HomeMy WebLinkAbout1.2-7044 Ph 1 & 2 Record Drawingzo I 1z z 0 EXIST. ZONE = R-1 PARCEL 2 PARCEL MAP NO. 10155 P.M. BK 49. PGS. a2-83 STORM DRAIN IMPROVEMENTS UNIT PHASE 1 ONSITE PHASE I OFFSITE PHASE2 ONSITE TOTAL 18" STORM DRAIN LF 2208 - 625 2833 24" STORM DRAIN LF 267 - 426 693 30" STORM DRAIN LF 65 - - 65 STORM DRAIN MANHOLES EA. 10 - 5 is CATCH BASINS EA. 6 - 7 13 OUTLETSTRUCTURE EA. I I - I SEWER IMPROVEMENTS 6" SEWER LINE LF 1062 483 1545 8" SEWER LINE LF 2570 1916 1097 5583 4" LATERALS LF 2630 1281 1900 5811 STANDARD MANHOLES EA. 13 7 4 24 CLEANOUTS EA. 3 0 1 4 STAMP AN OS� INTO CURB FACE OVER EACH SEWER LATERAL q MUL11PLE UTILITY TRENCH SEWER MAIN It 5' H5 T�p T� FINISHED STREET GRADE TO 7' MAXL ______TWP- — 0 1% MIN. 1% MIN. ON DEEP SEWER. SLOPE LATERALS SET LATERAL PROVIDING PROPER CLEARANCE UNDER WATERLINE AND LATERAL IS WVTHIN REQUIRED UTILITY TRENCHES TO LOT LINE SO THAT THE END OF TOLERANCE. DETAIL TYPICAL SEWER LATERAL INSTALLATION FOR SHALLOW INSTALLATION OF SEWER LATERALS FROM SHALLOW SEWER MAINS. THE SEWER LATERALS MUST CROSS OVER THE WATER OR UTILITY TRENCH. THESE INSTALLATIONS MUST RECEIVE SPECIAL TREATMENT FOR LATERALS MEN CROSSING OVER THE WATERMAIW A SEWER LATERAL CROSSING ABOVE A WATER MAIN SHALL BE CONSTRUCTED OF A CONTINUOUS 20' SECTION OF CLASS 200 (DR 14 PER AWWA C900) PLASTIC PIPE OR EQUIVALENT. CENTERED ON THE PIPE BEING CROSSED. NOTE: CONTRACTOR TO VERIFY THAT WATER MAIN AND SEWER LATERAL CROSSINGS ARE IN CONFORMANCE WITH CAUFORNIA HEALTH CODE REQUIREMENTS. EXIST. ZONE = R-1 TRACT NO. 6916 UNIT 2 M.S. 61, PGS 109-111 KEY MAP DENOTES SHEET NUMBER SCALE: 1" = 200' LEGEND ------ _,"11111111150 iiiiiiiiiiiiii ' I 1 4 m1h 1 11011 NX:4 mm;mq = KERN COUNTY CALIFORNIA SEWER & STORM DRAIN CONSTRUCTION PLANS 0 FOR Ilz CD d TRACT NO. 7044 PHASES 1 & 2 CIVIL ENGINEER: MCINTOSH & ASSOCIATES 2001 WHEELAN COURT WIN I I BAKERSFIELD, CA 93309 CONTACT PERSON — ROGER MCINTOSH (661) 834-4814 0 < 0 BENCHMARK: g±IAKqS__ RDA ;51 T. 30S., R27E., NORTHEAST CORNER OF CONCRETE ENCASEMENT AT THE CENTERLINE INTERSECTION OF PANAMA LANE AND BUENA 5: VISTA ROAD. PAN kNE ELEVAnON 348.61' (U.S.G.S. DATUM) PROJECT z 0 � im I 01 'e BASIS OF BEARINGS: BERKSHILE ROAD 0 20 THE BEARING OF N 89*08'46" W SHOWN FOR THE EAST —WEST LINE OF SECTION 30, T. 30 S., R. 27 E. AS SHOWN ON PARCEL MAP No. 10155 w 57< z RECORDED IN PARCEL MAP BOOK 49, PAGES 82 M TC MCCUTCHEN ROAD AND 83 IN THE OFFICE OF THE KERN COUNTY RECORDER WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. VICINITY MAP NOT TO SCALE INDEX OF SHEETS SHEET TITLE 1� COVER SHEET 2. NOTES & SPECIFICATONS 3. YUKON RIVER AVENUE 4. MARTIAN RIVER STREET & BREITENBUSH AVENUE 5. LAKE BRACCIANNO AVENUE 6. KOYUK RIVER STREET 7. LAKE GARDA STREET, COW CREEK WAY & SCRIVIA COURT 8, CHETCO RIVER STREET & LAGO PUCCINNI STREET 9. SUMP EXHIBIT 10. OFF —SITE IMPROVEMENTS 11. OFF —SITE IMPROVEMENTS NOTE: PHASE I & 2 ARE TO BE CONSTRUCTED SIMULTANEOUSLY. NOTE: 1. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CITY CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE TELEPHONE 326-3049 NO CITY INSPECTIONS WILL BE GIVEN FOR THE WORK IN THIS AREA UNTIL A STREET PERMIT WTH APPROPRIATE SECURITY AND INSURANCE HAS BEEN OBTAINED. Z ALL MATERIALS SUPPUED FOR THIS PROECT WILL REQUIRE A CERTERCATE OF COMPLIANCE STATING THAT THE REQUIREMENTS & STANDARDS SET FORTH BY THE CITY OF BAKERSFIELD HAVE BEEN MET. FL/VL FLOWLENE RIW RIGHT-OF-WAY C.L GENTERUNE M.H./MH MANHOLE TO 7' MAX. ELEV. ELEVATION SMH SEVEN MANHOLE C.O.8. CITY OF BAKERnELD SDMH STORM DRAIN MANHOLE T.O.M. TOP OF MANHOLE CB CATCH BASIN T.O.C. TOP OF CLEANOUT GB GRADE BREAK INV. INVERT S/W SIDEWALK EL./ELEV- ELEVATION FH FIRE HYDRANT PA PROPERTY UNE O.W.S. DESIGN WATER SURFACE �SURFACE MARKER FOR FP. EDGE OF PAVEMENT XEHN EX. RIGHT-OF-WAY LATERALS PER C.O.B. STD. S-1 EX./EXIST EXIS71NG CWS CITY WATER SERVICE C/G CURB & GUTTER STD. STANDARD 0 SURVEY MONUMENT 8 PROPOSED GATE VALVE & VALVE BOX - SEE CWS KAN 0 STORM DRAIN MANHOLE TYPE *A0 EXISTING GATE VALVE PER CO.B. STANDARD. W PROP= FIRE HYDRANT MUM CATCH BASIN WITH 3.5' OPENING ASSEMBLY - SEE CWS PLAN PER COS. STANDARD DETAIL S-1Z V EXISYING FIRE HYDRANT UNLESS OTHERWISE NOTED. 6 PROPOSED 2* BLOWOFF (D CONSTRUCT SEWER MANHOLE TYPE 'A' ASSEMBLY - SEE CWS PLAN PER C.O.B. STANDARD DETAIL S-7. /_PIPE SIZE 0 CONSTRUCT SEVER CLEANOUT PER 80S—UTEUTY.. COB. STANDARD DETAIL S-2D. W-WATER S-SEWER (D EXISTING SEWER MANHOLE G-GAS D-DRAIN ENGINEEROS STATEMENT THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES. STANDARDS, AND DESIGN CRITERIA AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS AND ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCESt STANDARDS AND DESIGN CRITERIA SHALL BE CORRECTED DURING CONSTRUCTION AND SUCH CORRECTtONS SHALL BE REFLECTED ON CORRECTED PLANS SUBMITTED TO THE CITY ENGINEER. AralwA1111 R.C.E. 55102 2-7-2-46 DATE IN ACCORDANCE WITH THE CONDITIONS OF THE VESTING TENTATIVE MAP, THE IMPROVEMENT PLANS HAVE BEEN REVIEWED BY THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT. ALL IMPROVEMENTS ARE PUBLIC AND ARE TO BE PUBLICLY MAINTAINED. APPROVED BY: NICOLAS FIDLER, PUBLIC WORKS R.C.E. NO. 61069 -7�) 1 0 20 zo REVIEWED BY: STUART J. PATTESON R.C.E. NO. 44898 DATE ASSISTANT PUBLIC WORKS DIRECTOR LEGEND (CONT.): �19T'om- TOP OF MANHOLE — - — - — - — CENTERUNE _n CONSTRUCT STORM DRAIN PER C.O.B. STD. �S— CONSTRUCT SEVER PER C.O.S. STANDARD —w— PROPOSED WATER - SEE CWS PLAN TRACT BOUNDARY EXISTING SEWER EXISTING WATER EXISTING STORM DRAIN ESS EXISTING EDGE OF PAVEMENT t�SNSp PHASE LINE EASEMENT LEGEND SECTION LETTER SHEET WHERE SECTION IS SHOWN 0* Know what'sbelow, Call before you dig. VAII vw'T 1. GENERAL CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS� LABOR, EQUIPMENT AND SUPERVISION NECESSARY TO COMPLETE INSTALLATION. UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS BEFORE CONSTRUCRON. TELEPHONE 811- CONTRACTOR TO CALL FOR LISA LOCATE AND POTHOLE ALL MARKED UTILITIES THAT CROSS OR ARE WHIM 5' HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES. VERTICAL AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY EXCAVATIONS TO VERIFY THAT THE PROPOSED DESIGN DOES NOT CONFLICT WITH ANY UTILITIES. IN THE EVENT A CONFLICT EXISTS THE ENGINEER SHALL BE NORFIED IN ORDER TO REDESIGN THE ALIGNMENT. IF RELOCATION OF EXISTING UnUTIES IS DEEMED NECESSARY THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF THE AUGNMENT REQUIRES ADDITIONAL FITTINGS, PIPE OR EXCAVATION THE CONTRACTOR SHALL BE COMPENSATED FOR REVISION. IN THE EVENT A UTILITY IS DAMAGED THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ITS REPAIR. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING SEWER INES THAT THE NEW SYSTEM TIES INTO PRIOR TO TRENCHING. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER SO THAT ANY NECESSARY ADJUSTMENTS MAY BE MADE. UnUTIES SHALL BE THOROUGHLY RESEARCHED AND LOCATED BY CONTRACTOR PRIOR TO TRENCHING. CROSSING UTILITIES SHALL BE DAYLIGHTED AND CHECKED FOR GRADE, BY CONTRACTOR PRIOR TO TRENCHING. ALL EXfSnNG IMPROVEMENTS, (CURB, GUTTER, SIDEWALK, CROSS GLITTER, FENCES, ETC.) THAT ARE REMOVED, DAMAGED OR UNDERCUT SHALL BE REPAIRED OR REPLACED AS DIRECTED BY THE CITY ENGINEER. ALL EXISTING PAVING AND SURFACING REMOVED. DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE NTH THE CITY OF BAKERSFIELD STANDARD DRAWING ST-6, EXCEPT AS NOTED ON PLANS, STAMP AN *S� INTO THE CURB FACE OVER EACH SEWER LATERAL AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED MTHIN EXISTING ACCEPTED STREET RIGHT-OF-WAY. UNLESS SECURED BY AN IMPROVENT AGREEMENT, APPROVED INSURANCE AND SECURITY BASED ON AN APPROVED ENGINEER2S ESTIMATE FOR THE WORK PERFORMED WITHIN THE RIGHT-OF-WAY SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT COMPACTION TESTS SHALL BE THE RESPONSIBUTY OF THE DEMELOPER/CONTRACTOR. THE NUMBER AND LOCATION OF REWIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER NO PUBUC WORKS INSPECTIONS WELL BE GIVEN FOR THE WORK IN THE UNDEDICATED ROADWAYS IN THIS PROPERTY UNTIL A SUBDIVISION PERMIT HAS BEEN OBTAINED. 2. STANDARD DETAILS THE FOLLOWNG CITY OF BAKERSFIELD STANDARDS SHALL BE CONSIDERED PART OF THESE PLANS: D-11, D-14, D-16. D-18 SW-11 SW_z SW-3. SW_4. SW-5. SW-6, SW-9, SW-11, ST-6, ST-22 3. VVP INSTALLATION MATERIALS - THE PIPE AND FITTINGS SHALL BE EXTRA STRENGTH mTRIFIED CLAY CONFORMING TO CURRENT ASTM SPECIFICATION C-700 AND SHALL BE INSTALLED IN CONFORMANCE NTH THE PROVISIONS OF SECTION 71 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA. DEPARTMENT OF TRANSPORTATION, CURRENT EDITION AND THE CURRENT ASTM SPECIFICATIONS C-12. JOINTS : THE PIPE AND FITTINGS SHALL HAVE A SOCKET END AND A SPIGOT END VffWC-OMPRESSION JOINTS CONFORMING WIN THE CURRENT ASTM SPECIFICATION C-425, THE PIPE AND FITTINGS FOR 6", 8% 10". AND 12m SANITARY SEWER MAINS MAY BE PLAIN -END VATH COMPRESSION COUPLINGS CONFORMING WIIH THE CURRENT ASTM SPECIFICATION C-425. EXCEPTING THAT A STAINLESS STEEL SHEAR RING AS MANUFACTURED BY MISSION CLAY PRODUCTS CORPORATION FOR THEIR "MAINUNEu BANDSEAL COMPRESSION COUPLING. OR APPROVED EQUAL. SHALL BE ROUIRED. THE PIPE AND FITTINGS FOR PRIVATE SANITARY SEWER HOUSE OR BUILDING LATERALS MAY BE PLAIN -END NTH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. (STAINLESS STEII SHEAR RINGS ARE NOT REQUIRED) 4. ADS PIPE INSTALLATION � MATERIALS : PIPE AND FITTINGS SHALL MEET THE REGUIREMENTS OF THE CURRENT ASTM SPECIFICATIONS D-2680 AND D-2751. