Loading...
HomeMy WebLinkAbout4700 Coffee Rd Final ELD 10-9-2019 UST System Post Installation Test Report ELD Test Date: Customer: Location: Tested By: CGRS, Inc. 5444 Dry Creek Road Sacramento, CA 95838 Project No:6-13320-18118-9975 Cal Valley Equipment Brookside Market & Deli 7608 Fruitvale Ave. Bakersfield, CA 93308 4700 Coffee Rd. Bakersfield, CA 93308 October 9, 2019 ® Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services Test Certification Post Installation Enhanced Leak Detection (ELD) 6-13320-18118-9975 Brookside Market & Deli October 9, 2019 4700 Coffee Rd.Sergio L. Nunez Bakersfield, CA 93308 Post Installation ELD Test Results 87 Octane Primary Containment System PASS 91 Octane Primary Containment System PASS Diesel Primary Containment System PASS 10/9/2019 Date 10/9/2019 Date This document certifies that the UST systems listed below at the above referenced location have been tested and passed the iota®VaporTite V005 tightness test and iotaVision™L005.CGRS further certifies that the iota®VaporTite V005 and iotaVision™L005 meets the post installation testing requirements for post installation testing for newly installed underground storage tank systems as per the California Health and Safety Code,Chapter 6.7,section 25290.1(j)(1). Final Test Date:IOTA Technicians: Site Information Installation Contractor Information Facility:Customer Name/CA Contractor's License #: Address:Address: City, State, Zip:City, State, Zip: County:Contact: CUPA Contact:Phone/Email: CUPA Email: Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result Tank 1 22,000 87 Octane DW Fiberglass CSI Yes PASS Tank 2 8,000 91 Octane DW Fiberglass CSI Yes PASS Tank 3 20,000 Diesel DW Fiberglass CSI Yes PASS Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result S1 48 52 407.35 87 TS PASS S2 42 52 311.87 87 FS PASS S3 48 52 407.35 91 TS PASS S4 42 52 311.87 91 FS PASS S5 48 52 407.35 DSL TS PASS S6 42 52 311.87 DSL FS PASS Junction Boxes with Tank Connection Description Test Result S1 Tank Probe and Turbine J-Box Open During Test PASS S3 Tank Probe and Turbine J-Box Open During Test PASS S5 Tank Probe and Turbine J-Box Open During Test PASS UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result UDC1 42 22 36 144.00 Bravo PASS UDC2 42 22 36 144.00 Bravo PASS UDC3 42 22 36 144.00 Bravo PASS UDC4 42 22 36 144.00 Bravo PASS Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result TS1 24 22 36 82.29 Bravo PASS Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result 87 PL Brugg DW Stainless Steel 2 150 PASS 91 PL Brugg DW Stainless Steel 2 150 PASS DSL PL Brugg DW Stainless Steel 2 130 PASS Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result 87 Vent NOV DW Fiberglass 2 55 PASS 91 Vent NOV DW Fiberglass 2 75 PASS DSL Vent NOV DW Fiberglass 2 75 PASS Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result VR NOV DW Fiberglass 3 170 PASS Reviewed By Date IOTA Tech Signature Date Final ELD Test Project Worksheet 10/9/2019 Brookside Market & Deli Cal Valley Equipment Sergio L. Nunez hwines@BakersfieldFire.us; kkarns@bakersfieldfire.us PIPING TANKS 4700 Coffee Rd.7608 Fruitvale Ave. Bakersfield, CA 93308 COMPONENTS IN CONTAINMENT Kern Manny Justiniano Bakersfield FD 661-615-4075/manny@calvalley.com Leak Logs / Repair Bakersfield, CA 93308 10/9/2019 CA License No. 10/9/2019 06-1727 Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services PASS 91 Vent PASS 10/9/2019 Date DSL PL PASS 10/9/2019 Date VR PASS DSL Vent PASS 87 Vent 87 PL PASS 91 PL PASS COMPONENTS RESULTS Piping Secondary Communication Confirmation 4700 Coffee Rd.Sergio L. Nunez Bakersfield, CA 93308 Secondary Flow Communication Test Certification 6-13320-18118-9975 Brookside Market & Deli October 9, 2019 CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed throughout the secondary piping components listed below.