Loading...
HomeMy WebLinkAboutFMC Permit 9-20-21BILLING & PERMIT STATEMENT �o PERMIT # LOCATION OF E oaoPERF,No °�no�ncl�r Ce�fi � Duer�i Pp03E""DD`tSL1`b C�srv�2vv��21��. BAKERSFIELD FIRE DEPARTMENT Prevention Services 2101 H Street Bakersfield, CA 93301 Dhnnn• 991 71 04 L F1111 0 1010 PROPERTY- e(k Na�tilE AD F PHON CITY, K ��5 i_D STATE ZIP CODE CONTRA U AM C tcm- EXP R ION D TEOak P ON C,ONTR R CO P NY N F x Olwmt�DVK ADDRESS Please make checks payable to CITY OF BAKERSFIELD. NO CASH Please, Thank you. OFFICE _ Alarm - New & Modification (minimum charge) FA $ 302 Over 10,000 sq ft $ 0 .0302 x sq ft Alarm - Minor Modification (Add 1 device/ Relocation of 2 devices) ;$ 99/hr (2 hrs minimum) _ $198 Sprinkler - New & Modification (minimum charge) FIRE $ 302 Over 10,000 sq ft $ 0 .0302 x sq ft -- ---------------------- ----- - -- Sprinkler - Minor Modification (<10 heads) $ 99/hr (2 hrs minimum) = S198 Commercial Hood (New & UL 300 Upgrade Modification) FHD '$ 244 Addit; I H d Undergroun ag ank (Removal) TR �$ 619/tank UST Testing Fuel Mont Cert S13989/Cath. Prot. Overfill Prev $ 99/hr (2 hrs minimum) _ $198 NOTE: $99 for ea -ype of test/per ite/per USI (system even if scheduled at the same time TT Oil well (Installation, Inspection, or re -inspection) X $ 99/hr Q Tent TENT '$ 99/hr 84 84 QAfter-hours i lona oo $ 59/hood Commercial Hood -Minor Modification (add/move nozzle) $ 99/hr (2 hrs minimum) _ $198 Spray Booth (New & Modification) SB $ 244 0 Aboveground Storage Tank (1 inspection per installation) AST $ 207/tank Q Each Additional Tank $ 99/Tank 99/hr 84 Aboveground Storage Tank (Removal, Mod, or Inspection) ATR 1$ 129/tank 99/hr 84 Underground Storage Tank (Installation/Inspection) NI 1$ 913/tank a Underground Storage Tank (Modification) MOD $ 913/site 0.02/page Underground Storage Tank (Minor Modification) MTM $ 185/site Undergroun ag ank (Removal) TR �$ 619/tank UST Testing Fuel Mont Cert S13989/Cath. Prot. Overfill Prev $ 99/hr (2 hrs minimum) _ $198 NOTE: $99 for ea -ype of test/per ite/per USI (system even if scheduled at the same time TT Oil well (Installation, Inspection, or re -inspection) X $ 99/hr Q Tent TENT '$ 99/hr 84 84 QAfter-hours inspection fee 125/hr 2 hrs minimum = 250 Pyrotechnic (1 permit per event, plus an inspection fee $ 99/hr + (5 hrs min standby fee/insp) = s594 of S99/hr during business hours) PYRO , NOTE: After hours Pyrotechnic event inspection is :a'3 $125 hr jt5 hrs min standby fee/insp f = $693 0 Re-inspection/Follow-up Inspection i$ 99/hr 84 0j _— Portable LPG {Propane): # of Cages? $ 99/hr 84 ElExplosive Storage 9 $ 244 --'------ 84 1 Copying & File Research (File Research fee $51/hr) i $ 0.02/page 84 Miscellaneous Site Plan Review (Carnival & Fairs/Vehicle '$ Display/Motion Picture) 99/hr 84 FD2021 (Rev 05/21)