Loading...
HomeMy WebLinkAboutTank Closure Report (9-6-21)MARK R. MAGARGEE, PG, CHG CONSULTING HYDROGEOLOGIST 6730 Canaletto Avenue Bakersfield, CA 93306 (661) 205-7000 mrmagargee@gmail.com September 6, 2021 Mr. Randy Raymond 12825 South Union Avenue Bakersfield, California 93307 TANK CLOSURE SOIL SAMPLING REPORT FOR THE ASSESSOR’S PARCEL NUMBER 015-220-01-00-5 1001 NILES STREET, BAKERSFIELD, CALIFORNIA (BFDPSD PERMIT TO ABANDON 21-10000346) Dear Mr. Raymond: Randy Raymond contracted with Kern County Construction, Inc. (KCC) to abandon a 1,000-gallon underground storage tank (UST) at the site. The tank removal was performed under Bakersfield Fire Department Prevention Services Division (BFDPSD) Permit to Abandon (PTA) 21-10000346 (see Attachment 1 for the BFDPSD PTA 21-10000346). Mark R. Magargee, PG, CHg (MRM) was contracted by KCC to prepare this Tank Closure Soil Sampling Report. SITE DESCRIPTION The site is located at 1001 Niles Street, Bakersfield, Kern County, California (see Figure 1 - Site Location Map). The site is located within Section 28, Township 29 South (T29S), Range 28 East (R28E), Mount Diablo Base and Meridian (MDBM) The site elevation is approximately 470 feet above mean sea level (MSL). The topography at the site slopes gently to the southwest. The site is located on the south side of Niles Street and east side of Owens Street, approximately 1,000 feet to the south of State Route 178, and a mile to the east of downtown Bakersfield (see Figure 2 - Site Vicinity Aerial). The site is identified as Kern County Assessor’s Parcel Number (APN) 015-220-01-00-5 (see Figure 3 – Assessor’s Parcel Map). The site is currently a vacant lot that was the location of an inactive 1,000-gallon underground storage tank (UST) (see Figure 4 - Plot Plan). TANK CLOSURE SOIL SAMPLING On August 18, 2021, the 1,000-gallon UST was removed from the site. Prior to removal of the UST, the UST was triple rinsed by Adams Services, Inc. (Adams) and 75 gallons of rinsate was transported by Adams under hazardous waste manifest to World Oil Recycling in Compton, California (see Attachment 2 Assessor’s Parcel Number 015-220-01-00-5 1001 Niles Street Bakersfield, California September 6, 2021 - Page 2 for the Hazardous Waste Manifest). Subsequently the BFDPSD authorized removal and loading of the UST on a trailer for transport by Adams to the S A Recycling in Bakersfield, California (see Attachment 3 for the Tank Disposition Forms). Upon removal of the UST, KCC provided a technician to collect soil samples at the direction of Mr. Malcolm Moore with the BFDPSD from locations beneath the western and eastern ends of the UST. Soil samples TK-1-2 and TK-1-6 were collected from two and six feet beneath the invert at the western end of the UST and soil samples TK-1E-2 and TK-1E-6 were collected from two and six feet beneath the invert at the eastern end of the UST (see Figure 4 for the sample locations and Attachment 4 for a Photographic Log documenting the tank removal and soil sampling). The soil samples were transported under chain-of-Custody document to Zalco Laboratories, Inc. (Zalco) where the four samples were analyzed for Total Petroleum Hydrocarbons (TPH) as gasoline, diesel, and motor oil using US Environmental Protection Agency (EPA) Method 8015M; a full list of volatile organic compounds (VOCs) using EPA Method 8260C, and the California Code of Regulations Title 22 metals using EPA Method 6010B. TPH as oil and the full list of VOCs were not detected above the minimum reporting level (MRL) in the four soil samples, with the exception of TPH as motor oil, which was detected at a concentration of 58.6 milligrams/kilogram (mg/kg) in soil the sample at two feet beneath the eastern end of the UST (TK-1E-2) but was not detected in the soil sample collected from six feet