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGH OUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LINE ON NEW PIPELINES, CUT -IN FITTINGS ARE NOT PERMITTED. JOINTS : USE ONLY SOLVENT WELDED JOINTS. THE ASSEMBLY OF JOINTS SHALL BE TN —ACCORDANCE NTH THE MANUFACTURER'S RECOMMENDATIONS. MERE ABS PIPE CONNECTS TO VCP, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. INSTALLATION ; PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE NTH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS 1. 11, AND [it EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 5, PVC PIPE INSTALLATION MATERIALS � PIPE AND FITIINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTIA SPECIFICATION D-3034 FOR SDR35. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGHOUT AND FREE FROM CRACKS. HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LINE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. JOINTS : USE ONLY ELASTOMERIC CASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL -§E IN -ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS MERE PVC PIPE CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION 0-2321. ONLY CLASS 1. 11, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 6. REINFORCED CONCRETE PIPE NTH PVC LINING. REINFORCED CONCRETE PIPE WITH PVC LINING SHALL MEET THE FOLLOWING REQUIREMENTS: 1.A. MATERIALS. REINFORCED CONCRETE PIPE (RCP) SHALL BE EITHER CLASS IV OR CLASS V NTH WALLS 08" OR V. RCP SHALL MEET ASTM C 76 FOR STRENGTH, ASTM C 361 OR AWWA C302 EXCEPT TEST PRESSURE SHALL BE 5 PSI FOR RUBBER GASKETS, AND LINER TESTS IN ACCORDANCE VATH THE FOLLOWING PARAGRAPHS. PIPE SHALL BE WET CAST. VIBRATED AND STEAM OR WATER CURED. JOINTS SHALL BE BELL AND SPIGOT DESIGN NTH A CONTAINED O-RING GASKET. PVC LINER SHALL BE CAST INTO THE WALL OF THE RCP AND SHALL COVER 3604 OF THE PIPE. ALL WORK FOR AND IN CONNECTION NTH THE INSTALLATION OF THE LINING IN CONCRETE PIPE AND FIELD SEALING AND WELDING OF JOINTS SHALL BE DONE IN STRICT CONFORMITY WTH ALL APPLICABLE SPECIFICATIONS, INSTRUCTIONS AND RECOMMENDATIONS OF THE LINING MANUFACTURER. LINER SHALL MEET THE FOLLOWING REQUIREMENTS. I.B. PHYSICAL PROPER TIES OF LINER. ALL PLASTIC UNER PLATE SHEETS. WELDING STRIPS AND OTHER ACCESSORY ITEMS, SHALL HAVE THE FOLLOWING PHYSICAL PROPERTIES MEN TESTED AT 77-F ±5 (2WC ±3 ). PROPER INITIAL (PAR. I.C) TENSILE STRENGTH 2200 PSI MIN. 2100 PSI MIN. (15 MPA MIN.) (14.5 MPA MIN-) ELONGATION AT BREAK 200% MIN. 200% MIN. SHORE DUROMETER, TYPE 0 I -SEC. 50-60 ±5 (WIH RESPECT TO INITIAL TEST RESULT) 10-SEC. 35-50 ±5 WEIGHT CHANGE ±1.5 TENSILE SPECIMENS SHALL BE PREPARED AND TESTED IN ACCORDANCE WITH ASTM D412 USING DIE S. WEIGHT CHANGE SPECIMENS SHALL BE I -INCH (25-MM) BY 3-INCH (75-MM) SAMPLE& SPECIMENS FOR TESTING OF INITIAL PHYSICAL PROPERTIES MAY BE TAKEN FROM LINER PLATE SHEET AND WELDING STRIP AT ANY TIME PRIOR TO FINAL ACCEPTANCE OF THE WORK - LINER PLATE LOCKING EXTENSIONS EMBEDDED IN CONCRETE SHALL WITHSTAND A TEST PULL OF AT LEAST IGO POUNDS PER LINEAR INCH (1800 KG/M), APPLIED PERPENDICULARLY TO THE CONCRETE SURFACE FOR A PERIOD OF ONE MINUTE. WTHOUT RUPTURE OF THE LOCKING EXTENSIONS OR WTHDRAWAL FROM EMBEDMENT. THIS TEST SHALL BE MADE AT A TEMPERATURE OF 70- - 80- F(21' - 27- C) INCLUSIVE. ALL PLASTIC LINER PLATE SHEETS. INCLUDING LOCKING EXTENSIONS, ALL JOINT, CORNER AND WELDING STRIPS SHALL BE FREE OF CRACKS, CLEAVAGES OR OTHER DEFECTS ADVERSELY AFFEC71NG THE PROTECTIVE CHARACTERISTICS OF THE MATERIAL THE ENGINEER MAY AUTHORIZE THE REPAIR OF SUCH DEFECTS BY APPROVED METHODS. THE LINING SHALL HAVE GOOD IMPACT RESISTANCE, SHALL BE FLENBLE AND SHALL HAVE AN ELONGATION SUFFICIENT TO BRIDGE UP TO 1/4-INCH (6 MM) SETTUNG CRACKS, WHICH MAY OCCUR IN THE PIPE OR IN THE ANT AFTER INSTALLATIONS. WITHOUT DAMAGE TO THE LINING. I.C. CHEMICAL RESISTANCE OF LINER.* AFTER CONDITIONING TO CONSTANT WEIGHT AT 110 F(43 C), TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL BE EXPOSED TO THE FOLLOWING SOLUTIONS FOR A PERIOD OF 112 DAYS AT 77w F ±5 (26 C ±3 ). AT 28-DAY INTERVALS, TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL BE REMOVED FROM EACH OF THE CHEMICAL SOLUTIONS AND TESTED IN ACCORDANCE NTH SECTION 7-2.03(l.B) PARA. 2 ABOVE. IF ANY SPECIMEN FAILS TO MEET THE 112-DAY REQUIREMENTS BEFORE COMPLETION OF THE 112-DAY EXPOSURE THE MATERIAL WLL BE SUBJECT TO REJECRON. CHEMICAL SQWTION CONCENTRATION SULFURIC ACID 20%** SODIUM HYDROXIDE 5% AMMONtUM HYDROXIDE 5%** NITRIC ACID 1%** FERRIC CHLORIDE 1% 1% SOAP Oix DETERGENT 0.1% (LINEAR ALKYL BENZYL SLILFONATE OR LAS BACTERIOLOGICAL BOD NOT LESS THAN 700 PPM *THIS IS TO BE USED AS A PRE -QUALIFICATION TEST AND WHEN MATERIAL FORMULATIONS ARE CHANGED. �VOWMETRIC PERCENTAGES OF CONCENTRATED C.P. GRADE REAGENTS. I.D. DETAILS AND DIMENSIONS OF LINER SHEETS. LINER SHEETS SHALL BE A MINIMUM OF 0.065 INCH (1.65 MM) IN THICKNESS LOCKING EXTENSIONS OF THE SAME MATERIAL AS THAT OF THE LINER SHALL BE INTEGRALLY EXTRUDED NTH THE SHEET. I.E. INSTALLATION OF LINING. INSTALLATION OF THE LINING, INCLUDING PREHEATING OF SHEETS IN COLD WEATHER AND THE WELDING OF ALL ,K)INTS, SHALL BE DONE IN ACCORDANCE VATH THE RECOMMENDATIONS OF THE LINER MANUFACTURER. COVERAGE OF THE LINING SHALL NOT BE LESS THAN THE MINIMUM SHOWN ON THE PLANS. THE LINING SHALL BE INSTALLED WITH THE LOCKING EXTENSIONS RUNNING PARALLEL NTH THE LONGITUDINAL AXIS OF THE PIPE THE LINING SHALL BE HELD SNUGLY IN PLACE AGAINST INNER FORMS. LOCKING EXTENSION SHALL TERMINATE NOT MORE THAN 1-1/2 INCHES (38 MM) FROM THE END OF THE INSIDE SURFACE OF THE PIPE SECTION. JOINT FLAPS WHEN USED SHALL EXTEND APPROXIMATELY 4 INCHES (100 MM) BEYOND THE END OF THE INSIDE SURFACE. CONCRETE POURED AGAINST LINING SHALL BE VIBRATED, SPADED OR COMPACTED IN A CAREFUL MANNER SO AS TO PROTECT THE LINING AND PRODUCE A DENSE, HOMOGENOUS CONCRETE, SECURELY ANCHORING THE LOCKING EXTENSIONS INTO THE CONCRETE. IN REMOVING FORMS, CARE SHOULD BE TAKEN TO PROTECT THE LINING FROM DAMAGE. SHARP INSTRUMENTS SHALL NOT BE USED TO PRY FORMS FROM LINED SURFACES. MEN FORMS ARE REMOVED, ANY NAILS THAT REMAIN IN THE LINING SHALL BE PULLED, WITHOUT TEARING THE LINING, AND THE RESULTING HOLES CLEARLY MARKED. ALL NAIL AND nE HOLES AND ALL CUT. TORN AND SERIOUSLY ABRADED AREAS IN THE UNING SHALL BE PATCHED. PATCHES MADE ENTIRELY NTH WELDING STRIP SHALL BE FUSED TO THE LINER OVER THE ENTIRE PATCH AREA- LARGER PATCHES MAY CONSIST OF SMOOTH LINER SHEET APPLIED OVER THE DAMAGED AREA NTH ADHESIVE - ALL EDGES MUST BE COVERED NTH WELDING STRIP FUSED TO THE PATCH AND THE SOUND LINING ADJOINING THE DAMAGED AREA. HOT JOINT COMPOUNDS, SUCH AS COAL TAR, SHALL NOT BE POURED OR APPLIED TO THE LINING THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PREVENT DAMAGE TO INSTALLED LINING FROM EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE WORK. I.F APPLICATION TO CONCRETE PIPE - SPECIAL REQUIREMENTS. THE LINING SHALL BE SET FLUSH WITH THE INNER EDGE OF THE BELL OR SPIGOT END OF A PIPE SECTION AND SHALL EXTEND TO THE OPPOSITE END OR TO APPROXIMATELY 4 INCHES (100 MNI) BEYOND THE OPPOSITE END DEPENDING UPON THE TYPE OF LINING JOINT TO BE MADE NTH THE ADJOINING CONCRETE PIPE. WHEREVER CONCRETE PIPE OR CAST -IN -PLACE STRUCTURES PROTECTED NTH LINING, JOIN STRUCTURES NOT SO UNED (SUCH AS BRICK STRUCTURES. CONCRETE PIPE OR CAST -IN -PLACE STRUCTURES NTH CLAY LINING OR CLAY PIPE), THE LINING SHALL BE EXTENDED OVER AND AROUND THE END OF THE PIPE AND BACK INTO THE STRUCTURE FOR NOT LESS THAN 4 INCHES (100 MM). THIS PROTECTING CAP MAY BE MOLDED OR FABRICATED FROM THE LINING MATERIAL BUT NEED NOT BE LOCKED INTO THE PIPE. MERE A PIPE LATERAL (NOT OF PLASTIC LINED CONCRETE) IS INSTALLED T14ROUGH LINED CONCRETE PIPE, THE SEAL BETWEEN THE LINED PORTION AND THE LATERAL SHALL BE PER THE MANUFACTURER'S RECOMMENDATIONS UNED CONCRETE PIPE MAY BE CURED BY STANDARD CURING METHODS. CARE SHALL BE EXERCISED IN HANDLING, TRANSPORTING AND PLACING LINED PIPE TO PREVENT DAMAGE TO THE LINING. NO INTERIOR HOOKS OR SLINGS SHALL BE USED IN LJFTING PIPE ALL HANDLING OPERATION SHALL BE DONE NTH AN EXTERIOR SLING OR NTH A SUITABLE FORK LIFT. ON PIPE HAVING A 3W LINER COVERAGE, THE LONGITUDINAL EDGES OF THE SHEET SHALL BE BUTT WELDED. MEN PIPE TUBES ARE FURNISHED, THESE ARE SHOP -WELDED JOINTS. NO PIPE WITH DAMAGED LINING WILL BE ACCEPTED UNTIL THE DAMAGE HAS BEEN REPAIRED TO THE SATISFACTION OF THE ENGINEER. 1.G. FIELD JOINTS IN LINING FOR CONCRETE PIPE THE JOINT BETWEEN SECTIONS OF LINED PIPE SHALL BE PREPARED IN THE FOLLOWING MANNER: IF REQUIRED, THE INSIDE JOINT SHALL BE FILLED AND CAREFULLY POINTED NTH CEMENT MORTAR IN SILICH A MANNER THAT THE MORTAR SHALL NOT. AT ANY POINT, EXTEND INTO THE PIPE BEYOND THE STRAIGHT LINE CONNECTING THE SURFACES OF THE ADJACENT PIPE SECTIONS. PIPE JOINTS MUST BE DRY BEFORE LINING JOINTS ARE MADE. ALL MORTAR AND OTHER FOREIGN MATERIAL SHALL BE REMOVED FROM LINING SURFACES ADJACENT TO THE PIPE JOINT, LEAVING THEM CLEAN AND DRY. FIELD JOINTS IN THE LINING AT PIPE JOINTS MAY BE EITHER OF THE FOLLOWING DESCRIBED TYPES: TYPE P-1: THE JOINT SHALL BE MADE WITH A SEPARATE 4--INCH (100-MM) JOINT STRIP AND TWO WELDING STRIPS. THE 4-INCH (100-MM) JOINT STRIP SHALL BE CENTERED OVER THE JOINT, HEAT-SEAL.ED TO THE LINING. THEM WELDED ALONG EACH EDGE TO ADJACENT LINER SHEETS NTH A 1-INCH (25-MM) WELD STRIP. THE 4-INCH (100-MM) JOINT STRIP SHALL LAP OVER EACH SHEET A MINIMUM OF 1/2 INCH (13 MM). TYPE P-2. THE JOINT SHALL BE MADE VATH A JOINT FLAP NTH LOCKING EXTENSIONS REMOVED AND EXTENDING APPROXIMATELY 4 INCHES (100 MM) BEYOND THE PIPE END- THE JOINT FLAP SHALL OVERLAP THE LINING IN THE ADJACENT PIPE SECTION A MINIMUM OF 1/2 INCH (13 MM) AND BE HEAT -SEALED IN PLACE PRIOR TO WELDING. THE FIELD JOINT SHALL BE COMPLETED BY WELDING THE FLAP TO THE LINING OF THE ADJACENT PIPE USING I -INCH (25-MM) WELD STRIP. CARE SHALL BE TAKEN TO PROTECT THE FLAP FROM DAMAGE. EXCESSIVE TENSION AND