HomeMy WebLinkAbout1620 e brundage _envirotech report 6.22.20_17-24WASTE DISCHARGE REQUIREMENTS UPDATE OR NPDES PERMIT
REISSUANCE: WDRs must be updated periodically to reflect changing technology
standards and conditions. A new application is required to reissue an NPDES
permit which has expired.
OTHER: If there is a reason other than the ones listed, please describe the reason
on the space provided. (if more space is needed, attach a separate sheet.)
V. CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
It should be emphasized that communication with the appropriate RWQCB staff is
vital before starting the CEQA documentation and is recommended before
completing this application. There are Basin Plan issues which may complicate the
CEQA effort, and RWQCB staff may be able to help in providing the needed
information to complete the CEQA documentation.
Name the Lead Agency responsible for completion of CEQA requirements for the
project, i.e., completion and certification of CEQA documentation.
Check YES or NO. Has a public agency determined that the proposed project is
exempt from CEQA? If the answer is YES, state the basis for the exemption and the
name of the agency supplying the exemption on the space provided. (Remember
that, if extra space is needed, use an extra sheet of paper, but be sure to indicate
the attached sheet under Section V11. Other.)
Check YES or NO. Has the "Notice of Determination" been filed under CEQA? If
YES, give the date the notice was filed and enclose a copy of the Notice of
Determination and the Initial Study, Environmental Impact Report, or Negative
Declaration. If NO, check the box of the expected type of CEQA document for this
project, and include the expected date of completion using the timelines given under
CEQA. The date of completion should be taken as the date that the Notice of
Determination will be submitted. (if not known, write "Unknowns')
V1. OTHER REQUIRED INFORMATION
To be approved, your application MUST include a COMPLETE characterization of
the discharge. If the characterization is found to be incomplete, RWQCB staff will
contact you and request that additional specific information be submitted.
This application MUST be accompanied by a site map. A USGS 7.5' Quadrangle
map or a street map, if more appropriate, is sufficient for most applications.
VII. OTHER
If any of the answers on your application form need further explanation, attach a
separate sheet. Please list any attachments with the titles and dates on the space
provided.
VIII. CERTIFICATION
Certification by the owner of the facility or the operator of the facility, if the operator
is different from the owner, is required. The appropriate person must sign the
application form.
Form 200 (10/97) 5