastside Canal
Crossings Planned Major Thoroughfare Area exists.
5. The Council hereby finds that, as to the Eastside Canal Crossings
Planned Major Thoroughfare Area, as described in the plans and maps attached hereto
and incorporated herein by reference, subdivision and development of property within
each such area will require construction of facilities, described in each such area either
on the basis of benefits conferred on property for subdivision or on the need for such
facilities created by the proposed subdivision and development of other property within
such area, and that the fees provided within the schedule attached, are fairly
apportioned.
6. The Eastside Canal Crossings Planned Major Thoroughfare Area
Plan is hereby adopted.
---------- 00000 ----------
AKF9
-r
m
~ r
V O
ORIGINAL
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by
the Council of the City of Bakersfield at a regular meeting thereof held on
MAR 17 2021, by the following vote:
CD- COUNCILMEMBER: ARIAS, GONZALES, WEIR, SMITH, FREEMAN, GRAY, PARLIER
NOES: COUNCILMEMBER: fyO.,&—
ABSTAIN: COUNCILMEMBER: 0+4.
ABSENT: COUNCILMEMBER:
J LIE DRIMIKIS, CMC
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED: MAR 17 2011
By: t;0(/4aWU1/
KAREN GOH, Mayor
CITY OF BAKERSFIELD
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
VIRIDIANA GALLARDO-KING
Deputy City Attorney
Attachments:
Exhibit "A" Cost Estimate
Exhibit "B" Fee Schedule
Exhibit "C" Map of Improvements
Exhibit "D" Map of Benefit Area
S:\PROJECTS\Bridge District\MBTA Packet\5_Res Est Example.DOC
oQ�AKF�
n
U r—
CRIG!NAL
Exhibit A
Eastside Canal — Major Bridge and Thoroughfare District
District improvements encompass both City and County property. Improvements include widening of canal
crossing at Redbank Road, construction of canal crossing at E Wilson Road and widening of canal crossing at
Muller Road. The individual improvements are described below. The Cost of the improvements are divided
into 3 sub -districts each, encompasses a one square mile area centered at each crossing. Only undeveloped
parcels are included in the District. The total acreage of each parcel is included, even if only a part of the
parcel is in the 1 mile service area. Due to the proximity of the crossings there is an overlap of the districts.
In an attempt at fairness in the distribution of the cost, these sub -districts are divided into 2 north and south
sub -districts each. The parcels included in each district and sub -districts are shown in Figure 1 and in Table 1
and Tablet below.
Sub -District 1
Sub -District 2
Sub -District 3
173-080-03
173-240-17
173-291-17
173-080-05
173-260-01
173-291-38
1 173-090-06 1 173-260-16 1 173-292-05 1
1 173-260-03 1 173-270-14 1 173-293-35 1
1 173-260-11 1 173-270-15 1 173-293-36 1
1 173-270-07 1 173-291-17 1 174-020-09 1
174-020-12
1 173-270-23 1 173-292-03 1 177-182-51 1
1 1 173-293-34 1 177-280-19 1
177-
177 -
Table 1
Exhibit A
Sub -District
Sub -District
Sub -District
Sub -District
Sub -District
Sub -District
1 North
1 South
2 North
2 South
3 North
3 South
173-080-03
173-240-17
173-240-17
173-291-17
173-291-17
174-013-07
173-080-05
173-260-01
173-260-01
173-291-38
173-291-38
174-020-06
173-080-06
173-260-03
173-260-03
173-291-39
173-291-39
174-020-09
173-080-13
173-090-06 173-260-16
173-260-16
173-292-05
173-292-05
174-020-17
173-270-07
173-270-07
173-293-14
173-293-14
177-280-17
173-270-08
173-270-08
173-293-34
173-293-34
177-280-18
173-270-14
173-270-14
173-293-35
173-293-35
177-280-19
1 1 173-280-13 1 173-280-13 1 1 1 177-280-22 1
177-280-30
177-280-40
Table 2
CRIGNAL
Exhibit A
The cost for the improvements shown in Exhibit C as as follow:
Eastside Canal - Major Bridge and Thoroughfare District Date: 12/30/2020
Redbank Road and Wilson Road Crossing Job No: 5046
Area: 958.51 Acres Prepared By: MAL
Item No. Item Description Qty Unit Unit $ Item $ TOTALS
MB&TD Costs for Canal Crossing Improvements
Redbank Road Canal Crossing
1405.00
Canal Crossing Widening - Headwall and
1.
grading included
2.
Remove Concrete Head Wall
3.
Retaing Wall
4.
6' Chainlink Canal Fence
5.
21' Pipe Gate
6.
6" Curb & Gutter
7.
Sidewalk
8.
Driveway
9.
Sawcut
10.
Pavement Removal (disposal off-site)
11.
AC Paving / Agg Base / Subgrade
12.