DISTORTION IN BENDING BACK THE FLAP TO EXPOSE THE PIPE JOINT DURING LAYING AND JOINT MORTARING SHALL BE AVOIDED. AT TEMPERATURES BELOW 50 F(10 C), HEATING OF THE LINER MAY BE REQUIRED TO AVOID DAMAGE. THE JOINT FLAP OR STRIP ON BEVELED PIPE SHALL BE TRIMMED TO A VADTH (MEASURED FROM THE END OF THE SPIGOT) OF APPROXIMATELY 4 INCHES (100 MM) FOR THE ENTIRE CIRCUMFERENTIAL LENGTH OF THE LINING. ALL WELDING OF JOINTS IS TO BE IN STRICT CONFORMANCE NTH THE SPECIFICATIONS AND INSTRUCTIONS OF THE LINING MANUFACTURER. WELDING SHALL FUSE BOTH SHEETS AND WELD STRIP TOGETHER TO PROVIDE A CONTINUOUS JOINT EQUAL IN CORROSION RESISTANCE AND IMPERMEABILITY TO THE LINER PLATE. HOT-AIR WELDING TOOLS SHALL PROVIDE EFFLUENT AIR TO THE SHEETS TO BE JOINED AT A TEMPERATURE BETWEEN 500 AND 600 F (260 AND 316 C). WELDING TOOLS SHALL BE HELD APPROXIMATELY 1/2 INCH (13 MM) FROM AND MOVED BACK AND FORTH OVER THE JUNCTION OF THE TWO MATERIALS TO BE JOINED. THE WELDING TOOL SHALL BE MOVED SLOWLY ENOUGH AS THE WELD PROGRESSES TO CAUSE A SMALL BEAD OF MOLTEN MATERIAL TO BE VISIBLE ALONG BOTH EDGES AND IN FRONT OF THE WELD STRIP. THE FOLLOWING SPECIAL REQUIREMENT SHALL APPLY MEN THE LINER CD\ERAGE IS 360 DEGREES: MEN GROUNDWATER IS ENCOUNTERED THE LINING JOINT SHALL NOT BE MADE UNTIL PUMPING OF GROUNDWATER HAS BEEN DISCONTINUED FOR AT LEAST THREE DAYS AND NO VISIBLE LEAKAGE IS EVIDENT AT THE JOINT. MEN WELDING THE DOWNSTREAM SIDE OF A JOINT STRIP OR FLAP, DO NOT WELD 6 TO 8 INCHES (150 TO 200 MM) AT THE PIPE INVERT TO PROVIDE REUEF OF POTENTIAL FUTURE GROUNDWATER BUILD-UP. 1.H. APPLICATION TO CAST -IN -PLACE CONCRETE STRUCTURES - SPECIAL REQUIREMENTS. LINER SHEETS SHALL BE CLOSELY FITTED AND PROPERLY SECURED TO THE INNER FORMS. SHEETS SHALL BE CUT TO FIT CURVED AND WARPED SURFACES USING A MINIMUM NUMBER OF SEPARATE PIECES. UNLESS OTHERWISE SHOWN ON THE PLANS., THE LINING SHAU. BE RETURNED AT LEAST 3 INCHES (75 MM) AT THE SURFACES OF CONTACT BETWEEN THE CONCRETE STRUCTURE AND ITEMS NOT OF CONCRETE (INCLUDING MANHOLE FRAMES, GATE GUIDES, CLAY PIPE OR BRICK MANHOLES AND CLAY OR CAST IRON PIPES)- THE SAME PROCEDURE SHALL BE FOLLOWED AT JOINTS MERE THE TYPE OF PROTECTIVE LINING IS CHANGED OR THE NEW WORK IS BUILT TO JOIN EXISTING UNLINED CONCRETE. AT EACH RETURN, THE RETURNED LINER SHALL BE SEALED TO THE ITEM IN CONTACT WIN THE PLASTIC -LINED CONCRETE. IF THE LINER CANNOT BE SEALED WITH ADHESIVE BECAUSE OF THE JOINT AT THE RETURN BEING TOO MADE OR ROUGH OR BECAUSE OF SAFETY REGULATIONS, THE JOINT SPACE SHALL BE DENSELY CAULKED VATH LEAD WOOL OR OTHER APPROVED CAULKING MATERIAL TO A DEPTH OF 2 INCHES (50 MM) AND FINISHED WITH A MINIMUM OF I INCH 925 MM) OF AN APPROVED CORROSION RESISTANT MATERIAL 1.1. TESTING AND REPAIRING DAMAGED SURFACES. AFTER THE PIPE IS INSTAUXD IN THE TRENCH. ALL SURFACES COVERED VATH UNING� INCLUDING WELDS, SHALL BE TESTED WITH AN APPROVED, CONTRACTOR SUPPLIED, ELECTRICAL HOLIDAY DETECTOR (TINKER & RASOR MODEL NO. AP-W VATH POWER PACK OR APPROVED EQUAL) NTH THE INSTRUMENT SET BETWEEN 18,000 AND 22.000 VOLTS. ALL WELDS SHALL BE PHYSICALLY TESTED BY A NONDESTRUCTIVE PROBING METHOD. ALL PATCHES OVER HOLES, OR REPAIRS TO THE LINER MEREVER DAMAGE HAS OCCURRED, SHALL BE ACCOMPLISHED IN ACCORDANCE INITH SECTION 7-2.03(l.E) PARA. 8 ABOVE EACH TRANSVERSE WELDING STRIP WHICH EXTENDS TO A LOWER EDGE OF THE LINER WILL BE TESTED BY THE PURCHASING AGENCY. THE WELDING STRIPS SHALL EXTEND 2 INCHES (50 MIN) BELOW THE LINER TO PROVIDE A TAB. A 10-POUND (5 KG) PULL WILL 13E APPLIED TO EACH TAB. THE FORCE WILL BE APPLIED NORMAL TO THE FACE OF THE STRUCTURE BY MEANS OF A SPRING BALANCE. LINER ADJOINING THE WELDING STRIP WILL BE HELD AGAINST THE CONCRETE DURING APPLICATION OF THE FORCE. THE 10-POIJND (5 KG) PULL WILL BE MAINTAINED IF A WELD FAILURE DEVELOPS, UN nL NO FURTHER SEPARATION OCCURS. DEFECTIVE WELDS WILL BE RETESTED AFTER REPAIRS HAVE BEEN MADE. TABS SHALL BE TRIMMED AWAY NEATLY BY THE INSTALLER OF THE LINER AFTER THE WELDING STRIP HAS PASSED INSPECTION. INSPECTION SHALL BE MADE INITHIN 2 DAYS AFTER THE JOINT HAS BEEN COMPLETED IN ORDER TO PREVENT TEARING THE PROJECTING WELD STRIP AND CONSEQUENT DAMAGE TO THE LINER FROM EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE WORK. SHOP DRAWINGS. CONTRACTOR SHALL SUBMIT MANUFACTURER INFORMATION SHOWING DIMENSIONAL, MATERIAL AND JOINT CRITERIA TO THE ENGINEER FOR REVIEW. PIPE TRENCH CLASSIFICATION. RCP CLASS IV SHALL BE INSTALLED PER ASTM TRENCH DESIGNATION *C. RCP CLASS V SHALL BE INSTALLED PER ASTM TRENCH DESIGNATION *00. PVC FOR PIPE SIZES 18* AND LESS. POLY VINYL CHLORIDE PIPE SHALL MEET THE FOLLOWING REQUIREMENTS: 1. MATERIAL PVC PIPE SHALL MEET OR EXCEED ALL REQUIREMENTS SET FORTH IN ASIM 0 3034 NTH SDR OF 35. FLASTOMERIC SEALS AND JOINTS SHALL CONFORM TO ASTM D 3212 AND ASTM F 477. 2. TESTING. MANUFACTURING TESTING METHODS SHALL CONFORM TO ASTM F-679 (T-WALL). CERTIFICATES OF COMPULANCE SHALL BE MADE AVAILABLE TO THE ENGINEER. 3. INSTALLATION. INSTALLATION OF PIPE SHALL FOLLOW MANUFACTURER'S GUIDELINES. THESE SPECIFICATIONS AND ASTM D 2321 'UNDERGROUND INSTALLATION OF FLEXIBLE THERMOPLASTIC SEWER PIPE'. 4. FIELD TESTS IN-Fla-D PRESSURE TESTS SHALL CONFORM TO THESE SPECIFICATIONS AND THE FOLLOWING: DEFLECTION MEASUREMENT OF PVC PIPE AFTER 30 DAYS OF INSTALLATION THE CONTRACTOR SHALL MEASURE PIPE DEFLECTION BY PULLING A 00-NO-GO 5% MANDREL THE MANDREL SHALL BE PULLED THROUGH THE PIPE VATH ROPE BY ONE PERSON WITHOUT MECHANICAL ADVANTAGE. THE MANDREL SHALL HAVE VANES AT LEAST AS LONG AS THE PIPE DIAMETER. THE MANDREL SHALL BE USED IN STRICT CONFORMANCE NTH PIPE AND MANDREL MANUFACTURER'S RECOMMENDATIONS, THE MANDREL DIAMETER WILL BE CALCULATED USING THE FOLLOWING FORMULA: MANDREL DIAMETER - BASE PIPE I.D. -(Y/100 X BASE PIPE I.D.) WHERE Y = ALLOWABLE DEFLECTION IN X (5%) BASE I.D. = ACTUAL INSIDE PIPE DIAMETER (PROVIDED BY PIPE MANUFACTURER) THE MANDREL SHALL HAVE AN ODD NUMBER OF VANES WTH SEVEN (7) MINIMUM. THE MINIMUM LENGTH OF THE CIRCULAR PORTION OF THE MANDREL SHALL BE EQUAL TO THE NOMINAL DIAMETER OF THE PIPE. ANY SEC71ON OF INSTALLED PIPE THAT FAILS THE MANDREL TEST SHALL BE EXCAVATED, RE-BACKFILLED, RECOMPACTED AND RETESTED UNTIL THE MANDREL TEST CAN BE PASSED. RE -ROUNDING WILL NOT BE ALLOWED. PIPE TRENCH CLASSIFICATION. PVC PIPE SHALL BE INSTALLED PER CITY STANDARD S-39, AS MODIFIED ON THE CONTRACT PLANS. COMPACTION ABOVE THE PIPE ZONE SHALL BE AS SHOWN ON THE PLANS. 7. TRENCH EXCAVATION THE EXCAVATION OF TRENCHES FOR PIPING LAID IN THE GROUND SHALL BE IN OPEN -CUT FROM THE SURFACE OF THE GROUND EXCEPT MERE BORING IS REQUIRED. THE TRENCHES SHALL BE OF WIDTH AS SHOWN ON STANDARD S-39 AND DETAILED SECTIONS ON THE PLANS FOR PROPER PIPE INSTALLATION. THE HOLES FOR 80-LS AND FITTINGS SHALL BE EXCAVATED BY HAND. TO A NDTH PROVIDING UNIFORM BEARING ALONG THE LENGTH OF THE PIPE. IT IS THE INTENTION OF THESE REQUIREMENTS TO PROVIDE FIRM, UNIFORM BEARING FOR THE PIPE CONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE NTH THE DETAILED SECTIONS PROVIDED IN THE PLANS. SELECTION OF TRENCH TYPES MAIL BE AS REQUIRED BY THE TYPES OF PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL MEET CITY STANDARD S-39. TRENCH LINES SHALL MEET ALL FEDERAL AND STATE SAFETY REQUIREMENTS. LIIIIIIIIII-11CRINeff"111m, IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ENCAVA11ON SHALL BE SUPPORTED AS SET FORTH IN THE RULES, ORDERS, AND REGULATIONS OF THE STATE DIVISION OF INDUSTRIAL SAFETY. IF THE CONTRACTOR DESIRES TO DEVIATE FROM THE SAFETY ORDERS. HE SHALL SUBMIT DATA BY A REGISTERED CIVIL ENGINEER TO THE STATE DIVISION OF INDUSTRIAL SAFETY. JUSTIFYING THE ALTERNATE PROCEDURES TO BE USED. FAILURE TO COMPLY NTH ANY OF THESE RULES. ORDERS AND REGULATIONS SHALL BE SUFFICIENT CAUSE FOR THE STATE DIVISION TO IMMEDIATELY SUSPEND ALL WORK. COMPIENSARON FOR LOSSES INCURRED BY THE CONTRACTOR BY SUCH AN EMERGENCY SUSPENSION SHALL NOT BE ALLOWED. DURING BACKFIWNG, THE BOTTOM OF THE SHORING SHALL BE KEPT ABOVE THE LEVEL OF THE BACKFILL AT ALL TIMES. SECTION 6422 OF THE CALIFORNIA LABOR CODE REQUIRES THE CONTRACTOR TO SUBMIT TO THE ENGINEER A DETAILED PLAN. DRAVANG THE DESIGN OF SHORING, BRACING. SLOPING OR OTHER PROVISIONS TO BE MADE BY THE CONTRACTOR FOR THE PURPOSE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF TRENCHES NECESSARY FOR THE CONSTRUCTION OF THE PROJECT. IF SUCH PLAN VARIES FROM THE SHORING SYSTEM STANDARD ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, THE PLANS SHALL BE PREPARED AND CERTIFIED BY A REGISTERED CIVIL OR STRUCTURAL ENGINEER; HOWEVER, USE OF SYSTEMS THAT ARE LESS EFFECTIVE THEN THOSE REQUIRED BY THE CONSTRUCTION SAFETY ORDERS IS PROHIBITED ON THIS PROJECT. 9. TRENCH BACKF1LL TREN04ES SHALL NOT BE LEH OPEN FARTHER THAN THREE HUNDRED (300) FEET IN ADVANCE OF PIPE LAYING OPERATIONS OR TWO HUNDRED (200) FEET TO THE REAR THEREOF, UNLESS OTHERIMSE PERMITTED BY THE ENGINEER. ALL WORK SHALL CONFORM TO THE APPLICABLE SECTIONS OF THE STANDARD SPECIFICATIONS. DATED JULY. 1992- BEDDING CLASS SHALL BE AS SPECIFIED IN THE PIPE OPTIONS. