Loading...
HomeMy WebLinkAbout1620 e brundage _envirotech report 6.22.20_77-126Bakersfield Transfer, Inc. Standardized Hazardous Waste Facility Permit, Series B Effective Date: April 7, 2008 Page 22 P. The Permittee shall not be a designated Treatment, Storage, or Disposal Facility on the manifests for any exempt transfer activities conducted pursuant to California Code of Regulations, title 22, section 66263.18. Q. The Permittee shall not mix used oil with other hazardous waste, including household hazardous waste and hazardous waste from a conditionally exempt small quantity generator. R. The Permittee shall not store hazardous waste in excess of one year from the date the hazardous waste arrives at the Facility. S. The Permittee shall manage any waste water generated from washing tanker trucks or other containers as a hazardous waste. T. For the purpose of compliance with the permitted maximum capacity limitations, all containers in the permitted Units are assumed to be full. U. Authority To Construct Facility 1. No later than sixty (60) calendar days prior to commencing the construction of any permitted unit, the Permittee shall submit to DTSC a schedule detailing the dates and length of time required for the planned construction. 2. No later than sixty (60) calendar days after completing construction of any permitted unit and at least fourteen (14) calendar days before the Permittee commences any hazardous waste management activities in the permitted unit, the Permittee shall submit to DTSC an engineer's certification stating that the permitted unit has been constructed in accordance with the approved Standardized Permit Application. 3. The Permittee shall obtain approval from DTSC of regarding any significant deviations from the construction plans provided in the approved Standardized Permit at least fourteen (14) calendar days prior to any construction activities. 4. No later than one hundred and twenty (120) calendar days after completing construction of the Facility, the Permittee shall submit to DTSC as-built drawings of the Facility. 5. The Permittee shall notify DTSC in writing at least fourteen (14) calendar days before the Permittee commences any hazardous waste management activities to allow DTSC the opportunity to inspect the Facility. If DTSC declines to inspect or fails to respond to the Permittee's written notification, the Permittee may commence the permitted hazardous waste management activities at the Facility at the end of the 14-day period.