HomeMy WebLinkAboutRES NO 074-2021RESOLUTION NO. 074-2 0 2 1
A RESOLUTION ADOPTING A LIST OF PROJECTS FOR
FISCAL YEAR 2021-22 FUNDED BY THE ROAD
REPAIR AND ACCOUNTABILITY ACT OF 2017 (SB 1)
AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO
SUBMIT SAID PROJECT LIST TO THE CALIFORNIA
TRANSPORTATION COMMISSION
WHEREAS, Senate Bill 1 (SB 1) the Road Repair and Accountability Act of
2017 (Chapter 5, Statues of 2017) was passed by the California Legislature and
signed into law by the Governor in April 2017 to address the significant multi-
modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will
ensure the residents of Bakersfield are aware of the projects proposed for funding
in our community and which projects have been completed each fiscal year;
and
WHEREAS, the City must adopt by resolution a list of projects proposed to
receive fiscal year funding from the Road Maintenance and Rehabilitation
Account (RMRA), created by SB 1 which must include a description and the
location of each proposed project, a proposed schedule for the project's
completion and the estimated useful life of the improvement; and
WHEREAS, The City will receive an estimated $7.6 million in RMRA funding in
Fiscal Year 2021-22 from SB 1 which will allow the City of Bakersfield to,advance
City Council Goal no. 6 - "Enhance Infrastructure" and to rehabilitate, repair, and
resurface roads to improve driving experience, safety and have less wear and
tear on vehicles; and
WHEREAS, This is the fifth year in which the City is receiving SB 1 funding
which enables the City to continue essential road maintenance and
rehabilitation projects that would not otherwise have been possible without SB 1;
and
WHEREAS, the 2021 study completed by NCE found the City's streets and
roads have an overall pavement condition index (PCI) of 65 and this revenue will
help to increase the overall quality of our local road system and over the next
decade will bring the streets and roads to a target PCI of 80; and
G:\GROUPDAMDMINRPT\2021\5-19\Resa-SBI 21.22 Fnal.Docz
Page 1 of 4 Pages
WHEREAS, The City used a Pavement Management System to develop the
SB 1 project list to ensure revenues are being used on the most high-priority and
cost-effective projects that also meet the City's priorities for transportation
investment; and
WHEREAS, Exhibit A lists the SB 1 projects proposed; and
WHERAS, SB 1 funds enable the City to invest in our local streets and roads
infrastructure with 'a focus on basic maintenance and safety, complete streets
infrastructure and use of cutting-edge technology, materials and practice, which
will have significant positive impact by continuing to enhance the road
resurfacing program; and
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield
as follows:
The City Council finds and declares that the foregoing recitals are
true and correct and are hereby incorporated fully as a material part
of this Resolution and based upon such matters, the City Council
makes the additional findings set forth herein below.
2. The City Council adopts the list as projects necessary to meet the
goal of increasing City's PCI from 65 to over 80 to meet stated goals
of SB 1 funding.
3. The City Council authorizes the Public Works Director to submit a list
of projects as identified in Exhibit A to the California Transportation
Commission.
------- 00000-------
o�eA.KF,p
,n
G:\GROUPDAT\ADMINRPT\2021\5.19\Reso - SSI 21.72 FInaLDoan
Page 2 of 4 Pages
HEREBY CERTIFY that the foregoing Resolution was passed and adopted
by the Council of the City of Bakersfield at a regular meeting thereof held on
MAY 19 2021 , by the following vote:
�9YF COUNCILMEMBER ARIAS, GONZALES, WEIR, SMITH, FREEMAN, GRAY,EIR-
NOES: COUNCILMEMBER NcrV>_
ABSTAIN: COUNCILMEMBER NOr-&—
S N COUNCILMEMBER 106, e.r
APPROVED: MAY 19 2021
By 44,644
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
CITY ATTORNEY
4J SHUA H. RUDNICK
eputy City Attorney
G:\GROUPDA7\ADMINRPT\2021\5-79\Reso-SBI 21.22 flnal.0—
LIE DRIMAKIS, CMC
City Clerk and Ex Officio Clerk of the
Council of the City of Bakersfield
Page 3 of 4 Pages
EXHIBIT A
Project
Name/ Location
PCI
SBI Funding
Description
Est. Construction
Estimated
#
(FY 20/21)
Dates
Useful Life
T2K302
Pavement Rehab Union
PCI - 47
$1,250,000
Work includes pavement rehabilitation by excavating
June 2022 -
20- 25 years
Avenue from SR 58 to Belle
the existing pavement structural section, constructing a
September 2022
Terrace
new pavement structural section using Hot Mix Asphalt
(Type A), modification of access ramps to meet current
(Ward 2)
ADA standards, modifications of curb & gutter,
adjustments of manholes and monuments, installation
of pavement markings and striping and installation of
traffic detector loops.
T2K303
Pavement Rehabilitation
PCI - 47
$4,500,000
Work includes pavement rehabilitation by excavating
June 2022 -
20 -25 years
White Lane from Gosford
the existing pavement structural section, constructing a
October 2022
Road to Old River Road
new pavement structural section using Hot Mix Asphalt
(Type A), modification of access ramps to meet current
(Ward 5)
ADA standards, modifications of curb & gutter,
adjustments of manholes and monuments, installation
of pavement markings and striping and installation of
traffic detector loops.
T2K309
Pavement Rehabilitation
PCI- 40
$1,000,000
Local match for federal RSTP Pavement Rehabilitation
May 2022 -
20 -25 years
California Avenue from Union
Project.
September 2022
Avenue and Washington
Street (Wards 1/2)
T2K310
Pavement Rehabilitation
PCI - 56
$325,000
Streets Division staff will perform section repairs, as
August 2021 -
10 -15 years
Panorama Drive from Fairfax
needed, along with a complete overlay on the
September 2021
Road to Morning Drive
following road segments. Annual contracts, including
material suppliers, trucking and asphalt grinding
(Ward 3)
contractors will perform a portion of the work. City
Streets crews will perform paving operations.
T2K311
Pavement Rehabilitation
PCI - 35
$325,000
Streets Division staff will perform complete
July 2021 to
15-20 years
Hallisey Street Area from
reconstruction of this area. Annual contracts, including
September 2021
Marilyn Place to Barbara
material suppliers, trucking and asphalt grinding
Avenue, Marilyn Place from
contractors will perform a portion of the work. City
Akers Road to west end ,
Streets crews will perform paving operations. Work
Barbara Avenue from Akers
includes pavement rehabilitation by excavating the
to west end, Thorseson Court
existing pavement structural section, constructing a
from Hallisey Street to west
new pavement structural section using Hot Mix Asphalt
end, Hallisey Court from
(Type A), modification of access ramps to meet current
Hallisey Street to west end.
ADA standards, modifications of curb & gutter,
adjustments of manholes and monuments, installation
CITY p
(Ward 6)
of pavement markings and striping and installation of
1
1
1 traffic detector loops.