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL BE IN ACCORDANCE VATH CITY STANDARD ST-22. EXCEPT THAT COMPACTION SHALL 13E NO LESS THAN NINETY PERCENT (90%) UP TO THIRTY INCHES (30") FROM FINISHED GRADE. BACKFILL MATERIALS IN THE PIPE ZONE SHALL BE PLACED IN LAYERS NOT TO EXCEED TWELVE (12) INCHES SIMULTANEOUSLY. ON EACH SIDE OF THE PIPE, IN SUCH A MANNER AS NOT TO DAMAGE OR DISTURB THE PIPE OR ITS ALIGNMENT AND GRADE. BAcKnLL MATERIAL ABOVE THE PIPE ZONE SHALL BE FREE OF DELETERIOUS MATERIALS AND LUMPS OR STONES EXCEEDING THREE (3) INCHES IN GREATEST DIMENSION AND SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES. EA04 LAYER SHALL BE THOROUGHLY COMPACTED BY VIBRATORY OR MECHANICAL TAMPING, OR BY A COMBINATION OF THESE METHODS. FLOODING AND JETTING SHALL NOT BE ALLOWED. THERE MUST BE AT LEAST (ME FOOT OF COVER OVER THE PIPE BEFORE COMPACTION ABOVE THE PIPE ZONE YELL BE ALLOWED. IMPORTED BEDDING AND ELACKFILL MATERIAL SHALL BE OBTAINED. AND ANY EXCESS BODING AND BACKFILL MATERIAL SHALL BE DISPOSED, BY ANY LEGAL MEANS AT THE DISPOSAL OF THE CONTRACTOR. THE CONTRACTOR MAY SUBMIT TO THE ENGINEER SIEVE ANALYSIS FOR UTILIZATION OF IN -SITU MATERIALS. BLOW PIPE SPRINGLINE. CONTRACTOR SHALL PROVIDE NFIRM BEDDING* SUPPORT FOR THE PIPE BELOW THE SPRINGUNE. FIRM BEDDING MEANS THAT THE PIPE MUST REST ON THE GRANULAR MATERIAL SPECIFIED PREVIOUSLY IN THE SPECIFICATIONS. BELL OR COUPLING HOLES SHALL BE CAREFULLY EXCAVATED AT PROPER INTERVALS, SO THAT NO PART OF THE LOAD IS SUPPORTED BY THE BELLS OR COUPUNGS. DURING BEDDING AND BACKFILLING. CONSOLIDATION OF MATERIAL AROUND AND UNDER BELLS AND COUPLINGS SHALL BE AVOIDED. CONTRACTOR SHALL SHOVEL-SUCE OR HAND TAMP BEDDING IN THE HAUNCH AREAS, AS THIS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS. SHOVEL-SUCING OR HAND TAMPING SHALL BE DONE BEFORE THE BEDDING IS BROUGHT UP TO THE QUARTER POINT OF THE PIPE. INITIAL EACKFILL "BEDDING MATERIALO AS SPECIFIED BY ASTM 2321-8 SHALL BE USED IN THE PIPE ZONE FOR INITIAL BACKFILL AFTER THE PIPE HAS BEEN PROPERLY LAID AND INSPECTED, INITIAL BACKFILL SHALL BE PLACED ON BOTH SIDES AND OVER THE PIPE TO SUCH A DEPTH THAT. AFTER THOROUGH CONSOLIDATION. THE FINAL DEPTH SHALL BE AT LEAST TO THE ELEVATION SHOWN ON THE PLANS. THE MATERIAL SHALL BE CONSOUDATED BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND MANNER OF TAMPING MUST BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO COMMENCING OPERATION. IMPACT EQUIPMENT MAY BE ALLOWED UNDER THE DIRECTION OF THE ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THE USE OF THIS EQUIPMENT. HYDRA -HAMMER WILL NOT BE PERMITTED. SUBSEQUENT RACKFII I. ABOVE THE LEVEL OF INITIAL BACKFILL, THE TRENCH MAY BE BACKFILLED WITH NATIVE MATERIAL RESULTING FROM TRENCH EXCAVATION, OR AT THE OPTION OF THE CONTRACTOR, SELECT IMPORTED MATERIALS MAY BE USED. NATIVE MATERIAL OR IMPORTED MATERIAL MAY BE COMPACTED BY TAMPING AND/OR ROLLING. USING EQUIPMENT AND METHODS APPROVED BY THE ENGINEER. WHEN THE CONTRACTOR COMPACTS BY TAMPING AND/OR ROLLING, THE BACKFILL MATERIAL SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES IN LOOSE DEPTH, EACH LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROILING BEFORE SUCCEEDING LAYERS ARE PLACED. COMPACTION OF SUBSEQUENT BACKFIL.L WTHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED PERMANENT SURFACING GRADE SHALL BE ACCOMPLISHED BY TAMPING AND/OR ROILING AS SPECIFIED ABOVE- WHERE THE TRENCH IS WITHIN THE PAVEMENT ON STREETS� THE BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED PERMANENT GRADE SHALL BE COMPACTED TO NINETY PERCENT (90%) RELATIVE COMPACTION. SUBSEQUENT BACKFILL PLACED BY TAMPING AND/OR ROILING SHALL BE FREE FROM STONES OR LUMPS EXCEEDING THREE (3) INCHES IN GREATEST DIMENSIONS, VEGETABLE MATTER, OR OTHER UNSATISFACTORY MATERIALS. IN NO CASE SHALL &7RNG BE ALLOWED FOR BACKFILL COMPACTION WITHIN THE STREET. WHEN APPROVED BY THE ENGINEER, JETTING MAY BE USED IN NON-SIREET AREAS. BACKFILL TESTING AND COMPACTION, TESTING OF BACKFILL MATERIALS AND COMPACTION SHALL BE IN ACCORDANCE WITH SECTION 19, -EARTHWORK" AND SECTION 6-3. *TESTING 1. OF THE STANDARD SPECIFICATIONS, STATE OF CALIFORNIA, DEPARTMENT OF PUBLIC WORKS, DIVISION OF HIGHWAYS. EACH LAYER OF BACKFILL MATERIAL SHALL MEET THE COMPACTION, SAND EQUIVALENT, AND GRADATION REQUIREMENTS BEFORE THE NEXT LAYER IS PLACED. EACH LAYER OF BACKFILL SHALL BE THOROUGHLY COMPACTED TO THE RELATIVE COMPACTION OF NOT LESS THAN IS SHOWN ON CITY OF BAKERSFIELD STANDARD S-39 AS MODIFIED ON THE CONTRACT PLANS, EXCEPT THAT COMPACTION WITHIN THE ROADWAY STRUCTURAL SECTION SHALL BE NO LESS THAN NINETY PERCENT (90%) RELATIVE COMPACTION FOR THE TOP FINISHED 30", AND SHALL BE DETERMINED BY CALIFORNIA TEST METHODS 216 OR 231, OR ASTM (CURRENT EDITION) D1557 AND ONE OF THE FOLLOWING D2922 OR D1556. IF THE RELATIVE COMPACTION, AS DETERMINED BY TESTING� FAILS TO MEET THE SPECIFIED PERCENTAGE THE TRENCH SHALL BE RE -EXCAVATED AND RE -COMPACTED. COMPACTION TESTS WILL BE THE SUBDIVIDERS RESPONSIBILITY. THE NUMBER AND LOCATIONS OF THE TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. 10. �MK rIrt INWA�11� SEVER PIPE SHALI_ CONFORM TO THE PLANS, AND THESE SPECIAL PROVISIONS T14E PRICE PER LINEAL FOOT SHALL INCLUDE BUT NOT BE LIMITED TO EXCAVATION, BEDDING AND BACKFILL HANDLING OF MATERIALS. ALL PIPE� FITTINGS� SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES- ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING NTH A JOINT DAMAGED OR FLATIENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE NTH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOMSTREAM END OF THE TRUNK SEVER OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WIN EACH PIECE LAID TRUE TO LINE AND GRADE. AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT NTH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE AS THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE. AT TIMES MEN WORK IS NOT IN PROGRESS. OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. NTH BELI ED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACAUTATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUT71NO PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. PIPELINE TESTING. ALL SEWERS SHALL BE TESTED FOR TIGHTNESS MEN COMPLETED AND READY FOR SERVICE TESTING SHALL BE CONDUCTED IN ACCORDANCE IMTH THE UNIFORM PLUMBING CODE AIR TEST METHOD UPC SEC. 318-6(4). OR THE WATER EXFILTRATION TEST OR AIR PRESSURE TEST PER SECTION 306-1.4. -TESTING PIPEUNES- OF THE 1994 EDITIONS, -STANDARD SPECIFICATIONS' FOR PUBLIC WORKS CONSTRUCTION, AND CHAPTER 1.3 OF THE CITY OF BAKERSFIELD SUBDIVISION DESIGN MANUAL AND THE PIPE SUPPLIER'S REQUIREMENTS. THE CONTRACTOR SHALL N07IFY THE ENGINEER 24 HOURS PRIOR TO ANY TESTING. CLEANING PIPE LINES. CARE SHALL BE EXERCISED IN LAYING OF PIPE LINES TO EXCLUDE DIRT AND ANY OTHER FOREIGN MATERIAL MEN PIPE LAYING IS INTERRUPTED, AS AT NIGHT, THE PIPE ENDS SHALL BE SUITABLY CLOSED. UPON COMPLETION, AND BEFORE PLACING INTO SERMCE, ALL LINES SHALL BE FLUSHED AND MANDRELLED TO REMOVE ANY DIRT OR FOREIGN MATERIALS MICH WOULD CLOG PUMPS, EQUIPMENT, SPRAY HEADS. ETC. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING SEWER UNE. SEVER LATERALS. SEWER LATERALS SHALL CONFORM TO THIS IN EVERY REGARD. EXISTING SEWER LATERALS SHALL BE LOCATED BY THE CONTRACTOR AND CONNECTED TO AND EXTENDED OR RECONSTRUCTED ACCORDING TO THE PLANS. COMPRESSION COUPLINGS MAY BE UTILIZED FOR CONNECTING TO EXISTING LATERALS. POSITIVE GRADE TO THE TRUNK SEWER SHALL BE MAINTAINED AND INVERT GRADES SET AS CALLED ON THE PLANS. SEWER WYES SHALL BE INSTALLED ON THE TRUNK IN ACCORDANCE NTH THE PIPE MANUFACTURERS RECOMMENDATIONS. PAYMENT FOR SEVER LATERALS WILL BE PAID AS SEWER FOR THE APPROPRIATE DIAMETERS. 11. SYSTEM TESTING A MANDREL TEST AND PRESSURE TEST SHALL BE PERFORMED ON INSTALLED PIPE IN ACCORDANCE NTH THE CITY OF BAKER91ED SUBDIVISION MANUAL AND THE RECOMMENDATIONS OF THE MANUFACTURER. PRIOR TO FINAL ACCEPTANCE, ALL SEWER LINES SHALL BE INSPECTED NTH VIDEO EQUIPMENT DESIGNED FOR THIS PURPOSE. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING 3606, IN ORDER TO MEW AND RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED. THE VIDEO INSPECTION SHALL BE WTNESSED BY THE CITYS CONSTRUCTION INSPECTOR, WHO IMLI ALSO INITIAL AND DATE THE *CHAIN OF CUSTODYO FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY CITY OF ANY PIPE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE NTH THE SPECIFICATIONS. A RECORDED VIDEO CASSETTE, THE COMPLETED *CHAIN OF CUSTOOYm FORM AND A WRITTEN LOG (MICH INCLUDES THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CONNECTED LATERALS) OF THE INSPECTION SHALL BE PROVIDED FOR MEWING, AND SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE, THE VIDEO CASSETTE SHALL BECOME THE PROPERTY OF THE CITY. IZ WYE FITTINGS SHALL BE INJECTION MOLDED IN-UNE TYPE AND SHALL BE USED FOR ALL LATERAL CONNECTIONS AND SHALL BE ROTATED A MINIMUM OF 23 DEGREES ABOVE THE HORIZONTAL PLANE RUNNING THROUGH THE CENTERUNE OF THE MAIN. ALL LATERALS SHALL BE C IN DIAMETER EXCEPT AS NOTED ON PLANS, EXTENDING A MINIMUM OF 4' BEYOND THE PROPERTY LINE OR RIGHT-OF-WAY LINE NTH 3cr OF COVER AT FLOW LINE SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY LINE OR RIGHT-OF-WAY LINE AS SHOWN IN THE NSEWER LATERAL MARKER" DETAIL. C.O.B. SID. BET. SW-1. LATERALS SHALL BE A MINIMUM OF 5.0` DEEP AND A MAXIMUM OF 7' DEEP AT PROPERTY UNE OR RIGHT-OF-WAY LINE AND A MINIMUM OF 2,5' DEEP AT FLOMNE. LINED MANHOLES THE CORED HOLE SHALL HE APPROXIMATELY 3 INCHES GREATER THAN THE OUTSIDE DIAMETER OF THE CONNECTING LINE. THE CORED HOLE SHAU_ BE DESIGNED TO CUT A HOLE WITH MINIMUM DAMAGE TO THE REINFORCING STED, PIPE OR PLASTIC LINER. PRIOR TO THE INSTALLATION OF THE PVC BOOT ON THE CONNECTION, PLASTIC LINER AROUND THE PIPE AT THE CORED HOLE SHALL BE CLEANED PER THE PLASTIC LINER MANUFACTURE'S RECOMMENDATION. THE END OF THE CONNECTING LINE SHALL BE SEALED TO THE PVC BOOT NTH SIKA 11 PRIMER AND SIKA FLEX 1A SEALANT OR AN APPROVED EQUAL THE PVC BOOT SHALL BE ORDERED SO IT WILL FIT SNUGGLY 0 THE OUTSIDE WALL OF THE CONNECTION. THE PVC BOOT AND WELD STRIPS SHALL BE INSTALLED AND TESTED FOR HOLIDAYS PER THE PLASTIC LINER MANUFACTURER'S RECOMMENDAnON. THE CONNECTION LINE SHALL BE CENTERED IN THE CORED HOLE ANBD PLACED SO IT IS FLUSH NTH THE INSIDE WALL OF THE RCP. THE PVC BOOT WELD STRIPS SHALL BE MANUFACTURED BY AMERON, INC. OR AN EQUAL APPROVED BY THE CITY ENGINEER. 