Pole relocaton
13.
Canal Gate Replacement
Kern Delta Fees
14. Seepage Loss Fee
15. Plan Review Fee
16. Encroachment Permit
Surveying and Design Engineering
17. Engineering and Surveying
30
If
1405.00
42,150
2
ea
2000.00
4,000
38
If
80.00
3,040
277
If
10.00
2,770
1
ea
4000.00
4,000
76
If
40.00
3,040
285
sf
6.00
1,710
198
sf
9.00
1,782
80
If
3.00
240
76
sf
0.95
72
1273
sf
6.20
7,893
1
ea
15000.00
15,000
1
ea
15000.00
15,000
5,000
27. Encroachment Permit
Subtotal 100,697
32
If
249.47
7,983
2
Is
5000.00
10,000
2
Is
500.00
1,000
Subtotal 18,983
1
Is
10000.00
10000.00
Subtotal 10,000
Subtotal Costs 129,680
18. 20% Contingency 25,936
Redbank Crossing - Total 155,616.05
Sub -District Acres = 419.09
Sub -district 1 Proportionate Share Cost Per Acre = 371.32
Wilson Road Canal Crossing
20. Canal Crossing - Headwall Included
90
If
1387.00
124,830
21. 6' Chainlink Canal Fence
76
If
10.00
760
22. 6" Curb & Gutter
76
If
40.00
3,040
23. Sidewalk
285
sf
6.00
1,710
24. AC Paving / Agg Base / Subgrade
2432
sf
6.20
15,078
Subtotal
145,418
Kern Delta Fees
25. Seepage Loss Fee
90
If
249.47
22,452
26. Plan Review Fee
1
Is
5000.00
5,000
27. Encroachment Permit
1
Is
500.00
500
Subtotal
27,952
Surveying and Design Engineering
28. Engineering and Surveying
1
Is
10000.00
Subtotal
10,000
Subtotal Costs
183,371
29. 20% Contingency 36,674
Wilson Crossing - Total 220,044.84
Sub -District Acres = 430.64
Sub -district 2 Proportionate Share Cost Per Acre = 510.97
�gAK�c9
a
H m
U r -
O
CRiG(tN.',A
Exhibit A
Eastside Canal - Major Bridge and Thoroughfare District
Redbank Road and Wilson Road Crossing
Area: 958.51 Acres
371.32
Sub -districts 1S and 2N (257.43 acres) Proportional Share (371.32+510.97) /AC =
882.29
Date: 12/30/2020
Job No: 5046
Prepared By: MAL
Item No. Item Description
Qty
Unit
Unit $
Item $ TOTALS.
Muller Road Canal Crossing
31. Canal Crossing Widening - Headwall included
50
If
1387.00
69,350
32. Remove Concrete Head Wall
2
ea
2000.00
4,000
33. 6' Chainlink Canal Fence
76
If
10.00
760
34. 6" Curb and Gutter
76
If
40.00
3,040
35. Sidewalk
285
sf
6.00
1,710
36. Sawcut
80
If
3.00
240
37. Pavement Removal (disposal off-site)
76
sf
0.95
72
38. AC Paving / Agg Base / Subgrade
2033
sf
6.20
12,605
39. Pole Relocation
1
ea
15000.00
15,000
40. Pipe Access Gate Relocation
2
ea
1500.00
3,000
Subtotal 109,777
Kern Delta Fees
41. Seepage Loss Fee
50
If
249.47
12,474
42. Plan Review Fee
1
Is
5000.00
5,000
43. Encroachment Permit
1
Is
500.00
500
Subtotal 17,974
Surveying and Design Engineering
44. Engineering and Surveying
1
Is
10000.00
Subtotal 10,000
Total Costs 137,751
45. 20% Contingency 27,550
Muller Crossing Total 165,300.60
Sub -District Acres = 532.92
Sub -district 3 Proportionate Share Cost Per Acre = 310.18
Sub -district 1 N (161.66 acres) Proportional Share / AC =
371.32
Sub -districts 1S and 2N (257.43 acres) Proportional Share (371.32+510.97) /AC =
882.29
Sub -districts 2S and 3N (173.21 acres) Proportional Share (510.97+310.18) / AC =
821.15
Sub -district 3N (16.91 acres Parcel 177-182-51 Only) Proportional Share / AC =
310.18
Sub -district 3S (342.80 acres) Proportional Share / AC =
310.18
IZ'
MCINTOSH & ASSOCIATES, Civil Engineers & Land Surveyors, 2001 Wheelan Court, Bakersfield, California 93309 0 AKF9c
Eastside Canal Crossing - MBTD 2020-12-23.xis Page 2 of 2 MB Y-"
r- m
U p
CRIG!NAI
Exhibit B
Eastside Canal - Major Bridge and Thoroughfare District I
Parcel
173-080-03
173-080-05
173-080-06
173-080-13
173-080-17
173-090-06
173-240-17
173-260-01
173-260-03
173-260-11
173-260-15
173-260-16
173-270-07
173-270-08
173-270-14
173-270-15
173-270-23
173-280-13
173-291-17 .