beneath the eastern end of the UST (TK-1E-6). Seven of the 17 CCR Title 22 metals were not detected above the MRL. Arsenic, barium, beryllium, cadmium, chromium, cobalt, copper, lead, mercury, molybdenum nickel, vanadium, and zinc were detected at maximum concentrations of 2.4, 110, 15, 18, 20, 0.14, 370, 15, 27, and 50 mg/kg, respectively. All of the metals detected were less than 1/10 of their respective CCR Title 22 Total Threshold Limit Concentrations (TTLCs) and consistent with the concentrations of these metals in the near surface soils in the Bakersfield area (see Table 1 - Summary of Soil Sample Analytical Results and Attachment 5 for the Laboratory Report). The State Water Resources Control Board’s (SWRCB’s) Low Threat UST Case Closure Policy (Policy) for commercial and industrial use properties specifies maximum benzene concentrations of 8.2 and 12 mg/kg for the intervals from surface to 5 feet below grade (fbg) and 5 to 10 fbg, respectively; maximum ethylbenzene concentrations of 89 and 134 mg/kg for the intervals from surface to 5 fbg and 5 to 10 fbg, respectively: and maximum naphthalene concentrations of 35 and 35 mg/kg for the intervals from surface to 5 fbg and 5 to 10 fbg, respectively. Benzene, ethylbenzene, and naphthalene were not detected in the soil samples. Therefore, the concentrations of benzene, ethylbenzene, and naphthalene are less than the limits specified in the Policy. Assessor’s Parcel Number 015-220-01-00-5 1001 Niles Street Bakersfield, California September 6, 2021 - Page 3 CONCLUSIONS AND RECOMMENDATIONS Based upon the laboratory results of the soil samples, TPH as gasoline, diesel, and motor oil and the full list of VOCs were not detected with the exception of a single detection of TPH as motor oil at two feet beneath the eastern end of the UST, but was not detected in the soil sample collected from six feet beneath the eastern end of the UST, the concentrations of benzene, ethylbenzene, and naphthalene are less than the limits specified in the SWRCB’s Policy, and the CCR Title 22 metals which were detected, were detected at concentrations less than 1/10 of their respective CCR Title 22 TTLCs and consistent with the concentrations of these metals in the near surface soils in the Bakersfield area. Therefore, MRM recommends that the BFDPSD issue a No Further Action (NFA) determination in association with the in place removal of the 1,000-gallon UST at the site. This report has been prepared for the exclusive use of Randy Raymond as it pertains to the soil sampling conducted in association with the removal of the 1,000-gallon UST at APN 015-220-01-00-5 which is located at 1001 Niles Street, Bakersfield, Kern County, California. The services performed by MRM were conducted in a manner consistent with the level of care and skill ordinarily exercised by members of its profession currently practicing under similar conditions in the State of California. No other warranty is expressed or implied. MRM trusts that you will find this Tank Closure Soil Sampling Report to your satisfaction. If you have any questions or require additional information, please contact Mr. Mark R. Magargee, PG, CHg, at (661)205-7000 or at e-mail address mrmagargee@gmail.com. Respectfully submitted, Mark R. Magargee, PG, CHg Consulting Hydrogeologist Enclosures: Figure 1 - Site Location Map Figure 2 - Site Vicinity Aerial Figure 3 - Assessor’s Parcel Map Figure 4 - Plot Plan Table 1 - Summary of Soil Sample Analytical Results Attachment 1 - BFDPSD PTA 21-10000346 Attachment 2 - Hazardous Waste Manifest Attachment 3 - Tank Disposition Forms Attachment 4 - Photographic Log Attachment 5 - Laboratory Report cc: Mr. Malcolm Moore, BFDPSD Mr. Josh Simmons, KCC FIGURE 1 - SITE LOCATION MAP SITE LEGEND REVISED: SEPTEMBER 6, 2021: drm Mark R Magargee, PG, CHg KERN