13. ALL SEWER STUBS SHALL BE CLOSED NTH A STANDARD PLASTIC PLUG. SOLVENT WELDED 14. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWINGS S-7. S-8, AND S-21 AND SECTIONS 70-1.02H AND 71-1.07 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CAUFORNIA. DEPARTMENT OF TRANSPORTATION, CURRENT EDITION. ALL CLEANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE NTH THE CITY OF BAKERSFIELD STANDARD DRAWING S-20. MANHOLES SHALL BE TYPE mA" FOR PIPES LINDER 487 IN DIAMETER AND TYPE NB" FOR PIPES 48m IN DIAMETER OR LARGER UNLESS NOTED OTHERIMSE. THE BOTTOM MANHOLE BARREL AT THE MANHOLE FOUNDATION SHALL BE SET ON A Z* MORTAR RED OR SET ON KENT-SEAL. IN A GROOVED FOUNDATION. 15. STORM DRAIN PIPE STORM DRAIN PIPE. CONTRACTOR SHALL UTILIZE RCP PIPE, CLASS III WTH RUBBER GASKET JOINTS PER ASTM SPECIFICATION C-76. UNLESS OTHERWISE NOTED ON THE CONTRACT PLANS. REINFORCED CONCRETE PIPE. REINFORCED CONCRETE PIPE SHALL CONFORM TO THE PROVISIONS IN SECTION 65, NEINFORCED CONCRETE PIPE", OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS EXCEPT AS OTHERWISE DESIGNATED BY CLASSIFICATION ON THE PLANS OR IN THE SPECIFICATIONS. MINTS FOR CULVERT AND DRAINAGE PIPES SHALL CONFORM TO THE PLANS OR SPECIFICATIONS FOR STANDARD JOINTS - HYDROSTATIC TESTS SPECIFIED BY SECTION 65-1.08 *LAYING SIPHON AND PRESSURE PIPE", OF THE STANDARD SPECIFICATIONS WILL NOT BE REQUIRED. REINFORCED CONCRETE PIPE SHALL HAVE RUBBER GASKETED JOINTS CONFORMING TO SECTION 65-1.06B, NRUBBER GASKETED JOINTS�, OF THE STANDARD SPECIFICATIONS. HANDLING OF MATERIALS. ALL PIPE, FITTINGS� SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING� HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS. SPECIAL CARE SHALL 13E EXERCISED SO THAT PREFORMED RESILIENT JOINTS ON PIPE AND FITTINGS ULL NOT BE DAMAGED. ANY PIPE OR FITTING NTH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE COND17ION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE STORM DRAIN OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT NTH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE. AS T14E WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE. AT TIMES MEN WORK IS NOT IN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. NTH BELLED END PIPE. BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACIUTATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING. ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL MAKE PROVISONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING STORM DRAIN LINE CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY. ERECTION, AND COMPLETION OF THE WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY. NTH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDinONAL COMPENSATION VALL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. 11101111W.T404-ITI)WOETAM" IN CASING OR SMOOTH OUTSIDE WALLED PIPE FOR BORED/JACKED PIPE SHALL BE INSTALLED. IT SHALL HAVE EVEN BEARING THROUGHOUT ITS LENGTH AND SHALL SLOPE TOWARD ONE END. SPACE BETWEEN CASING AND PIPELINE SHALL BE BACKFILLED NTH SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE CASING ALSO SHALL BE BACKFILLED NTH GROUT OR SAND. THE ENDS OF SPACE BETWEEN THE CASING AND THE PIPE SHALL BE SEALED WITH GROUT. THE STRENGTH OF PIPE DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL LOAD ONLY ANY ADDITIONAL STRENGTH REQUIRED BY BORING/JACKING OPERATIONS SHALL BE FURNISHED AT THE CONTRACTOR'S EXPENSE THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OF BORING/JACKING OPERATIONS PRIOR TO BORING OR JACKING. ELORING/JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER, CONSISTENT VATH CURRENT ACCEPTED PROCEDURES. WATER BORING SHALL NOT BE PERMITTED. THE CASING PIPE SHALL BE JACKED WITH SUCH PRECISION THAT VILL ALLOW THE REPLACEMENT OF THE PIPELINE TO THE LINE AND GRADE AS INDICATED ON THE PLANS. UPON COMPLETION OF THE INSTALLATION OF THE CASING AND INSTALLATION OF THE PIPELINE TO GRADE. THE VOID BETWEEN THE CASING OR RC PIPE AND THE EXCAVATION SHALL BE COMPLETELY FILLED NTH SAND, COMPACTED BY THE USE OF AIR-BLOVANG SAND EQUIPMENT OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HIS APPROVAL IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERA RON AT ALL TIMES. SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DANGEROUS OR UNREASONABLE SLOUGHING OF MATERIAL WHICH MAY JEOPARDIZE THE SAFETY OF WORKERS OR THE STABILITY OF THE SOIL AND ROADWAY ABOVE, THE CONTRACTOR SHALL FURNISH AND INSTALL BREASTBOARDING AND/OR FACE CLOSURE NTH SUFFICIENT JACKS TO INHIBIT THE SLOUGHING AND/OR CLOSING THE WORK FACE THE CONTRACTOR, BEFORE RESUMING WORK SHALL FURNISH THE ENGINEER WITH A DETAILED PLAN OF PRECEDING NTH THE WORK, FOR HIS REVIEW AND APPROVAL ANY AND ALL EXPENSES THEREFORE WILL BE CONSIDERED AS INCLUDED IN THE BID PRICE AND NO ADDITIONAL COMPENSATION WILL BE MADE THEREFORE. MINOR STRUCTURES. PORTLAND CEMENT CONCRETE MINOR STRUCTURES SHALL CONFORM. IN DESIGN, MATERIALS. AND CONSTRUCTION, TO THE PROVISIONS OF SECTIONS 70-1.02 H OF THE STANDARD SPECIFICATIONS AND T14ESE SPECIAL PROVISIONS. MANHOLES SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS S-7 AND S-8. DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARD S-12. TEMPORARY INLET GRATES SHALL CONFORM TO DETAILS ON THE PLANS. THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE STRENGTH REQUIREMENT OF ASTM. C-478, EACH SUCCESSIVE MANHOLE SECTION SHALL BE SET ON A BED OF PORTLAND CEMENT GROUT OR 'KENT SEAL* TO MAKE A WATERTIGHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE AND SHALL BE SET PLUMB. 18. ADJUST SURVEY MONUMENT ENCASEMENTS SURVEY MONUMENT AND FRAME AND COVER INITH ENCASEMENTS SHALL BE ADJUSTED OR INSTALLED NEW TO FINISH GRADE AT THE LOCATIONS SHOWN ON THE PLANS, IN ACCORDANCE WITH THESE SPECIAL PROVISIONS, AND CITY STANDARD S-29. THE SURFACE OF THE CONCRETE SHALL HE PROTECTED FROM PUBUC TRAFFIC FOR A MINIMUM OF THREE DAYS. AT THE OPTION OF THE CONTRACTOR, MINOR CONCRETE CONTAINING A MINIMUM OF SEVEN SACKS OF CEMENT PER CUBIC YARD MAY BE USED AND THE TIME REQUIRED FOR PROTECTION OF THE CONCRETE SURFACE FROM PUBLIC TRAFFIC SHALL BE REDUCED TO A MINIMUM OF ONE DAY� THE MONUMENT VALL BE SET BY OTHERS. THE OWNER WILL PROVIDE SURVEYS. CONTRACTOR SHALL GIVE THE OWNER 24 HOURS NOTICE MEN SURVEYS ARE REQUIRED. ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HIS OPER SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER. N_ MV5FIRS4 0 15 Know what's below. Call before you dig. \N � � k� � N 0 2§ z wg >_ m W > z c; 0 z m (L 5V 25' SCALE: 0, 1" = 50' 50' Too, 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 324 SECTION A SCALE, HORZ. 1" = 50' VERT. I' = 5' 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 324 6 5 INTERSECTION A. IU+W.W �.!_ YUKL)N Ni" A"Vt A. 16+05.00 C.L. KOYUK RIVER STREET 4 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 324 10 w STA. 10+00.00 C.L. SCRIMP, COURT w 0) SCRIVIA C (SEE SH 30, I IL 12' ie� 18, 17 29 2++ RW gI i.�� ;w� 7�g 'W W 11+00 Ll FL 12+ 6. 9)1 I-E 17 F_t_�RW c! 19 18;w ;73 ;72 w 9 g 9 TREET 99 9 6) + + + + + !2 c,i w n LEGEND: FL/F.L ABBREMATIONS FLOVUNE R/W RIGHT-OF-WAY C.L. CENTERILINE MA/MH MANHOLE ELEV. ELEVA noN SMH SEWER MANHOLE QO.B_ CITY OF BAKIRFIELD SDMH1 STORM DRAIN MANHOLE T.O.M. TOP OF MANHOLE CEI CATCH BASIN T.O.C. TOP OF CLEANOUT GB GRADE BREAK INV. INVERT S/W SIDEWALK EL/ELEV. ELEVATION FH FIRE HYDRANT PA PROPERTY UNE D.W.S. DESIGN WATER SURFACE E.P. EDGE OF PAVEMENT XRW U RIGHT-OF-WAY EX.A-AST. EXISTING GINS CITY WATER SERVICE C/G CURB & GUTTER STD. STANDARD 0 SURVEY MONUMENT PROPOSED GATE VALVE & VALVE BOX - SE CWS PLAN 0 STORM DRAIN MANHOLE TYPE *Am x EXISTING GATE VALVE PER C.O.B. STANDARD. CATCH BASIN WITH 3S OPENING W PROPOSED FIRE HYDRANT ASSEMBLY - SEE GINS PLAN PER C.O.B. STANDARD DETAIL S-Iz V EXISTING FIRE HYDRANT UNLESS OTHERWISE NOTED. 6 PROPOSED 27 BLOWOFF CONSTRUCT SEWER MANHOLE TYPE OAN ASSEMBLY - SEE CWS PLAN PER C.O.B. STANDARD DETAIL S-7. /—PIPE SZE CONSTRUCT SEWER CLEANOUT PER I 8 . S —UTILITY.. C.O.B. STANDARD DETAIL S-20. W-WA7ER S-SEWER G) EXISTING SEWER MANHOLE G-GAS D-DRAIN tp L2 130.00 LF OF Eer SS S0911 OE 71 SHEET JE QL INTERSECTION ET STA. 19+20.00 CL YUKON RIVER STA_ 13+00.00 C.L LAGO PUCCINI CHETOO RIVER STREET 3(Y 30 ee d _1 to I ee 13 1 18, 18, 112' Ems +t; 24 1 99 ++ Nil + + t w3i z /RW_ 25 NEW WATER MAIN PER WATER PLANS (TYP) �J�222 7g LIF OF 18' SO tB911 �51-W 1 1 SO FL DO 17+00 18+00 L3 s 17mw u o bb mu 11 01 T7s. SS N8911 I W 4 LF OF 6 IZ-7- L,— aw C? m 66 70 69 68 67=w 65 64 g + + + \C.L INTERSEG�TION STA. 14+MGO C.L. YUKON RIVER AVENUE STA. 13+00.00 C.L. COW GREEK WAY LEGEND (CONT.): 519 To M. TOP OF MANHOLE ,jPL-� — - — - — - — CENTERUNE CONSTRUCT STORM DRAIN PER C.O.B. SM. 9— CONSTRUCT SEWER PER CO.B. STANDARD _w— PROPOSED WATER - SEE CWS PLAN TRACT BOUNDARY EXISTING SEWER EXISTING WATER a(ISTING STORM DRAIN EXISTING EDGE OF PAVEMENT I=t 1=1 M PHASE LINE EASDAENT LEGEND GTION LETTER A 2 SHEET MHERE SECTION IS SHOWN CONSTRUCTION NOTES STUB & PLUS STORM DRAW/SEWER. EXTEND WTH FUTURE DEVELOPMENT. CONTRACTOR TO HAVE LICENSED SURVEYOR VERIFY LOCA71ON AND ELEVATION OF INVERT PRIOR TO BACKFILL CONSTRUCT PIPE SADDLE PER C.O.B. SM. D-9 AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE LESS THAN 12� I 36 H+,O 5a L 37 4i iC �CCINI STREET SHEET 8) 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 324 DO 9"o LINE TABLE LINE # LENGTH BEARING Li 300.00 NEW 11' 51sW 1_2 130.00 SEW 11' 51"E L3 170.00 SB9* 11' 51"F L4 320.00 S89' 11' 51"E L5 37.01 S37' 36' 56" 0 a 9-/_� !;�i I v 0 FT qw ........... "&4 