173-291-38
173-291-39
173-292-01
173-292-03
173-292-05
173-293-14
173-293-34
173-293-35
173-293-36
177-182-51
174-013-07
174-020-06
174-020-09
174-020-12
174-020-15
174-020-17
177-280-17
177-280-18
177-280-19
177-280-20
177-280-21
177-280-22
177-280-30
177-280-40
Total Acres:
Acres
48.97
30.50
21.32
25.83
21.07
13.97
17.37
38.13
39.09
3.40
32.27
38.41
4.17
1.55
8.55
26.49
9.41
38.59
3.04
3.05
3.04
10.00
22.97
116.97
2.43
3.04
3.04
5.63
16.91
152.72
2.26
39.55
46.77
31.28
15.87
5.00
5.00
10.00
14.45
2.39
2.39
10.00
5.12
952.01
Sub District
1 North
1 North
1 North
1 North
1 North
1 North
1 South & 2 North
1 South & 2 North
1 South & 2 North
1 South & 2 North
1 South & 2 North
1 South & 2 North
1 South & 2 North
1 South & 2 North
1 South & 2 North
1 South & 2 North
1 South & 2 North
1 South & 2 North
2 South & 3 North
2 South & 3 North
2 South & 3 North
2 South & 3 North
2 South & 3 North
2 South & 3 North
2 South & 3 North
2 South & 3 North
2 South & 3 North
2 South & 3 North
3 North
3 South
3 South
3 South
3 South
3 South
3 South
3 South
3 South
3 South
3 South
3 South
3 South
3 South
3 South
Cost Per Acre
$371.32
$371.32
$371.32
$371.32
$371.32
$371.32
$882.29
$882.29
$882.29
$882.29
$882.29
$882.29
$882.29
$882.29
$882.29
$882.29
$882.29
$882.29
$821.15
$821.15
$821.15
$821.15
$821.15
$821.15
$821.15
$821.15
$821.15
$821.15
$310.18
$310.18
$310.18
$310.18
$310.18
$310.18
$310.18
$310.18
$310.18
$310.18
$310.18
$310.18
$310.18
$310.18
$310.18
Total Fees:
Fee
$18,183.49
$11,325.23
$7,916.52
$9,591.17
$7,823.69
$5,187.33
$15,325.39
$33,641.74
$34,488.74
$2,999.79
$28,471.52
$33,888.78
$3,679.15
$1,367.55
$7,543.58
$23,371.88
$8,302.35
$34,047.59
$2,496.30
$2,504.51
$2,496.30
$8,211.51
$18,861.83
$96,050.00
$1,995.40
$2,496.30
$2,496.30
$4,623.08
$5,245.13
$47,370.54
$701.00
$12,267.58
$14,507.07
$9,702.40
$4,922.54
$1,550.90
$3,101.79
$4,482.09
$741.33
$741.33
$3,101.79
$1,588.12
540,961.49
Fees to be adjusted annually by City of Los Angeles Construction Cost Index (CCI) published by E.N.R.
o�eAKF9
CT
m
~ r
U G
ORIGlr.A
Exhibit C
Improvements associated with each sub -district are described below:
Redbank Road Crossing
Redbank Road is classified as a collector (90' right-of-way) see Figure 2 below. The work associated with
this crossing is as follow:
• Removal of existing concrete headwalls
• Extension of canal crossing (15' to the North and 15' to the South)
• Construction of 6' concrete wall along the south side
• Construction of 6' chain link fence at north side
• Construction of 6' chain link fence along canal property on south side.
• Construction of Pipe Gate for vehicle access
• Construction of Driveway
• Grade canal to match existing canal walls to new culvert and headwall
• Sawcut existing pavement 1' beyond existing edge of pavement
• Remove and discard of 1' section of pavement sawcut.
• Pave the additional portion of the road (20' on both side)
• Construct Curb, Gutter and Sidewalk
• Relocate power poles
• 1 canal gate will be replaced
qN
1�
1 LIMITS OF GRADING
n
Z
i4 1 1
FUTURE CURB & GUTTER
_REDBANK ROAD , _`44 _
CANAL GATE TO BE RELOCATED �
_ COUNTY
CITY
FUTURE BACK OF WALK
CANAL GATE TO BE REMOVED
CULVERT EXTENSION
_r RELOCATE EXISTING POLE >-
EXISTING EP a
EXISTING CULVERT =
SAWCUT/LIMITS OF PAVEMENT c
',,,, EXISTING EP
0
,-FUTURE CURB & GUTTER a'
$ CULVERT EXTENSION
i
1` LIMITS OF GRADING
11 I
REDBANK CULVERT CROSSING
o�gAKF9
Cn
T
~ r
U CD
0RIG!NAL
Exhibit C
East Wilson Road Crossing
East Wilson Road is classified as a collector (90' right-of-way) see Figure 3 below. The work associated with
this crossing is as follow:
• Construct canal crossing
• Grade canal to match new culvert and headwall with existing canal
• Construction of 6' chain link fence over headwall
• Pave 64' wide roadway
• Construct Curb, Gutter and Sidewalk
�fi
a
1N
LIMITS OF GRADING
z
1
CULVERT EXTENSION
r
}
U.
