HomeMy WebLinkAbout1620 e brundage _envirotech report 6.22.20_77-126Bakersfield Transfer, Inc.
Standardized Hazardous Waste Facility Permit, Series B
Effective Date: April 7, 2008
Page 22
P. The Permittee shall not be a designated Treatment, Storage, or Disposal Facility
on the manifests for any exempt transfer activities conducted pursuant to
California Code of Regulations, title 22, section 66263.18.
Q. The Permittee shall not mix used oil with other hazardous waste, including
household hazardous waste and hazardous waste from a conditionally exempt
small quantity generator.
R. The Permittee shall not store hazardous waste in excess of one year from the
date the hazardous waste arrives at the Facility.
S. The Permittee shall manage any waste water generated from washing tanker
trucks or other containers as a hazardous waste.
T. For the purpose of compliance with the permitted maximum capacity limitations,
all containers in the permitted Units are assumed to be full.
U. Authority To Construct Facility
1. No later than sixty (60) calendar days prior to commencing the construction of
any permitted unit, the Permittee shall submit to DTSC a schedule detailing
the dates and length of time required for the planned construction.
2. No later than sixty (60) calendar days after completing construction of any
permitted unit and at least fourteen (14) calendar days before the Permittee
commences any hazardous waste management activities in the permitted
unit, the Permittee shall submit to DTSC an engineer's certification stating
that the permitted unit has been constructed in accordance with the approved
Standardized Permit Application.
3. The Permittee shall obtain approval from DTSC of regarding any significant
deviations from the construction plans provided in the approved Standardized
Permit at least fourteen (14) calendar days prior to any construction activities.
4. No later than one hundred and twenty (120) calendar days after completing
construction of the Facility, the Permittee shall submit to DTSC as-built
drawings of the Facility.
5. The Permittee shall notify DTSC in writing at least fourteen (14) calendar
days before the Permittee commences any hazardous waste management
activities to allow DTSC the opportunity to inspect the Facility. If DTSC
declines to inspect or fails to respond to the Permittee's written notification,
the Permittee may commence the permitted hazardous waste management
activities at the Facility at the end of the 14-day period.