CITY RECORDS NO: < o 0 0 L L.J.J.. I i ... __1_LJ uj Lu > Lu > z o L_-A A Co CREEK SHEE 13V F 1 3 55 561 + ;i 27AS 123.31 LTF 8�� SsEVmV W 53 30, 52 112, 18, STA. 11+30.00 C.L. BREETENBUSH AVENUE PHASE 1 STX 10+00.00 C.L COW CREEK WAY y ej w IN't 66 V�I,AII%30 1, STX 'D+DCUA 1 9 N5 58 59 t2 62 "57 61 6,6 1 60 1 to I + 9 + 9 + MIA= + + Rw I M&E Ij 8� SE 24VOa LF 8* 1 207.51 _D Limm� L 2SOM c� 1 51 50 49 1 48 1 47 9 PHASE 1 BREITENBUSH AVENUE STA. 10+00.00 C.L. TO 16+20.00 C.L SCALE: 1* = 50' HORIZONTAL 1 1 = 5' VERWAL LAGO PUCCINI STREET FF SEE SHEET 8) LINE TABLE 30" 30 1 63 2' 11111 8' 12' UNE # LENGTH BEARING 40 LI 159.54 NOD' 48' OVE 98 L2 26.41 S32' 59' OCE + + L3 130.00 S89' 11' WE L4 490.00 SB9* 11' 51�E L5 5016 N14* 39' 36"W 44 43 946 45 1 + Ed 0�1 Q! 41 q INTERSECTION STA. 16+20.00 C.L. BREFTENBUSH AVENUE STA. 10+00.00 C.L. LAGO PUCCINI STREET raw 42 d STORM DRAIN TO SUMP (SEE SHEET 9) SCALE: 1*' = 50' 50' 25' ol so' Too' 9+50 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 17+i5 f A SECTION MEW - STA, 14+05.00 HOWZ_ I = VERT. 11 51 LEGEND: LEGEND (CONT.): CONSTRUCTION NOTES: ABEERFMATIONS G) STUB & PLUG STORM DRAIN/SEWER. FL/F.L. FLOWLINE R/W RIGHT-OF-WAY ejg� TOP OF MANHOLE EXTEND WITH FUTURE DEVELOPMENT. C.L CENTERUNE M.H./MH MANHOLE CONTRACTOR TO HAVE LICENSED ELEV. ELEVATION SMH SEWER MANHOLE — - — - — - — GENTEFEUNE SURVEYOR VERIFY LOCATION AND C.O.B. CITY OF BAKERFIELD SDMH STORM DRAIN MANHOLE ELEVATION OF INVERT PRIOR It) T.O.M. TOP OF MANHOLE Cs CATCH BASIN CONSTRUCT STORM DRAIN PER C.O.B. STD. SACKFlLL 7, T.O.C. TOP OF CLEANOUT GB GRADE BREAK _.—s— CONSTRUCT SEWER PER C.O.B. STANDARD INV. NYRT S/W SIDEWALK CONSTRUCT PIPE SADDLE PER EL/ELEV. ELEVATION PH FIRE HYDRANT PROPOSED WATER SEE CWS PLAN C.O.B. STD. D-9 AT LOCATIONS OF PA PROPERTY LINE D.W.S. DESIGN WATER SURFACE TRACT BOUNDARY CROSSING PIPES M7H CLEARANCE E.P. EDGE OF PAVEMENT XRW EX. RIGHT-OF-WAY LESS THAN 12w EX/EXIST. EXISTING CWS CITY WATER SERVICE EXISTING SEWER t C/G CURB & GUTTER SID. STANDARD EXISTING WATER SURVEY MONUMENT PROPOSED CATE VALVE & VALVE BOX - SEE M PLAN EXISTING STORM DRAIN 0 STORM DRAIN MANHOLE TYPE *A" X EXISTING GATE VALVE EXISTING EDGE OF PAVEMENT PER C.O.B. STANDARD. CATCH BASIN WITH 3.5' OPENING V PROPOSED FIRE HYDRANT ASSEMBLY - SEE CWS PLAN M PHASE LINE PER C.". STANDARD DETAIL S-1Z EXISTING FIRE HYDRANT EASEMENT LEGEND v m A*T UNLESS OTHERWISE NOTED. "A- PROPOSED 27 BLOWOFF tj CONSTRUCT SEWER MANHOLE TYPE ASSEMBLY - SEE COS PLAN SECTION LETTER PER C.O.B. STANDARD DETAIL S-7. /---PIPE SIZE j S CONSTRUCT SEWER CLEANOUT PER SINS —UTILITY.. �w4SHEET C.O.B. STANDARD DETAIL S-20. W-WATER S-SEWER �D EXISTING SEVIER MANHOLE C-GAS D-DRAIN MERE SECIION IS SHOWN IO+OD.00 C.L K0YUK RIVM STREET 26 54 WATER MAIN aS7 WATER PU Typ) IT 259-25 LF 180 SI 5 LF 8 SI 53 TRwT 52 INA "k' 51 141 50 I= IS IS 4D + c I=I ct SCALE: 1" - 50' IzI 50' 25' 0 50, Too' ,w1w 9+50 10+00 ll+Oc LIGEND: FL/F.L ABBREMATIONS FLOWUNE R/W RIGHT-OF-WAY C.L CENTERLINE MM./MH MANHOLE ELEV. ELEVATION SMH SEWER MANHOLE C.O.B. CITY OF RAKERFIELD SDMH STORM DRAIN MANHOLE T.O.M. TOP OF MANHOLE CB CATCH BASIN T.O.C. TOP OF CLEANOUT OR GRADE BREAK INV. INVERT S/W SIDEWALK EL/ELEV. ELEVATION F14 FIRE HYDRANT PA PROPERTY LINE OW.S. DESIGN WATER SURFACE F P. EDGE OF PAVEMENT XRW EX. RIGHT-OF-WAY EX./EXIST. EXISTING CWS CITY WATER SERVICE C/O CURB & GUTTER SM. STANDARD SURVEY MONUMENT PROPOSED GATE VALVE & VALVE BOX - SEE GWS PLAN 0 STORM DRAIN MANHOLE TYPE -A- X EXISTING GATE VALVE I PER C.O.B. STANDARD. )SE' CATCH BASIN WTH 3.5 OPEHING PROPOSED FIRE HYDRANT ASSEMBLY - SEE CWS PLAN PER CO.B. STANDARD DETAIL S-IZ V EXISANG FIRE HYDRANT UNLESS OTHERVASE NOTED. 6 PROPOM 27 BLOWOFF CONSTRUCT SEWER MANHOLE TYPE *A" ASSEMBLY - SEE CWS PLAN PER C.O.B. STANDARD DETAIL S-7. —PIPE SIZE 0 CONSTRUCT SEWIN CLEANOUT POR a . S—UTILITY: C.O.B. STANDARD DETAIL S-20. W-WATER S-SEWER OS EXISTING SEWER MANHOLE G-GAS D-DRAIN 27 49 9 NOT'Al-13 48 13+00,00 C.L LAKE BRACCIANNO AVENUE 10+00.00 rL LAKE GARDA STREET e INTERSECTION STA. 15+47.31 QL LAKE BRACCIANNO AVENUE STA. 11+5EL54 C.L MAR DAN RIVER STRUT PHASE 2 t8 w�? 9 %Jni 29 1 Ili 30 31 1 32g 1 33'- 1 34 1 35 III I + I :t I k\ I I 47 INS IZ) IX w 46 eg 98 + + b I = CR I 45 44 t LAKE BRACCIANNO AVENUE STA. 10+00.00 C.L. TO 18+55.00 C.L. SCALE: 1" = 50' HORIZONTAL 1 1 = 5' VERTICAL 12+00 13+00 LEGEND (CONT.): 19 Tom. Ikj�� TOP OF MANHOLE — - — - — - — CENTERUNE —0 --- CONSTRUCT STORM DRAIN PER C.O.B. STD. �-�s� CONSTRUCT SEWER PER C.O.B. STANDARD —w— PROPOSED WATER - SEE CWS PLAN TRACT BOUNDARY EXISTING SEWER —w— EXISTING WATER EXISTING STORM DRAIN EXJSIING EDGE OF PAVEMENT M PHASE LINE EASEMENT LEGEND SECTION LEM A 2 SHUT WHERE SECTION IS SHOWN p wz� �� I tRW 43 I 42 IFL T 41 PHASE 2 36 40 9 37 STORM DRAJN TO SUMP (SEE SHEET 9) 38 35.0- SUMP SEE SHEET 9 w cl) X IL LINE TABLE UNE # ING Ll L2 13 14 14+00 15+00 16+00 17+00 18+00 19+00 20+00 CONSTRUCTION NOTES: STUB & PLUG STORM DRAIN/SEWER. EXTEND WITH FUTURE DEVELOPMENT. CONTRACTOR TO HAVE LICENSED SURVEYOR VMIFY LOCATION AND O-EVATION OF INVERT PRIOR TO BACKFILL CONSTRUCT PIPE SADDLE PER C.O.B. STD. D-9 AT LOCATIONS OF CROSSING PIPES WTH CLEARANCE LESS THAN 120 �Iw 20+50 360 360 360 360 358 358 358 1 358 356 zt 356 356 356 + > Sri >w> MLM I z 354 354 354 354 4 I --J 352 352 352 352 350 350 INSTALL 16,64 LF 350 350 IN 3TALL a OF 181 R -RCP 0 Ifr RGE-RCP Gi _0 i 348 - 0 1100%L 348 348 348 lzINSTALL 6.00 LF OF 18' RGJ-RCP 346 346 346 346 344 344 344 1 Nz. 344 FINE H GROUN PRO ILE OVU 342 342 342 342 340 - '340 340 340 PIPE 338 ik - 338 338 338 Hil -A, I 336 336 36 336 3 < 334 334 334 334 ;I ir SEWER 0 z < 332 332 332 ------ 2 330 330 330 330 328 328 328 q 328 326 326 1 326 �en 326 A, 324 1? b V 324 324 32 4 -4 > 322 322 322 322 8 320 320 320 320 318 318 318 318 316 316 316 316 A SEC B SECTION MEW STk 15+15.00 C.L. TION \AEW STA. 12+54.25 C.L �GALt: MUHL. 1'-:;� sLALL: MUHL. lm I, 5V VERT. 1' 5' VERT. 1 p 5 360 360 358 358 356 1- 356 354 354 352 Ew] 352 z 350 350 348 348 i INSTALL 23.00 IF OF li*-� 346 prf�m Ilk 1 346 344 344 342 FINIS I GROUNIJ 342 340 PROF LE� 340 PIPE 338 336 336 334 334 332 332 330 330 328 1- 328 I 326 326 rri OR c� cq 324 ------ a�M�— 1 324 322 32.2 320 320 8 318 318 316 316 ZI�UIIUIN j&vy - ZIIA. Al-t: HUH4- I �U VERT. l" = S' U14 I-T OL u gil I LJ A w 1`54 �E53 + gm m + + 52 0 SENTO Y 5 1 30 1 30 IS' 2Z 22� E 255.84'-S- 40OG0 LF '.2 50 o 26 0 25 1 RE 3 30, 49 g LAKE EIRACCIANNO AVENUE (SEE SHEET 5) 7 b PHASE 2 3g 4 5 2 6 311i /RW OVG�l DRAJ909 SQO&48'09 \FIL co + 14+00 15+,00 S W48*09" W 349.16- 16+00 s E S0019120�W FIL .00 LF 8- SEWER, T00:48-04-W FL 00 LF 8- -09-W RN PROPOSED WAT;ER MAIN PER WATER PUNS (TYP) 1Z 12 18' 18� 12, 5 119 1 0, 30, m 9 230d 24 1 �=� p K 1 21 17 22 1 E ;iE 2 0 PHASE 2 w w 18 w w YUKON RIVER AVENUE + + w =a (SEE SHEET 3) BERKSHIRE ROAD 0 tj WN 10 7 8 9 Ilz 5S 45J 36.15' 13' 111' 34' 3e 11'1 + 7�+w . . ........ N 0*481 E 35OGO' 1 + cij UNE BEARING DISTANCE W W ELI 31 co N W47470 E 43.24' L2 S 6518,390 W 51.9s L3 S 6tWW E 58.9v 1 16 515 1 gl 4 n 12 + + + + 8-4 m tua� KOYUK RIVER STREET STA. 10+00.00 C.L. TO 19+55.00 C.L. SCALE: 1" = 50' HORIZONTAL 360 . ..... 360 INSTALL 99.50 LF1 OF 360 360 z I 11 26.09 LF 18* ROII-RCP 0 0.20% 2ox 18" 1 a cL, 358 358 358 358 0 356 356 z 356 I 354 354 m I 352 352 352 w 4 z 350 �01 350 T 350 348 348 348 346 348 346 INSTIi 13.00 LF OF i 346 10! RG'i 0'-100% 346 1 1 344 "IN i 344 344 344 -T 342 342 342 342 340 IND 340 340 PIPE338 - -- — --- ------ . ..... - - ------ - 338 L- 338 336 336 %-'INV. 336 336 334 334 �Ni le DRAIN 1 INV. 8' SEIIIER I 334 1 S* SEWER 334 -717 1 332 -A 332 I r 332 332 330 L 330 330 1 ;o 330 T 398 328 8 32 Z Z 328 . . . ...... L I . .... 1 326 326 326 326 324 324 i awl w u i r! PVC SSEEil 0 0.2' X I INSTALL 40a.001 LF OF EIR Pvc Si 0 0.26% INSTALL 400.001 LF OF 01 LF OF Er Pvc si 0 100% 324 --- --- ----t 324 i 322 322 i f 322 322 320 320 320 318 318 318 318 1 L 316 316 9+50 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 20+50 316 316 STA. 10+00.00 C.L TO 19+55.00 C1. SCALE: I" = 5V HORIZONTAL 1 5' VERTICAL SECTION MEW STA. 12+05.69 C.L. EXISTING WATER bUAi HUXL. T = 50' VERT. 10 5! SURVEY MONUMENT PROPOSED GATE VALVE & VALVE CONSTRUCTION NO]i LEGEND: LEGEND (CONT.): BOX - SEE CWS PLAN EXISIINO STORM DRAIN z Ink 0 STORM DRAIN MANHOLE TYPE -A- EXISTING GATE VALVE EXISlING EDGE OF PAVEMENT STUB & PLUG STORM DRAJN/SEWER. ABBREVIATIONS PER C.O.B. STANDARD. Fi FLOWLINE R/W RIGHT-OF-WAY CATCH BASIN WITH 3.5 , OPENING PROPOSED FIRE HYDRANT PHASE UNE EXTEND WITH FUTURE DEVELOPMENT. C.L. CENTERUNE Mi MANHOLE TOP OF MANHOLE ASSEMBLY - SEE CIS PLAN CONTRACTOR TO HAVE LICENSED PER GO.B. STANDARD DETAIL S-12, V EXISTING FIRE HYDRANT EASEMENT LEGEND SURVEYOR VERIFY LOCATION AND CENTERUNE UNLESS OTHERWISE NOTED. 