COUNTY CONSTRUCTION ASSESSOR’S PARCEL NUMBER 015-220-01-00-5 1001 NILES STREET BAKERSFIELD, CALIFORNIA FIGURE 2 - SITE VICINITY AERIAL STATE ROUTE 58 MOUNT VERNON AVENUEU P R C T R A C K S kERN RI V E R STATE ROUTE 99UNION AVENUESTATE ROUTE 1 7 8 BNSF TRACKS SITE DOWNTOWN BAKERSFIELD LEGEND REVISED: SEPTEMBER 6, 2021: drm Mark R Magargee, PG, CHg KERN COUNTY CONSTRUCTION ASSESSOR’S PARCEL NUMBER 015-220-01-00-5 1001 NILES STREET BAKERSFIELD, CALIFORNIA ASSESSOR’S PARCEL NUMBER: 015-220-01-00-5 FIGURE 3 - ASSESSOR’S PARCEL MAP SITE LEGEND REVISED: SEPTEMBER 6, 2021: drm Mark R Magargee, PG, CHg KERN COUNTY CONSTRUCTION ASSESSOR’S PARCEL NUMBER 015-220-01-00-5 1001 NILES STREET BAKERSFIELD, CALIFORNIA FIGURE 4 - PLOT PLAN SOIL SAMPLE LOCATION 0 10 20 1 inch = 20 ft. ( IN FEET ) TK-1W TK-1E 1,000-GALLON UST NILES S T R E E T OWENS STREETLEGEND REVISED: SEPTEMBER 6, 2021: drm Mark R Magargee, PG, CHg KERN COUNTY CONSTRUCTION ASSESSOR’S PARCEL NUMBER 015-220-01-00-5 1001 NILES STREET BAKERSFIELD, CALIFORNIA TABLE 1. SUMMARY OF SOIL SAMPLE ANALYTICAL RESULTS ASSESSOR'S PARCEL NUMBER 015-220-01-00-5 1001 NILES STREET BAKERSFIELD, CALIFORNIA SAMPLE NUMBER TK-1W-2 TK-1W-6 TK-1E-2 TK-1E-6 DEPTH (fbg) 10 14 10 14 DATE SAMPLED 8-18-21 8-18-21 8-18-21 8-18-21 TRPH AS GASOLINE (mg/kg)ND (<0.25) ND (<0.25) ND (<0.25) ND (<0.25) TRPH AS DIESEL (mg/kg)ND (<10) ND (<10) ND (<10) ND (<10) TRPH AS OIL (mg/kg)ND (<25) ND (<25) 58.6 ND (<25) BENZENE (mg/kg)ND (<0.05) ND (<0.05) ND (<0.05) ND (<0.05)TOLUENE (mg/kg)ND (<0.05) ND (<0.05) ND (<0.05) ND (<0.05) ETHYLBENZENE (mg/kg)ND (<0.05) ND (<0.05) ND (<0.05) ND (<0.05) TOTAL XYLENES (mg/kg)ND (<0.05) ND (<0.05) ND (<0.05) ND (<0.05)MTBE (mg/kg)ND (<0.05) ND (<0.05) ND (<0.05) ND (<0.05) NAPHTHALENE (mg/kg)ND (<0.05) ND (<0.05) ND (<0.05) ND (<0.05) OTHER VOCS (mg/kg)ND (<0.05) ND (<0.05) ND (<0.05) ND (<0.05)ANTIMONY (mg/kg)ND (<10) ND (<10) ND (<10) ND (<10) ARSENIC (mg/kg)2.4 1.2 1.6 1.5 BARIUM (mg/kg)76 82 98 110BERYLIUM (mg/kg)CADMIUM (mg/kg)CHROMIUM (mg/kg)COBALT (mg/kg)COPPER (mg/kg)LEAD (mg/kg)MERCURY (mg/kg)MOLYBDENUM (mg/kg)NICKEL (mg/kg)SELENIUM (mg/kg)SILVER (mg/kg)THALLIUM (mg/kg)VANADIUM (mg/kg)ZINC (mg/kg) ND (<25) 26 50 18 12 16 31 ND (<0.5) ND (<2.5) 0.086 15 ND (<0.5) 4.9 0.097 14 ND (<1) ND (<2.5) 159.3 ND (<2.5) ND (<1) ND (<0.5) ND (<0.5) ND (<0.5) ND (<0.5) 11 ND (<0.5) ND (<0.5) 5.8 370 ND (<2.5) ND (<0.5) ND (<0.5) 15 ND (<0.5) 20 0.14 ND (<0.5) ND (<0.5) ND = Not detected above minimum reporting level. 27 49 ND (<2.5) ND (<1) ND (<25) ND (<25) 25 ND (<25) 20 44 2.6 0.13 ND (<0.5) 14 ND (<2.5) ND (<1) ND (<0.5) ATTACHMENT 1. BFDPSD PTA 21-10000346 ATTACHMENT 2. HAZARDOUS WASTE MANIFEST ATTACHMENT 3. TANK DISPOSITION FORMS ATTACHMENT 4. PHOTOGRAPHIC LOG MMark R Magargee, PG, CHg PHOTOGRAPHS OF SITE WORK PROJECT: APN 015-220-01-00-5 1001 Niles Street Bakersfield, California Photograph showing the subject vacant lot, with Niles Street at left and Owens Street at right (view looking southeast). Photograph showing the 1,000-gallon underground storage tank (view looking north). Page 1 of 3 MMark R Magargee, PG, CHg PHOTOGRAPHS OF SITE WORK PROJECT: APN 015-220-01-00-5 1001 Niles Street Bakersfield, California Photograph showing the tank cavity after removal of the tank (view looking north). Photograph showing the location of the western soil sampling at right and eastern soil sampling at left (view looking north). Page 2 of 3 MMark R Magargee, PG, CHg PHOTOGRAPHS OF SITE WORK PROJECT: APN 015-220-01-00-5 1001 Niles Street Bakersfield, California Photograph showing the loading of the tank onto a trailer for transportation to the recycling facility (view looking west). Photograph showing the permit to abandon number painted on the end of the tank (view looking west). Page 3 of 3 ATTACHMENT 5. LABORATORY REPORT