Loading...
HomeMy WebLinkAboutAPSA 6-29-21UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program BAKERSFIELD FIRE DEPT T3;k R t_R St� , _ .,u Prevention Services FIRE 2101 H Street DEPARTMENT Bakersfield, CA 93301 Tel.: (661) 326-3979 Fax: (661) 852-2171 FACILITY NAME INSPECTION.DATE ;INSPECTION PHONE NO. TIME NO OF EMPLOYEES ADDRESS �+ FACILITY CONTACT BUSINESS ID NUMBER CONSENT TO INSPECT NAME/TITLE , OA V FAE:F. T- PIAAIAOE�Q [�7 �+l�IliJ 1 � M �t=�fI.7 is i.'�:l:�Tj ���.TI�ilf:1 �i • � : f:T.l i i i�:'!.� iT-3 �K•Ti ��►�."'yll i ` - DESCRIPTION Yo IN I N/A COMMENTS Pre are an SPCC plan [CFR 112.3 ] Review or amend SPCC plan [CFR 112.5 (a)(d)] SPCC plan available on site [CFR 112.3(e)] Conduct inspections and test in accordance with written procedures [CFR 112.7(e)]' Maintain records of ins ections, tests and/or procedures [CFR 112.7(e)] Records of ins ections or tests signed by ins ector [CFR 112.7(e)] Ott; 1 IUN Z: St uu Finn (-.nhtnrnia Health X Safpty C:nrip- 9-x;?7fl d -R 7-97n 1? DESCRIPTION Y N N/ COMMENTS Self -certification for Tier I or II facility 112.6(a)(1),(b)(1)] Professional engineer certification [CFR112.3(d' and 112.6(b)(4) Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] Amendments required within 6 months of changes/certifications [CFR 112.5(a) and 112.6(a)(2), (b)(4) Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a) Diagram with location and contents of containers, transfer stations, connecting piping [I 12.7(a)(3) ape e of oil and storage ca acit for each container [CFR 112.7(a)(3)] k Discharge prevention measures and procedures for routine handling {-CFR 112.7(a)(3)] Countermeasures for discovery, response and clean-up CFR/ 12.7(a)(3)] Re uired contact list and phone numbers [CFR 1 I2.7(a)(3)] JCI, 1 iutm S: "enerai mwt:t: Kpnitirpmantc• f:n1itnrnta Health k -164atnty ['nrfae ?';-%?7n d r% ?r%?7n r% ?9;?7n oi? r - DESCRIPTION Y N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1) 1/10 Containers compatible with materials stored CFR 112.8(c)(1) Implement SPCC plan review changes or amendments within 6 months [CFR 112.5(a)(d) Prepare an oil contingency plan or written control/removal commitments [CFR 112.7(d)] l'L�Vl01VJVEUM W7fIIs= m.]IHIAT*Iitold illiku7MfR.lfi7i-3ZTmaws-Te-rENWj.'yllIW.1 DESCRIPTION Y N A COMMENTS Training proLram CFR 112.7 f)] r-,/' : J , , � '� 2 Train personnel in operation and maintenance of equipment [CFR 112.7(f)] Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] HCl. i iuri o: t-aclilty inSneCtion: cantnrnia Health & Satety 1.nr1A* 2527[1_t1.5 DESCRIPTION Y WNTIA COMMENTS Meet provisions of conditional exem tion [H&S 25270.4.5(b) Facility security adequate CFR 112.7(g)] Clean -Lip materials readil available CFR 112.7(c) Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8) Portable/mobile containers positioned to prevent discharge CFR 112-8(c)(1 1)100 Loading / unloading rack drains into containment area CFR 112.7(h) Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a), 112.7(c)] Secondary containment adequate to contain capacity of largest container + precipitation CFR 112.8(c)]' Remove accumulation of oil in seconda containment CFR 112.8(c)(10) Secondary containment valves) closed [CFR 112.8] Implement SPCC plan elements [CFR 112.3] NY HAZARDOUS WASTE ON SITE? ❑ YES ❑ NO §h--- ei�t E xplain: POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for regulatory citations and corrective actions • Correct the violation(s) noted above by • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Signature (that all violations have been corrected as noted) Date White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink - Prevention Sen -ices Copy FD2156b (Rev 9/10)