6 PROPOSED 2� BLOWOFF BACKIFILL Ei ELEVATION SMEH SEWER MANHOLE ELEVATION OF INVERT PRIOR TO C.O.B. CITY OF BAKERFIEUD SDMH STORM GRAIN MANHOLE CONSTRUCT SEVIER MANHOLE TYPE "A- ASSEMBLY - SEE CWS PLAN SECIRON LETTER TIO.M. TOP OF MANHOLE CB CATCH BASIN CONSTRUCT STORM DRAIN PER QO.B. STD. PER C.O.B. STANDARD DETAIL S-7. T.O.C. TOP OF CLEANOUT GB GRADE BREAK CONSTRUCT SEWER PER r.O.B. STANDARD 0 CONSTRUCT SEWER CLEANOUT PER /—PIPE SIZE A CONSTRUCT PIPE SADDLE PER INV. INVERT S/W SIDEWALK B�s —UTIi 2 C.O.B. STD. D-9 AT LOCATIONS OF EL/i ELEVATION FH FINE HYDRANT PROPOSED WATER - SEE CWS PLAN C.O.B. STANDARD DETAIL S-20. W-WATER S-SEWER CROSSING PIPES WITH CLEARANCE PA PROPERTY UNE D.W.S. DESIGN WATER SURFACE S) EXISTING SEWER MANHOLE G-GAS D-DRAIN SHEET WHERE SECTION IS SHOWN LESS THAN 12' EP. EDGE OF PAVEMENT XRW EX. RIGHT-OF-WAY TRACT BOUNDARY i EXISTING CWS CITY WATER SERVICE EXISTING SEWER C/G CURB & GUTTER STD. STANDARD V V4 I-T I - --------- 360 360 358 -------- - + 358 350 INS fA[L-f3—L OF 1 350 ligro R POP 0 00% 348 346 346 344 344 FINISH GROUN PROFILE OVER 338 338 336 336 2 334 Ei SEWER 334 332 L 332 33 0 330 328 9 -1 328 4e 326 326 324 INSTILL 25.131LEF i ----d 324 322 it 322 320 320 318 L 318 316 L 316 SECTION VIEW — STA. 13+05.59 C.L �CA�: HURL. VERT. 1" 5' SCALE: 1 50' 50' 25' 01 50' 1002 1" 1 1 01 120 �j LAKE EIRACCIANW AVENUE (SEE SHI 5) 354 352 350 348 w 344 342 340 338 336 334 332 330 328 326 324 322 320 318 316 9- -50 I -z 28 I �52 w CO m w 53 27 < IN I w X I (L w �02 "2 w + + �?' + - - Rl I I rL— DO S O448'Gg" W 305-00), 12+00 - ---r - � - I- — - L - — - FL R A= j PER WATER PLANS (TYP) PHASE 2 TER "All 5 29 10+00 11+00 12+00 STA. 10+00.00 C.L. TO 13+05.00 C.L. SCALE: 1* = 50' HORIZONTAL 1 0 = 5' VERTICAL 54 EIREITENBUSH AVENUE (SEE SHEET 4) 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 324 322 320 318 'A i A 13+00 13+50 900j, �1�1 = AVENUE RW56 mf;x �T C INTERSECTION STA. 13+00.00 C.L COW JRW STA_ 14+30-00 C.L. YUK :NUE 11 54.9 LF OF 255.05F 18-ORMN S .RD`48`O9l ­481 S-11+00— —N 048*09m E 300.00 290.00 �O 8" SEWER FIL Soo 109�11! 1 12' -18' 18' 12' 30, 30 57 4m u INI BREITENBUSH AVENUE g (SEE SHEET 4) �l� I :,I 2j 18' 71 I AY AVENUE !2 70 4� "-�tf YUKON RIVER AVENUE ggd�4 i(SEE SHEET 3) g w4l4n t2" 't It; COW CREEK WAY STA. 10+00.00 C.L. TO 13+00.00 C.L. SCALE: 1" = 50' HORIZONTAL LINE TABLE LINE # LENGTH I BEARING 1-1 59.09 N73* 26'56.19"W L2 52.08 S6C 57' 46.48-W PROPOSED WATER MAIN PER WATER PLANS (TYP) 2 189 YUKON RIVER AVENUE (SEE SHEET 3) SCALE: 1" 50' 50' 25' 0, 50' 100' 360 I ------ _- �_ T ----1 --- --- - 360 360 360 ,358 INSTALL 95 LF OF 186 R�-Rl ­91STALL-M 05-W OP-w- AG&_RCP 358 358 �IINST Al 358 INSTALL 3.00 LF I I OF 'rttt OF 18" J-RCP 10 T00% 356 356 356 356 354 354 354 354 To -w 352 352 352 352 N, 350 a, 350 350 1 350 7. Mww 348 348 348 www 348 346 346 346 FNISH GROUND PROFILE 0 0 ENTERLINE 344 344 344 344 342 ­,­' -------- 342 342 IT,— NO, 342 340 114 1 340 340 PROP f OVER -PIPE 340 338 L 338 3 38 338 1EEffi DR 336 z 336 33 6 336 INV. ar. z Bm SEWER 334 ------ — 334 334 334 332 332 332 332 330 com . ... .. z z . . .. .... 330 330 --------- — 330 328 La - — - - - - - - - - 328 328 328 DO T__ i 326 L 326 326 326 324 ­T_ 324 324 324 322 322 322 322 320 INS 290.00 LF 8' PVC 0 01?5% OF SEWER -1 320 3 120 320 318 318 318 1 ------- — - — --- 1 318 x1r .4 16 316 lip 9+50 10+00 11+00 12+00 1,3+00 1,3+50 STA. 10+00.00 C.L. TO 13+00.00 C.L. �A SECTION VIEW - STA. 10+49.95 C.L. SCALE: 1" = SIT HORIZONTAL �GAFE' HORZ '1� 50 1 5' VER11CAL VERT. 11 = 5, LEGEND: LEGEND (CONT.): CONSTRUCTION NOTES: ABBREVIATIONS E, ) STUB & PUUG STORM DRAINI FI FLOWUNE R/W RtGHT-OF-WAY TOP OF MANHOLE: EXIEND WITH FUTURE DEVELOPMENT. C.L CE141SUNE MN./MH MANHOLE CONTRACTOR TO HAVE LICENSED EII ELEVATION SMH SEWER MANHOLE — - — - — --- CENTERLIENE SURVEYOR VERIFY LOCATION AND C.O.B. C31Y OF BAKERFIELD SDMH STORM DRAIN MANHOLE ELEVATION OF INVERT PRIOR TO T.O.M. TOP OF MANHOLE CB CATCH BASIN CONSTRUCT STORM DRAIN PER C.O.B. STD. BACKnJLL T.O.C. TOP OF CLEANOUT GB GRADE BREAK S— CONSTRUCT SEWER PER C.0-8. STANDARD INV. INVERT S/W SIDEWALK EL/aEV ELEVATION FH FIRE HYDRANT PROPOSED WATER - SEE CWS PLAN CONSTRUCT PIPE SADDLE PER PA PROPERTY LINE D.W.S. DESIGN WA70 SURFACE C.O.B. STD. D-9 AT LOCATIONS OF E.P. EDGE OF PAVEMENT XRW EX. RIGHT-OF-WAY TRACT BOUNDARY CROSSING PIPES WTH C-EARANCE LESS THAN 12' EX./EXIST. EXISTING CWS CITY WATER SERVICE EXISTING SEWER C/G CURB & GUTTER STD. STANDARD EXISTING WATER SURVEY MONUMENT N PROPOSED GATE VALVE & VALVE BOX - SEE CWS PLAN EXISTING STORM DRAIN 0 STORM DRAIN MANHOLE TYPE "A" X EXISTING GATE VALVE EXISTING EDGE OF PAVEMENT PER C.O.B. STANDARD. CATCH BASIN WTH 3.5' OPENING )1( PROPOSED FIRE HYDRANT ASSEMBLY - SEE CWS PLAN PHASE LINE PER C.O.B. STANDARD DETAIL S-1z EXISTING FIRE HYDRANT EASEMENT LEGEND UNLESS OTHERWISE NOTED. PROPOSED 2" BLOWDFF CONSTRUCT SEWER MANHOLE TYPE *Am ASSEMBLY - SEE CWS PLAN SECTION LETTER PER C.O.B. STANDARD DETAIL S-7. /—PIPE S17E 0 CONSTRUCT SEWER CLEANOUT PER B�s —UTIUTy- 4SHEET C.O.B. STANDARD DETAIL S-20. W-WAiR S-SEWER OS EXISTING SEWER MANHOLE G-GAS D-DRAIN WHERE SECTION IS SHOWN �aw 9+50 PHASE 1 tj 3 EV-,, 11+00 N CW4ErOg* E 350.00 12+D0 FL 260.00 11 LF 87 SEWER Nor, wE FIL R;7 12 g g1l g 10 + + 4 5 Le, 99 99 8 g ? SCRIVIA COURT STA. 10+00.00 C.L. TO 13+50.00 C.L. SCALE: 10 = 50' HORIZONTAL 10+00 11+00 12+00 13+00 STA. 10+00.00 C.L. TO 13+50.00 C.L. SCALE: 1" = 50' HORIZONTAL 1 " = 5' VERTICAL viv 14+00 M E; �7) STA. 18+OZ94 C.L. 13ERKSHRE ROAD C �15 17 1 C T+ 13 1 s14 1 18 9 9, 0 3V 8 9 9 1;4 �A f7�� + 112'1 18'1 8' 12' vt t + + I 4- 1 I Ft -W W A. PBOPn 11+00 12+00 N 0'409" E 4 0 1�4+ 0 S FL,\ WE WATWED MAIM PER WATER PLANS TYP YUKON RIVER AVENUE 24 1 c; 23 g 22 1 �21 1 g 20 19 (SEE SHEET 3) 13,1 II* 34� 11', + + + + 58' BERKSHIRE ROAD CHETCO RIVER STREET STA. 10+00.00 C.L. TO 14+67.74 C.L. SCALE: 1" = 50' HORIZONTAL 1 0 = 5' VERTICAL 3 0. 3 2 z 41 LINE TABLE ONE # LENGTH BEARING Ll 58.82 N74' 25' 23"W L2 50.59 S71- 29- 06-W 63 1 MSEC11ON I lO+0GG0 CL LAGO PUWMI STREET CL BREITINBUSHi AVENUE �umm`� 0 * �11+000�N 0*48'W E 300.00`�o 9 A 0 81 9+50 10+00 11+00 12+00 13+00 14+00 15+00 15+50 1�+ �3 1 0�00 LEGEND: FL/F.L ABBREVIATIONS FLOVAUNE R RIGHT-OF-WAY C.L. M.e CENTERUNE /MH MANHOLE ELEV. ELEVATION SMH SEWER MANHOLE CO.B. CITY OF BAKERFIELD SDMH STORM GRAIN MANHOLE TAM. TOP OF MANHOLE 03 CATCH BASIN T.O.C, TOP OF QIANOUT G8 GRADE BREAK INV. INVERT S/W SIDEWALK EL/ELEV. O-EVATION AN FIRE HYDRANT PA PROPERTY ONE D.w.s. DESIGN WATER SURFACE LIP. EDGE OF PAWMENT XRW EX. RIGHT-OF-WAY EX/EXIST. EXISTING CWS CITY WATER SERVICE C/G CURB & GUTTER SID. STANDARD SURVEY MONUMENT PROPOSED GATE VALVE VALVE BOX - SEE CWS PLAN 0 STORM GRAIN MANHOLE TYPE wA" x EXISTING GATE VALVE PER C.O.B. STANDARD. mr CATCH BASIN WITH 3.5 OPENING PROPOSED FIRE HYDRANT ASSEMBLY - SEE CWIS PLAN PER C.O.B. STANDARD DETAIL S-12, EXISTING ARE HYDRANT UNLESS OTHERVASE NOTED. PROPOSED 27 BLOWOFF (D CONSTRUCT SEWER MANHOLE TYPE "e ASSEMBLY - SEE CWS PLAN PER C.O.B. STANDARD DETAIL S-7. /—PPE SIZE 0 CONSTRUCT SEWER CLEANOUT PER 8.S —UTILITY.. CAR. STANDARD DETAIL S-20. W-WATER S-SEWER IS� EXISTING SEWER MANHOLE G-GAS D-DRAIN 8gd 8 8 &ANAYUKON RIVER AVENUE 9; (SEE S T 3 25 Iv 26 127 28 t; Iy; 30' 30 1 �3 12' 18' 18' 111 6 4 R 7; 0149W E 8 1 'SEWER SGO 48i(W�W TiT I- S-T— �14+0611 j=Li-423"--- 243.31 LF 60 Flo --T Tw- w X 8 1 0; 1 m 13N 0; 1 tN c; R39 1 938 R c; 637 I c; 35 CR 'R c; R� 34 I 33 + + iz 06 + + 5 � + 1 + + + LAGO PUCCINNI STREET STA. 10+00.00 C.L. TO 16+50.00 C.L SCALE I = 50' HORIZONTAL 1 1 = 5' VERTICAL LEGEND (CONT.): 3519 Tom. W�� TOP OF MANHOLE — - — - — - — CENTMNE I>----- CONSTRUCT STORM DRAIN PER C.O.B. SM. —.—s— CONSTRUCT SEWER PER C.O.S. STANDARD PROPOSED WATER - SEE CWS PLAN TRACT BOUNDARY EXISTING SEWER EXISTING WATER EXISTING STORM DRAIN EXISTING EDGE OF PAVEMENT 111111111 M PHASE LINE EASEMENT LEGEND .IEESECTION LETTER SHET WHIERE SECTION IS SHOWN 3 k?9 BERKSHIRE ROAD p + 1�* 13' 11' 34' 1 58, +1 45' go + 9 + !Q I'D 16+00 L 1,09- 1 6+00 L ci 0 WR 0 3t rc < -4 R32 mw ;5;i 0 < 31 GO SCALE: 1" 50' 1�x 50' 25' 01 50, 100, 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 328 326 324 00 LAKE BRACCIANNO AVENUE EIREITENBUSH AVENUE 50' 25' SCALE: 01 1" 50' 50, 100, SUMP LOT STA, 10+00.00 CL TO 19+55.00 C.L. SCALE: 1* = 50' HORIZONTAL 0 348 --- - --- T_ ­1346 346 I APPROXIMATE FG OVER STORM DRAIN 344 344 4­1 t 342 342 7 340 340 -- ------- --- 338 338 336 336 334 334 332 332 330 -A 330 BOTTOM ELEV IN GRAIN 328 328 326 326 324 324 322 322 3 0 320 2 IN U 53�78 LF I 7- ___r_ _F ------ 318 318 INSTAI L 260.02 LF! OF le LGL-RCP R 0.20%'i 006 5 LF Of 316 316 SUMP LOT STORM DRAIN \1 �9 1­-50' LEGEND: FL/F.L ABBREVIATIONS FLOMME R W RtGHT-OF-WAY QL CENTERLINE M.H�/MHI MANHOLE ELEV. ELEVAT10N SMH SEWER MANHOLE GOB. CITY OF BAKERFIELD SDMH STORM GRAIN MANHOLE T.O.M. TOP OF MANHOLE CB CATCH BASIN T.O.C. TOP OF CLEANOUT GB GRADE BREAK INV. INVERT S/W SIDEWALK EL/ELEV. ELEVATION FH FIRE HYDRANT PA PROPERTY LINE D.W.S. DESIGN WATER SURFACE E.P. EDGE OF PAVEMENT XRVV EX. RIGHT-OF-WAY EX./EXIST. EXISTING GINS CITY WATER SERVICE C/G CURB & GUTTER STD. STANDARD SURVEY MONUMENT PROPOSED GATE VALVE & VALVE BOX - SEE M PLAN 0 STORM DRAIN MANHOLE TYPE -A- EXISTING GATE VALVE PER COB. STANDARD. )1( PROPOSED FIRE HYDRANT mr CATCH BASIN WITH 3.51 OPENING ASSEMBLY - SEE CWS PLAN PER C.O.B. STANDARD DETAIL S-IZ V EXISTING FIRE HYDRANT UNLESS 07HERVASE NOTED. 6 PROPOSED 0 BLOWOFF (D CONSTRUCT SEWER MANHOLE TYPE -A' ASSEMBLY - SEE CWS PLAN PER C.O.B. STANDARD DETAIL S-7. /�PIPE SIZE o CONSTRUCT SEVIER CLEANCUT PER Bas-UnRiTy.. C.O.B. STANDARD DETAIL S-20. W-WATER S-SEWER CD EXISTING SEWER MANHOLE G-GAS D-DRAIN LEGEND (CQNT.L 519 TO A ,.j� TOP OF MANHOLE - - - - - - - CENTERLINE �D --- CONSTRUCT STORM DRAIN PER C.O.B. SM. �s� CONSTRUCT SEWER PER C.O.B. STANDARD -w- PROPOSED WATER - SEE CWS PLAN TRACT BOUNDARY EXISTING SEVER EXISTING WATER EXISTING STORM DRAIN EXISTING EDGE OF PAVEMENT m PHASE LINE EASEMENT LEGEND SECTION LETTER A 2 �t �uim IS SHOWN CONSTRUCTION NOTES: STUB & PWG STORM DRA1N/SEWER. EXTEND WITH FUTURE DEVELOPMENT CONTRACTOR TO HAVE LICENSED SURVEYOR VERIFY LOCATION AND ELEVATION OF INVERT PRIOR TO BACKFft.L CONSTRUCT PIPE SADDLE PER C.O.B. SM. D-9 AT LOCATIONS OF GROSSING PIPES NTH CLEARANCE LESS THAN 12m CONSTRUCT STORM DRAIN MANHOLE TYPE *A7 WITH TRAFFIC RATED GRATE INLET COVER. CONTRACTOR TO ROTATE GONE TO WHERE THE OPEN114G MATCHES SWALE FLOWUNE CURVE TABLE GURVEE ADIUS LENGTH TANGENT DELTA CI 10!kOW 39.42� 19.9dV 2103W340 C2 63.00' 7L50' 40,15? 