Loading...
HomeMy WebLinkAboutSB989 2021 Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ☐ Installation ☐ Repair ☐ 6 Month X 36 Month CERS ID 10123837 Test Date 5/5/2021 Facility Name 4010 ARCO Facility Address 4010 Wible Rd City Bakersfield ZIP Code 93309 Company Performing the Test Advanced Compliance Phone 6617064321 Mailing Address 4007 Brae Burn Dr Bakersfield Ca 93306 Service Technician Performing Test Bradley Hinsley Contractor/Tank Tester License Number 971259 ICC Number 8373948 ICC Expiration Date 8/10/2021 Manufacturer and Test Equipment Training Certifications Expiration Date ICC Service Techican 8/10/2021 INCON STS 10/9/2021 Test Procedures Used Components Tested PEI/RP1200-19 Sect. 4. Tank Annular PEI/RP1200-19 Sect. 5. Line Secondary PEI/RP1200-19 Sect. 6. Containment Sump I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 5/5/2021 Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST 6. TANK SECONDARY CONTAINMENT TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure X Vacuum ☐ Hydrostatic Test Equipment Used: Annular Testing Set-Up Tank ID 87S 87M 91 Diesel Tank Manufacturer Unknown Unknown Unknown Unknown Tank Capacity 9,684 9,684 9,684 9,684 Test Start Time 06:49 08:22 10:10 12:38 Initial Reading -10.00 InHg -10.00 InHg -10.00 InHg -10.00 InHg Test End Time 07:49 09:22 11:10 13:38 Final Reading -10.00 InHg -10.00 InHg -10.00 InHg -10.00 InHg Change in Reading 0.0 InHg 0.0 InHg 0.0 InHg 0.0 InHg Pass/Fail Criteria +/- 0.0 InHg +/- 0.0 InHg +/- 0.0 InHg +/- 0.0 InHg Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type X Pressure ☐ Vacuum ☐ Hydrostatic Test Equipment Used: Product Line Testing Set-Up Pipe Run ID 87S 87M 91 Diesel Pipe Manufacturer Unknown Unknown Unknown Unknown Test Start Time 06:35 06:49 07:15 07:34 Initial Reading 5.0 PSI 5.0 PSI 5.0 PSI 5.0 PSI Test End Time 07:35 07:49 08:15 08:34 Final Reading 5.0 PSI 5.0 PSI 0.0 PSI 5.0 PSI Change in Reading 0.0 PSI 0.0 PSI 5.0 PSI 0.0 PSI Pass/Fail Criteria +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass X Fail X Pass ☐ Fail Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 7. PIPE SECONDARY CONTAINMENT TEST 8. SUMP/UDC TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: INCON STS Sump/UDC ID 87MFS 87MSTP 87SFS 87SSTP Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 79 79 79 79 Sump Bottom to Top of Highest Pipe Penetration (inches) 19 43 18 37 Test Start Time 10:39 11:05 09:55 09:55 Initial Reading 3.3763 4.4814 3.7761 4.7678 Test End Time 10:54 11:20 10:10 10:10 Final Reading 3.3761 4.4812 3.7760 4.7687 Change in Reading 0.0002 0.0002 0.0001 0.0009 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass X Fail X Pass ☐ Fail Sump/UDC ID 91FS 91STP Diesel FS Diesel STP Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 79 79 79 79 Sump Bottom to Top of Highest Pipe Penetration (inches) 19 45 19 43 Test Start Time 11:05 11:52 12:49 12:49 Initial Reading 4.9318 3.7010 4.7485 4.8473 Test End Time 11:20 12:08 13:04 13:04 Final Reading 4.9333 3.7007 4.7485 4.8481 Change in Reading 0.0015 0.0003 0.0000 0.0008 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Additional copies of this page may be attached. Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 4 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: INCON STS Sump/UDC ID Disp 1/2 Disp 3/4 Disp 5/6 Disp 7/8 Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 10 10 10 10 Sump Bottom to Top of Highest Pipe Penetration (inches) 8 8 8 8 Test Start Time 17:23 17:05 15:02 15:02 Initial Reading 1.0132 1.3563 2.6980 2.0188 Test End Time 17:38 17:20 15:17 15:17 Final Reading 1.0145 1.3562 2.6951 2.0190 Change in Reading 0.0013 0.0001 0.0029 0.0002 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass X Fail X Pass ☐ Fail Sump/UDC ID Disp 9/10 Disp 11/12 Sump Manufacturer Unknown Unknown Sump Depth (inches) 10 10 Sump Bottom to Top of Highest Pipe Penetration (inches) 8 8 Test Start Time 14:35 14:35 Initial Reading 1.2170 1.3636 Test End Time 14:50 14:50 Final Reading 1.2160 1.3625 Change in Reading 0.0010 0.0011 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST (continued) Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 91 Product line and Disp 5/6 failed. Must be repaired and retested. 9. COMMENTS