0
x
LIMITS OF WORK
C)
q
O
FUTURE CURB & GUTTER
�C E. WILSON ROAD I
1
,
FUTURE BACK OF WALK
FUTURE CURB & GUTTER a'
a
CULVERT EXTENSION
N t
LIMITS OF GRADING
EAST WILSON CULVERT CROSSING
o��AKF�.nc,
c
� r
U �
CRIGINAL
Exhibit C
Muller Road Crossing
Muller Road is classified as an arterial (110' right-of-way) see Figure 4 below. The work associated with this
crossing is as follow:
• Removal of existing concrete headwalls
• Extension of canal crossing (25' to the North and 25' to the South)
• Sawcut existing pavement 1' beyond existing edge of pavement
• Remove and discard of 1' section of pavement sawcut.
• Pave the additional portion of the road (33' on both sides)
• Construction of 6' chain link fence on top of new headwalls
• Grade canal to match existing canal slopes to new culvert and headwall
• Construct Curb, Gutter and Sidewalk
• Relocate power pole
• Relocate access gates on south side of road
N
IN
0
q
—I q_ LIMITS OF GRADING
1 CULVERT EXTENSION
FUTURE CURB & GUTTER
------- t t
HULLER ROAD
— —t
RELOCATE EXISTING GATE T.
1 EXISTING EP
`EXISTING CULVERT =
SAWCUT/LIMITS OF PAVEMENT
EXISTING EP c
0
RELOCATE EXISTING GATE
FUTURE CURB & GUTTE0l
Ja
FUTURE BACK OF WALK t. N RELOCATE EXISTING POLE
—I CULVERT EXTENSION
LIMITS OF GRADING
MULLER CULVERT CROSSING
o�gAKF9
�n
T
CRIGii` AL
IIIICI=111,H1111111N=
0 RMS,Mimi l�
r 1
11
173-240-17
U-
w
6
0
r, ----------
0
0
M
i
173-291-38
173-291-391
173-291-17
—1— 173-293-35
173-293-36
Fl -FT
T
173-21
93-14 1 .;
173-080-03
�1 I�173-080-13
til �
U
173-080-05 a�
173-080-06
173-270-08EH
\ e i
173-270-07 -
/ 171 3-270-14
�rsi►Ii i iim
h +�� 173-270-23
f I
Ln
o
N 173-280-13
i
►tri
r
:3 I --
o
M
T, Wilson Rd. 430.64 Ac
Crossing
M r�17,cril, -1
173-292-05
o rn N
O
o
N N N
a w 174-020-060 CNN
CO
-- ---- _ ill - - -� � .._...�. �.�' OD� 00i 00
l N'N'N
532.92 Ac
Muller Rd. I .�
Cros, ng
0 174-020-12 =�
0 CD -_j
Q N p 1 w
2 p N w�
174-013-07 2 4- �I
a Ln o
z0 00� CD
z 020, �
E. WHITE LANE__
�C = Tributary only to Muller Crossing due to proximity 177-280-1.8 �
bai<erstiew
M
�
CD
CD
N
N U
173-291-38
173-291-391
173-291-17
—1— 173-293-35
173-293-36
Fl -FT
T
173-21
93-14 1 .;
173-080-03
�1 I�173-080-13
til �
U
173-080-05 a�
173-080-06
173-270-08EH
\ e i
173-270-07 -
/ 171 3-270-14
�rsi►Ii i iim
h +�� 173-270-23
f I
Ln
o
N 173-280-13
i
►tri
r
:3 I --
o
M
T, Wilson Rd. 430.64 Ac
Crossing
M r�17,cril, -1
173-292-05
o rn N
O
o
N N N
a w 174-020-060 CNN
CO
-- ---- _ ill - - -� � .._...�. �.�' OD� 00i 00
l N'N'N
532.92 Ac
Muller Rd. I .�
Cros, ng
0 174-020-12 =�
0 CD -_j
Q N p 1 w
2 p N w�
174-013-07 2 4- �I
a Ln o
z0 00� CD
z 020, �
E. WHITE LANE__
�C = Tributary only to Muller Crossing due to proximity 177-280-1.8 