65601'2e C3 136.77' M56 11-30' 9*2644r C4 9Z31' 55.04' 2&37* FUTURE LOT LINE LINE TABLE LINE ff LENGTH BEARING Li 216,41 SO4 48' 08.90"W L2 20.57 N89* 5S 57.1rW L3 23.77 N89' 11' 51.100W L4 48.80 N5G* 15' 13.72�W 1_5 229.43 NO' 34' 06.84"E L6 95.62 N72' 27' 57.03"E L7 23.18 S68' 08� 17.47"E 1_8 2.66 SEW 37' 47.WE L9 62.13 N72* 13' 28.72"E L10 10.11 N7* 50' 50.22-W L11 97,36 NO* 23' 41.53"E L12 84.02 NO� 37' 4&59"E L13 19.67 N50' 15 13.72"W L14 79,35 So' 26' 08191"W 13.00 N89- 52' 25.19-W RL15 L16 66.18 SO' 25' 11.39OW L 17 30.89 SS 25' 46�24�W W BACKFILL PER SOL SUMP OvEREXCAvATIoN W9.00, ABSORPTION EVALUATION . . . . . . . SEC11ON EXPANDED SUMP SCALE. N.TS. IN US ��-a�t/ VFJ IT TRACT BOUNDARY 4 SEXISTING CHAIN LINK FENCE SCALE: 1" 30' (PROTECT IN PLACE) 30, 15' 0. 30' 60 Know whars below. Call before you dig. Uj m 0 0 < d 0 z 0 CL X uj CL ca 0 �� - �) 0 Ll L4 P), I �, ->- CITY RECORDS NO: OD FUTURE STREET 29 SEE LEFT FOR CONTINUATION FUTURE STREET 98" CL. INTERSECTION STA. 6+60.05 C.L STREET 'C! SEE RIGHT FOR CONTINUATION tj t tj C.L. INTERSECTION STA. 1+00.00 C.L. STREET Of 0 STA. 1+00.00 C.L. STREET 'B" F SSMIJ-05 STA. 3+19.66 C.L. STREET 'All Ilk T W 6+6500 �CL 500 LT 0 tj I 8 9 STA. 19+25.00 SEWER C.L INTERSECTION + �ig e Z �2 2+4.55 C L A r 'C' /f 1+00.00 C1 SITREET 'a' 9 �jfi -4� `,0 9 9 9 9 9 9 9 9 + n P G + 6 0 m 'Pis & PLUG 80 SIDWER + + + STA. 0+98.22 C.L 5.00 FIT. al;� �<: STA. 6+75-00 C.L 5.00 LT. - - -- - - - - - - - - - ;� �i STA. 13+65.00 SEVER + F e SSMH-03 �i w A� - - - - - - - - - - - - 2+41155, QL 5.00p RUT t�; ;5 ;s //1FUTURE STR T $80 F_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - T - - - STA. 13+65.00 SEWER FUTURE STREET W 2+00 NOT4BOTE zl 1 -0 9 1 281100 LF 8" SEWER +G, Sol ]::SOO`_j8l 0. SEVER _2+00� Elf SEWER 140.3 LF Il Swl 07 S_ -Do- -- Js� N 4+00- 5+ IS 6+00—s 7+00 Q9*w L flll' 0 + SS A- 8' SE7R ST) .4 51-E S 8911,51" E 7' - — - — - — ---- 8* SEVER - + SEWER EASEMENT SEWER EASEMENT 10.000 24.1 IQOe Elf SEWER FSEE NOTE BELOW PER DOC. # 219119141 L - - - - - S 57027'Oe IN S8911,510E IN T49090 E _,Z�PER DOC. IF 219119141 ad; 1, 1 � __-I :::E EX. 48' SEWER 1 FUTURE STREET `C' SEWER EASEMENT PER Dl #219119141 10.00' - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - g FUTURE STREET `C` _7 MN I C.L. INTERSECTION SEE RIGHT FOR CONTINUATION STA. 1+00.00 C.L STREET C Ign rf� + STA. 3+19.66 C.L. STREET 'A' -ft STA. 2+43.55 C.L. STREET Fr gi L I C.L INTERSECIMN STA. 1+00.00 C.L. STREET El p FUTURE STREET$W FUTURE STREET "Do SEE LEFT FOR CONTINUATION INSTALL 10 LF OF 8" PVC SEW 0 0.25% SEE SHEET 11 FOR CONTINUATION & CAP FOR FUTURE CONNECTION INV. O-EV. = 329.20 STREET "Al SCALE 10 = 50' HOR. 1 " = 5* VERT. 350 ------ 7 T __ �_ f -T____� - - 350 348 348 346 346 344 4 344 342 342 340 340 OVER PIPE (APPOOK) 338 338 336 336 334 334 332 332 330 ----- - 330 328 : I-- 'i f ___1 328 326 — ----- 526 INV. B* SEWER 324 324 322 322 320 320 318 318 316 316 + 314 < 314 312 ILSAlL M�4S7V_LT_rPWSV1ER r6_V,57%+_ 312 310 1 - L 310 0+50 1+00 2+00 3+00 3+60 OFFlllllllf SITE IMPROVEMENTS FUTURE TRACT No. 7041 SCALE 1 = 50' HORIZONTAL 1 4 = 5 VERTICAL STREET 9131* SCALE Is 50' HOR. im 51 VERT. STREET `Cs SCALE 1 0 50t HOR, 1" 59 VERT. 354 rrrrrr—rr I --- r-r-r-r-r- ­- 3 54 354 y T T_ T 354 if if 352 352 f 352 352 1 4 350 350 f 350 L 350 T 348 348 348 348 346 346 346 346 1 4 344 344 344 344 Lf - - - - - - 342 342 342 342 1 T_! f EX GROUND PROFILE OVER Pik (AP EX, GROUND ROFILE ili VC6 Jaw 340 4lD 340 340 am 338 338 4- 338 338 336 336 336 f j 336 334 334 334 334 332 332 332 F 332 330 330 330 330 1 -1 17� 328 328 328 328 P SEVER INV. e SEWER i 12 i INV. Er SEWER f INSTALL 1DOD LF 'OF Bw INSTALL 10.00 LF f 0.25% CAP F� FUTURE ECTI Vil 8" SEWER 326 f i j 326 326 PVC 0 25% & FOR FUTURE f f NECTION w 324 324 324 ED n l r 4 I L-Li f m 322 2 T' 322 322 32 flf; cf, -d fg n i I i 320 320 t 320 320 ix I &2� Li 318 318 318 318 i S 'ALL IJA33 LF OF El PVC SEWER 0 6.25% f INSTAU� 2KOO1 LF OF 8`1 PVC SEWER 0 0.2§% f IEMI 28DOO LF OF Ef M 2Dn 0 DR5% i z 3 _T­ 316 LLI 316 ? ---- - -- 16 316 w� 314 L__ 314 314 ------ L__ 314 UJI > 1+00 0+50 1+00 2+00 3+00 4+00 5+00 6+00 7+00 0+25 2+00 2+75 LEGEND: LEGEND (CONT.): CONSTRUCTION NOTES: ABBREVIATIONS (V.I.F-) VERIFY IN FIELD 519 TOM' STUB & PLUG STORM DRAIN/SEWER. FL/l FLOWLINE W RIGHT-OF-WAY TOP OF MANHOLE EXTEND VATH FUTURE DEVELOPMENT. FWF—SITE IMPROVEMENTS TO BE CONSTRUC'urED WITH PHASE 1 C.L MR CENTERLENE N�/MH MANHOLE CONTRACTOR TO HAVE LICENSED vp Ior ELEV. ELEVATION SMH SEWER MANHOLE CENTERUNE SURVEYOR VERIFY LOCATION AND C.O.B. CITY OF SAKERRELD SDMH STORM DRAIN MANHOLE ELEVATION OF INVERT PRIOR M T.O.M. TOP OF MANHOLE CB CATCH BASIN CONSTRUCT STORM DRAIN PER C.O.B. STD. BACKFILL 14�� T.O.C. TOP OF CLEANOUT OR GRADE BREAK �l CONSTRUCT SEWER PER C.O.B. STANDARD S�_� INV. INVERT S/W SIDEWALK EL/ELEV ELEVATOR FH FIRE HYDRANT —w— PROPOSED WATER - SEE CWS PLAN CONSTRUCT PIPE SADDLE PER P/L Fk ROPIETITY LINE Owl DESIGN WATER SURFACE C.O.B. SM. D-9 AT LOCATIONS OF FP. EDGE OF PAVEMENT XRW EX. RIGHT-OF-WAY TRACT BOUNDARY CROSSING PIPES WITH CLEARANCE LESS THAN 120 EX./EXIST. EXISTING CWS CITY WATER SERVICE EXISTING SEWER C/G CURB & GUTTER SM. STANDARD EXISTING WATER (1) SURVEY MONUMENT H PROPOSED GATE VALVE & VALVE BOX - SEE CIS PLAN a(ISTING STORM DRAIN SCALE: 1" 50' 0 STORM DRAIN MANHOLE TYPE `A I �N EXISTING GATE VALVE EXISTING EDGE OF PAVEMENT 50* 25' of 50' 100* PER C.O.B. STANDARD. 4( CATCH BASIN NTH 3.5 OPENING PROPOSED FIRE HYDRANT ASSEMBLY - SEE CWS PLAN 11111 PHASE LINE PER C.O.B. STANDARD DETAIL S-12, b/ EXISTING FIRE HYDRANT EASEMENT LEGEND UNLESS OTHERVASE NOTED ' 6 PROPOSED 2m BLOWOFF CONSTRUCT SEWER MANHOLE TYPE *A* ASSEMBLY - SE M PLAN SECTION LETTER PER C.O.B. STANDARD DETAIL S-7. SIZE /—PIPE C014STRUCT SEWER CUFANOUT PER B"S—UTILITY.. .44:SHEET C.O.B. STANDARD DETAIL S-20. W-WATER S-SEWER (D EXISTING SEWER MANHOLE G-GAS D-DRAIN WHERE SECTION IS SHOWN FUTURE MARTIAN RIVER STREET SEE —RIGHT FOR CONTINUATION I w C.L INTERSECIION C.L. INTERSECTION STA. 1+00.00 C.L. §TREETD STA. 3+82.50 CIL. STREET T� STA. 6+60.00 C.L. STREET 'C* STA. I+GDOG C.L FUTURE MARTIAN RIVER SSMH-06 STA6. 3+77.50 INSTALL 10 LF OF 8' STA. 22+10.70 FUTURE 0ONNECTIOl INV. ELEV. = 329.8 R --------------------- SEWER EASNENT PER DOC. #2191191141 V-�SS911'51'E PW SEWER & 1125% NOG'a48oG91E I & PLUG AT END FO 282.50 LF OF 8ft SS N89`11'510W laOD LF OF e SS 3+00 72+'60 7FUTTURE- STREET ID1 u F —�F- b + + m ? FUTURE STREET *Co SEE SHEET 10 FOR CONTINUATION STA. 3+87.50 C.L. 5.00 LT. __j 41.61' N 1943V337 W OFFIIIIII SITE IMPROVEMENTS F=RE TRA%'.l No. 7043 SCALE: 1" 50' 50' 25, ol 50, Too' SCALE: 1" 50' HORIZONTAL 356 356 --T 354 L-, -J -- - ------ 354 352 352 350 I r 350 348 348 346 -- ----- 346 344 344 - --- --- --------- -------------- ------------- 342 (EX. 342 GROUND PROFILE OVER PIPE (APPROX) 340 340 338 338 336 ------ 336 334 ------ --------- - 334 332 332 330 I r 330 INSTALL 10 06 LF OF 8* PVC L 328 328 I kialOO.25XI CAP FOR FUTURE CONNECTION 326 --t - ----- 326 324 _J ------ - L ... .......... 11 324 4 322 322 320 -4 320 318 T 318 INSTALL i8Z50 LF i OF F PVC SEWER6o.26% -41 R 116 0+50 1+00 2+00 3+00 4+00 SCALE I = 50' HORIZONTAL 1 1 = 5' VERTICAL 4+50 FUTURE STREET V SEE LEFT FOR CONTINUATION tj pod SE"�12 EASEMENT PER DOC. #219119141 7 4+00 1 I IS 5+1 S� 256.1 LUF OF SS SDO*48'09*i:�� - 46.00 LF OF 8' SSIO 1 10. 100' NW48'09*E 8 r SEWER SE S8911,51WE - — — — — — — — — — — — cr c; a 6 c; OFF�SITE IMPROVEMENTS F=RE TRACT No. 7043 SCALE: I" = 50' HORIZONTAL T- 3-09-W- - —310,83 LF OF 8- SS SOO-48-09-W - lo.00' / N B" SEWER TRACT BWNDARY S8911'WE STA. 7+63�211 C.L. INSTALL 10 LF OF 9" PVC SEWER 0 0.2,15% & PLUG AT END FOR FUTURE CONNECTION INV. ELEV. = 33ZO9 SCALE: I" = 50* HORIZONTAL I I = 5' VERTICAL 43 RW FIL Tj FIN 42 I 1 11 LAKE BRACC10 SEE SHE 50' 25' SCALE: 0, 1" 50' 50' Too' LEGEND: LEGEND (CONT.): CONSTRUCTION NOTES: FL/F L ABBREVIATIONS FLOWLINE R/W RIGHT-OF-WAY 19 TOM. TOP OF MANHOLE STUB & PLUG STORM DRAIN/SEWER. EXTEND WIIHI FUTURE DEVELOPMENT. OFF -SITE IMPROVEMENTS TO BE CONSTRUCTED WITH PHASE 1 C.L. CENTERILINE M.H./MH MANHOLE CONTRACTOR TO HAVE LICENSED ELEV. ELEVATION SMH SEWER MANHOLE — - — - — - — CENTERUNE SURVEYOR VERIFY LOCATION AND CO.B. CITY OF BAKERFIELD SDMH STORM DRAIN MANHOLE ELEVATION OF INVERT PRIOR TO TAM. TOP OF MANHOLE ca CATCH BASIN CONSTRUCT STORM DRAIN PER CO.B. STD- BACKFILL T.o.c. TOP OF CLEANOUT GB GRADE BREAK --s— CONSTRUCT SEWER PER C.O.D. STANDARD Ntip�, V & N INV. INVERT S/W SIDEWALK EL/ELEV. ELEVATION FH FIRE HYDRANT PROPOSED WATER - SEE CWS PLAN CONSTRUCT PIPE SADDLE PER PAL PROPERTY LINE DAS, DESIGN WATER SURFACE C.O.B. STD. 0-9 AT LOCATIONS OF CROSSING PIPES WITH CLEARANCE E.P. EDGE OF PAVEMENT XRW EX. RIGHT-OF-WAY TRACT BOUNDARY LESS THAN If EX./EXIST. EXIS IING CWS CITY WATER SERVICE EXISTING SM C/O CURB & GUTTER STD. STANDARD EXISTING WATER Fc 0 SURVEY MONUMENT N PROPOSED GATE VALVE & VALVE BOX - SEE GWS PLAN L) EXISTING STORM DRAIN 0 49 -a -'a 0 STORM DRAIN MANHOLE TYPE "A- X DOSTING GATE VALVE EXIS IRIG EDGE OF PAVEMENT PER C.O.B. STANDARD CATCH BASIN WITH 3.5' OPENING PROPOSED ASSUABLY FIRE HYDRANT - SEE CWS PLAN IIIIIIIII PHASE LINE PER C.O.B. STANDARD DETAIL S-IZ EXISTING FIRE HYDRANT 4> EASEMENT LEGEND UNLESS OT14ERVASE NOTED. vt4 IT 1� CONSTRUCT SEWER MANHOLE TYPE *9 PROPOSED 27 BLOWOFF AMBLY - SEE CWS RAN SECTION LETTER PER C.O.D. STANDARD DETAIL S-7. /—PIPE SIZE A 5 0 CONSTRUCT SEWER ClEANOUT PER ans—LITILITY.. —ESHEET n C.O-B. STANDARD DETAIL S-20. W-WATER S-SEWER 2 (!S� EXISTING SEWER MANHOLE G-GAS D-DRAIN WHIRL SECTION IS SHOWN