HomeMy WebLinkAbout4012 White Ln Final ELD 2019 UST System Post Installation Test Report
ELD Test Date:
Customer:
Location:
Tested By: CGRS, Inc.
5444 Dry Creek Road
Sacramento, CA 95838
Project No:6-5230-18150-9938
Tanknology
7-Eleven #22150
11000 N. MoPac Expressway #500
Austin, TX 78759
4012 White Lane
Bakersfield, CA 92595
September 24, 2019
®
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
9/25/2019
Date
9/24/2019
Date
91 Octane Primary Containment System PASS
Diesel Primary Containment System PASS
Post Installation ELD Test Results
87 Octane Primary Containment System PASS
4012 White Lane Sergio L. Nunez
Bakersfield, CA 92595
Test Certification
Post Installation Enhanced Leak Detection (ELD)
6-5230-18150-9938
7-Eleven #22150 September 24, 2019
This document certifies that the UST systems listed below at the above referenced location have been tested
and passed the iota®VaporTite V005 tightness test and iotaVision™L005.CGRS further certifies that the
iota®VaporTite V005 and iotaVision™L005 meets the post installation testing requirements for post
installation testing for newly installed underground storage tank systems as per the California Health and
Safety Code,Chapter 6.7,section 25290.1(j)(1).
Test Date:IOTA Technicians:
Site Information Installation Contractor Information
Facility:Customer Name/CA Contractor's License #:
Address:Address:
City, State, Zip:City, State, Zip:
County:Contact:
CUPA Contact:Phone/Email:
CUPA Email:
Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result
Tank 1 20,000 87 Octane DW Fiberglass Xerxes Yes PASS
Tank 2 8,000 91 Octane DW Fiberglass Xerxes Yes PASS
Tank 3 12,000 Diesel DW Fiberglass Xerxes Yes PASS
Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result
S1 44 56 368.61 87 TS PASS
S2 42 56 335.86 87 FS PASS
S3 44 56 368.61 91 TS PASS
S4 42 56 335.86 91 FS PASS
S5 44 56 368.61 DSL TS PASS
S6 42 56 335.86 DSL FS PASS
Junction Boxes with Tank Connection Description Test Result
S1 Tank Probe and Turbine J-Box Open During Test PASS
S3 Tank Probe and Turbine J-Box Open During Test PASS
S5 Tank Probe and Turbine J-Box Open During Test PASS
UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
UDC1 42 22 36 144.00 Bravo PASS
UDC2 42 22 36 144.00 Bravo PASS
UDC3 42 22 36 144.00 Bravo PASS
UDC4 42 22 36 144.00 Bravo PASS
UDC5 42 22 36 144.00 Bravo PASS
UDC6 42 22 36 144.00 Bravo PASS
Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
TS1 24 22 36 82.29 Bravo PASS
Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result
87 PL NOV DW Fiberglass 2 310 PASS
91 PL NOV DW Fiberglass 2 300 PASS
DSL PL NOV DW Fiberglass 2 180 PASS
Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result
87 Vent NOV DW Fiberglass 2 120 PASS
91 Vent NOV DW Fiberglass 2 105 PASS
DSL Vent NOV DW Fiberglass 2 125 PASS
Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result
VR NOV DW Fiberglass 3 315 PASS
Reviewed By Date IOTA Tech Signature Date
9/24/2019
CA License No.
9/25/2019 06-1727
4012 White Lane 4583 E. Eisenhower Circle
Anaheim, CA 92807
COMPONENTS IN CONTAINMENT
Kern Ken Redfern
Howard Wines; Kris Karnes 714-630-6690/kredfern@rdbuilders.com
Leak Logs / Repair
Bakersfield, CA 92595
kkarns@bakersfieldfire.us; hwines@bakersfieldfire.us
PIPING
TANKS
Final ELD Test Project Worksheet
9/24/2019
7-Eleven #22150 RD Builders
Sergio L. Nunez
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
Secondary Flow Communication Test Certification
6-5230-18150-9938
7-Eleven #22150 September 24, 2019
4012 White Lane Sergio L. Nunez
Bakersfield, CA 92595
COMPONENTS RESULTS
Piping Secondary Communication Confirmation
87 PL PASS
91 PL PASS
9/25/2019
Date
DSL PL PASS
9/24/2019
Date
VR PASS
DSL Vent PASS
87 Vent PASS
91 Vent PASS
CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed
throughout the secondary piping components listed below.