Loading...
HomeMy WebLinkAboutSB989 Results 2021 Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ☐ Installation ☐ Repair ☐ 6 Month X 36 Month CERS ID 10132189 Test Date 8/16/2021 Facility Name The Spot Food Mart #2 Facility Address 3699 Wilson Rd. City Bakersfield ZIP Code 93309 Company Performing the Test Advanced Compliance Phone 6617064321 Mailing Address 4007 Brae Burn Dr Bakersfield Ca 93306 Service Technician Performing Test Bradley Hinsley Contractor/Tank Tester License Number 971259 ICC Number 8373948 ICC Expiration Date 8/9/2023 Manufacturer and Test Equipment Training Certifications Expiration Date ICC Service Techican 8/9/2023 INCON STS 10/9/2021 Test Procedures Used Components Tested PEI/RP1200-19 Sect. 4. Tank Annular PEI/RP1200-19 Sect. 5. Line Secondary PEI/RP1200-19 Sect. 6. Containment Sump I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 8/16/2021 Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST 6. TANK SECONDARY CONTAINMENT TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure X Vacuum ☐ Hydrostatic Test Equipment Used: Tank Annular Test Setup Tank ID Waste Oil 87 91 Diesel Tank Manufacturer UNKNOWN UNKNOWN UNKNOWN UNKNOWN Tank Capacity 500 11,849 11,849 11,849 Test Start Time 07:43 08:29 08:58 10:10 Initial Reading -10.00 InHg -10.00 InHg -10.00 InHg -10.00 InHg Test End Time 08:43 09:29 09:58 11:10 Final Reading -10.00 -10.00 InHg -10.00 InHg -10.00 InHg Change in Reading 0.0 InHg 0.0 InHg 0.0 InHg 0.0 InHg Pass/Fail Criteria +/- 0.0 InHg +/- 0.0 InHg +/- 0.0 InHg +/- 0.0 InHg Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type X Pressure ☐ Vacuum ☐ Hydrostatic Test Equipment Used: Line Secondary Test Setup Pipe Run ID 87 91 Diesel Pipe Manufacturer UNKNOWN UNKNOWN UNKNOWN Test Start Time 08:44 09:24 09:41 Initial Reading 5.0 PSI 5.0 PSI 5.0 PSI Test End Time 09:44 10:24 10:41 Final Reading 5.0 PSI 5.0 PSI 5.0 PSI Change in Reading 0.0 PSI 0.0 PSI 0.0 PSI Pass/Fail Criteria +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 7. PIPE SECONDARY CONTAINMENT TEST 8. SUMP/UDC TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: INCON STS Sump/UDC ID Waste Oil 87 Fill 91 Fill Diesel Fill Sump Manufacturer UNKNOWN UNKNOWN UNKNOWN UNKNOWN Sump Depth (inches) 46 49 49 49 Sump Bottom to Top of Highest Pipe Penetration (inches) 27 14 14 14 Test Start Time Sump 12:14 11:38 09:57 Initial Reading Failed 3.0549 5.4918 1.6587 Test End Time Visually 12:29 11:53 10:12 Final Reading Failed 3.0558 5.4919 1.6578 Change in Reading Failed 0.0009 0.0001 0.0009 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results ☐ Pass X Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Sump/UDC ID 87 STP 91 STP Diesel STP Disp 1/2 Sump Manufacturer UNKNOWN UNKNOWN UNKNOWN UNKNOWN Sump Depth (inches) 49 49 49 37 Sump Bottom to Top of Highest Pipe Penetration (inches) 35 30 37 18 Test Start Time 12:45 13:19 14:00 14:55 Initial Reading 2.2100 6.2624 4.2641 2.4117 Test End Time 13:00 13:34 14:15 15:10 Final Reading 1.6608 5.9231 3.4815 2.4125 Change in Reading 0.5492 0.3393 0.7826 0.0008 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results ☐ Pass X Fail ☐ Pass X Fail ☐ Pass X Fail X Pass ☐ Fail Additional copies of this page may be attached. Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 4 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: INCON STS Sump/UDC ID Disp 3/4 Disp 5/6 Disp 7/8 Sump Manufacturer UNKNOWN UNKNOWN UNKNOWN Sump Depth (inches) 37 37 37 Sump Bottom to Top of Highest Pipe Penetration (inches) 18 18 18 Test Start Time 14:55 15:31 15:50 Initial Reading 4.1154 6.5563 4.4349 Test End Time 15:10 15:46 16:05 Final Reading 4.1157 6.5560 4.4358 Change in Reading 0.0003 0.0003 0.0009 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST (continued) Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 Waste Oil Sump, 87, 91 and Diesel STP Sumps all failed, must be repaired and retested. All else pased. 9. COMMENTS