HomeMy WebLinkAbout4700 Coffee Rd Final ELD 10-9-2019 UST System Post Installation Test Report
ELD Test Date:
Customer:
Location:
Tested By: CGRS, Inc.
5444 Dry Creek Road
Sacramento, CA 95838
Project No:6-13320-18118-9975
Cal Valley Equipment
Brookside Market & Deli
7608 Fruitvale Ave.
Bakersfield, CA 93308
4700 Coffee Rd.
Bakersfield, CA 93308
October 9, 2019
®
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
Test Certification
Post Installation Enhanced Leak Detection (ELD)
6-13320-18118-9975
Brookside Market & Deli October 9, 2019
4700 Coffee Rd.Sergio L. Nunez
Bakersfield, CA 93308
Post Installation ELD Test Results
87 Octane Primary Containment System PASS
91 Octane Primary Containment System PASS
Diesel Primary Containment System PASS
10/9/2019
Date
10/9/2019
Date
This document certifies that the UST systems listed below at the above referenced location have been tested
and passed the iota®VaporTite V005 tightness test and iotaVision™L005.CGRS further certifies that the
iota®VaporTite V005 and iotaVision™L005 meets the post installation testing requirements for post
installation testing for newly installed underground storage tank systems as per the California Health and
Safety Code,Chapter 6.7,section 25290.1(j)(1).
Final Test Date:IOTA Technicians:
Site Information Installation Contractor Information
Facility:Customer Name/CA Contractor's License #:
Address:Address:
City, State, Zip:City, State, Zip:
County:Contact:
CUPA Contact:Phone/Email:
CUPA Email:
Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result
Tank 1 22,000 87 Octane DW Fiberglass CSI Yes PASS
Tank 2 8,000 91 Octane DW Fiberglass CSI Yes PASS
Tank 3 20,000 Diesel DW Fiberglass CSI Yes PASS
Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result
S1 48 52 407.35 87 TS PASS
S2 42 52 311.87 87 FS PASS
S3 48 52 407.35 91 TS PASS
S4 42 52 311.87 91 FS PASS
S5 48 52 407.35 DSL TS PASS
S6 42 52 311.87 DSL FS PASS
Junction Boxes with Tank Connection Description Test Result
S1 Tank Probe and Turbine J-Box Open During Test PASS
S3 Tank Probe and Turbine J-Box Open During Test PASS
S5 Tank Probe and Turbine J-Box Open During Test PASS
UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
UDC1 42 22 36 144.00 Bravo PASS
UDC2 42 22 36 144.00 Bravo PASS
UDC3 42 22 36 144.00 Bravo PASS
UDC4 42 22 36 144.00 Bravo PASS
Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
TS1 24 22 36 82.29 Bravo PASS
Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result
87 PL Brugg DW Stainless Steel 2 150 PASS
91 PL Brugg DW Stainless Steel 2 150 PASS
DSL PL Brugg DW Stainless Steel 2 130 PASS
Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result
87 Vent NOV DW Fiberglass 2 55 PASS
91 Vent NOV DW Fiberglass 2 75 PASS
DSL Vent NOV DW Fiberglass 2 75 PASS
Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result
VR NOV DW Fiberglass 3 170 PASS
Reviewed By Date IOTA Tech Signature Date
Final ELD Test Project Worksheet
10/9/2019
Brookside Market & Deli Cal Valley Equipment
Sergio L. Nunez
hwines@BakersfieldFire.us; kkarns@bakersfieldfire.us
PIPING
TANKS
4700 Coffee Rd.7608 Fruitvale Ave.
Bakersfield, CA 93308
COMPONENTS IN CONTAINMENT
Kern Manny Justiniano
Bakersfield FD 661-615-4075/manny@calvalley.com
Leak Logs / Repair
Bakersfield, CA 93308
10/9/2019
CA License No.
10/9/2019 06-1727
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
PASS
91 Vent PASS
10/9/2019
Date
DSL PL PASS
10/9/2019
Date
VR PASS
DSL Vent PASS
87 Vent
87 PL PASS
91 PL PASS
COMPONENTS RESULTS
Piping Secondary Communication Confirmation
4700 Coffee Rd.Sergio L. Nunez
Bakersfield, CA 93308
Secondary Flow Communication Test Certification
6-13320-18118-9975
Brookside Market & Deli October 9, 2019
CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed
throughout the secondary piping components listed below.